Loading...
HomeMy WebLinkAboutC-2591(E) - Pacific Coast Highway Highway Widening, Newport Boulevard to Highland StreetCITY OF NEWPORT BIACH OFFICE OF THE CITY CLERK P.O. BOX 1768, NEWPORT BEACH, CA 92658 -8915 TO: FINANCE DIRECTOR FROM: CITY CLERK DATE: December 2, 1988 (714) 644 -3005 f Z -l.2 SUBJECT: Contract No. C- 2591(E) Description of Contract Widening of Pacific Coast Highway between Newport Blvd. and Highland Street Effective date of Contract November 30, 1988 Authorized by Minute Action, approved on November 28, 1988 Contract with Hoag Memorial Hospital Presbyterian Address 301 North Newport Blvd. Newport Beach .CA 92663 Amount of Contract (See Agreement) " � 64e Wanda E. Raggio City Clerk WER:pm Attachment 3300 Newport Boulevard, Newport Beach No.�mber 28, 1988 CITY COUNCIL AGENDA uY ;i'" ,!TY'CO JNAITEM NO. F -3(b) CITY `){ WEI`'PURT BOW •T0: CITY COUNCIL NOV 2 8 1988 APTROnlft FROM: Public Works Department i SUBJECT: AGREEMENT WITH HOAG HOSPITAL FOR WIDENING OF PACIFIC COAST HIGHWAY RECOMMENDATION: Approve Agreement with Hoag Hospital and authorize Mayor and City Clerk to execute. DISCUSSION: Hoag Hospital anticipates that future development of the Hospital property will require additional improvements to Pacific Coast Highway that are not included in the improvements that will be financed by Caltrans as part of the widening project between Newport Boulevard and Highland Street. These improvements include a fourth westbound lane between the Newport Boulevard • off -ramp and Highway Station 46 + 52 westerly of Superior Avenue; a traffic signal at the Balboa Coves entrance; an underground storm drain between the Newport Boulevard off -ramp and the signalized entrance; addition of 13 spaces to the planned public parking lot at the northeasterly corner of Superior Avenue and Pacific Coast Highway; widening of the planned median at the signalized intersection to allow for a double left -turn lane from Pacific Coast Highway; and the differential cost between a 12 foot wide concrete sidewalk and the planned 8 foot wide A.C. walks. The additional Hospital improvements are incorporated in the Agreement with Caltrans that was approved by the Council on November 14th. The estimated cost of these Hospital improvements is $738,771. A summary of the Agreement is as follows: Hospital shall: 1. Prepare plans and contract documents for proposed Hospital improvements. 2. Obtain Caltran's and City's approvals of plans and contract document for Hospital's improvements. • 3. Grant to Caltrans the right -of -way required for the Hospital's improvements. 4. Grant to City an easement for construction and maintenance of traffic signal loops for the northerly leg of the traffic signal. • 4- Subject: Agreement with Hoag Hospital November 28, 1988 Page 2 • 5. Pay City for the cost of constructing Hospital's additional highway improvements, additional 13 parking spaces and 50% of the total parking lot landscaping. The cost payable to the City shall include the total bid price for the various items of work plus a prorata share of the contractor's mobilization and survey costs, and the City's contract administration and inspection. 6. Deposit with City upon demand, but not later than City awarding a construction contract, an amount of $60,000. Thereafter to reimburse City within 30 days after receipt of each monthly billing for progress payments made by City to contractor. 7. Reimburse City for cost of constructing portion of future Hospital access road from Superior Avenue. Reimbursement will be due City immediately upon Hospital's extension of parking lot entrance road to the westerly boundary of Hospital property. City shall: 1. Administer a construction contract for the project including • Hospital's additional improvements. 2. Invoice Hospital for monthly progress payments made to the Contractor for construction of the Hospital's improvements. City and Hospital mutually agree: 1. If the City and /or Caltrans remove the public parking lot, then neither City or Caltrans will be responsible for the replacement of any parking paid for by Hospital. 2. Hospital is paying 50% of cost of landscaping parking lot as consideration for use of public property for construction of 13 additional parking spaces. 3. The 13 additional parking spaces constructed at Hospital's expense will become part of the public parking lot to be operated by City and Hospital will have no ownership interest or preferential use of the spaces. 