HomeMy WebLinkAboutC-2657 - Santa Ana Delhi Channel ConstructionCITY*OF NEWPORT BIACH OFFICE OF THE CITY CLERK P.O. BOX 1768, NEWPORT BEACH, CA 92658 -8915 T0: FINANCE DIRECTOR FROM: CITY CLERK DATE: December 16, 1987 (714) 644 -3005 /Z /��A7 SUBJECT: Contract No. C -2657 Description of Contract Santa Ana Delhi Channel Construction between Mesa Drive and Irvine Avenue Effective date of Contract August 11, 1987 Authorized by Minute Action, approved on June 22, 1987 Contract with Orange County Flood Control District; Address Orange'County Development Agency; and County of Orange Amount of Contract (See Agreement) " S ie4�e Wanda E. Raggio City Clerk WER:pm Attachment Hof 3300 Newport Boulevard, Newport Beach • TO: CITY COUNCIL FROM: Public Works Department • June 22, 1987 CITY COUNCIL AGENDA BY THE CITY COUNC(LTEM NO. F -3(c) CITY OF NEWPORT BEACH JUN 2 2 1987 APPROVED SUBJECT: SANTA ANA DELHI CHANNEL CONSTRUCTION BETWEEN MESA DRIVE AND IRVINE AVENUE RECOMMENDATIONS: ,G / 1. Find that the Orange County Environmental Management Agency's plans for the construction of improvements to the Santa Ana -Delhi Channel between Mesa Drive and Irvine Avenue are consistent with the City's General Plan. 2. Approve the County's prepared plans and specifications for the portion of the work within the City of Newport Beach. 3. Authorize the Mayor and the City Clerk to execute a cooperative • agreement with the County of Orange, the Orange County Flood Control District and the Orange County Development Agency (for Santa Ana Heights) to provide for funding of a portion of the channel improvements which will allow for the future widening of Irvine Avenue northerly of Mesa Drive. DISCUSSION: The Orange County Flood Control District plans to construct improve- ments to the Santa Ana -Delhi Channel from downstream of Mesa Drive to upstream of Irvine Avenue. These improvements include a concrete rectangular channel and new culvert crossings at both Mesa Drive and Irvine Avenue. Portions of the project are in the City of Newport Beach and the County has requested that the City find that the project is in conformance with the General Plan and approve plans and specifications for those portions in the City. The flood control facilities are in conformance with the City's General Plan. They provide for the widening of Irvine Avenue to six lanes in the future. The need to widen Irvine Avenue was established by the County in their EIR 508 for the expansion of John Wayne Airport. • The County has a long- standing policy concerning the Flood Control District funding of flood control facilities that provides for future widening of roadways. The District will pay for the replacement of only those portions of bridges and culverts that exist at the time the drainage facility is constructed. The cost of extra length or width of culverts and bridges that are needed for future widening is the responsibility of the agency that controls the roadway. 0 r June 22, 1987 Subject: Santa Ana Delhi Channel Construction between Mesa Drive and Irvine Avenue Page 2 •Three facilities need to be lengthened to provide for the future widening of Irvine Avenue: A. The Irvine Avenue culvert -- Lengthen culvert from 79 feet to 110 feet = 42 feet ($175,000) B. The Mesa Drive Culvert -- Lengthen culvert from 54.7 feet to 62 feet = 7.3 feet ($25,000). C. Single - barrel extension upstream of Mesa Drive approximately 350 feet (allows for the widening where the channel parallels Irvine Avenue)($389,000). All of the proposed facilities to provide for future widening are within the boundaries of Newport Beach. On March 23, 1987, the City Council adopted a resolution requesting the County to provide $175,000 from their Major Bridge Program to fund the increased length of the Irvine Avenue culvert. The County has provided these funds. The lengthening of the Mesa Drive culvert primarily serves the Santa •Ana Heights area, and the Santa Ana Heights Redevelopment Agency has agreed to fund the $25,000 for this portion of the project. County traffic studies predict that the future growth in