Loading...
HomeMy WebLinkAboutX2019-4170 - Misc'i,' COMMUNITY DEVELOPMENT DEPARTMENT K X V1 � 1 � Q BUILDING DIVISION C9G//FOR .P ' 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 926588915 www.newportbeachca.gov 1 (949) 644-3200 SETBACKS AND TOP OF SLAB/FLOOR ELEVATION CERTIFICATE QLL L0«hion The purpose of this certificate is to insure that the structure is located properly on site per the approved drawings. This certificate also verifies the top of slab/floor elevation noted on the approved drawings. After the top of slab/floor elevation is verified to match the elevation specified on the approved drawings, the contractor and inspector can measure the height of the structure to the top of slab/floor to verify that it is equal or less than the dimension shown on building sections and elevations. This form must be filled out by a registered surveyor or civil engineer authorized to perform surveys. The survey must be done after the concrete forms are in place or preferable after the concrete slab is poured or raised floor is built. but prior to starting wall framing. Engineer/Surveyor's Name ._1;46z M 1 idt rYta License # Z-51/653 Engineer/Surveyor's Address aa4l & -P kt- 6ore 4- or, Job Address ID3 V0.5'-A1AG crux Setbacks: Sketch a site plan and specify surveyed setbacks (use back page). * Top of slab/floor elevation: %V% * If slab/floor elevation varies, sketch a plan or section through slab on the back page and specify the elevations. Use same datum used in the survey of record. I certify that the setbacks are Is, are not ❑, per City approved plans. Describe any deviations from plans: 1 certify that top of slab/floor any deviations from plans: _ q- Ai- z0 Date Pnrms/Scrl+ncksandTopufSlabElcvationCcn. is ❑, is not ❑, per City approved drawings. Describe stamp and /pfiiEDe� ^L\ OF 1a5rn�" G ie eK PI L,