4. If in the future a condition for a California Coastal Commission • permit for development of adjacent Hospital property requires Hospital to provide public parking, the 13 parking spaces may be used as a credit towards the public parking requirement. Parking credits will not be allowed for any City code required parking. 5. The construction of the additional street and parking improvements by Hospital does not constitute approval by City of any future development on the adjacent Hospital property. Je4 Benjamin B. Nolan Public Works Director DCS:so i AGREEMENT r PACIFIC COAST HIGHWAY WIDENING FOR HOAG HOSPITAL THIS AGREEMENT, is made and entered into this 30th day of November, 1988, between the CITY OF NEWPORT BEACH, a municipal corporation, hereinafter referred to as "CITY ", and HOAG MEMORIAL HOSPITAL PRESBYTERIAN, a California Corporation, hereinafter referred to as "HOSPITAL ". WITNESSETH: WHEREAS, CITY has entered into an agreement with the California Department of Transportation for the preparation of drawings and contract docu- ments for the widening of Pacific Coast Highway between Newport Boulevard and Highland Street, hereinafter referred to as "PROJECT "; and WHEREAS, construction of said project is now scheduled to begin in January 1989; and WHEREAS, HOSPITAL is the owner of undeveloped property adjacent to a portion of Pacific Coast Highway that is included in PROJECT; and WHEREAS, HOSPITAL anticipates that future development of the HOSPITAL property will require additional improvements to Pacific Coast Highway and parking not presently included in PROJECT; and WHEREAS, the future construction of the additional HOSPITAL street and parking improvements after PROJECT is completed will increase the construction cost of these improvements because of demolition and relocation of improvements constructed as part of PROJECT; and WHEREAS, HOSPITAL desires to include the additional street and parking improvements in the project in order to affect a cost savings; and WHEREAS, HOSPITAL is willing to pay for the costs of adding the addi- tional improvements to the PROJECT; and WHEREAS, CITY is willing to include the additional HOSPITAL street and parking improvements in PROJECT in order to minimize the adverse impacts on traffic that the separate future construction of the HOSPITAL improvements would cause; and 1 of 5 • J WHEREAS, HOSPITAL is acquiring an easement from Caltrans for future access between Superior Avenue and the HOSPITAL property; and WHEREAS, Caltrans is constructing a public parking lot adjacent to Superior Avenue and that in order to minimize access onto Superior Avenue, CITY desires to construct parking lot entrance road over future HOSPITAL access easement that will conform in horizontial alignment and grade to the access road planned by HOSPITAL; and WHEREAS, CITY and Caltrans plan construction of a public parking lot between Superior Avenue and the HOSPITAL's property that will be operated by CITY; and WHEREAS, the California Coastal Commission as a condition of the permit for the additional improvements is requiring HOSPITAL to provide 13 additional parking spaces and the above described parking lot is capable of being expanded; NOW, THEREFORE, BE IT RESOLVED that for and in consideration of the mutual promises and agreements contained herein, the parties do agree as follows: 1. HOSPITAL SHALL: improvements. a. Prepare plans and contract documents for proposed HOSPITAL b. Obtain Caltrans and CITY'S approvals of plans and contract documents for proposed HOSPITAL improvements. c. Grant to Caltrans the right -of -way required for the construc- tion of the proposed HOSPITAL street improvements. d. Grant to CITY an easement for construction and maintenance of traffic signal loops for the northerly leg of the proposed traffic signal. Said easement is shown on a drawing marked Exhibit "A" attached hereto and by this reference incorporated herein. e. By executing this agreement, grant City right -to -enter to construct drainage facilities and grading on HOSPITAL property that are shown on plans. f. Pay CITY for the cost of constructing HOSPITAL'S additional highway improvements, additional 13 parking spaces and 50 percent of parking lot landscaping as setforth in Exhibit "B" attached hereto and by this reference incorporated herein. Said costs payable to CITY shall include the total bid 2 o 5 9 • prices for the various items of work plus a prorata share of the contractors mobilization and survey costs, and