traffic on Irvine Avenue will be as follows: Santa Ana Heights Development Agency 52.1% Airport Expansion 17.5% City 30.4 %* *Includes regional growth which will occur in Costa Mesa, Irvine, and County areas. The County has asked the City to pay for 30.4% of the cost of extending the single - barrel culvert (estimated to be $120,000). The Development Agency will advance the money to the City until such time as the City par- ticipates in a road widening project for Irvine Avenue in three to four years. At that time, the City's share would come from the Circulation and Transportation fund, the Gas Tax fund and possibly the Arterial Highway Financing Program (AHFP). • As a part of the proposed Santa Ana Heights annexation, the staff will request that the rather unusual City boundary along the Santa Ana -Delhi Channel between Mesa Drive and Irvine Avenue be adjusted as shown on the attached sketch. If this adjustment occurs, the culverts and channel work will no longer be in the City and there will be no obligation for the City to pay for the single - barrel culvert extension if the de- annexation occurs prior to the road widening. rry N 1 w i i u � r ,f fin .. i m w aiSrIN6 c11Y ,• •' 90/NDAQ'1(/Nf M1O l ANNfX f •� I w 1 7711S A,PEA --�— '— pR i �zv AO #afeY BQ/N�I2Y [ /hE N J� 1 NSLE 6AkREC n'EW 4f,-SA Ae _ _ c ✓[ufkT _/ r� ' I i Q p DEL"' rI I -rya rte. ..+ i• ♦ 2 � , sAnrrAA#A -Wl0 QMN Fl L4 _ _ fAIfNT 1811 Y OF N G E ENVIRONMENTAL MANAGEMENT PUBLIC WORKS Mr. Ben Nolan, DPW City of Newport Beach P.O. Box 1768 Newport Beach, CA 92658 -8915 August 26, 1987 FILE Subject Cooperative Agreement D87 -093, Santa Ana - Delhi Channel Improvements For Irvine Avenue And Mesa Drive Dear Mr. Nolan: SANTA ANA, CA 92702 -4048 TELEPHONE: (714) 834 -2300 Enclosed is one fully executed original of subject agreement for the City's files together with a copy of the minute order authorizing county execution of it. Also enclosed is a summary of bids dated 6- 17 -87. Plugging those bid prices into exhibit A of the agreement (not revised), would result in the estimated costs for each entity as shown on the attached "Cost Breakdown Exhibit" which was prepared with the Board Agenda item transmittal. Reimbursements to OCFCD are due only after final accounting. Since the project construction is ex- pected to continue into summer of 1988, the reimbursements should not be due until fiscal year 1988 -89. In the event of administrative questions, please have staff contact Dave Updegraff at (714) 834 -3561. Ja J , r//u yours, // a n HN:mk 8236 Attachments: 1. Agreement & Minute Order 2. "Cost Breakdown Exhibit" 3. Bid Abstract cc: G. Rebeila, Airport, w /all attachments R. Adler, Planning, w /all J. Natsuhara, w11 & 2 W. Hartman, w11 & 2 E. McCormack w/2 C. Caliendo, Airport, w/2 G. Scofield, CAO ERNIE SCHNEIDER PCB% .:4 n$ 9 DIRECTOR, EMA C. R. NELSON AU 22 71987 I .�� IRECTOR OF PUBLIC WORKS CITY of LOCATION: NEYA?, Fi b€lIGIE 00 CIVIC CENTER DRIVE WEST SANTA ANA, CALIFORNIA X11: MAILING ADDRESS: Y� -_ \ / I 1 �' P.O. BOX 4048 FILE Subject Cooperative Agreement D87 -093, Santa Ana - Delhi Channel Improvements For Irvine Avenue And Mesa Drive Dear Mr. Nolan: SANTA ANA, CA 92702 -4048 TELEPHONE: (714) 834 -2300 Enclosed is one fully executed original of subject agreement for the City's files together with a copy of the minute order authorizing county execution of it. Also enclosed is a summary of bids dated 6- 17 -87. Plugging those bid prices into exhibit A of the agreement (not revised), would result in the estimated costs for each entity as shown on the attached "Cost Breakdown Exhibit" which was prepared with the Board Agenda item transmittal. Reimbursements to OCFCD are due only after final accounting. Since the project construction is ex- pected to continue into summer of 1988, the reimbursements should not be due until fiscal year 1988 -89. In the event of administrative questions, please have staff contact Dave Updegraff at (714) 834 -3561. Ja J , r//u yours, // a n HN:mk 8236 Attachments: 1. Agreement & Minute Order 2. "Cost Breakdown Exhibit" 