HomeMy WebLinkAboutC-2662 - Balboa Peninsula Seawall, Island Street to Adams StreetCIT�OF NEWPORT &ACH OFFICE OF THE CITY CLERK P.O. BOX 1768, NEWPORT BEACH, CA 92658 -8915 September 19, 1989 (714) 644 -3005 Ronald L. Harris Construction 1756 Pueblo Crest La Habra, CA 90631 subject: Surety: Merchants Bonding Company (Mutual) Bonds No.: CA111545 Contract No.: C -2662 Project: Balboa Peninsula Seawall - Island to Adams Street The City Council of Newport Beach on August 14, 1989 accepted the work of subject project and authorized the City Clerk to file a Notice of Completion and to release the bonds 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. The Notice was recorded by the Orange County Recorder on August 25, 1989, Reference No. 89- 456167. Sincerely,( rene Butler Assistant City Clerk IB:pm cc: Public Works Department 3300 Newport Boulevard, Newport Beach RECORDING REQUESTED BY AND WHEN RECORDED RETURN TO: EXEMPT RECORDING REQUEST PER* GOVERNMENT CODE 6103 City Clerk City of Newport Beach e 3300 Newport Boulevard EXEMPT ?F�,F Newport Beach, CA 92663 98 i4h �IB NOTTCF. OF COI PUBLIC WORKS 1. c. ;i 1i' 89 °456167 RE%J%1GO FIC1AL RECORDS OF ORAn LINTY, CAUFORNIA 3:00 AUG 2 5 1989 4 0-RECORDER 1 o All Laborers and Material Men and to Every Other Person Interested: YOU WILL PLEASE TAKE NOTICE that on May 26, 1989 the Public Works project consisting of Balboa PPninaula Cc^vall _ T-1..+.d t;e — Adams Street - Contract No. 2662 on which Ronald L. Harris Construction was the contractor, and Merchants Bonding Company (Mutual) _ was the surety, was completed. VERIFICATION I, the undersigned, say: CITY OF NEWPORT BFACH blic orke Director I am the Public Works Director of the City of Newport Beach; the foregoing Notice of Completion is true of my own knowledge. I declare under penalty of perjury that the foregoing is true and correct. Executed on August 24, 1.989 at Newport Beach, California. A Public Wbrks Director VERIFICATION OF CITY CLERK I, the undersigned, say: I am the City Clerk of the City of Newport Beach; the City Council of said City on August 14, 1989 accepted the above described work as completed and ordered that a Notice of Completion be filed. I declare under penalty of perjury that the foregoing is true and correct. Executed on August 24, 1989 at Newport Beach, California. i / /i/ %i ,i`!Li - • • • is TO: CITY COUNCIL FROM: Public Works Department f August 14, 1989 CITY COUNCIL AGENDA ITEM N0. F -11 BY iR' PITY COUNCIL CITY OFIcWPORT BEACII AUG 14 1989 _- APPRO :D - - - -. SUBJECT: ACCEPTANCE OF BALBOA PENINSULA SEAWALL, ISLAND AVENUE TO ADAMS STREET CONTRACT NO. 2662 RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the bonds 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. DISCUSSION: The contract for the construction of the subject project has been completed to the satisfaction of the Public Works Department. The Bid Price was $191,591.50 Amount of Unit Price Items constructed 199,049.75 Amount of Change Orders 11,118.20 Total Contract Cost $210,167.95 The increase in the amount of the unit price items constructed was due to the actual length of the wall being longer than shown on the estimate, and the replacement of approximately 10% more sidewalk. Two Change Orders were issued. The first, in the mount of $9,846.50, provided for the replacement of deteriorated street light conduit adjacent to the new wall. The second, in the amount of $1,271.70, provided for work around an existing water main, additional utility sleeves at the piers, and additional brick paving at the Alvarado Street end. Funds for the project were budgeted in the General Fund, Account No. 02- 4197 -427. The contractor is Harris Construction of La Habra. The contract date of completion was June 1, 1989. The work was completed by May 26, 1989. Benjamin B. Nolan Public Works Director PD:so a 06dpe"ra XA41to"94 303 East Edgewater Balboa, California 92661 OY TP.7 ,ITY COUNCIL C111( 'A NEWPORT BEAC12 FEB 13 1989 City Council jUj-jCjj Of crch Cis D�00 . ..... ....... os) v Maqzjg Address ,; , - > Dora Nell Hedrick 1537 East Harmony Lan- Pullirton, California (714) 871.2866 January 22-, 1839 Su'aJ--Ct Ealboa ',-eiainsu"la Se^. ,--.11 - !,-'L-.rd -.'-ve. to ?C.a= -)t. Derr City "ou--acil; Do rot- touch i-ni -io-�-Jerty -..-ithout my 1-)ormisollon. It is icy -,pier, my pro-1-erty and -y utility service lines. u i'ahinc- t' o u ' du.e co.- ei--cation, to the United .:D klates of AL. o---ic a's "c1l", tiltut-j. 0 --,1 10 u I,] -n.,.Tf u.1 "Fory RECEIVED AN 25 1989 CI ry CLERK CITY OF "EwPORT BEACH 707 7(f t alboa a- f ;-2 1_4 -71-23-66 r1 i --1 cc: 0 1 tu y t t 0 r 1710 y D C aate l I � Ii may' LN-aw 7* avanager o c-.,,�4ary Dir. 0 F6 & R Mr. ❑Fsa V13 v Ce!M M. Dir 43 MW i • CITY OF NEWPORT BEACH OFFICE OF THE CITY CLERK P.O. BOX 1768, NEWPORT BEACH, CA 92658 -8915 TO: FINANCE DIRECTOR FROM: CITY CLERK DATE: February 10, 1989 (714) 644 -3005 SUBJECT: Contract No. C -2662 Z - /D - JPy Description of Contract Balboa Peninsula Seawall Island Street to Adams Street Effective date of Contract February 9, 1989 Authorized by Minute Action, approved on January 23, 1989 Contract with Ronald L. Harris Construction Address 1756 Pueblo Crest La Habra, CA 90631 Amount of Contract $191,597.50 , " ` " 4�et Wanda E. Raggio City Clerk WER:pm Attachment 3300 Newport Boulevard, Newport Beach V • : 6;t� ua- NOTICE INVITING BIDS Sealed bids may be received at the office of the City Clerk, 3300 Newport Boulevard, P. 0. Box 1768, Newport Beach, CA 92658 -8915 until 11:00 a.m. on the 11th day of Januar_y__, 1988, at whic te us such bids sha7T be opened and read for BALBOA PENINSULA SEAWALL ISLAND STREET TO ADAMS STREET it e o Pro,Iect WON� ,V 2662 Contract No. $167,000.00 Engineer's Estimate .. \�� FOB Vow n Approved by the City Council this 12thday of December ., 1988. Wanda E. taggio City Clerk Prospective bidders may obtain one set of bid documents at no cost at the office of the Public Works Department, 3300 Newport Boulevard, P. 0. Box 1768, Newport Beach, CA 92658 -8915. For further information, call Stephen Luy at 644 -3311. ro ect Manager :- r • • PR 1.1 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT BALBOA PENINSULA SEAWALL ISLAND STREET TO ADAMS STREET 1988 -89 CONTRACT NO. 2662 PROPOSAL To the Honorable City Council City of Newport Beach 3300 Newport Boulevard P. 0. Box 1768 Newport Beach, CA 92658 -8915 Gentlemen: The undersigned declares that he has carefully examined the location of the work, has read the Instructions to Bidders, has examined the Plans and Special Provisions, and hereby proposes to furnish all materials and do all the work required to complete this Contract No. 2662 in accordance with the Plans and Special Provisions, and will take in full payment therefor the following unit price for the work, complete in place, to wit: ITEM QUANTITY ITEM-DESCRIPTION UNIT TOTAL NO. AND UNIT UNIT PRICE WRITTEN IN WORDS PRICE PRICE 1. Lump Sum Mobilization @ Ten Thousand ---------------- - - - - -- Dollars and No -------------------------------- - Cents $ 10,000.00 Per Lumo Sum •2. 1 Construct crub inlet per CNB Std. -305 -L Each @ Two Thousand and Three Hundred - - -- Dollars and No -------------------------------- - Cents $ 2,300.00 $ 2,300.00 Per Each 3. 78 Install 18" storm drain pipe Lineal Feet @ Thirty---------------------- - - - - -- Dollars and No -------------------------------- - Cents $ 30.00 $ 2,340.00 Per Lineal Foot A t o I U '\ i 7 f 00 N r o urt 4J 4J O ro U , J 34- H i •r •.- O •r yrY C •OO roa U L J ro V b OE 3 W r i U L O N Y +J 1.1 N r L N C r 4J p •�- •r i 0 •r 1 34 d O ro O i CD ,_ J u Oro N•O U ro L. N M C C C C Y tD tO yyma�/�g rn .�0 O N C L Y E r 1 w O 7 10 L U U r N N N 0 4J C L 'O 4- U•r y O L N 9 u N N C! C G M = aJ 4- to W Oy 4J 4a4J N C L i O N O o O c C T N O C N U r O C G C O L N to N O N•- O >a�io'u a' ar Y > E d P °1u 4- w O L _..1 - w •r N J L 7 i L N= A Cr d! 4J C 3 yY•r 2 o N ro E 3 u L v i 4 d r i C pO C ro +L0 to a = 3 4- 'p O. u G A 9 0 PR 1.2 ITEM QUANTITY ITEM DESCRIPTION UNIT TOTAL NO. AND UNIT UNIT PRICE WRITTEN IN WORDS PRICE PRICE 4. 1200 Construct PCC gravity retaining wall Lineal Feet @ One Hundred and Three------ - - - - -- -Dollars and No-------------------------- - - - - -- Cents $ 103.00 $ 123,600.00 Per Lineal Foot 5. 180 Remove and reconstruct existing brick Square Feet area Fifteen-------------------- - - - - -- -Dollars and No-------------------------- - - - - -- -Cents $ 15.00 $2,700.00 Per Square Foot 6. 8,850 Construct P.C.C. sidewalk per CNB Square Feet Std. -180 -L Four--- ------------------ -- - - - - -- -Dollars and Twenty- Five- ---------------- - - - - -- -Dents S 4.25 $ 37,612.50 Per Square foot 7. 440 Install 6" PVC sidewalk drain pipe Lineal Feet Twenty- Two----------------- - - - - -- -Dollars and No------------------------------- - -Dents $ 9,680.00 Per Ei r neal Foot $ 22.00 8. 7 Install 8" square sidewalk drain inlet Each Three Hundred & Twenty Five - - - - -- -Dollars and No------------------------------- - -Dents $ 325.00 $ 2,275.00 Per Each 9. 3 Construct PCC pipe anchor Each Two Hundred and Fifty------ - - - - -- -Dollars and No------------------------- - - - - -- -Lents $ 250.00 $ 750.00 Pe r ac • 0 PR 1.3 ITEM QUANTITY ITEM DESCRIPTION UNIT TOTAL NO. AND UNIT UNIT PRICE WRITTEN IN WORDS PRICE PRICE 10. 20 Construct 6" PCC curb Type B per Feet CNB Std.