the CITY'S cost of contract administration and inspection. g. Obtain an encroachment permit from Caltrans for construction of proposed HOSPITAL improvements within Caltrans right -of -way. h. Deposit with CITY upon demand, but not later than prior to CITY awarding a construction contract for the project, an amount of $60,000. Thereafter, to reimburse CITY within 30 days after receipt of each monthly billing for monthly progress payments made by CITY to contractor for HOSPITAL's improvements setforth in Exhibit "B" plus a prorata share of construction engineering and administration costs incurred by CITY. i. Reimburse CITY for cost of constructing portion of future HOSPITAL access road from Superior Avenue. The estimated cost to be reimbursed is setforth in Exhibit "C." Reimbursement will be due CITY immediately upon HOSPITAL's extension of parking lot entrance road to the westerly boundary of HOSPITAL property. 2. CITY SHALL: a. Administer a construction contract for the PROJECT including HOSPITAL'S additional improvements as setforth in Exhibit "B ". b. Award a construction contract for the PROJECT, including HOSPITAL'S additional improvements, as setforth in Exhibit "B ". The award of contract will be subject to approval by Caltrans and the availability of funds. c. Invoice HOSPITAL for monthly progress payments made to the contractor for construction of the HOSPITAL'S improvements as setforth in Exhibit "B" plus a prorata share of mobilization and survey costs. In addition CITY shall charge HOSPITAL a prorata share of construction engineering and administration costs incurred by CITY. d. Retain all books, documents, papers, accounting records and other evidence pertaining to costs incurred for construction of HOSPITAL'S improvements as setforth in Exhibit "B" and Exhibit "C" and make such materials available to HOSPITAL at all reasonable times during the construction period and for one year from the date of final payments under this agreement. 3 of 5 e. Upon completion of construction of HOSPITAL'S improvements as setforth in Exhibit "B" and Exhibit "C" and acceptance of the work by the CITY, CITY shall provide HOSPITAL with an itemization of all costs chargeable against HOSPITAL'S deposit. f. Refund to HOSPITAL within 60 days after completion of the PROJECT and acceptance by CITY any unexpended funds remaining in HOSPITAL'S deposit. 3. It is mutually understood and agreed as follows: a. If the CITY and /or Caltrans remove the public parking lot between Superior Avenue and the HOSPITAL, neither the CITY or Caltrans will be responsible for the replacement of any parking paid for by HOSPITAL. b. HOSPITAL is paying 50 percent of cost of landscaping parking lot as consideration for use of public property as area for construction of 13 additional parking spaces. c. The 13 additional parking spaces constructed at HOSPITAL's expense will become part of a public parking lot to be operated by CITY and HOSPITAL will have no ownership interest or preferential use of said spaces. d. If in the future a condition for a California Coastal Commission permit for development of adjacent HOSPITAL property requires HOSPITAL to provide public parking, the 13 parking spaces may be used as a credit towards said public parking requirement. Parking credits will not be allowed for any CITY code required parking. e. The construction of the additional street and parking improvements by HOSPITAL does not constitute approval by CITY of any future development on the adjacent HOSPITAL property. f. This agreement represents the full and complete understanding of every kind or nature whatsoever between the parties hereto and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions hereof. Any modification of this Agreement will be effective only by written execution signed by both CITY and HOSPITAL. 4 of 5 i i g. All notices which may be given hereunder shall be in writing and, if given to City, may be given personally to the Mayor, City Manager or City Clerk of City or may be mailed by first class mail with postage prepaid to 3300 W. Newport Boulevard, Newport Beach, California 92663, and, if given to HOSPITAL, may be given personally to an officer of HOSPITAL or may be mailed by first class mail with postage prepaid to 301 North Newport Boulevard, Newport Beach, California 92663. Either party may give written notice to the other of a different address to which notice by mail should be sent. IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the dates set forth opposite their respective signatures. HOAG MEMORIAL HOSPITAL PRESBYTERIAN DATED: November r8 ,1988 By: �C!