3. Bid Abstract cc: G. Rebeila, Airport, w /all attachments R. Adler, Planning, w /all J. Natsuhara, w11 & 2 W. Hartman, w11 & 2 E. McCormack w/2 C. Caliendo, Airport, w/2 G. Scofield, CAO soft MINUTES OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA AUGUST 11, 1987 COOPERATIVE AGREEMENT NO. D87 -093 WITH.THE CITY OF NEWPORT BEACH FOR SANTA (FLOOD): Environmental Management Agency, on behalf of the Orange County P oo-TTontrol District, requests approval of Cooperative Agreement No. D87 -093 providing for reimbursements from the Orange County Development Agency, City of Newport Beach and the County Airport and Road funds, for the construction of road betterments to Irvine Avenue and Mesa Drive. MOTION: On motion by Supervisor Vasquez, seconded by Supervisor Riley, the oar - authorized execution of Cooperative Agreement No. D87 -093 which specifies various agencies' participation in the cost of improvement to the Santa Ana -Delhi Channel. Supervisor Wieder was absent. MOTION CARRIED. ;;.V ti `t ®F1013 -2.3 (12/76) 1 2 3 4 0 c -zks�7 Agreement No. D87 -093 A G R E E M E N T THIS AGREEMENT, for purposes of identification, hereby dated the day of , 10, -7, is BY AND BETWEEN f (j X AND THE ORANGE COUNTY FLOOD CONTROL DISTRICT, a body corporate and politic in the State of California, hereinafter referred to as "DISTRICT," THE COUNTY OF ORANGE, a political subdivision of the State of California, hereinafter referred to as "COUNTY," THE CITY OF NEWPORT BEACH, a municipal corporation, hereinafter referred to as "CITY," THE ORANGE COUNTY DEVELOPMENT AGENCY, a body corporate and politic in the State of California, hereinafter referred to as "DEVELOPMENT AGENCY." W I T N E S S E T H WHEREAS, DISTRICT proposes to improve the Santa Ana -Delhi Channel in the vicinity of Irvine Avenue and Mesa Drive by constructing a concrete rectangular channel and culvert crossings hereinafter referred to as PROJECT; and WHEREAS, the Irvine Avenue bridge over said channel does not comply with current design loading requirements; and WHEREAS, DISTRICT in implementing PROJECT proposes to remove existing bridges over the Santa Ana Delhi Channel at Irvine Avenue and at Mesa Drive and replace the two bridges with triple barrel culverts; and WHEREAS, the Irvine Avenue and Mesa Drive culverts are within present CITY limits and will benefit CITY and COUNTY in accomplishing future road improvements if culverts are lengthened to accommodate future road improvements; and -1- Agreement No. D87 -093 WHEREAS, COUNTY EIR 508 and 508A on the John Wayne Airport expansion and Santa Ana Heights redevelopment determined a need to implement traffic mitigation measures and widen Irvine Avenue, and proposed that CITY, DEVELOPMENT AGENCY and COUNTY Airport fund their pro rata shares of cost; and WHEREAS, the lengthening of the culverts at Irvine Avenue and Mesa Drive is in addition to what is needed for flood control purposes but is necessary to implement future traffic mitigations on Irvine Avenue and Mesa Drive that are described in EIR 508 and 508A; and WHEREAS, CITY is considering a request to the Local Agency Formation Commission (LAFCO) to de -annex those portions of the Santa Ana -Delhi Channel northerly of the south right -of -way line of Mesa Drive which would remove most of PROJECT from CITY jurisdiction; and WHEREAS, DISTRICT funding policy for replacement of bridges and culverts crossing DISTRICT facilities was set forth in Board of Supervisors Resolution No. 68 -458; and WHEREAS, Irvine Avenue is designated a Modified Major (6 -lane divided) highway on COUNTY's Master Plan of Arterial Highways and on the Santa Ana Heights Specific Plan, but is still shown a lesser width on CITY's master plan of highways; and WHEREAS, DEVELOPMENT AGENCY, COUNTY Airport and CITY desire to fund each's pro rata share of improvements associated with Irvine Avenue (except bridge replacement), based upon generation of additional traffic from each entity as forecasted by COUNTY's analysis as follows: -2- n 0 Agreement No. D87 -093 CITY 30.48 (includes regional traffic