- 182 -L. @ Seventeen ------------------- - - - - -- Dollars and No ------------ -------------------- - Cents $ 17.00 Per Foot TOTAL PRICE WRITTEN IN WORDS One Hundred Ninety -One Thousand, Five Hundred Ninety- Seven ---------------------- - - - - -- Dollars and Fifty--------------------- ------- --- -- --------- - - - - -- - Cents January 11, 1989 Date 213 - 694 -3070 Bidder's Telephone Number Ronald L. Harris Construction s /Ronald Harri! thorized Signa [; 375146 A - B 1756 Pueblo Crest - La Habra Contractor's License No. & C asst ication Bidder's Address $340.00 $ 191,597.50 Page 2 INSTRUCTIONS TO BIDDERS Attached are samples of Certificate of Insurance and Endorsement documents (pages 12, 13 and 14) which shall be completed and executed by the successful bidder after he receives a letter of award from the City of Newport Beach. Since the City of Newport Beach will not permit a substitute format for the attached Certificate of Insurance and Endorsement documents, bidders are advised to review their content with insuring and legal agents prior to submission of bid. The successful bidder shall also supply a payment bond and a faithful performance bond before a purchase order is issued by the City. BONDING COMPANIES shall be acceptable as sureties in accordance with the latest revision of Federal Register Circular 570. Bids shall not be received from bidders who are not licensed in accordance with the provisions of Chapter 9, Division III of the Business and Professions' Code. The low bidder shall also be required to possess a City of Newport Beach business license prior to issuance of a purchase order. Bids shall be submitted on the attached PROPOSAL form. The additional copy of the PROPOSAL form may be retained by the bidder for his records. The estimated quantities indicated in the PROPOSAL are approximate, and are given solely to allow the comparison of bid totals. Bids are to be computed upon the estimated quantities indicated in the PROPOSAL multiplied by unit price submitted by the bidder. In the event of discrepancy between wording and figures, bid wording shall prevail over bid figures. In the event of error in the multiplication of estimated quantity by unit price, the correct multiplication will be computed and the bids will be compared with correctly multiplied totals. The City shall not be held respon- sible for bidder errors and omissions in the PROPOSAL. Contract documents shall bear signatures and titles of persons authorized to sign on behalf of the bidder. For corporations, the signatures shall be of the President or Vice- President. For partnerships, the signatures shall be of a general partner. For sole ownership, the signature shall be of the owner. In accordance with the California Labor Code (Sections 1770 et seq.), the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages in the locality in which the work is to be performed for each craft, classification, or type of workman or mechanic needed to execute the contract. A copy of said determination is available in the office of the City Clerk. All parties to the contract shall be governed by all provisions of the California Labor Code relating to prevailing wage rates (Sections 1770 -7981 inclusive). The Contractor shall be responsible for compliance with Section 1777.5 of the California Labor Code for all apprenticeable occupations. 375146 A - B Contr's Lic. No. & Classification_ 1/11/89 15ate ut orize ignature Tit I e 1 • Page 3 DESIGNATION OF SUBCONTRACTORS State law and /or City Specifications require the listing of all subcontractors who will perform work in an amount in excess of one -half of one percent of the prime contractor's total bid. If a subcontractor is not listed, the prime contractor will be responsible for performing of that portion of the work. Substitution of subcontractors shall be made only in accordance with State law and /or the Standard Specifications for Public Works Construction, as applicable. The bidder, by signing this designation, certifies that bids from the following subcontractors have been used in formulating the bid for the project and that these subcontractors will be used subject to the approval of the Engineer and in accordance with the applicable provisions of the City's Specifications. Subcontract Work Subcontractor Address 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. :.�. VOMM42M .� .� wner Aut orized Signature Tit le BIDDER'S BOND KNOW ALL MEN BY THESE PRESENTS, Page 4 That we, Harris Construction , as bidder, and Merrhants and firmly bound Tan Percent of lawful money of be made, we bind THE CONDITION OF Bonding Company (Mutual) unto the City of Newport the Total Amount Bid the United States for the ourselves, jointly and s THE FOREGOING OBLIGATION , as Surety, are held Beach, California, in the sum of Dollars ($ (10 %) ), payment of which sum well and truly to ?verally, firmly by these presents. IS SUCH, That if the proposal of the above bounden bidder for the construction of Ralhoa Peninsual Seawall Island Street to Adams Street 2662 Title o Project Contract No. in the City of Newport Beach, is accepted by the City Council of said City, and if if the above bounden bidder shall duly enter into and execute a contract for such construction and shall execute and deliver to said City the "Payment" and "Faithful Performance" contract bonds described in the Specifications within ten (10) days (not including Saturday, Sunday, and Federal holidays) from the date of the mailing of contract documents for execution to the above bounden bidder by and from said City, then this obligation shall become null and void; otherwise it shall be forfeited to the said City. In the event that any bidder above named executed this bond as an individual, it is agreed that the death of any such bidder shall not exonerate the Surety from its obligation under this bond. IN WITNESS WHEREOF, we hereunto set our hands and seals this 10th day Of Ja,,,,ar.y , 19 -a. (Attach acknowledgment of Attorney -in -Fact) Federico No ary ub is Commission Expires: 1n -lg -gn Harris Construction Bidder s Ronald Harris Authorize Signature Title Merchants Bonding Company (Mutual) Surety BY: Jeffrey R. Gryde Title: Attorney -in -Fact 0 0 NON - COLLUSION AFFIDAVIT The bidder, by its officers and agents or representatives present at the time of filing this bid, being duly sworn on their oaths, say that neither they nor any of them have, in any way, directly or indirectly, entered into any arrange- ment or agreement with any other bidder, or with any public officer of such CITY OF NEWPORT BEACH whereby such affiant or affiants or either of them, has paid or is to pay to such bidder or public officer any sum of money, or has given or is to give to such other bidder or public officer anything of value whatever; or such affiant or affiants or either of them has not directly or indirectly, entered into any arrangement or agreement with any other bidder or bidders, which tends to or does lessen or destroy free competition in the letting of the contract sought for by the attached bids; that no bid has been accepted from any subcontractor or materialman through any bid depository, the bylaws, rules or regulations of which prohibit or prevent the bidder from con- sidering any bid from any subcontractor or materialman which is not processed through said bid depository, or which prevent any subcontractor or materialman from submitting bids to a bidder who does not use the facilities of or accept bids from or through such bid depository; that no inducement of any form or character other than that which ap ^ears upon the face of the bid will be sug- gested, offered, paid or delivered to any person whomsoever to influence the acceptance of the said bid or awarding of the contract; nor has the bidder any agreement or understanding of any kind whatsoever with any person whomso- ever to pay, deliver to, or share with any other person in any way or manner, any of the proceeds of the contracts sought by this bid. Harris Construction Bidder s /Ronald Harris, Owner Authorized Signature /Title Subscribed and sworn to before me this Ze z�(_ day of Zed 19 , �. My commission expires: i Notary Public Page 5 nF =1CiAL SEAL m;l JEANiE77E A. FEDERICO o Nowy Public - -California ORANGE COUNTY -✓ My Comm i Oct. 19, 1990 Page 5 0 0 Page 6 TECHNICAL ABILITY AND EXPERIENCE REFERENCES The undersigned submits herewith a statement of the work of similar character to that proposed herein which he has performed and successfully completed. Year Completed For Whom Performed (Detail) Person to Contact Telephone No. Ronald L. Harris Construction Bidder s /Ronald Harris /Owner Authorize d Signature/Title r NOTICE s - 0 The following are contract documents which shall be completed and executed by the successful bidder after he receives a letter of award from the City of Newport Beach: PAYMENT BOND (pages 8 & 9) FAITHFUL PERFORMANCE BOND (pages 10 & 11) CERTIFICATE OF INSURANCE & ENDORSEMENTS (pages 12, 13, 14) CONTRACT (pages 15 & 16) The City of Newport Beach will not permit a substitute format for these contract documents. Bidders are advised to review their content with bonding, insuring and legal agents prior to submission of bid. BONDING COMPANIES shall be acceptable as sureties in accordance with the latest revision of Federal Register Circular 570. INSURANCE COMPANIES shall be (1) licensed to conduct business in California, and (2) assigned Policyholders' Rating A (or higher) and Financial Size Category Class VIII (or larger) in accordance with the latest edition of Best's Key Rat in Guide: Pro ert - Casualty. Coverages shall be prove ed or a YPES OF N URANCE checked on the CERTIFICATE OF INSURANCE. All costs associated with the specifications of these contract documents shall be absorbed in the bid. Such specifications shall include those contained in (1) each contract document and (2) the Standard S ec ications for Public Works Construction (latest edition a opted or use in the City ot Newport Beach), except as supplemented or modified by the Special Provisions for this project. Page 7 EXECUTED IN FOUR (4) COUNTERPARTS Page 8 PAYMENT BOND Bond No. CA111545 Premium: Included in the Perf. Bond KNOW ALL MEN BY THESE PRESENTS, That WHEREAS, the City Council of the City of Newport Beach, State of California, by motion adopted January 23, 1989 has awarded to Harris Construction hereinafter designated as the "Principal ", a contract for Balboa Peninsula Seawall Island Street to Adams Street (C -2662 in the City of Newport Beach, in strict conformity with the Drawings and Specifications and other contract documents in the office of the City Clerk of the City of Newport Beach; WHEREAS, said Principal has executed or is about to execute said contract and the terms thereof require the furnishing of a bond with said contract, providing that if said Principal or any of his or its subcontractors, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the work agreed to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same to the extent hereinafter set forth: NOW, THEREFORE, We Harris Construction as Principal, and Merchants Bonding Company (Mutual) as Surety, are held firmly bound unto the City of Newport Beach, in the sum of One Hundred Ninety One Thousand, Five Hundred Ninety Seven and - - -50 /100 Dollars ($ 191,597.50 ), said sum being equal to 100% of the estimated amount payable by the City of Newport Beach under