� J. du -� Chairman/of the Board CITY OF NEWPORT BEACH DATED: ,1988 APPROVED AS TO FORM By. 60'v � Asst.-'City-Attorney, Carol Korade City of Newport Beach ATTEST: 1 City Clerk, Wanda Raggio City of Newport Beach 5 of 5 E C. o U -CT Cy cx Lil �Y] L 3 - -- a m L�J --�Lill CN r r _ `- 3 c Vi o Q Ocn � ° o U o m HOAG HOSP. N9 °21'00 "E 125.00' BALBOA M ENTRANCE — ROAD / COVES I LLJ o Cfl C c N p a e p ij ��•i % , V I 1� EO co LL 1 1 - �7 ' CID B.C. EXHIBIT A SWEET 1 OF 1 SHEET SKETCH TO ACCOMPANY A LEGAL DESCNEITfON FOR `7�obelt`Beitj. ll am�Ffost IBZ�` ssociates NOAG HOSPITAL ENTRANCE ROAD PROFESSIONAL ENGINEERS, PLANNERS & SURVEYORS SIGNAL EASEMENT P.O.BO %19739�1Q25 ALTON PARKWAY, RVINE,CALIFORNIA9271B (711) 172 -3505 -3505 CONTAINING: 2430 SQ. FT. DATE SCALE FIELD BOOK JOB NO. MAY 311989 111= 40' 24257 L FYHTRTT nRn Description of Hospital Improvement Costs: 11 1. Additonal 12 foot wide traffic lane between the Highway 55 off -ramp intersection with Pacific Coast Highway and Station 46 + 52.49 westerly of Superior Avenue, including grading, sub -base, base, asphalt concrete pavement and traffic striping and markings. 2. Differential cost for a double left -turn lane for west bound traf- fic at the proposed traffic signal to be located at the Balboa Coves access point. The differential shall include the cost of all grading, base, paving, median paving, median landscaping, traffic striping and marking, and traffic signs in excess of the cost of the planned PROJECT improvements consisting of a 14 -foot wide raised landscaped median. 3. Traffic signal at Balboa Coves access. 4. Differential cost between a 12 foot wide concrete sidewalk and an 8 foot wide asphalt concrete sidewalk adjacent to Hospital property that abuts Pacific Coast Highway. 5. Differential cost between the planned open channel drainage facili- ties adjacent to the Hospital property for the PROJECT and the underground drainage facilities shown on the drawings for the Hospital's additional improvements. 6. Differential cost of increasing public parking from 52 spaces to 65 spaces. 7. 50 percent of parking lot landscaping and irrigation cost. i FINAL COST ESTIMATE (See pages 2 of 6 through 6 of 6) 1 of FINAL COST ESTIMATE PACIFIC COAST HIGHWAY WIDENING (Hoag Hospital Costs) PAGE TOTAL $131,580.00 2 o 6 19- Oct-88 Exhibit "B" JN 24257 :ITEM; ITEM ; ;UNIT OF :ESTIMATED: NO ; CODE ; ITEM :MEASURE :QUANTITY ; ITEM PRICE : TOTAL ; ___='--------'--------------------------------- '------- '--- - - - - -- ---------- -- '-- - - - - - -- ------------------------- - - - - -- ----- - - - - -- ____________-' 1 ,070001 ;Construction Staking (3% + / -) : LS ; 1 ; $17,785.00 ; $17,785.00 ; - -- '--------'--------------------------------- '------- '--------- '------------ '--------------- ' 12 ;150808 :Remove or Abandon Storm Drain ; LF ; 490 ; $5.00 ; $2,450.00 t_,._:. I--------'--------------------------------- '------- '--------- '------------ '--------------- ' 15 ;150608 :Remove Chain Link Fence ; LF ; 310 ; $2.00 ; $620.00 '---- I--------'---------------------------------'-------'--------- '- ---- -- --- -- '-- --- ----- - --- -' : 18 ;151281 -A :Salvage Roadside Sign (SC -9) ; EA ; 14 ; $50.00 ; $700.00 ; ---- ' -------- ' --------------------------------- '------- '--------- '------------ '--------------- ' 20 ;151281 -C :Salvage Roadside Sign (PDS -7 & 8): EA ; 3 ; ($50.00); ($150.00); ----'--------'--------------------------------- '------- '--------- '------------ ' --------------- I 1 I , , I 71. ;152391 -A :Relocate Roadside Sign (Metal ; EA ; 13 : ($150.00)1 , ' :Post (SC -9) i_.._--'--------'--------------------------------- '------- '--------- ' ------------ ' --------------- ' i1 '152392-1;Relocate Roadside Sign (Wood Post: EA : 15 : ($150.00): ($2,250.00): i '(SC -9) 1 I 1 1 1 1 )A '152392 -B I :Relocate Roadside Sign (Wood Post: EA : 1 : ($150.00)I : ($150.00)I :(SC -19 & 20) --------' --------------------------------- '------- '--------- '------------ '--------------- ' 25 1152392- CIRelocate Roadside Sign (Wood Post: EA ; 1 ; ($150.00): ($150.00): :(PDS -7 & 8) ----'--------'--------------------------------- '------- '--------- '------------ '--------------- ' 26 :1.52393 -B :Relocate Roadside Sign (Strap/ : EA ; 9 : ($60.00)i :Saddle Bracket Meth.)