increases) COUNTY Airport 17.58 DEVELOPMENT AGENCY 52.18 and, WHEREAS, DEVELOPMENT AGENCY is willing to pay for the cost of lengthening the Mesa Drive culvert to span the 60 -foot street right of way; and WHEREAS, DEVELOPMENT AGENCY is willing to contribute CITY's share of cost for Irvine Avenue until such time as CITY participates in the widening of Irvine Avenue to six (6) travel lanes; and WHEREAS, DISTRICT will include the lengthening of the culverts in its construction contract provided it is reimbursed for the additional cost; and WHEREAS, COUNTY budgets and administers both the John Wayne Airport Enterprise Trust Fund, hereinafter called "Airport Trust," and a Major Bridge Program, hereinafter referred to as "Bridge Fund "; and WHEREAS, COUNTY has programmed $175,000 in its Bridge Fund to pay for lengthening the culvert at Irvine Avenue beyond what is DISTRICT responsibility; and WHEREAS, DISTRICT staff requested CITY, by letter dated August 25, 1986, to determine PROJECT's conformance to CITY's General Plan pursuant to Government Code Section 65402; and WHEREAS, DISTRICT's Board of Supervisors Resolution No. F87 -8, dated May 12, 1987, requests CITY approval of PROJECT plans and specifications pursuant to the Orange County Flood Control Act. NON, THEREFORE, IT IS AGREED by and between the parties hereto as follows: I. DISTRICT SHALL: A. Be and is hereby designated as Lead Agency for PROJECT and shall prepare and process all necessary environmental documents required by the California Environmental Quality Act of 1970 (CEQA) as amended. B. Be and is hereby designated as Project Engineer, Contracting and -3- , 0 0 Agreement No. D87 -093 Construction Agent for the parties to do and perform all things necessary in order to design and construct PROJECT and to execute and deliver all documents required in connection with the construction and completion of PROJECT including its Notice of Completion and final accounting report. C. Prepare contract plans and specifications for PROJECT based on criteria set forth in the current Design Manual of the Orange County Flood Control District as approved by Director, County of Orange Environmental Management Agency, hereinafter referred to as DIRECTOR EMA. D. Design culvert crossings for ultimate right of way widths of 60 feet for Mesa Drive and 108 feet for Irvine Avenue, as compatible with the Santa Ana Heights Specific Plan. E. Submit PROJECT plans and specifications for approval by CITY's City Engineer or his designee, hereinafter referred to as "CITY ENGINEER," prior to advertising PROJECT for construction bids, and obtain approval of PROJECT plans by CITY prior to contract award. F. During the period of construction, have jurisdiction over the entire construction area including the portion of PROJECT within CITY limits. G. Be financially responsible for all PROJECT cost except those costs identified in this Agreement as the responsibility of the other Parties hereto; and shall advance all funds required for award of contract. For purposes of this Agreement, four portions of PROJECT are identified as not being DISTRICT's cost responsibility, defined as follows: 1. "Mesa RCB Extension ": The cost to lengthen the replacement triple -box culvert at the Mesa Drive crossing 7.3 feet more than existing (62 -foot -wide road structure minus 54.7 -foot -wide existing bridge); plus the share of cost of any contract change order concurred by DEVELOPMENT AGENCY's Executive Director for the purpose of facilitating anticipated future improvements to Mesa Drive; 2. "Irvine RCB Extension ": The cost to provide an extra 42.4 feet of -4- 1' 2 3 Agreement No. D87 -093 length of the replacement triple -box culvert at the Irvine Avenue crossing (110 - foot -wide road structure minus 79 -foot -wide existing bridge, plus adjustment for skew); 3. "Single Barrel Extension ": The cost to extend one barrel of the triple -box culvert approximately 350 feet upstream of Mesa Drive to allow for future widening of the east side of Irvine Avenue, including incremental RCB length for ultimate curb return areas at