CASE NO.:
❑ REQUEST FOR MODIFICATION TO PROVISIONS
OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE)
OF THE NEWPORT BEACH MUNICIPAL CODE
(See Reverse for Basis for Approval) (Fee $297)
REQUEST FOR ALTERNATE MATERIAL
OR METHOD OF CONSTRUCTION
(See Reverse for Basis for Approval) (Fee $297)
For above requests, complete Sections 1, 2 & 3
below by printing in ink or typing.
JOB ADDRESS:
SITE ADDRESS: 101 Bavview Place
Owner Roger Bernstein
Address 400 Water Street Suite #200
Excelsior, MN Zip 55331
Daytime Phone ( 952 ) 294-1242
"8 O3AGOSD '
III #FOR STAFF USE ONLY III
Plan Check # 23V,-2021 # of Stories
Occupancy Classification V2•) 152
Use of Building A4ssfTeO la%Jtr.7f1 # of Units O)
Project Status toLap C44 5K
Construction Type 1'yS tSPR,
Verified by 1ar1 IntY cra A
No. of Items a
Fee due .52-91
DISTRIBUTION:
.01- Owner O'Plan Check_
❑ Petitioner ❑ Inspector
❑ Fire ❑ Other
PETITIONER:
Petitioner Douglas Pancake
(Petitioner to he architect or engineer)
Address 19000 MacArthur Blvd #500
Irvine, CA Zip 92612
Daytime Phone ( 949)720-3850
Email: dougp@pancakearchitects.com
1 2 REQUEST: Submit plans if necessary to illustrate request. Additional sheets or data maybe attached. II
to
access
3 JUSTIFICATION/FINDINGS OF EQUIVALENCY: CODE SECTIONS: I
CPC 403.2 and 408.5 exception #1
This is a senior community where we need roll -in showers for the residents. CBC Chapter 11A
to
Position Architect of Record
Petitioner's
Signature 1 CA Professional Lic. # C-27254 Date: 7/20/22
FOR STAFF USE ONLY
DEPARTMENT ACTION: In accordance with: 9CBC 104.11/CFC 104.9
(Alternate materials & methods)
❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved
By: Date
;Request (DOES) DOES NOT�essen any fire protection requirements.
Request (DO<DOES ..) le2en the structural integrity
❑ CBC 104.10/CFC 104.8
(CBC Modification)
❑ Written Comments Attached
The Request is: g. Granted ❑ Denied (See reverse for appeal information)
❑ Granted (Ratification required)
Conditions of Approval:
— — — CHIEF BUILDING OFFICIAL
Signature -- `7"1`='= ""- _ Position
Print Namee1 "11& J�� N✓+s
UUL 2 0 2022
Date
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant, statement of reasons for appeal and filing fees are required.)
CASHIER RECEIPT NUMBER: /%l / �/ �l kIO3 Forms\madif 07/08/22
Guidelines for Approval of Alternate Materials Design and Methods of Construction
Basis For Approval
For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification
or a request for alternate material or method of construction, he/she must determine that special, individual reasons
exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The
resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that such
modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide
sufficient information with this application to allow the above evaluation to be made.
Requirements for Submittals
The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the
applicable data listed below:
• State specific code provisions for which alternative is requested and why request is being submitted.
• Describe by code section those provisions for which alternative is desired.
• Compare the proposed alternative versus the code requirements in terms of structural strength, suitability,
effectiveness, fire resistance, safety and health impacts affecting the building or user of the building.
• Demonstrate that the proposed alternative is compatible with balance of code requirements.
• When applicable, specify how authoritative consensus document(s) are used to substantiate proposal.
(Reference draft ICC Building Performance Code Commentary Section 1.4.2.3 for background information).
• Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended
use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for
demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site.
• Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method
to ensure continued compliance.
• State how and where alternate proposal is incorporated within construction plans and prepare plan amendments
as necessary. The design professional has the responsibility to coordinate all construction documents and
ensure compatibility between documents.
• The report and design documents shall be dated, signed and stamped by the design professional according to
the plan submittal procedure.
• For alternate methods of design requests, the applicant shall set performance criteria for his design.
Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to
start of design.
Alternative Design Review/Verification
The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to
the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to
make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses
the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant to
the Building Division prior to commencing the review.
• Verify that all applicable information and justifications listed above as requirements for submittals is received and
verify that evaluation and design methods used by designer are appropriate to the alternative proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing
agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code
and intended use.
• Evaluate performance of material and possible flaws that could affect performance of material in its installed
state.
• The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative
materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not
satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable
reason(s).
Inspection/Field Verification
The alternate proposal as approved in the construction documents must be verified by inspection, and, where
necessary, testing as follows:
• To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the
manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification,
quality assurance processes, and testing, as applicable.
• When appropriate, an approved third party quality assurance inspection and testing service may be required for
continuous and complex inspection and testing activities. This is intended to verify that construction complies
with the code and the approved plans.
Information on Procedure for Appeal from a Determination or Action by the Chief Building Official or
Fire Code Official
Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent
may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual
reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to
State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent
to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or
providing equivalency would create an unreasonable hardship.
Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You
will be notified in writing of the appeal hearing's time and date.
z_
J
W
0 >
W W
O CO
a `•�
O
O -
z
N ,
z_
J
W
W
LL 00
O N
d
O
f-
O
LNz
N
RUBBER DAM
blo
SLOPE TO DRAIN
ANON -RECESSED SLAB - LOW PROFILE DESIGN
CENTER DRAIN
RUBBER DAM
GRATE COVERING
DRAIN
SLOPE TO DRAIN
BNON -RECESSED SLAB - LOW PROFILE DESIGN
FRONT TRENCH DRAIN
0 19000 MacArthur Boulevard CLEARWATER AT NEWPORT BEACH �!_
Suite 500 S f O IW Irvine, CA92612-1460 DOUGLAS PANCAKE ARCHITECTS
T le49p20-ses0 F:ts49»20-sa4a 19000 MACARTHUR BLVE, STE 500, IRVINE 92612
`J w .pancakearchitec com PROJECT NO: 15025.00 7/20/2022
Douglas Pancake SHOWER THRESHOLD
ebestbatK
Intelligent Designs
Keep water in...
and slips and structural
damage out.
Bestbath's WaterStopper`I is simply the most effective
water containment system on the market. Whether
stepping in by foot, with the help of a walker, or rolling
in with a wheelchair, WaterStopper keeps water where
it belongs: in the shower!
■ Protects bathers of all abilities
■ Installs in minutes
■ Reduces risk of damage from
mold or rot
p Works with any low -step,
no -step or barrier -free shower
Specifications
bestbath
Rubber WaterStopper Kit
"THE SOLUTION TO WET FLOORS"
- Material:
T-shaped Strip: Grey or Beige EPDM Rubber, 50 Durometer
Endcaps: injection molded Vyram rubber, matching color
- Dimensions: Will fit on any Access ADA or Barrier
- Available for other Brands
- Installation: Self -Adhesive
114.' --
Cross Section
Scale 1:1
a
Tape -weighted curtain
without WaterStopper
Tape -weighted curtain
with WaterStopper
3.16T Flattens under wheelchair
TWS