(SC -19 & 20): '°__° i--------' --------------------------------- '------- '--------- '--- ------ --- ' --------------- I I , I I ' I I 29 J152693-Ai Roadside Sign (Strap & : EA : 6 : ($60.00): 1 ($360.00): :Saddle Bracket Meth.)(SC -9) __.. ,--------'--------------------------------- '------- '--------- '------------ '--------------- ' : 38 152471 :Adjust Meter Box : EA : 1 : $200.00 ; $200.00 ---- ' -------- ' --------------------------------- '------- '--------- '------------ '--------------- ' 40 160101 :Clearing & Grubbing ; LS : 1 : $1,000.00 ; $1,000.00 I__.,..--------'--------------------------------- '------- '--------- '------------ 1 , 41 '190101 :Roadway Excavation (Intl AC Pvmt), : CY : 6730 : '--------------- $10.00 : ' $67,300.00 - -- '--------'--------------------------------- '------- '--------- '------------ ' --------------- ' 43 :200001 -A :Highway Planting : LS : 1 : $12,950.00 : $12,950.00 '---- ' -------- ' --------------------------------- '------- '--------- '------------ , I '--------------- ' 44 :200001 -B :Parking Lot Planting : LS : 1 : $21,360.00 : $21,360.00 ----'-----------------------------------------''--------- '--- -- ------ -'---------- ' ------- 1 I , I , - - - - -' , 45 :208000 -A :1 Highway Irrigation System : LS : 1 : $13,255.00 : $13,255.00 '---- ' -------- ' --------------------------------- '------- `--------- '------------ '--------------- , I I 1 I I , ' 1 46 :208000 -B :Parking Lot Irrigation : LS : 1 : ($490.00): ($490.00): PAGE TOTAL $131,580.00 2 o 6 0 . FINAL COST ESTIMATE PACIFIC COAST HIGHWAY WIDENING (Hoag Hospital Costs) 19- Oct -88 JN 24257 ------------------------------------------------------------------------------------------------ ITEM: ITEM i iUNIT OFiESTIMATEDi i NO ; CODE ; ITEM ;MEASURE;QUANTITY ; ITEM PRICE ; TOTAL ----- -------------- -- -- - --- - - - - - -- --- - - - - -- ----- - - - - -- 47 ;250201 ;Class 2 Aggregate Subbase ; CY ; 1220 ; $12.00 ; $14,640.00 '---- ' -------- ' --------------------------------- '------- '--------- ' CY 1695 ------------ ' --------------- ' $35,595.00 48 260201 ;Class 2 Aggregate Base ; ; ; $21.00 ; ; ---- '..-------' --------------------------------- '------- '--------- '------------ '--------------- ' 49 394012 ;Place Asphalt ConcreteDike(0.50'); LF ; 730 ; $3.00 ; $2,190.00 ; ----'..-------' --------------------------------- '------- '--------- '------------ '--------------- ' 51 1:390103 ;Asphalt Concrete (Type "B ") ; TON ; 1775 ; $35.00 ; $62,125.00 ; '---- I...-------' --------------------------------- '------- '--------- '------------ '--------------- ' 52 510109 ;Class A Concrete (Footing) ; CY ; 140 ; $250.00 ; '--------------- $35,000.00 ' ' ---- ' -------- ' --------------------------------- '------- '--------- '------------ 53 510311 ;Class C Concrete (Backfill) ; CY ; 28 ; $150.00 ; $4,200.00 ; ••___'------------------------------------------ '------- '--------- '------------ 1 I 1 1 1 I '--------------- ' f f 54 ;510502 ;Minor Concrete (Minor Structures); CY ; 6 ; $400.00 ; $2,400.00 '---- ' -------- ' --------------------------------- '------- '--------- '------------ I I I I 1 1 '--------------- ' I I 55 ;510509 ;Minor Concrete (Misc.) CY ; 6 ; $300.00 ; $1,800.00 ___..'••----°--' --------------------------------- '------- '--------- '------------ i--------------- ' 57A ; ;Retaining Wall "H" ; SF ; 320 ; $12.00 ; $3,840.00 --------------------------------- '------- '--------- '------------ '--------------- ' ;5 ?i� ;Retaining Wall "I" ; SF ; 2330 ; $12.00 ; $27,960.00 - -.. .. ------'--------------------------------- '------- '--------- '------------ 58 ;510104 ;Class A Concrete (Box Culvert) ; CY 6 ; '--------------- $250.00 ; ' $1,500.00 ---- ' -------- ' --------------------------------- '------- '--------- '------------ 60 520106 ;Bar Reinforcing Steel (Epoxy Ctd); LBS ; 1320 ; '--------------- $0.65 ; ' $858.00 ' ---- ' -------- ' --------------------------------- '------- '--------- ' I I I I I I 61 ;562000- A;Furnish Roadside Sign (Stage I) ; EA ; 4 ; ------------ ' --------------- ' I 1 ($200.00); ($800.00); ---- ' -------- '---------------------------------' ------- ' --------- ' 1 1 I I I I ------------ ' --------------- ' I I 62 ;562000- B;Furnish Roadside Sign ; EA ; 17 ; $200.00 ; $3,400.00 ;(Stage II & II -A) '---''_-------' --------------------------------- '------- '--------- '------------ 63 ;562000- C;Furnish Roadside Sign (PDS -7 & 8); EA ; 5 ; '--------------- ($200.00); ' ($1,000.00); 1--- -: --------- ' --------------------------------- ' ------- '--------- '------------ ' --------------- ' 65 1562007 4 Install Roadside Sign (SC -19 & 20; EA ; 6 ; ($150.00)1 ;(Metal Post) ; ; ; ; ; I..