Loading...
HomeMy WebLinkAboutX2021-3285 - LandscapeAppendix E LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: (1) 1 am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape project for the property located at 2001 Port Ramsgate PI. Newport Beach, Ca 92660 (provide address or parcel number(s)) was installed by me or under my supervision. street (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for the efficient use of water in the landscape. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. Yes No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. Yes No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. 33 Jack Locker Print Name / eCA,2, Sig ature 10 Portland PI., Laguna Niguel, Ca Address (949)443-4200 Telephone Landscape Design Professional's Stamp (If Appropriate) March 8, 2023 Date 937052 License Number Lockerjr@gmail.com E-mail Address 34 IRRIGATION CONTROLLER SCHEDULE CIMLS. STATION: NEWPORT BEACH AN I FEB I MAR I All I MAY I JUN I ILL. I AUG I SEP, I OCT. I NOV. I DEC. I TOTAL ET DATA MONTHLY 2.6 2.5 3.5 42 5,0 4,7 53 5.3 4.5 3,3 2.5 2.0 = 45.4 IRRIGATION SCHEDULE: DRIPPEAlINE Wha AVERUM PRECIPITATION MlEd06M. THISSCHEDULE IS INTENDED ASA STARTING POVONLY. THE IRRIGATION CONTRACTOR SHALL ADJUST RUN TIMES FOR ACTUAL SITE CONDITIONS and MICR06CLIMATES, SPLIT RUN TIMES MAY BE REQUIRED hY SLOPE CONDITIONS and VARYING 8 0 IL I NF ILTRATION RATES. APPLICATION RATE SHALL NOT EXCEED THE INFILTRATION PATE of THESOIL, IRRIGATION RUN-TIMES SHALL be BETWEEN THE HOURS of B:00 P.M. AND 10:00 A.M. PRESSURE LOSS CALCULATION I IRRIGATION SCHEDULE SAMPLE: JULY 5.3 ETD for DRIP I Raal P I FRcnaxLosecxcuunoxs xwNMxxvm WATRMETEAM W4 ash 34- FLWAMM P STATb'NMS. not LUH= WA mma PHoxe Mi UEWEO. NGI, A. NEUIIEIEV. A XP= . 1®1111E(AN11{(A VAIVEno. AI — NiE 1' ll u a..UEAln ElEV.6NICVItlI1EM PRE63.AiRN — PN LP VATMMUER CL PS _ Efl69.IC[LIAKE RALLCiFj Pa _ —_ —_ fiAftiiLbNPKEYENEFR "I ELbxVEiEA - PSI MMTFAVALVE Pal 1 UNE OATv&w Psi w LEE "mm os PSI _ VAIRM PIN VANLYE PoI I I IAMfnaL. 02 ni _ NIEIULLP£ ml t,MTAV LPE PM r wLPPLLPE n .1 x w UUV IRA 0A ml IMMOLWSnNM 02 Pal NEvgn%IPV.IMr •I•l PSI TmksMT9l Loss: xs Psl PRUNURETUCPEPATE" W Psi TOTALM IRERE(MREP Ids PSI LUMaiSTUXPVIYMEAVUL - ES PPidFTRWUAIFOPRF591REpE18Wf P51 RENDUVERTERPRENSURE f011 PSI PLANT WATER MO. VALUE UNITS A MRWA4F ipgl9lglIBIG90UWCWER B RFfERENCEPEAKIO 31 SAYS C RFAEP0ICEEM 63 INCHES 0 LMIORCAREaO.K 09 1 PLANTFACiORK am 2 VEQ.DENMW I 3 NCROMMATE 10 E MOSCAPEET 3.18 INCHES F AVERAGEONLYE MIoB INCITES "I PER(AS.RCE VALUE UNITS G PHECIPMTE am INMR N OLSNiM.UN EOPHITY San nEC M9L SOIEWLEMADRER 1R1 9CRED LINO PARAMETERM VALUE UNITS A IRRIGATION AL 35 RAYS K IVATERTOAPPLY om INCHES L LOYIBABWNOWY 30 NAMES IA UPPER 3081ANRY 61 NNUIEB N MICTEORUNTIME v MINUTES 0 CYCLE STARTS: e TWETOPoA40FF WA UP D 8IIEWIYallm 2 aYaLE$ I SILCAMORY 2 2 ROPE a 3 COMPACEION 0 1 9xUa(IIIs1WE 0 SUMMARY VALUE UNITS WATERIPA EO Dan INCHES INIERJPI 3s DAYS MOESEEROAr p MINUTESPERCYCLE 2M MINUTES THIS IRRIGATION SYSTEM HASBEEN DESIGN FOR A PRESSURE THESE IRRIGATION SCHEDULES ARE FOR TWICE WEEKLY IRRIGATION PER CITY OF NEWPORT BEACH REQUIREMENTS. THE OF55PSI, IF THE WATER PRESSURE VARIES BY MORE THAN 20% UPPER BOUNDARY IRRIGATION RUN TIME HAS BEEN SELECTED FOR THE INITIAL PLANT ESTABLISHMENT PERIOD (MINIMUM THE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT ONEYEAR), ONCE PLANTS ARE ESTABLISHED THE RUN TIMES MAYBE SHORTENED TO THE LOWER BOUNDARY. ROUTINE ON HOW TO PROCEED. FAILURE TO DO SO WILL ALL PLANT OBSERVATION AND MAINTENANCE ARE REQUIRED FOR OPTIMAL PLANT HEALTH. REPAIRWREPLACEMENTS ON THE RESPONSIBILITY OF THE CONTRACTOR. MAXIMUM APPLIED WATER ALLOWANCE and ESTIMATED APPLIED WATER USE CALCULATIONS: M.A.W.A E.A,W,U, - SEE TABLE BELOW MAWA = (ETO) (0.62) i(0,55 x LA) EAWU = (ET) x (Plant Factor) x (Hydnozone Ama)x (,62) =(45.4) x(62)[(0.55 x 1,443)= 22,3409allonslyear ImOation Efficiency (72%-90%) = 15,0440allanslyear Hydrozones (by r.c.v. station): RCV STATION WATER USE ETO PLANT FACTOR xTOa4lZOxa MSA ISO. CONY. FACTOR IRRIGATION EFFICIENCY Gallmsftar Al DRIP LOW 45.4 03 734 0.62 81% 7,652 A2 TREE DRIP LOW 45,4 03 20 0,62 81% 209 A3 TREE DRIP LOW 45.4 0.3 20 0.62 81% 209 A4 DRIP LOW 45,4 0.3 669 0.82 111% 6,974 TOTAL 15,044