Mesa Drive; 4. "Orchard Signal ": The cost, including value of COUNTY- furnished signal equipment, to install a new traffic signal on Irvine Avenue at Orchard Drive as identified in the Santa Ana Heights Specific Plan. 5. Each of items 1, 2, 3, and 4 above will include prorated shares of certain other generalized contract items plus engineering and administrative costs, and will be determined using final dimensions and final contract prices, on the basis shown on Exhibit "A" which is attached and made part of this Agreement. The cost of any contract change orders for the purpose of facilitating future road betterments will be considered to be a part of said items 1, 2, 3 or 4, whichever applies. II. CITY SHALL: A. Hereby determine that PROJECT is compatible with CITY's General Plan. B. Hereby approve the PROJECT plans and specifications as to the contemplated flood control improvements within CITY boundaries, pursuant to the Orange County Flood Control Act. C. Be financially responsible for a thirty and 4/10 percent (30.48) share of Single Barrel Extension, as defined in Section I.G, although said share may be advanced by DEVELOPMENT AGENCY. Said share is estimated to be approximately One Hundred Twenty Thousand Dollars ($120,000), as shown on Exhibit "A," and shall not exceed One Hundred Fifty Thousand Dollars ($150,000) unless approved in writing -5- • by CITY. • Agreement No. D87 -093 D. Reimburse DEVELOPMENT AGENCY for any funds advanced by it on CITY's behalf for PROJECT, payable upon the widening or restriping of Irvine Avenue to provide six (6) travel lanes adjacent to PROJECT, provided the Single Barrel Extension remains within CITY boundaries at the time of contract award for Irvine Avenue widening, and provided the Single Barrel Extension is not an ineligible item for State gas tax expenditure. E. Upon completion and acceptance of PROJECT by DISTRICT, accept maintenance responsibility of roads rebuilt by PROJECT within CITY limits. III. COUNTY SHALL: A. Reimburse DISTRICT using its Airport Trust, for seventeen and 5/10 percent (17.58) share of Single Barrel Extension, as defined in Section I.G. Said share is estimated to cost approximately Seventy Thousand Dollars ($70,000), as shown on Exhibit "A," and shall not exceed One Hundred Thousand Dollars ($100,000) unless approved in writing by COUNTY. B. Reimburse DISTRICT using its Bridge Fund, the entire share of cost for Irvine RCB Extension, as defined in Section I.G. Said share is estimated to be One Hundred Sixty -five Thousand Dollars ($165,000), as shown on Exhibit "A." C. Reimburse DEVELOPMENT AGENCY for funds it advances on behalf of CITY pursuant to Paragraph IV.B herein, in the event CITY de- annexes Irvine Avenue adjacent to PROJECT prior to the contract award for widening Irvine Avenue adjacent to PROJECT; such reimbursement by COUNTY shall be made after de-annexation, as soon as COUNTY road funds for such reimbursement are approved in COUNTY's budget. IV. DEVELOPMENT AGENCY SHALL: A. Reimburse DISTRICT for the cost of Mesa RCB Extension plus a fifty -two and 1 /10 percent (52.18) share of Single Barrel Extension, both as defined in Section I.G herein. Said share of cost is estimated as $25,000 for Mesa RCB based on 7.3 -foot extension, plus $200,000 for the share of the Single Barrel -6- Agreement No. D87 -093 Extension, plus $90,000 for the Orchard Signal. Such reimbursement for the Mesa RCB Extension, the Single Barrel Extension and the Orchard Signal shall not exceed the aggregate sum of Three Hundred Ninety Thousand Dollars ($390,000) unless approved by AGENCY. B. Reimburse DISTRICT for CITY's share of PROJECT cost set forth in Paragraph II.C, as an advance on behalf of CITY in the event that the final accounting report for PROJECT is approved prior to the award of contract for the widening of Irvine Avenue adjacent to PROJECT to provide six (6) travel lanes. Such advance on CITY'S behalf shall not exceed the sum of One Hundred Fifty Thousand Dollars ($150,000) unless approved by DEVELOPMENT AGENCY. V. PAYMENT AND FINAL ACCOUNTING: Within four