-_.-'--------'--------------------------------- '------- '--------- '------------ I I '--------------- 1 I I I I 66 ;562007- CI ;Install Roadside Sign (PDS-7 & 8); EA ; 3 ; I $150.00 ; $450.00 ;(Metal Post) ' ' ----'--------'--------------------------------- '------- '--------- '------------ I I 1 I I I 68 C;Install Roadside Sign EA 3 '--------------- 1 I ' ;566005- ; ; ; ($150.00); ($450.00); ;(PDS -7 & 8) (Wood Post) ' ----'--------'--------^--------------------°-'-------'--------- '------ ------ '---- --- --- - ----' 69 ;568001- A;Install Roadside Sign (Wood Post); EA ; 11 ; $150.00 ; $1,650.00 i r i(SC-19 & 20) ' ------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------ PAGE TOTAL $194,458.00 3 o 6 s • FINAL COST ESTIMATE PACIFIC COAST HIGHWAY WIDENING (Hoag Hospital Costs) 19- Oct -88 JN 24257 ------------------------------------------------------------------------------------------------ ';ITEM; ITEM ; ;UNIT OF;ESTIMATED NO ; CODE ; ITEM ;MEASURE;QUANTITY ; ITEM PRICE ; TOTAL ; - ------------------- ---- - - - - -- - - - - - -- - -- - - -- -- 7.1 C;Install Roadside Sign (Strap/ EA 13 ; ----- -- - - -- -------- - - - - -- $60.00 ; $780.00 ;568001- ; ; ;Saddle Bracket Method (PDS-7 & 8); ; ----'--------' --------------------------------- '------- '--------- '------------ '--------------- ' 72 ;568015- B;Install Roadside Sign (Mast Arm ; EA ; 5 ; $50.00 ; $250.00 Hanger Method (SC -19 & 20) ----'--------'--------------------------------- '------- '--------- '------------ '--------------- ' 73 ;568015- C;Install Roadside Sign (Mast Arm ; EA ; 6 ; $50.00 ; $300.00 ;Hanger Method (PDS -7 & 8) '----'--------' --------------------------------- '------- '--------- '------------ '--------------- ' 75 650014 ;18" Reinforced Concrete Pipe ; LF ; 476 ; $75.00 ; $35,700.00 ; "D" Load Per Plan ---'--------'--------------------------------- '------- '--------- '------------ '--------------- ' 76 1650018 124" Reinforced Concrete Pipe ; LF ; 2 ; $78.00 ; $156.00 "'D" Load Per Plan i7 650022 ;30" Reinforced Concrete Pipe ; LF ; 508 ; $85.00 ; $43,180.00 "'D" Load Per Plan 78 1650026 ;36" Reinforced Concrete Pipe ; LF ; 398 ; $100.00 ; $39,800.00 ; "'D" Load Per Plan 90 ;721420 ;Concrete (Ditch Lining) ; CY ; 10 $150.00 ; $1,500.00 '---- ' -------- ' --------------------------------- '------- '--------- '------------ '--------------- ' 91 731501 ;Minor Concrete (Curb) ; CY ; 4.2 ; $250.00 ; $1,050.00 ; ---- ' -------- ' --------------------------------- '------- '--------- '------------ '--------------- ' 92 731502 ;Minor Concrete (Median) ; CY ; 7 ; ($265.00); ($1,855.00); ----'--------'--------------------------------- '------- '--------- '------- -- --- '--------------- ' 93 731504 ;Minor Concrete (Curb & Gutter) ; CY ; 6.6 ; $250.00 ; $1,650.00 ---- ' -------- '--------------------------------- '------- '--------- '------------ 94 ' --------------- ' ;731516 ;Minor Conc.(Vall.Gut, Drwy &Alley); CY ; 9 ; ($2DO.D0); ($1,BDD.00); ---°'-----°-'---------------------------------'-------'-------- -'--- 96 ;731521 ;Minor Concrete (Sidewalk) CY ; 300 ; --- -- --- -'- $200.00 ; ----- --- - -- - --' $60,000.00 --------'--------------------------------- '-------'--------- '------------ '--------------- ' 97 ;731523 ;Minor Concrete (Wheelchair) ; CY it 3 ; $4DO.00 ; $1,200.00 ; '---- ' -------- ' --------------------------------- '------- '--------- '------------ '--------------- ' 98 75001 :Misc. Iron and Steel LBS ; 1406 ; $1.50 ; $2,109.00 ---- ' -------- ' --------------------------------- '------- '--------- '------------ 102 833088 ;Decorative Handrailing(Ret.Walls); LF ; 44 ; '--------------- $50.00 ; ' $2,200.00 ' ---- ' -------- ' --------------------------------- '------- '--------- '------------ '--------------- ' 103 840506 ;8" Thermoplastic Traffic Stripe ; LF ; 220 ; $2.50 ; $550.00 ;Detail 36 & 38 (Ultimate) ------------------------------------------------------------------------------------------------ PAGE TOTAL $186,770.00 4 of 6 PAGE TOTAL ($82,982.00) 5 of 6 FINAL COST ESTIMATE PACIFIC COAST HIGHWAY WIDENING (Hoag Hospital Costs) 19-Oct -88 JN 24257 :ITEM: ITEM :UNIT OF :ESTIMATED: : NO : CODE : ITEM :MEASURE :QUANTITY : ITEM PRICE : TOTAL : - - - - -- --------------------------- - - - - -- - - - - - -- -- - -- - -- - -- --- - - - - -- -------- - - - - -- 