the terms of the contract; for which payment well and truly made., we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the above bounden Principal or his subcontractors, fail to pay for any materials, provisions, or other supplies, used in, upon, for, or about the performance of the work contracted tob be done, or for any other work or labor thereon of any kind or for amounts due under the Unemployment Insurance Code with respect to such work or labor, that the Surety or Sureties will pay for the same, in an amount not exceeding the sum specified in the bond, and also, in case suit is brought upon the bond, a reasonable attorney's fee, to be fixed by the Court as required by the provisions of Section 3250 of the Civil Code of the State of California. : •,:, y 0 0 Page 9 Payment Bond (Continued) The bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Section 3181 of the California Civil Code so as to give a right to them or their assigns in any suit brought upon this bond, as required by the provisions of Sections 3247 et. seq. of the Civil Code of the State of California. And said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alterations or additions to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any wise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alterations or additions to the terms of the contract or to the work or to the specifications. In the event that any principal above named executed this bond as an individual, it is agreed that the death of any such principal shall not exonerate the Surety from its obligations under this bond. IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named, on the _j1 day of January , 1989 . Harris Construction (Seal) Name of Contractor (Principal) Authorized Signaturee and Title Authorized Signature and Title Merchants Bonding Company (Mutual) (Seal) Name of Surety P. O. Box 880287 San Diego, CA 92108 - 0006 Address OT Surety ; 5)"t e dqd it title Authorized Agent Jeffrey R. Gryde, Attorney -in -Fact Address of Agent (714) 250 -9129 Telephone No. of Agent ! 0 � . \ ( ID / {k % k kJ§ f k)0 $ CL } E j § \ @ k f, } {, %� /\_\c!k \ 2k ��` \ f ] ■� ƒ /z _ \k\ 0 { § §f \ \ f /,\3kaK! cc \ X222!§ _ E /\ \\ \ } !7777 |0 f 2¥ ! ! ( E a u $ fE om022` z 0 :E k§ CD � \ \)jCL k w kƒ } � �/ \ \°| \ - } \\ @ [ \/� \\ . } } / \} ~ \ \ / z . \ / / ! ° fa 3 a \ 2�} � � MERAANTS BONDING COMPANY MUTUAL — DES MOINES, IOWA POWER OF ATTORNEY Know AN Men By These Presents• that the MERCHANTS BONDING COMPANY (Mutual), a corporation duly organized under the laws of the State of Iowa. and having Its Principal office In the City of Des Moines, County of Pak, State of Iowa, halh made, constituted and appointed, and does by these presents make, constitute and appoint Jeanette A. Federico, and Jeffrey R. Gryde of Orange and State a California its true and lawful Attorney- A-Fact, with lull power and autterity, hereby conferred In Its name, place and stead, to sign, execute, acknowledge and deliver M its behalf as surety: Any and all bonds and undertakings in its normal course of business, provided no'&e bond or undertaking shall exceed the sum of Five Hundred Thousand dollars and 00 /100 ($500,000) and to bind the MERCHANTS BONDING COMPANY (Mutual) thereby as fully and to the same extent as R such bond or undertaking was NOW by the duty authorized oftims of the MERCHANTS BONDING COMPANY (Mutual), and all the acts of said Attorney, pursuant to the authority herein given, are hereby ratified and confirmed. This Power- ol•Atomey Is made and executed pursuant to and by authority of the following By-Laws adopted W the Board of Directors of the MERCHANTS BONDING COMPANY (Mutual). ARTICLE 2, SECTION 6A. — The Chairman of the Board or President or any Vice President or Secretary shall have power and authority to appoint Attomeys•In•Fad, and to authorize them to execute on behalf of to Company, and attach the seal of the Company thereto, bonds and undertakings, reoognizanae, contracts of indemnity, and other writings obligatory in the nature thereof. ARTICLE 2, SECTION 68. — The signature of any authorized officer and the Seal of the Company may be affixed by facsimile to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed. In Witness Whereof, MERCHANTS BONDING COMPANY (Mutual) has casedtheso presents to be sinned by is Vice Presidgltiand Executive Vice President, and is rate seal to be hereto affixed, this day 6 h of July .t�v.A...D'.'. 1913, Attest: MERCHANTS BOhIpIILI(jty. t&M._Y (Mutual) BY -e_ sea. ch.w.m -.-+'�,• • � Pn.Wan STATE OF IOWA •••,•i•••••• COUNTY OF POLK d, On" 6th day of JU�y 19 87 . baton me appealed M.J. Lag and Rodney Bliss III, to me personally known, who being 69 me duly sworn did say that they are Vice President and ExecWve Vice President respectively of the MERCHANTS BONDING COMPANY (Mutual), the corporation described in the foregoing kebumant, and that the Seal affixed to the said Instrument is the Corporate Seal of the $aid Corporation and that the said Instrument was signed and seated In behalf of said Corporation by authority of its Board of Directors. M Testkrony Whereof, l have hereunto set my hand and affixed my Otfdel Seal, at the CRY of Des Moines. Iowa the day and yew first above written. • ' Ch : Nate Puck. ro+ csr.rx b.• IOWA i m ant rxn•rY••iwh Eq— 8-4-89 :��r•'•.....:'1rr STATE OF IOWA •, �Rt A� s COUNTY OF POLK s. I, M.J. Lag, Vice President of the MERCHANTS BONDING COMPANY (Mutual), do hereby c9 grilwitV above and foregoing Is a true and owned copy of the POWER OF ATTORNEY, executed b "DING COMPANY (Mutual). which is still in force elf filled. , In Witness Whereof. I have hereunto fill my had and affixed the seal of the Company, at 41$ 4b A'^ =�S t� 31st days January t9, 89 j° • !L:'t ' c_ Until Revoked This power of atlor ey expires •.�j�,• • •„ EXECUTED IN FOUR (4) *NTERPARTS Page 10 FAITHFUL PERFORMANCE BOND Bond No. CA111545 Premium: $3,874.00 KNOW ALL MEN BY THESE PRESENTS, That WHEREAS, the City Council of the City of Newport Beach, State of California, by motion adopted January 23 1989 has awarded to _ Harris rnnstrurtinn hereinafter designated as the "Principal% a contract for Balboa Peninsula Seawall Tsland Ctrppt to Adam ctraat in the City of Newport Beach, in strict conformity with the Drawings and Specifications and other contract documents in the office of the City Clerk of the City of Newport Beach; WHEREAS, said Principal has executed or is about to execute said contract and the terms thereof require the furnishing of a bond for the faithful performance of said contract; NOW, THEREFORE, We Harris Construction as Principal, and Merchants Bonding Company (klutual) as Surety, are held firmly bound unto the City of Newport Beach, in the sum of One Hundred Ninety One Thousand, Five Hundred Ninety Seven and - -50 /100 Dollars ($191,597.50 ), said sum being equal to 100% of the estimated amount of the contract, to be paid to the said City or its certain attorney, its successors, and assigns; for which payment well and truly made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the above bounden Principal, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well keep truly and perform the covenants, conditions, and agreements in the said contract and any alteration thereof made as therein provided on his or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City of Newport Beach, its officers and agents, as therein stipulated, then this obligation shall become null and void; otherwise it shall remain in full force and virtue. And said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alterations or additions to the terms of the contract Page 11 Faithful Performance Bond (Continued) or to the work to be performed thereunder or to the specifications accompanying the same shall in any wise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alterations or additions of the contract or to the work or to the specifications. In the event that the principal above named executed this bond as an individual, it is agreed that the death of any such principal shall not exonerate the Surety from its obligations under this bond. IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named, on the i 1st day of January , 19 89. Harris Construction (Seal) Name of ontractor (Principal) Authoriz�7e 5ignat' ure and Tit I e Authorized Signature and Title Merchants Bonding Com an (Mutual) 15ea1) Name o Surety P. O. Box 880287 San Die o CA 92108 - 0610.6 - Address OT S—uzrefy- /TTjqe-aqaZ1t1e of Authorized Agent Jeffrey R. Gryde, Attorney -in -Fact Address of Agent (714) 250 -9129 Telephone No. of Agent ! ■ � \ _ \ § Eko % \ k § //k ` I 2 ! ■ % k ! @ \ CL �k .k��m $ k�0 \k{ k �4 (D :E 0 0 \ rd kcZk(D. \ ` \3 \�j03t \ a%`m % $ & ��-P § #a ■§m {!J }2)�\4w ® | 0 { k \ i / )E oww16 E ®\ -' k2 / / {aCL 2 k f\ 2% & \ ■ \ � { � \ \ \ / o \ \ -4 LU } \ C4-Fv- 0 ƒ \ §� MERCANTS BONDING COM &Y - MUTUAL -- DES MOINES, IOWA POWER OF ATTORNEY Know All Men By These Presents, that the MERCHANTS BONDING COMPANY (Mutual), a corporation duly organized under the laws of the State of Iowa, and having its principal elks in the City of Des Moines, County of Polk, State of Iowa, hath made, constituted and appunted, and does by these presents make, constitute and appoint Jeanette A. Federico, and Jeffrey R. Gryde of Orange and State of California cis true and lawful AttomeyAn -Fact, with full power and authority hereby conferred in he name, place and stead, to so. execute, acknowledge and deliver in its belied as surety: Any and all bonds and undertakings in its normal course of business, provided no bne bond or undertaking shall exceed the sum of Five Hundred Thousand dollars and 00 /100 ($500,000) and to bind the MERCHANTS BONDING COMPANY (Mutual) thereby as fully and to the same extent as if such bond or undertaking was signed by the duty authorized officers of the MERCHANTS BONDING COMPANY (Mutual), and all the acts of said Attorney. pursuant to the authority herein given, are hereby ratified and confirmed. This Power -of- Attorney is made and executed pursuant to and by authority of the following By -Laws adopted by the Board of Directors of the MERCHANTS BONDING COMPANY (Mutual). ARTICLE 2, SECTION 6A. — The Chairman of the Board or President or any Vice President or Secretary shall have power and authority to appoint Attorneys- in -Facl, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, reoognizances, contracts of indemnity and other writings obligatory in the nature thereof. ARTICLE 2, SECTION 6B. — The signature of any authorized officer and the Seal of the Company may be affixed by facsimile to any Power of Attorney of Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shad have the same face and effect as though manually fixed. In Witness Whereof, MERCHANTS BONDING COMPANY (Mutual) has caustag t ese presents to be by its Vice Presidgn,and Executive Vxxr President, and its corporate seal to be hereto affixed, this day with of July A.D.. 19B y Attest: MERCHANTS BOryp11WW¢i/f fhtJY (Mutual) By _e_ rk. F,.tlC.nn •. –Y�,• • •�.vciilPTghi vnsa.,x STATE OF IOWA '•••... •..