months after acceptance of PROJECT improvements by DISTRICT, DISTRICT shall prepare a Final Accounting Report for PROJECT construction for review and approval by CITY ENGINEER and by authorized representatives of the other Parties hereto. Within thirty days (30 days) after approval of the Final Accounting Report by the authorized representatives, the Parties hereto shall reimburse DISTRICT for each Party's own respective share of PROJECT cost subject to each's cost limitation, if any, and other conditions as provided in this Agreement. VI. IT IS MUTUALLY UNDERSTOOD AND AGREED: A. This agreement will automatically terminate in the event DISTRICT does not award a contract for PROJECT construction prior to July 1, 1988, unless extended by mutual agreement. B. Nothing herein shall limit DISTRICT'S right, at its sole discre- tion, to reject any or all bids for PROJECT construction, for reasonable cause. C. That neither CITY nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by DISTRICT under or in connection with any work, authority or jurisdiction delegated to DISTRICT under this agreement. It is also understood and -7- 9 0 Agreement No. D87 -093 agreed that, pursuant to Government Code Section 895.4, DISTRICT shall fully indemnify, defend, and hold CITY harmless from any liability imposed for injury (as defined by Government Code Section 810.8), occurring by reason of anything done or omitted to be done by DISTRICT under or in connection with any work, authority or jurisdiction delegated to DISTRICT under this agreement. D. That neither DISTRICT nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by CITY under or in connection with any work, authority or jurisdiction not delegated to DISTRICT under this agreement. It is also understood and agreed that, pursuant to Government Code Section 895.4, CITY shall fully indemnify, defend, and hold DISTRICT harmless from any liability imposed for injury (as defined by Government Code Section 810.8), occurring by reason of anything done or omitted to be done by CITY under or in connection with any work, authority or jurisdiction not delegated to DISTRICT under this agreement. -8- 11 211 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Agreement No. D87 -093 IN WITNESS WHEREOF, CITY has caused this agreement to be executed by its Mayor and attested by its Clerk, and DISTRICT and other Parties have caused this agreement to be executed by the Chairman of their Board of Supervisors and attested by its Clerk, all thereunto duly authorized by the City Council and the Board of Supervisors, respectively. Dated: 19� ATTEST: Clerk of the Cou CITY OF NEWPORT BEACH BY City Attorney ORANGE COUNTY FLOOD CONTROL DISTRICT; ORANGE COUNTY DEVELOPMENT AGENCY; and COUNTY OF ORANGE Dated: // 1987 BY airman, Board of Supervisors SIGNED AND CERTIFIED THAT A COPY OF THIS DOCUMENT HAS BEEN DELIVERED TO THE CHAIRMAN OF THE BOARD C/ �✓A 9 {� LINDA D. R013ERTS Clerk of the Board of Supervisors of Orange County, California PWT10 -81 7162 APPROVED AS TO FORM: ADRIAN RUYPER, COUNTY COUNSEL ORANGE COUNTY, CALIFORNIA BY Ti 6 - //- y Date -9- EXHIBIT "A" Page 1 of 4 The methodology outlined below shall be used in determining the pro rata share of project cost for County Major Bridge Fund, City of Newport Beach, John Wayne Airport and the Orange County Development Agency. 3. Clearing and Grubbing x ratio 1,230 4. Unclassified Excavation x ratio 9,993 5. Unclassified Fill x ratio 301 6. Shoring x ratio 7,380 Total $ 136,987 Contingencies 58 6,849 Estimated 158 Engr, and Admin. 20,548 Total Cost $ 164,384 Note: Total culvert extension (plus associated cost) for Irvine Avenue will be funded by the County Major Bridge Fund. Unit uantit 1 Price2 Cost/Ft. I. "Irvine RCB Extension ": Triple Barrel Box Culvert Extension at Irvine Avenue a. Cubic yd. Portland Cement 9.2 $200.00 /cy $ 1,840 Concrete per ft. b. Lb. Bar Reinforcing Steel per ft. 1,880 $ 0.45/lb 846 c. Cubic yd. Structure Backfill per ft. 3.28 $ 25.00 /cy 82 d. Square yd. Filter Fabric per ft. 8.39 $ 2.00 /yd2 17 Total Cost /ft. $ 2,785 e. Culvert Extension cost 118,084 (42.4 ft. x cost /ft.) f. Total Project Cost $4,790,036 g. Pro rata share of Culvert Extension (2.468 =) 0.0246 new r Total Project Cost = Ratio h. Total Culvert Extension plus associated cost 1. Culvert Extension (from "e") $ 118,084 2. Mobilization x ratio 2,219 3. Clearing and Grubbing x ratio 1,230 4. Unclassified Excavation x ratio 9,993 5. Unclassified Fill x ratio 301 6. Shoring x ratio 7,380 Total $ 136,987 Contingencies 58 6,849 Estimated 158 Engr, and Admin. 