1105 :840509 :12" Thermoplastic Traffic Stripe : LF : 500 : $3.00 : $1,500.00 : :(Ultimate) '----'--------' --------------------------------- '------- '--------- '------------ '--------------- ' 11107 :840516 :Thermoplastic Pavement Marking ; SF : 531 : $4.00 : $2,124.00 : :(Ultimate) : ----'--------' ------------- - ------------------- '------- '--------- '------------ '--------------- ' 1109 840656 :Paint Traffic Stripe (2 -Coat) : LF : 500 ; $0.60 ; $300.00 : :(Stage Const.) ----'--------'---------------------------------'-------'--------- I '-- --- -- -- --- '- --- -- ---- --- --' I I , '110 :840657 -A :Paint Traffic Stripe (2 -Coat) : LF : 1105 : $0.60 : $663.00 : : :(Ultimate) ' I I I i I I 1 1111 :840657 -B :Paint Traffic Stripe (2 -coat) : LF : 300 : $0.60 : $180.00 : :(Ultimate) (PDS-9) ' I , I , I I :11"2 '1840666 :Paint Pavement Marking (2 -Coat) : SF : 473 : ($3.00): ($1,419.00): : : :(Stage Const.) : : '----'--------' --------------------------------- '------- '--------- '------------ '--------------- ' 113 !840667 -A :Paint Pavement Marking (2 -Coat) : EA : 9 : $75.00 : $675.00 : :(Ultimate) 115 840100 :Paint Median Curb (Detail B) : EA : 1 : $50.00 : $50.00 : ' ---- ' -------- ' --------------------------------- '------- '--------- '------------ '--------------- ' 116 :850101 ;Pavement Marker (Non- Reflective) : EA : 1165 : ($2.00)i :(Ultimate) : : : : I ----'--------' --------------------------------- '------- '--------- '------------ '--------------- ' 117 850102 :Pavement Marker (Reflective) : EA : 40 : $5.00 ; $200.00 : :(Ultimate) ----'--------'--------------------------------- '------- '--------- '------------ '--------------- ' :118 850102 :Pavement Marker (Reflective) : EA : 145 : ($5.00): ($725.00): :(Stage Const.) : : : : : -- :119 --------'--------------------------------- '------- '--------- '------------ '--------------- :860251 :Signal & Lighting Mod. (Loc. E -1); LS : 1 : $300.00 ; ' $300.00 ' ---- ' -------- ' --------------------------------- ' ------- '--------- '------------ '--------------- ' 125 860257 :Signal & Lighting Mod. (Loc. E-8)1 : 1 : $5,000.00 : $5,000.00 : ' ---- ' -------- ' --------------------------------- ' ------- '--------- '------------ '--------------- ' 126 860258 :Signal & Lighting Mod. (Loc. E -9): LS : 1 : $200.00 : $200.00 : ' ---- ' -------- ' --------------------------------- ' ------- '--------- '------------ '--------------- ' , , I i I I , 1 127 860259 :Signal & Lighting Mod.(Loc. E -10): LS : 1 : ($1,700.00): ' '--------------------------------- ($1,700.00): ---- I 128 -------- ' ------- '--------- ' ------------ ' --------------- , , I i , 1 860260 :Signal & Lighting (Loc. E -11) : LS : 1 :($58,000.00): I ' ($58,000.00): ' ---- ' -------- '--------------------------------- ' ------- '--------- ' ------------ ' --------------- ' , , I , I 1,129-1,860261--!,Signal --------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------ & Lighting Mod.(Loc. E -13): LS : 1 : ($30,000.00): ($30,000.00): PAGE TOTAL ($82,982.00) 5 of 6 FINAL COST ESTIMATE PACIFIC COAST HIGHWAY WIDENING (Hoag Hospital Costs) 19- Oct -88 JN 24257 ------------------------ ------------------------ ;ITEM; ITEM ; ;UNIT OF;ESTIMATED NO ; CODE ; ITEM ;MEASURE;QUANTITY ; ITEM PRICE ; TOTAL ;1:31 '860263 ;Signal & Lighting Mod.(Loc. E -16); LS ; 1 ; $500.00 ; $500.00 ; ' ---- ' -------- ' --------------------------------- ' ------- '--------- '------------ '--------------- ' ;133 ;860402 ;Lighting (City St) (Loc. E- 18 -22); LS ; 1 ($10,300.00); ($10,300.00); '----'--------'--------------------------------- ` ------- '--------- '------------ '--------------- ' 154 ;510109- A;Class A Concrete(Splash Wall Ftg); CY ; 6 ; $250.00 ; $1,500.00 ' ---- '-------- ' --------------------------------- '------- '--------- '------------ '--------------- ' 155 665114 ;15" Corrugated Steel Pipe ; LF ; 10 ; $35.00 ; $350.00 ---- ' -------- '--------------------------------- '------- '--------- '------- - ---- '--------------- ' 156 703216 ;18" Corrugated Steel Pipe Riser ; LF ; 12 ; $65.00 ; $780.00 ' ---- '-------- ' --------------------------------- '------- '--------- '------------ '--------------- ' 157 ; ;Masonry Splash Wall (8 "x 6"x IV)! 