•• COUNTY OF POLK o. On this 6th day of Jul fig 87 , before me appeared M.J. Long and Rodney Bliss III, to me personally known, who being bp duly sworn did say that they are Vice President and Executive Vice President respectively of the MERCHANTS BONDING COMPANY (Mutual), the corporation described in the Wregoing instrument, and that the Seal affixed to the said Instrument is the Corporate Seal of the said Corporation and that the said Instrument was signed and seated in behalf of said Corporation by authority of its Board of Directors. In Testimony Whereof, I have hereunto set my hand and affixed my, Official Seal, at the City of Des Manes, Iowa the day and year first above written. G. BAV •, • t 7 IOWA c m •• STATE OF IOWA COUNTY OF POLK w. f, M.J. Long, Vbe President of the MERCHANTS BONDING COMPANY (Mutual), do foregoing is a true and correct copy of the POWER OF ATTORNEY, executed by COMPANY (Mutual), which is still in force and effect. In VNtase whered. 1 have hereunto set my hand and affixed the seal of the Company, at this 31st dayof January 19, 89 This power of atbrney axon Until Revoked ir MY c 13pv= 8-4-89 *RTIFICATE OF INSURANCE I City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 NAME AND ADDRESS OF INSURED R LJ E COMPANIES AFFORDING A American States B C 9 ny E Page 12 nis is to certify that policies of insurance listed below have been issued to the insured named above and are in force at this time, including attached endorsement(s). )MPANY TYPES OF INSURANCE Policy Policy Exp. LIMITS OF LIABILITY IN THOUS N S 000 g. ro uc s :TTER COVERAGE REQUIRED No. Date Each Completed Occurrence 0 erations A GENERAL LIABILITY x Comprehensive Form x Premises - Operations X Explosion & Collapse Hazard C 3668 3 -1 2/14/9 Bodily Injury Y ur Y Property Damage $ $ $ $ x Underground Hazard x Products /Completed Operations Bodily Injury Hazard x Contractual Insurance and Property Damage Combined $ 1,000 $ 1,000 x Broad Form Property Damage x Independent Contractors X Personal Injury Marine Personal Injury 1,000, $ 1,000 Aviation A AUTOMOTIVE LIABILITY ❑x Comprehensive Form CC3030 61 Bodily Injury Each Person $ n Owned 2/14/9 $ o y niury Each Occurrence n Hired ProeertX Damage Non -owned Bodily Injury and Property Damage Combined $ 1,000 EXCESS LIABILITY ❑ Umbrella Form Bodily Injury ❑ Other than Umbrella Form and Property Damage Combined $ $ WORKERS' COMPENSATION Statutor and EMPLOYER'S LIABILITY JkLach Accident) )TE: The Comprehensive General Liability and Automotive Liability policies are endorsed with the attached City of Newport Beach Endorsements. :NCELLATION: Should any of the above described policies be cancelled or coverage reduced before the expiration date thereof, the -Insurance Company affording coverage shall provide 30 days' advance notice to the City of Newport Beach by registered mail, attention: Public Works Department. is Agency: PACIFIC INSURANCE AGENCY or z d ReprE60tative ate: California % Telephone: (714) 250 -4120 ?scription of operations /locations /vehicles: All operations performed for the City of Newport each by or on behalf of the named insured in connection with the following designated contract: Balboa Peninsula Seawall Island Street to Adams Street (C -2662) e um er )TICE: This certificate or verification of nsurance is not an insurance po i.cy and does not amend, extend or alter the coverage afforded by the policies listed herein. 'Notwith- standing any requirement, term, or condition'of any contract or other document with respect to which this certificate oh verification of insurance may be issued or may pertain, the insurance afforded by the policies described herein is subject to all the terms, exclusions and conditions of such policies, including attached endorsements. . • Page 13 CITY OF NEWPORT BEACH AUTOMOTIVE LIABILITY INSURANCE ENDORSEMENT It is agreed that: a With respect to such insurance as is afforded by the policy for Bodily Injury and Property Damage Liability, the City of Newport Beach, its officers and employees are additional insureds but only with respect to liability for damages arising out of the ownership, maintenance or use of automobiles (or autos) used by or on behalf of the named insured in connection with the contract designated below. The insurance extended by this endorsement to said additional insured does not apply to bodily injury or property damage arising out of automobiles (1) owned by or registered in the name of an additional insured, or (2) leased or rented by an additional insured, or (3) operated by an additional insured. The insurance afforded the additional named insured(s) shall apply as primary insurance and no other insurance maintained by the City of Newport Beach will be called upon to contribute with insurance provided by this policy. 2. The policy includes the following provision: "The insurance afforded by the policy applies separately to each insured who is seeking coverage or against whom a claim is made or suit is brought, except with respect to the limits of the Insurance Company's liability." 3. The limits of liability under this endorsement for the additional insureds named in paragraph 1 of this endorsement shall be the limits indicated below for either Multi- ple Limits or Single Limit, whichever is indicated by the letter X in the appropriate box. ( ) Multiple Limits Bodily Injury Liability Property Damage Liability (XX) Single Limit Bodily Injury Liability and Property Damage Liability Combined $ each occurrence $ each occurrence $ 11000,000 each occurrence The limits of liability as stated in paragraph 3 of this endorsement shall not in- crease the total liability of the Insurance Company for all damages as the result of any one accident or occurrence in excess of the limits of Liability stated in the policy as applicable to Automobile Liability Insurance. 4. Should the policy be cancelled or coverage reduced before the expiration date thereof, the Insurance Company shall provide 30 days' advance notice to the City of Newport Beach by registered mail, Attention: Public Works Department. 5. Designated Contract: Balboa Peninlll Island Street to Adams Street (C -2662) (Pro ect t e and Contract o. . This endorsement is effective 1/30/89 at 12:01 A.M. and forms a part of Policy No. CC3030761 Named Insured Ronald L. Harris ,f�ndorsement No. TBD Name of Insurance Compapy_American States ve • 0 Page 14 CITY OF NEWPORT BEACH COMPREHENSIVE GENERAL LIABILITY INSURANCE ENDORSEMENT it is agreed that: With respect to such insurance as is afforded by the policy for Comprehensive General Liability, the City of Newport Beach, its officers and employees are additional in- sureds but only with respect to liability arising out of operations performed by or on behalf of the named insured in connection with the contract designated below or acts and omissions of the City of Newport Beach in connection with its general supervision of such operations. The insurance afforded said additional insured shall apply as primary insurance and no other insurance maintained by the City of Newport Beach will be called upon to contribute with insurance provided by this policy. 2. The policy includes the following provision: "The insurance afforded by the policy applies separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the Insurance Company's liability." 3. The insurance afforded by the policy for Contractual Liability Insurance (subject to the terms, conditions and exclusions applicable to such insurance) includes liability assumed by the named insured under the indemnification or hold harmless provision con- tained in the written contract, designated below, between the named insured and the City of Newport Beach. 4. With respect to such insurance as is afforded by this policy, the exclusions, if any, pertaining to the explosion hazard, collapse hazard and underground property hazard (commonly referred to as "XCU "hazards) are deleted. 5. The limits of liability under this endorsement for the additional insured named in paragraph I of this endorsement shall be the limits indicated below for either Multiple Limits or Single Limit, whichever is indicated by the letter X in the appropriate box. ( ) Multiple Limits Bodily Injury Liability Property Damage Liability (X1 Single Limit H each occurrence $ each occurrence Bodily Injury Liability $ 1.000_o00 each occurrence and Property Damage Liability Combined The applicable limit of the Insurance Company's liability for the insurance afforded for contractual liability shall be reduced by any amount paid as damages under this endorsement in behalf of the additional insureds. The limits of liability as stated in this endorsement shall not increase the total liability of the Insurance Company for all damages as the result of any one occurrence in excess of the limits of liability stated in the policy as applicable to Comprehen- sive General Liability Insurance. 