Loading...
HomeMy WebLinkAboutF2022-0016 - Misc1' -oUt(Io CITY OF NEWPORT BEACH COMMUNrrIF DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive f P,p. Box 1768 1 Newport Beach CA 92658-8915 wwwnewportheachca.gov 1 (949) 644-3200 FIRE SPREiR ER NFPA 13D SYSTEM ROUGH INSPECTION CHECKL LS'T 1. Riser Construction and Location prpvat a- Dra n valve b- BacVbw device (single check) c. Beg activation device d. Inspector's test valve e. Riser sad per approved plans 2. Pressure Test a. System tested at operating Pressure for 2 hours b. Pressure gauge installed 3- �rinkter Heads shall not be installed n the frtdnas onor to the fittings being cemented in Place Remoorary test plugs) a- Instattatton and spacing of temporary test plugs 4. Piping a. Material installed per plan b- Hangers Per codes/prevent upward movement c. All CPVC piping shalt be installed by persons who have been certified by the manufactiAw for instattation of CPVC piping d. Piping protected from damage 5- Bell a- Wiring instaled per code b. Boxes installed at proper locations u u In ►, NOTE CPVC plastic Pipe In the garage shalt not he Amos_ed. Sprinkle,; that are listed as Response' or °ResidentiaP must be used. i FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED: M DATE " —II- lue F'm \F2 SpPo M' NFPA UD Slg _ RaUgh i.pe .. Chetl:la( OS/1 M, wroCITY OF NEWPORT BEACH 4 a C❑j-*nIU1`11TY DEVELOPMEN3' DEEAR`IRIEINT m BUILDING DIVISION 100 Civic Center Drive j P.O. Box 1788 1 Newport Beach, CA 92658-8915 www.newportheachca_gov l (949) 644-3200 FIRE SppjNK ER NFPA 13D SYSTEM FINAL CHECIaIST (RESIDENTIAL) 1. Water meter proper size 2 Fire sprinkler system installed per the approved plans 3_ A8 construction covers removed from sprinkler heads 4. Cover plates are NOT to be installed, but shall be available on the jobsite 5. All tape and paint removed from sprinkler heads 6. Frish trim installed around sprinkler heads 7. Proper signage posted at all required locations 8_ Row test conducted and bell tested 9. Location of inspectors testing vane in approved location SYSTEMS: 10. Clearances around sprinkler heads and riser - no obstructions 11. Operallng Pressure gauge installed at riser showing proper water pressure 12. Back flow preventer installed 13. System Installed per manufacturers specifications Y€S ld 7M FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVED: :7 jlA PERMIT FZ-a2 DATE: T''- - L3 Forms\Flre Sprinkler NFPA 1D System- FINAL ChPkle, REIOVN AL05/12/ID15