Loading...
HomeMy WebLinkAboutXR2022-2974 - MiscXC_2Dzz -,q 7 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.aov 1 (949) 644-3200 �/((*- Structural Observation Report Project Address: Report Date: J U N E 14, 1 921 CNB Inspector Name: CNB Permit #: J 1 y6 QOLgf'17 bRlvr Building Owner Name: Owner's Mailing Address (if different from site); 3?54 Owner's Telephone #: CNB Plan Check #: SNAr PtK MLVWl6S- LQ w. oaA&W /4vlt Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: eR ti _tt M. Save 'I fy Pit e dui24:Di I. ter-, o - qgc -L?fy' C 423 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check anDlicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings 8 Slab ❑ Concrete ❑ Steel ❑ Concrete ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry Wood ❑ Other: ❑ Other: ❑ Other: Other: 944 ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. 6 C l Lr l,(,_Cf- ❑ OBSERVED DEFICIENCIES AND COMMENTS: N 0 N L5- (NtkL ka6Qf: /,E �10161v2aL SY 4-VN GrNFuatir /k P6ZuVkery f.ONSTVL. DOSS- , 0 4l-rulevr DS FIcatrNC cr- (S-reo ❑ REPORT CONTINUED ON ATTACHED PAGES. FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. 1 am the licensed design professional retained by the owner to be in responsible '� ��"� .f 1 ` „-�.•�tt, charge of the structural observation; 2. 1, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the ; ' ;•g, 3-- 2 / .tY. ' _ approved const n documents; 1 1 understand,$gal efficiencies which I have documented must be corrected, prior to X .. .° �'";:��• ��'• final acce nce the structur ystems by the City of Newport Beach, Building ', •!:'f �, • _� l`c'��••CA1.�c�'� t Division.•' ,.` 4 A STAMP OF STRUCTURAL OBSERVER 11 _Y^ • {/? WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Fo, kStt wMObservzionRepon&In coons