6. Should the policy be cancelled or coverage reduced before the expiration date thereof, the Insurance Company shall provide 30 days' advance notice to the City of Newport Beach by registered mail, Attention: Public Works Department 7. Designated Contract: Balboa Project t e an Contract No. s This endorsement is effective 1/30/89 at 12:01 A.M. and forms a part of Policy No. CC3668431 Named Insured Ronald L. Harris Endorsement No. TBD Name of Insurance Company American States By� 0 0 Page 15 CONTRACT THIS AGREEMENT, entered into thi$d day of 19 by and between the CITY OF NEWPORT BEACH Xreinafter "City," and _No hereinafter "Contractor," is made with reference to the ollowing acts: (a) City has heretofore advertised for bids for the following described public work: Balboa Peninsula Seawall Island Street toAdamc et re - T tt e o Project ontract No. (b) Contractor has determined by City to be the lowest responsible bidder on said public work, and Contractor's bid, and the compensation set forth in this contract, is based upon a careful examination of all plans and specifi- cations by Contractor, NOW, THEREFORE, the parties hereto agree as follows: 1. Contractor shall furnish all materials and perform all of the work for the construction of the following described public work: Balboa Peninsula Seawall Island Street to Adams Street C -2662 Title of Project Contract No. which project is more fully described in the contract documnts. Contractor shall perform and complete this work in a good and workmanlike manner, and in accordance with all of the contract documents. 2. As full compensation for the performance and completion of this work as prescribed above, City shall pay to Contractor the sum of One Hundred and Ninety One Thousand Five Hundred Ninety Seven and 50/100 - - - -- {$191,597.50 This compensation includes (1) any loss or damage arising from the nature of the work; (2) any loss or damage arising from any unforeseen difficulties or obstructions in the performance of the work; (3) any expense incurred as a result of any suspension or discontinuance of the work; but excludes any loss resulting from earthquakes of a magnitude in excess of 3.5 on the Richter Scale and tidal waves, and which loss or expense occurs prior to acceptance of the work by City. 3. All of the respective rights and obligations of City and Contractor are set forth in the contract documents. The contract documents are incor- porated herein by reference as though set out in full and include the following: (a) Notice Inviting Bids (b) Instructions to Bidders and documents referenced therein (c) Payment Bond (d) Faithful Performance Bond (e) Certificate of Insurance and Endorsement(s) Page 16 (f) Plans and Special Provisions for e (g) This Contract. 4. Contractor shall assume the defense of, and indemnity and hold harmless, City and its officers, employees and representatives from all claims, loss or damage, except such loss or damage proximately caused by the sole negligence of City or its officers, employees and representatives. IN WITNESS WHEREOF, the parties hereto have caused this contract to be executed the day and year first above written. CITY OF NEWPORT BEACH i ��� ay ATTEST: CITY Ce os-r -a " #-✓ ae v o c o ntra„ t e Prin'fi pal Aut orTi izedsigna ure an Tie Authorized Signature and Title M,f, ,1 1!.I, CITY Ce os-r -a " #-✓ ae v o c o ntra„ t e Prin'fi pal Aut orTi izedsigna ure an Tie Authorized Signature and Title CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT INDEX SPECIAL PROVISIONS FOR BALBOA PENINSULA SEAWALL ISLAND STREET TO ADAMS STREET 1988 -89 CONTRACT NO. 2662 SECTION PAGE I. SCOPE OF WORK . . . . . . . . . . . . . . . . . 1 II. CLASSIFICATION OF CONTRACTOR'S LICENSE . . . . 1 III. AWARD AND EXECUTION OF CONTRACT. . . . . . . . 1 IV. TIME OF COMPLETION AND WORK SCHEDULE . . . . . 1 V. PAYMENT . . . . . . . . . . . . . . . . . . . . 2 VI. CONSTRUCTION SURVEY STAKING. . . . . . . . . . 2 VII. WATER . . . . . . . . . . . . . . . . . . . . . 2 VIII. SURFACE AND GROUNDWATER CONTROL. . . . . . . . 2 IX. STORM DRAIN . . . . . . . . . . . . . . . . . . 2 A. Materials. . . . . . . . . . . . . 2 B. A.C.P. Installation. . . . . . . . . . . . 2 X. UTILITIES . . . . . . . . . . . . . . . . . . . 3 XI. SLUICE GATE . . . . . . . . . . . . . . . . . . 3 XII. BRICK AREA . . . . . . . . . . . . . . . . . . 3 XIII. PRIVATE PIERS . . . . . . . . . . . . . . . . . 3 • SP1of 3 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT SPECIAL PROVISIONS FOR BALBOA PENINSULA SEAWALL ISLAND STREET TO ADAMS STREET CONTRACT NO. 2662 I. SCOPE OF WORK The work to be done under this contract consists of construction of sidewalk, roadway, gravity retaining wall, curb and gutter, storm drains, and curb inlets. All work necessary for the completion of this contract shall be done in accordance with (1) these Special Provisions, (2) the Plans (Drawing No. H- 5123 -S), (3) the City's Standard S ecia1 Provisions and Standard Draw in s for Public Works Construction, 988 Edition, and (4) the Standard pec1 cations for Public Works Construction, 1988 Edition. Copies of the Standard Specifications may be purchased from Building News, Inc., 3055 Overland Avenue, Los Angeles, California 90034, telephone (213) 870 -9871. Copies of the Standard Special Provisions and Standard Drawings may be purchased at the Engineer's office for $5 each. II. CLASSIFICATION OF CONTRACTOR'S LICENSE At the time of the award, the Contractor shall possess a General Engineering Contractor 'A' License or a Concrete Speciality Contractor C -8 License. III. AWARD AND EXECUTION OF THE CONTRACT The bidder's attention is directed to the provisions of Section 2 -1 of the Standard Special Provisions for requirements and conditions concerning award anTexecution o the contract. IV. TIME OF COMPLETION AND WORK SCHEDULE The Contractor shall complete all work within sixty (60) consecutive calendar days after commencing work, but no later than June 1, 1989. No work shall begin until a schedule of work has been approved by the Engineer. V. PAYMENT SP 2 of 3 The unit or lump sum price bid for each item of work shown on the Proposal shall be considered as full compensation for all labor, equipment, materials, and all other things necessary to complete the work in place, and no addi- tional allowance will be made therefor. Payment for incidental items of work not separately provided for in the pro- posal shall be included in the unit price bid for each item of work. Partial payments for Bid Item No. 1 shall be made in accordance with Section 10264 of the California Public Contract Code. The substitution of securities for any payment withheld in accordance with Section 9 -3.2 of the Standard Specifications is permitted pursuant to Government Code Sections 4590 and 14402 -5. VI. CONSTRUCTION SURVEY STAKING Field staking for control of construction will be provided by the Engineer. VII. WATER If the Contractor desires to use City's water, he shall arrange for a meter and tender a $500 meter deposit with the City. Upon return of the meter in good condition to City, the deposit will be returned to the Contractor, less a quantity charge for water usage. VIII. SURFACE AND GROUNDWATER CONTROL Groundwater will be encountered in the project area. The Contractor will be responsible for providing, installing, maintaining and operating a dewatering system in the project area. Groundwater or surface runoff water containing mud, silt or other deleterious material due to the construction of this project shall be treated by filtration or retention in settling basin(s) sufficient to present such material from migrating into the bay. XI. STORM DRAIN A. Materials The Contractor shall use asbestos cement pipe materials. B. A.C.P. Installation A.C.P. laying shall be performed in accordance with the recommendations of the manufacturer. Care shall be used to prevent damage in handling, moving, and placing the pipe. It shall not be dropped, dragged, nor handled in such a manner as to cause scratches, bruises, cracks, or chips. Power driven saws with abrasive discs shall not be used for dry cutting or beveling asbestos cement pipe. Asbestos cement chips and cuttings from the field operations shall be disposed of in a manner that will not contribute airborne asbestos dust to the atmosphere. n U 0 SP 3 of 3 Loose material shall never be dry swept. Water or other dust suppressants shall be applied in those circumstances where sweeping is unavoidable. X. UTILITIES During construction City forces will replace existing street light conduit and wiring where necessary. The Contractor shall cooperate with City forces and allow sufficient time for the replacement of any wiring and conduit. Most piers are served with water, power and /or telephone from the adjacent residence. The Contractor shall be responsible for capping or disconnecting such services at the property line prior to excavating for the seawall. The Contractor shall install a 3" PVC sleeve through the seawall to allow the property owner to reinstall his utilities. The Contractor shall provide a temporary cap or plug for the 3" sleeve to prevent the migration of materials from behind the seawall into the bay. The Contractor shall be responsible for any damages to private or public utilities resulting from his operations. XI. SLUICE GATE Installation of the sluice gate shall be performed by City forces and require approximately three working days. The Contractor shall not construct any portion of the curb inlet in such a manner as to limit installation or removal of the entire sluice gate assembly by City forces. XII. BRICK AREA The Contractor shall remove and salvage the existing bricks and benches at Alvarado street end. The Contractor shall construct a 4" thick p.c.c. slab, using class 520 -C -2500 concrete, and mortar and grout the salvaged brick in place to join the new adjacent sidewalk. The Contractor shall then reinstall the salvaged benches at their former locations in the brick area. XIII. PRIVATE PIERS The Contractor shall remove only that portion of private piers which protrude into the proposed seawall, plus one inch. This will allow sufficient room for the Contractor to install forms and allow the property owner to properly reconnect the pier. Removals shall be done in a neat workman like manner with clean, straight sawcuts and no splintering. Prior to pier removal, the Contractor shall install a firm temporary brace for the unsupported end of the pier. The brace shall be capable of withstanding tidal action, wave action and foot traffic until that time when the pier owner may reconnect his pier to the seawall. The Contractor shall remove only those sections of pier that may be returned to the property owner for reconnection in fourteen (14) calendar days. January 5, 1989 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT ADDENDUM NO.1 BALBOA PENINSULA SEAWALL ISLAND STREET TO ADAMS STREET CONTRACT NO. 2662 Bidders shall propose to complete Contract No. 2662 in accordance with the Proposal as modified by this Addendum: 1. PROPOSAL Revise the description of Item 3 to read: "Install 12" Storm Drain Pipe." 2. SPECIAL PROVISIONS Revise Section IV, TIME OF COMPLETION AND WORK SCHEDULE to read: "The contractor shall complete all work within ninety (90) consecutive calendar days after commencing work, but no later than June 1, 1989." Revise Section XIII, PRIVATE PIERS to read: "The Contractor shall remove only that portion of the private piers which protrude into the proposed seawall, plus six inches." Please si _ and date this ADDENDUM, and attach it to your bid Proposal. No bid will be considered unless this ADDENDUM is attached. J Steph n Luy Project Engineer /`O uJ/%L C. 4. X/a Q0,, BIDDER SIGNATURE Date 2 I I.