190 $10.00 $1,900.00 ' ---- '--------' --------------------------------- '------- '--------- '------------ '--------------- ' 158 860264 ;Signal & Lighting (E -13) ; LS ; 1 ; $74,000.00 ; $74,000.00 ; °---'--------'---------------------------------'-------'-------- -'-- ----- ---- -'--- --- ---- -- -- -' 159 860265 ;Signal & Lighting (E -23) ; LS ; 1 $112,000.00 ; $112,000.00 ; ----'--------'--------------------------------- `------- '--------- ' ------------ '--------------- ' 1160 ;999990 ;Mobilization (10% + / -) ; LS ; 1 ; $61,055.00 ; $61,055.00 ------------------------------------------------------------------ ------------- --------------- °-------------------------------------------------------------- ----- ------------------- - - - - -- PAGE TOTAL $241,785.00 GRAND SUBTTL $671,611.00 ------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------ ;161 ; ' ---- '--------' ;Contingency --------------------------------- (5% + / -) ; '------- LS ; '--------- 1 ; $33,580.00 ; '------------ '--------------- $33,580.00 ; ' 1162 ; -------------- ------------------------------------------------------------------------------------------------ ;Construction :Constructio------- Eng. /Admin. (5% + / -); ---- -. (5% ---------------------------------------------------- LS ; 1 ; $33,580.00 ; $33,580.00 Bracketed items indicate credit due to Hoag from Caltrans or the City of Newport Beach, that are no longer required because of Hoag additional improvements. Hospital for any items Hospitals' 6 of 6 GRAND TOTAL $738,771.00 EXHIBIT "C" FINAL COST ESTIMATE PACIFIC COAST HIGHWAY WIDENING (Superior Avenue Parking Lot Access Road Costs Approximate Length = 140 LF) SUB TOTAL $21,976.00 ------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------ ;161 ; ;Contingency (5% + / -) ; LS ; 1 ; $1,000.00 ; $1,000.00 ' ---- '------' --------------------------------- '------- '--------- '------------ '----------- ' 1162 ; ;Construction Eng. /Admin. (5 % + / -) LS 1 $1,000.00 ; $1,000.00 ------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------ GRAND TOTAL $23,976.00 JN 23627 10- Nov -88 ------------------------------------------------------------------------------------------ ;ITEM; ITEM ; ;UNIT OF;ESTIMATED; ; NO ; CODE ; ITEM ;MEASURE;QUANTITY ; ITEM PRICE ; TOTAL - - - -- --- ---------------------- -- - - - - -- - - - - -- --- - - - - -- ---- - - - - -- 1 1070001;Construction Staking (3% + /-) ; LS ; 1 ; '------- '--------- '------------ $580.00 ; '----------- $580.00 ' '---- ' ------ ' --------------------------------- 16 ;153215;Remove Concrete Curb and Gutter ; LF ; 82 ; $3.00 ; $246.00 ----'------ ' --------------------------------- '------- '--------- '------------ '----------- ' 30 ;153218;Remove Concrete Sidewalk ; SF ; 820 ; $0.50 ; $410.00 ----'------ ' --------------------------------- '------- '--------- '------------ '----------- ' 41 ;190101;Roadway Excay. (Incl. A.C. Pvmnt); CY ; 4 ; $10.00 ; $40.00 ---- ' ------ ' --------------------------------- '------- '--------- '------------ '----------- ' 48 ;260201;Class 2 Aggregate Base ; CY ; 70 ; $21.00 ; $1,470.00 ; '---- ' ------ ' --------------------------------- '------- '--------- '------------ '----------- ' 51 1390103;Asphalt Concrete (Type "B ") ; TONS ; 108 ; ---- ' ------ ' --------------------------------- '------- '--------- '------------ $35.00 ; '----------- $3,780.00 ' 93 ;731504;Minor Concrete (Curb & Gutter) ; CY ; 15 ; $250.00 ; $3,750.00 ----'------'--------------------------------- '------- '--------- '------------ '----------- ' 94 ;731516;Minor Concrete (X- gutter) ; CY ; 18.5 ; $200.00 ; $3,700.00 ----'------'--------------------------------- '------- '--------- '------------ '----------- ' 96 ;731521;Minor Concrete (Sidewalk) ; CY ; 24 ; $200.00 ; $4,800.00 '---- ' ------ ' --------------------------------- '------- '--------- '------------ '----------- ' 97 ;731523;Minor Concrete (Wheelchair) ; CY ; 3 ; $400.00 ; $1,200.00 '---- ' ------ ' --------------------------------- '------- '--------- '------------ ;999990;Mobilization '----------- ' ;160 (10 % + / -) ; LS ; 1 ; ------------------------------------------------------------------------------------------ ----------------------------------------------------------- ------------------ $2,000.00 ; =------ $2,000.00 - - - --- SUB TOTAL $21,976.00 ------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------ ;161 ; ;Contingency (5% + / -) ; LS ; 1 ; $1,000.00 ; $1,000.00 ' ---- '------' --------------------------------- '------- '--------- '------------ '----------- ' 1162 ; ;Construction Eng. /Admin. (5 % + / -) LS 1 $1,000.00 ; $1,000.00 ------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------ GRAND TOTAL $23,976.00