20,548 Total Cost $ 164,384 Note: Total culvert extension (plus associated cost) for Irvine Avenue will be funded by the County Major Bridge Fund. Note: Total culvert extension (plus associated cost) for Mesa Drive will be funded by the Orange County Development Agency. • • Page 2 of 4 Unit Quantity Price2 Cost/Ft. II. "Mesa RCB Extension ": Triple Barrel Box Culvert Extension at Mesa Drive a. Cubic yd. Portland Cement Concrete 8.1 $200.00 /cy $ 1,620 per ft. b. Lb. Bar Reinforcing Steel per ft. 1,280 $ 0.45/lb 576 c. Cubic yd. Structure Backfill per ft. 2.33 $ 25.00 /cy 58 d. Square yd. Filter Fabric per ft. 6.64 $ 2.00 /yd2 13 Total Cost /ft. $ 2,267 e. Culvert Extension cost (7.3 ft. x cost /ft.) 16,550 f. Total Project Cost $4,790,036 g. Pro rata share of Culvert Extension (0.358 =) .0035 "e" : Total Project Cost = Ratio h. Culvert Extension plus Associated Cost 1. Culvert Extension (from "e ") $ 16,550 2. Mobilization x ratio 315 3. Clearing and Grubbing x ratio 175 4. Unclassified Excavation x ratio 1,422 5. Unclassified Fill x ratio 43 6. Shoring x ratio 1,050 Total $ 19,555 Contingencies 58 978 Estimated 15% Engr. and Admin. 2,933 Total Cost $ 23,466 Note: Total culvert extension (plus associated cost) for Mesa Drive will be funded by the Orange County Development Agency. 1 • Page 3 of 4 III. "Single Barrel Extension ": Combination Channel /Single Box in lieu of Open Channel Unit uantit 1 Price2 Cost /Ft. a. Combination Channel /Single Box 1. Cubic yd. Portland Cement Concrete for Channel, per ft. 2. Cubic yd. P.C.C. for Box Culvert, per ft. 3. Lb. Bar Reinforcing Steel for Channel per ft. 4. Lb. Bar Reinforcing Steel for Box Culvert, per ft. 5. Cubic yd. Structural Backfill per ft. 6. Square yd. Filter Fabric per ft. Total Cost /ft. b. Open Channel (deduction) 1. Cubic yd. Portland Cement Concrete per ft. 2. Lb. Bar Reinforcing Steel per ft. 3. Cubic yd. Structure Backfill per ft. 4. Square yd. Filter Fabric per ft. Total Cost /ft. c. Cost Differential Between Open Channel and Channel/ Box ( "a " - "b ") d. Cost Differential x length of Channel/Box ( "c" x 353 ft.) e. Total Project Cost f. Cost differential x length (or "d ")s Total Project Bid = Ratio g. Cost differential plus associated cost 1. Cost differential ("d") 2. Mobilization x ratio 3.3 $130.00 /cy $ 429 5.1 $200.00 /cy 1,020 524 $ 0.40 /lb 210 550 $ 0.45/lb 248 2.83 $ 25.00 /cy 71 8.67 $ 2.00 /yd2 17 $ 1,995 5.8 $130.00 /cy $ 754 930 $ 0.40 /lb 373 2.90 $ 25.00 /cy 72 8.84 $ 2.00 /yd2 18 $ 1,217 $ 778 $ 274,634 $4,790,036 (5.738 =) 0.0573 $ 274,634 5,157 • • Page 4 of 4 Quantity 3. Clearing and Grubbing x ratio 4. Unclassified Excavation x ratio 5. Unclassified Fill x ratio 6. Shoring x ratio Total Contingencies 5% Estimated 158 Engr. and Admin. Total Cost h. Total cost to be distributed as follows: 1. Orange County Development Agency 2. John Wayne Airport 3. City of Newport Beach Total Unit Price 52.18 17.58 30.48 100.08 Cost/Ft. 2,865 23,275 700 17,190 $ 323,821 16,191 48,573 $ 388,585 202,453 68,002 118,130 $ 388,585 Note: Orange County Development Agency will advance City of Newport Beach's share of cost. City of Newport Beach will reimburse Development Agency for its pro rata share when Irvine Avenue is widened to a six -lane arterial highway adjacent to PROJECT. General Notes: 1. Unit quantities per linear foot of channel/box, are subject to verification based upon final pay quantity calculations. 2. Unit prices will be the actual contract unit price for the listed item; proration percentages will be adjusted accordingly, except under III.h. DU:mgPWD07 -20 7163