-., • • TO: CITY COUNCIL FROM: Public Works Department r 3�) 44anuary 23, 1989 CITY COUNCIL AGENDA CY TP- •ify COUNQUM NO. F -3(a) CITY 71 fiELWPORT BEACf JAN 2 3 1989 SUBJECT: BALBOA PENINSULA SEAWALL, ISLAND AVENUE TO ADAMS STREET CONTRACT NO. 2662 RECOMMENDATION: Award Contract No. 2662 to Harris Construction for the total bid price of $191,597.50 and authorize the Mayor and the City Clerk to execute the contract. DISCUSSION: At 11:00 a.m. on January 11, 1989, the City Clerk opened and read the following bids for this project: The low total price bid is 15% above the Engineer's estimate of $167,000.00. Harris Construction, the low bidder, has not performed previous contract work for the City. However, a check with their experience references and the State Contractors' License Board has shown that Harris Construction has successfully completed projects of a similar nature for other Southern California agencies and has no pending actions detrimental to their cont;ractor's license. Funds are available in the appropriation for Balboa Peninsula Coping Improvement, Account No. 02- 4197 -457. The Contract provides for the construction of a gravity retaining wall and a sidewalk with sub - drains at locations shown on the attached Exhibit A. A catch basin and storm drain discharge pipe will also be constructed at the end of Alvarado Street. BIDDER TOTAL BID PRICE Low Harris Construction $191,597.50 2 S.S.C. Construction 211,036.00 3 Ken Thompson 216,102.50 4 George Dakovich & Son 234,100.00 5 Wilson Equipment Rental 261,099.80 6 G.B. Cooke Inc. 273,008.00 7 Nobest Inc. 274,074.50 8 John L. Meek Construction 289,252.00 9 Pentaco Inc. & A.M. Galbreath 450,664.00 10 Silveri & LeBouff 492,939.99 The low total price bid is 15% above the Engineer's estimate of $167,000.00. Harris Construction, the low bidder, has not performed previous contract work for the City. However, a check with their experience references and the State Contractors' License Board has shown that Harris Construction has successfully completed projects of a similar nature for other Southern California agencies and has no pending actions detrimental to their cont;ractor's license. Funds are available in the appropriation for Balboa Peninsula Coping Improvement, Account No. 02- 4197 -457. The Contract provides for the construction of a gravity retaining wall and a sidewalk with sub - drains at locations shown on the attached Exhibit A. A catch basin and storm drain discharge pipe will also be constructed at the end of Alvarado Street. 0 Subject: Balboa Peninsula Seawall, Island Street to Adams January 23, 1989 Page 2 • Street (C -2662) The work will reduce flooding of the adjacent properties and street ends during high tides, and will facilitate drainage during storms. On July 12, 1988, the California Coastal Commission granted a permit for the subject project. A public meeting was held on October 11, 1988, at the Balboa Branch of the Public Library to allow those property owners adjacent to the subject project to express their concerns. Staff has made minor changes in the plans that have satisfied the concerns of the property owners. Staff has requested one property owner, Mr. Stacy Dobrzensky, to relocate his pier to allow for the stabilization of the beach adjacent to the seawall. Mr. Dobrzensky has agreed to relocate the pier. The Harbor Permit for the pier relocation was approved at the December 12, 1988, Council meeting. The plans and specifications were prepared by the Public Works Department. All work should be completed by June 1, 1989. Benjamin B. Nolan Public Works Director SL: so Attachment • NE to /nu NY tpp Ga�_2 �rr)90C� 16,00�� U •r f� t- XL_r,� `c /�°'��• I '� `.a III s a .vEwoue� _ s ;TR. N0. 60.5 / ,a ME �•/u�a i�cw✓/ CYWSf AI Y, r1R i (,p(/NTOy CLUB ,yyc\l nn; W������`����d Y 4 4 � -�c- J���O ;� ^ a • i -- POLO .w R guy lyy —PROJECT LOCATION CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT BALBOA PENINSULA SEAWALL ISLAND ST TO ADAMS ST 3 C -2662 at`, E I I DRAWING N0. EXHIBIT A • TO: CITY COUNCIL FROM: Public Works Department 4anuary 23, 1989 CITY COUNCIL AGENDA ITEM NO. F -3(a) SUBJECT: CORRESPONDENCE FROM DORA NELL HEDRICK CONCERNING BALBOA PENINSULA SEAWALL - ISLAND AVENUE TO ADAMS STREET (C -2662) The purpose of this communication is to document the City's position with regard to private pier installations located within the public right -of -way or on City tidelands which interfere with City construction projects, especially the proposed Balboa Peninsula seawall along Edgewater Avenue. This seawall project is part of the City's on -going program to protect low lying areas from tidal flooding by establishing bulkheads and seawalls at a minimum elevation of +9 MLLW datum. There are approximately 20 private piers within the limits of construction on the project. In order for the contractor to build the seawall • and new sidewalk, he must first disconnect all utility services to these piers and remove the interfering conduits and conductors within the sidewalk area. He must also cut -off the landward ends of all piers to the extent that they interfere with construction of the seawall. He is then required to establish temporary supports for the cut -off ends of the piers. The City's contractor will excavate, form and place concrete for the seawall. He is to embed 3 -inch diameter sleeves through the wall adjacent to private piers so that utility services may be re- established either before or after the City's contractor forms and places the new sidewalk. The landward ends of the cut piers could be permanently resupported upon the seawall after the forms are removed. Dora Nell Hedrick, owner of Edgewater Apartments adjacent to the proposed seawall, has written to the City to protest the project. Ms Hedrick owns one of the piers which will be disconnected, cut -off and temporarily supported by the City's contractor. She protests the City's practice of requiring property owners to re- establish any desired private harbor improvements subsequent to the City's construction. Her letter refers to statements included in the attached letter that staff recently mailed to pier permittees. • The requirement that the pier owners be responsible for restoring the pier ends and the private utilities to the piers is based on the opinion that (1) pier owners occupy the public tidelands under the conditions of a harbor permit, and (2) harbor permits allow owners to construct private facilities for the permittees' sole use, and therefore (3) the public should not be subjected to additional expenses in order to accommodate these facilities. The Tidelands Affairs Committee was previously consulted and supports this position. V • • Subject: Dora Nell January 23, 1989 Page 2 Heck's letter • It has been City practice to require pier permittees to bear the expense of re- establishing their facilities subsequent to the City's construction. Examples of this practice are (1) the rehabilitation of the Balboa Island seawall in the 100 block of South Bay Front, where pier permittees replaced their entire pier and utilities, and (2) the raising of the Little Balboa Island seawall, where permittees replaced their handrailings and certain other pier members subsequent to the City's construction. Both projects were performed during 1988. Staff has responded to Ms Hedrick's letter (copy attached). _ ,40 ?4�4 n amen 8. Nolan Public Works Director LD:so Attachments Dam Harshbarger Marine Director S• • February 13, 1989 Ms Dora Nell Hedrick 1537 East Harmony Lane Fullerton, CA 92631 Subject: Balboa Peninsula Seawall - Island Avenue to Adams Street Dear Ms Hedrick, This letter is written in response to your January 10, 1989, telephone conversation with me and letter to Steve Luy, Project Engineer. This seawall is being built as part of the City's program to protect low -lying areas from tidal flooding. New bulkheads and seawalls are being established at a minimum elevation of +9 MLLW datum, which is approximately 1 -1/2 feet above the sidewalk in front of your property. Toward that end, the City Council budgeted funds during FY 1987 -88 for a • preliminary study, and budgeted funds this year for construction of the wall in question. Once after the wall is built, City forces will no longer need to sandbag the area during times of higher high tides or storms, as they have had to do so many occasions in the past. The requirement that pier owners are responsible for restoring their piers and utilities thereto is based upon the opinion that (1) pier owners occupy the public tidelands under the conditions of a Harbor Permit, and (2) Harbor Permits allow owners to construct private facilities for the permittees' sole use, and therefore (3) the public should not be subject to additional expenses in order to accommodate these facilities. It has been City practice to require pier permittees to bear the expense of restoring handrailings, other members, utilities and even entire piers subsequent to the City's construction. Two such projects involving approximately 50 pier permittees were performed during 1988. Your letter has been placed on the laity Council's agenda of January 23, 1989. You may also appear before the City Council at that meeting, if you desire to do SO. • Very truly yours, A Lloyd Adlton DesigK Engineer LD:so TOY Me] Um Tidelands Administrator N • • • • AngAddress 5 X404 Dora Neil Hedrick _7 1 ony Lane 303 East Edgewater 9a Balboa, California 92661 (914) 8 9 RECEIVED PUBLIC 1k'URKS Stephen Luy - Project Engineer 1, Associate Civil Engineer c" Public Works Department �u City of Pdewport Beach � Subject: Balboa Fenirsula Seawall - Island Avenue to Adams St, Dear `r. Lu-y-; I want to register my complaints pertaining to the proposed cement seawall that would produce a barrier between my two lots and create a dangerous obstacle course for my invalid, crippled, energetic athletic younger tenants and my family. #1 I do not want the seawall' I have owned the property at 303 E. Edgewater Ave. for 26 years. In no way do I feel threatened by the higher tides as measured to the 1983 January e.:ample of 10 inches above normal. #2 All utilities are and not restored by th practice. Why are we and telephone services #3 A statement was ma utilities on the pier them at our own expens the restoration can no to be severed at ry residence lot line e Contractor. This is a very unfair to be deprived of water, electricity on the piers? de to the effect that if we ;ranted in the future, we would have to provide s u That permits are required and that tbe provided by the property owner. #4 As stated in the letter of Sepember 30, 19 83, we have been mislead as to the costs involved because of the state- ment that I quote here: "All work is to be done at no direct cost to the adjacent property osmer ". #5 I would consider that it appears the City of Newport Beach does not want to leave the property restored after their destruction has taken glace. It has been proposed that they walk away, leaving us in the lurch deceived and disadvantaged, wanting and waitinG, for a completed job, ' =lliat f9.irr_ess proposal is this that instead we are saddled with an incomplete construction job? #6 May are we required to complete the job of restoring our property to the former state of performance we have become accustomed to over the mast several years? ',Je are threatened with the withdra;ral of all utilities from our piers and docks and no reinstate ~Lent of the services by 3 said contractor recoivin:� the bid for the job. We are required to obtain buildir.F permits from Newport -'each Building Department and hire our own contractors; ;mater, Gus, electrical and telephone in order to return to normal. Why are vie being penalized? • #7 euotQ "The Contractor may at his discretion also provide quotations and contract directly with pier per - mittees and property oirners wino desire personal work upon their pier or upon the seawall directly adjacent to their property respectively:" You are stating again that this Is a "joint venture" with the property owners whereas money is required to change hands inorder to obtain a completed project by the deadline date of June 1, 19 89. shy is it proposed at this late date that we will be sharin3 costs with the City of Newport Dea.ch? The statement wras sprung on us, the property owners, January 7, 1909 - 4 days before the bids are to be opened for the job. 3 want to request a postponement of the date of January 11, 19 39 for the opening of bids to prospective Contractors. #S quote: "The City's work is beinG done in response to many requests of residents in the area and in the interest of health, welfare and safety of the General public." Whet does "health" mean. as used here? The r:eneral public will not be involved with hurdling over thevseawrall blockade is as my tenants and family would be required to do. Who pays the injury costs and hospitalization costs involved with this obstacle course? #9 I'm very concerned with my tenants beinG injured by the unsupported pier ending that will be cut off 6 Inches from the cement wall and left abc.ndoned in that fashion for us to repair and restore at a later cLnte. ..cote: "',e will ?:rovide ter orary nupp ^rt fcr the cut or su:norted end of piers during construction; however, upon completion of t::is work, pier permittees must re- establish permanent pier support." And who is responsible for this accident hazard and unsafe cindition in the n.oantirao? X10 ':l:, at :.re ti?ese "inc'Lrect costs" :.nd "under tl.e table payc,ents" that are inferred in these letters? Al, I too am very concerned about wr .t the seawall would look like, but that concern is diwarfod in comparison to all these other listed concerns and facts. #12 During this 26 year period, we have removed alot of • sand from the sidewalk with a broom, as required by the City Ordinance. If you build t,e blockade, for resoval of sand the labor out put is greatly increased. The swimmer's wet feet will lose alot of sand ouch tine tl;e,, Jump down from the steps and wrall. -3- 0 Y13 quote: "If you have any questions co;:ccr:ing the proposed seawall or the rifect it will have u,-)on your property -)lease be sure �o at the Octcber 3.1 th meeting." ? ;y representative attended the Oct. 11 th meotin; for me at the library and informed e that details • e;ould be available in icrch portainin; to V,o jro_�osed seawall. 114 If you proceed with bids on the ,ro3,osod wawa -ll before you are fully informed and rci -inded of necessary considera- tions, statements, firm policies and project requirer:;ents, you will be lax, in your responsibility to all property owners. Your bids are coming in on incomplete evaluations. #15 I sent my representative to attend the meeting that evening in my absence. As another statement I quote here from your letter of January 6, 198'9, you are positioning me to be ineliwible for r1romised embellish::ents to the seawall as, note: The Contractor will provide steps, fence posts, blockouts, and other features in the seawall as requested those at the October 11, 19 ° meeting." .thy would I be scriminatea against ror non a #16 I do not want my block wall and wrought iron fencing severed, destroyed or interferred irith on the residence lot side. #17 If there were a sea;;all out front of our -oroporty, it • would create a nuisance factor inviting unwanted noise from strangers sitting atop same and talking into the ;Tee hours of the morninG. '#18 I will state that my lots are nct sufferia damage from salt water of the high tides. The float on the vier is another matter and you are not taking responsibility for the float rising off the pilings and not settling back accurately, to avoid sustaining damage. ;119 What makes anyone figure that the utility lines will last forever and not deteriorate t• ;ith time - exposed to the chemical -reactions of environment, salt ,eater, cement, wire coatin -s, etc? Hour could they ever be replaced if they are sealed aormanently with, a non - shrink comentitious grout as proposed to seal the sleeves installed under tl,e sidewalk? #20 I T .y vacationing tenants are vulnerable to having• beach access subtracted during ti,eir stay and not only are they high paying renters, but they are also nayin; tiro City of Pdewport each a 9% bed tar.. The first date Per them is • May 26th for the i;e orial Day weekend. Therefore the com- pletion date of June 1, 1989 is unsatisfactory in our case. Thank you for pausing lone; enough to consider these points as presented in my letter. I am sending codes of this letter to my neighbors besides those listed on the .letter. W 4 0 Yours truly Dora 'Fell Hedrick 303dewater Avenue Balboa, California 92661 714 871 -2866 cc: City M.-nager marine Department: Tidelands Administrator City Council - .�iewport :each Central Newport Beach Co?,Irnunity Association • • rm January 6, 1989 L CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT PO. BOX 1769, NEWPORT BEACH, CA 92659 -9915 (714) 644 -3311 Subject: Balboa Peninsula Seawall - Island Avenue to Adams Street Dear Pier Permittee and /or Resident; This letter is intended to bring you up -to -date regarding the construction of the Edgewater seawall, which was described in our public meeting of October 11, 1988. (See attached letter and Exhibit "A "). Bids for construction of the wall will be opened on January 11th. Barring unforeseen circumstances, the City Council will award the contract to the lowest responsible bidder on January 23, 1989. The Contractor would then have until June 1, 1989, to complete the project. • The contract consists of seawall construction and reconstruction of the public sidewalk, including subdrains, plus work at certain street ends. The intent of the contract is to protect public and private property against the flooding which occurs during our higher high tide cycles. The Contractor must perform the work in stages in order to 1) minimize the overall duration of work adjacent to each pier or residence, and 2) minimize construction costs. We cannot foretell when work may be performed adjacent to your pier or residence; however, you will be able to observe his daily progress and to talk to our inspector or the Contractor on site if information is needed. The Contractor will begin each stage of work by removing the existing sidewalk, curb and any encroachments which may interfere with construction. He will then disconnect power and telephone conductors and cut and cap water and gas conduits to the piers. The disconnects and cuts will be made along the edge of sidewalk adjacent to the residence. The seawalls will then be formed and placed, including a 3 -inch diameter sleeve through the wall at each pier. After the forms are stripped, the sidewalk would then be formed and placed. After the City's work is completed, the 3 -inch diameter seawall sleeves may be • used by pier permittees to re -route power, telephone, water and gas services to their piers. The permittee will be responsible for reconnecting his services at the edge of the sidewalk, and for re- routing the services under the sidewalk through the sleeves and onto the piers as desired. Water or power reconnections will require permits from the City's Building Department. The permittees must also fill the sleeves with a non - shrink cementitious grout after the services have been re- established to the pier. 3300 Newport Boulevard, Newport Beach Page 2 • . If an existing pier interferes with seawall construction, the Contractor will • neatly cut off the pier to within 6- inches of the pier side of the new seawall. He must do so in order to install and to remove seawall forms. He will provide temporary support for the cut or supported end of piers during construction; however, upon completion of this work, pier permittees must re- establish permanent pier support. The permittee will be allowed to attach his end of pier to the new seawall, if desired. • • The Contractor must also remove all brickwork, ornamental and chain link fencing, etc. which will interfere with his work. Salvageable brickwork,fencing, etc. which has been removed will be placed upon the adjacent residential lot for reuse or disposal by the owner. The Contractor will provide steps, fence posts blockouts, and other features in the seawall as requested by those at the October 11th meeting. He may, at his discretion, also provide quotations and contract directly with pier permittees and property owners who desire personal work upon their pier or upon the seawall directly adjacent to their property, respectively. The City's work is being done in response to the many requests of residents in the area and in the interest of health, welfare and safety of the general public. If you have questions at this time, please contact either of the undersigned at your convenience. Your cooperation toward the successful completion of this project will be appreciated. Very truly yours, teve Luy Project Manager (714) 644 -3311 LD:so cc: City Manager Marine Department Central Newport Beach Tony Me T m Tidelan s Administrator (714) 644 -3044 Community Association /z r1 J • /3 0 CITY OF NEWPORT BEACH September 30, 1988 PUBLIC WORKS DEPARTMENT P.O. BOX 1768, NEWPORT BEACH, CA 92658 -8915 (714)644 -3311 Subject: Balboa Peninsula Seawall Construction (C -2662) Dear Property Owner: The City has recently obtained a permit from the California Coastal Commission for the construction of a seawall adjacent to the sidewalk in front of your home. The purpose of this proposed project is to minimize damage caused by flooding of public and private property during extreme high tides and /or storm activity. The locations of the proposed seawall are indicated on Exhibit "A" shown on the reverse side of this sheet. A public meeting will be held to discuss the seawall at 7 p.m. on October 11, 1988 at the Balboa Branch of the Public Library, 100 E. Balboa Boulevard. Cross sections of the proposed seawall are also shown on the reverse side. The seawall is designed to minimize the flooding problem without limiting access to piers and the beach. This work is being done in response to the requests of property owners in the area and in the interest of health, welfare and safety of the general public. All work is to be done at no direct cost to the adjacent property owner. If you have any questions concerning the proposed seawall or the affect it will have upon your property, please be sure to attend the October 11 meeting. Your cooperation toward the successful completion of this project will be appreciated. Very truly yours, Stephen Luy Project Engineer SL:dw 3300 Newport Boulevard, Newport Beach i • iy ilHl([ •r doe s cn. w SEAWALL CROSS - SECTION ADJACENT TO PRIVATE PROPER-{ ' PICTORIAL VIEW OF SEAWALL -60/6 EW. ♦nu(e f A/J r/NL H( i �JlL(MN� SEAWALL CROSS - SECTION SEAWALL CROSS - SECTION AT PIER ENTRANCE AT STREET END EAG 1' 'PA %l ?" a. � � } +r l; � �•MVTS7.' °�'1• i .. r•,�•% � �t pLe B r,,S[ =_t. °•_� :_7 d i' xx Y CA T.... ,� .4 �uU..L .?!yam (•� - i "'�,.. it `YJY Y. -_Iii ic , - I,IUIIL�e./r`'Qar 7s.. — _��Y VDO islf ° I .9 0 /%'� ',�. `T,'It j`'t __'.�v'i�AZ7 nrn J F�CiL > S a, C.DwA c i PROJECT LOCATION CITY OF NEWPORT BEACH DRAWN Aw DATE Q-29-RR PUBLIC WORKS DEPARTMENT APPROVED BALBOA PENINSULA SEAWALL rv�u�,� nAl �dgeu�ate� �jli�nestta 303 East Edgewater Balboa, California 92661 "RECENED ,AFTER AOM PRINTED:" 3 C-eL ) Stephen Luy - Project Enineer Associate Civil En,,,ineer Public Works Department City of Newport Deach Ma I Address Dor 11 Hedrick 1637 East Harmony Lane Fullerton, California (714) 871.2866 January 19, 1989 Subject: Balboa Peninsula Seawall - Island Avenue to Adams St. Dear Hr. Luy; Thank you for the reply to my letter of January loth through Lloyd Dalton's letter of the 13th I'm needing to bring; to everyones' attention that our area of Balboa is unique to other areas because we all own a beach lot fror._ Adams Street to Alvarado Ave. We therefore own the lot the pier is built upon. You stated in your letter the fact you could not restore utilities on public tidelands under the conditions of a Haber Permit; (1) pier owners occupy the public tide- lands under the conditions of a Harbor Permit, and (2) Harbor Permits allo @r owners to construct private facilities for the permittees' sole use, and therefore (3) the public should not be subject to additional expenses in order to accommodate these facilities. Ealboa Island was ofTerating under different rules because of the public lots the piers were built upon. In our circumstances you are trespassing on private property, severing our utility services, leaving the job before restoration has been completed to the pier boards, posts and all utility lines and pipes. These are infrin;;ements on our property rights since we orm the lot the pier is built upon. Very truly v urs, R O , V " 1 Dora Ne 1 Hedrick Os 303 E. Edgee;ater ^.venue Balboa, California 92661 714 871 -2866 cc: City Planar-er, Biarine Department: Tidelands Administ, City Council - i'e-,;port Beach, Central Ilerrport leach Community Association ,, �,. �`. ��. r ��', ,, . '�'� ';�' ��:� -�� February 13, 1989 Ms Dora Nell Hedrick 1537 East Harmony Lane Fullerton, CA 92631 Subject: Balboa Peninsula Seawall - Island Avenue to Adams Street Dear Ms Hedrick, This letter is written in response to your January 10, 1989, telephone conversation with me and letter to Steve Luy, Project Engineer. This seawall is being built as part of the City's program to protect low -lying areas from tidal flooding. New bulkheads and seawalls are being established at a minimum elevation of +9 MLLW datum, which is approximately 1 -1/2 feet above the sidewalk in front of your property. Toward that end, the City Council budgeted funds during FY 1987 -88 for a preliminary study, and budgeted funds this year for construction of the wall in question. Once after the wall is built, City forces will no longer need to sandbag the area during times of higher high tides or storms, as they have had to do so many occasions in the past. The requirement that pier owners are responsible for restoring their piers and utilities thereto is based upon the opinion that (1) pier owners occupy the public tidelands under the conditions of a Harbor Permit, and (2) Harbor Permits allow owners to construct private facilities for the permittees' sole use, and therefore (3) the public should not be subject to additional expenses in order to accommodate these facilities. It has been City practice to require pier permittees to bear the expense of restoring handrailings, other members, utilities and even entire piers subsequent to the City's construction. Two such projects involving approximately 50 pier permittees were performed during 1988. Your letter has been placed on the City Council's agenda of January 23, 1989. You may also appear before the City Council at that meeting, if you desire to do 50. i Li ton T01Y Mel um Engineer LO: so Tidelands Administrator Authorized to Publish Advertisements of all bntlSfncludmg public notices by Decree of the Superior Court of Orange County. California. Number A -6214, dated 29 September. 1961, and A- 2.931, dated 11 June. 1963. STATE OF CALIFORNIA County of Orange o .rte .•.« •wo .o ..o •v me .ma..v n ri m r povo ,win 10 pc. column .Um I am a Citizen of the United States and a resident of the County aforesaid. I am over the age of eighteen years, and not a party to or interested in the below entitled matter. I am a principal clerk of the Orange Coast DAILY PILOT, with which is combined the NEWS - PRESS, a newspaper of general circulation, printed and published in the City of Costa Mesa, County of Orange. State of California, and that a Notice of Bid` of which copy attached hereto is a true and complete copy, was printed and.published in the Costa Mesa, Newport Beach, Huntington Beach, Fountain Valley, Irvine, the South Coast communities and Laguna Beach issues of said newspaper for 2 tams consecutive weeks to wit the issue(s) of 198— 198— iI -I:Ii» , 198— I declare, under penalty of perjury, that the foregoing is true and correct. Executed on December 24 1988 at Costa Mesa, Califomia. U LQ1n3ture / l!_ U l Y cv PROOF OF PUBLICATION • • • is 0 TO: CITY COUNCIL FROM: Public Works Department Wcember 12, 1988 CITY COUNCIL AGENDA ITEM NO. F -15 SUBJECT: BALBOA PENINSULA SEAWALL, ISLAND STREET TO ADAMS STREET CONTRACT NO. 2662 BY THS {iITY COUNCIL RECOMMENDATIONS: CITY OF NEWPORT BEACH 1. Approve the plans and specifications. DEC 1 2 1988 2. Affirm the environmental assessment. 3. Authorize the City Clerk to u.nn ^., imm,nr., a °^^ _ DISCUSSION: The contract provides for the construction of a gravity retaining wall and a sidewalk with sub - drains at locations shown on the attached Exhibit A. A catch basin and storm drain will also be constructed at the end of Alvarado Street. The work will reduce flooding of the adjacent properties and street ends during high tides, and will facilitate drainage during storms. On July 12, 1988, the California Coastal Commission granted a permit for the subject project. A public meeting was held on October 11, 1988, at the Balboa Branch of the Public Library to allow those property owners adjacent to the subject project to express their concerns. Staff has made minor changes in the plans that have satisfied the concerns of the property owners. Staff has requested one property owner, Mr. Stacy Dobrzensky, to relocate his pier to allow for the stabilization of the beach adjacent to the seawall. Mr. Dobrzensky has agreed to relocate the pier. The Harbor Permit for the pier relocation will be considered under a different agenda item during this Council meeting. A Negative Declaration of Environmental Impact has been prepared by staff and approved by the Environmental Affairs Committee. Upon affirmation, the Negative Declaration will be published in our local newspaper and filed with the County Clerk. The Engineer's 'stimm'I is $167,000.00. Funds are available in the appropriation for Balboa Peninsula Coping Improvements, Account No. 02- 4197 -427. The plans and specifications were prepared by the Public Works Department. All work should be completed by June 1, 1989. 1�), Benjamin B. Nolan Public Works Director LD:so Attachment (y) • • 107 r Is V. r IL --I I A "j 5 CL op iN J vf Ur I 1A I ccvrEf (� w a� �• a P 1( t•. i �DWN 60,5 mi G A V CLUB L11 s. --u �.. OV. k, MA�00� MAG, IL A % Fill Ay upp ISLE �c SEAV C--- jotA 10 A'm' CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT BALBOA PENINSULA SEAWALL ISLAND ST TO ADAMS ST C-2662 PROJECT LOCATION DRAWN J Vy DATE Ic -C.- 00 APPROVED .,z DRAWING NO. EXHIBIT A