SUBJECT: Contract No. c -2885
Description of Contract Irvine Avenue School Beacon
Effective date of Contract December 9, 1991
Authorized by Minute Action, approved on October 28, 1991
Contract with Citv of Costa Mesa
Address P.O. Box 1200
Costa Mesa, CA 92628 -1200
Amount of Contract (See Agreement)
6e, 4e
Wanda E. Raggio
City Clerk
WER:pm
Attachment
3300 Newport Boulevard, Newport Beach
•
0
TO: CITY COUNCIL
0
October 28, 1991
CITY COUNCIL AGENDA
ITEM NO. F -3(a)
FROM: Public Works Department /Traffic Engineering
SUBJECT: IRVINE AVENUE SCHOOL BEACON (2 -Z , ?-5'
Authorize the Mayor and City Clerk to execute a cooperative
agreement with the City of Costa Mesa for the installation of
school warning beacons on Irvine Avenue near Mariners School.
DISCUSSION
Parents of children attending Mariners School have expressed
concern over the difficulty of crossing Irvine Avenue at Mariners
• Drive /18th Street. Staff of the two cities have met with parents
and the principal of the school. As a result of these
discussions, it is recommended that overhead flashing beacons be
installed that would operate during the hours that children are
going to and from the school. A sketch of the proposed work is
attached.
It is proposed that the City of Newport Beach contract for the
installation of the two beacons with the City of Costa Mesa paying
their share. The total cost is estimated at $24,000, with the
share for Newport Beach estimated at $13,000. This is a little
over half the total because our beacon will require a longer
conduit and wiring to access a source of electrical power. The
proposed agreement provides that upon installation each city will
be responsible for the operation and maintenance of the beacon
within their jurisdiction.
This project was approved by the Costa Mesa Traffic Commission at
a recent meeting and their funds are available. Funds are
available for this work in the current Traffic Signal budget.
Richard M. Edmonston
Traffic Engineer
RME:bb
WP:BEACON.CC
Attachment
(-qv
IFLOWER ST.
N !'
18th ST..
ti �\
LOCATION B -N
FEEO ,3 /
• O
W65 0
SPEED
LIMIT
25 E0
Flashing Beacons
FCASye12 �
F365 &0y
r.MEJ:
_ EG6e file re
SEa��ce
n16 TE 2
NOTE:
TRAFFIC SIGNAL AND HIGHWAY LIGHTING CONSTRUCTION
SHALL CONFORM TO STATE OF CALIFORNIA STANDARD
SPECIFICATIONS SECTIONS 90 AND STANDARD PLANS
( DATED JAN.. 1999) L SPECIAL PROVISIONS. i
BC
III
H
IQ al
iW \I
'I
MARINERS DR.':,
NOTES
OINSTALL CITY FURNISHED TYPE 184-70 POLES WITH 25' MAST
ARMS.
O FURNISH AND INSTALL 12' YELLOW FLASHING BEACONS WITH
FLASHER BOX AND •ELTEC' MODEL TC-12 765 DAY: TIMER.
OFURNISH AND INSTALL CONDUIT AND CONDUCTORS.FROM
ELECTRICAL FEED POINT TO POLES. .
OELECTRICAL SERVICE, FLASHER BOX AND TIMER
SHALL BE MOUNTED TO POLES.
ONEW CONDUIT SHALL BE 2- (METALLIC).
O NEW PULLBOXES SHALL BE !71/2.
OFURNISH AND INSTALL R2. R71 AND W65 SIGNS AS SHOWN.
APPROVED
TRAFFIC ENGINEER
CITY OF NEWPORT BEACH
R.E. NO.
APPROVED
TRAFFIC ENGINEER
CITY OF COSTA MESA
R. E. NO,
DRAWING NO. T - 5549 - L
Q
1
Lu
Z
I ;
i
M
ti �\
LOCATION B -N
FEEO ,3 /
• O
W65 0
SPEED
LIMIT
25 E0
Flashing Beacons
FCASye12 �
F365 &0y
r.MEJ:
_ EG6e file re
SEa��ce
n16 TE 2
NOTE:
TRAFFIC SIGNAL AND HIGHWAY LIGHTING CONSTRUCTION
SHALL CONFORM TO STATE OF CALIFORNIA STANDARD
SPECIFICATIONS SECTIONS 90 AND STANDARD PLANS
( DATED JAN.. 1999) L SPECIAL PROVISIONS. i
BC
III
H
IQ al
iW \I
'I
MARINERS DR.':,
NOTES
OINSTALL CITY FURNISHED TYPE 184-70 POLES WITH 25' MAST
ARMS.
O FURNISH AND INSTALL 12' YELLOW FLASHING BEACONS WITH
FLASHER BOX AND •ELTEC' MODEL TC-12 765 DAY: TIMER.
OFURNISH AND INSTALL CONDUIT AND CONDUCTORS.FROM
ELECTRICAL FEED POINT TO POLES. .
OELECTRICAL SERVICE, FLASHER BOX AND TIMER
SHALL BE MOUNTED TO POLES.
ONEW CONDUIT SHALL BE 2- (METALLIC).
O NEW PULLBOXES SHALL BE !71/2.
OFURNISH AND INSTALL R2. R71 AND W65 SIGNS AS SHOWN.
APPROVED
TRAFFIC ENGINEER
CITY OF NEWPORT BEACH
R.E. NO.
APPROVED
TRAFFIC ENGINEER
CITY OF COSTA MESA
R. E. NO,
DRAWING NO. T - 5549 - L
THIS AGREEMENT, made and entered into this
day of ��j��Zl-jQ� 1991,
BY AND BETWEEN
CITY OF NEWPORT BEACH,
hereinafter referred to as
"NEWPORT BEACH ",
AND CITY OF COSTA MESA, hereinafter
referred to as "COSTA MESA ",
WHEREAS, it has become desirable to better notify
motorists of the school zone on Irvine Avenue in the vicinity
of Mariners School; and
WHEREAS, NEWPORT BEACH and COSTA MESA contemplate the
installation of new school warning lights on Irvine Avenue
near said location, one of which is within the boundaries of
NEWPORT BEACH and one of which is within the boundaries of
COSTA MESA, hereinafter referred to as the "PROJECT ", and
wish to specify the proportionate share of the costs that are
to be borne by NEWPORT BEACH and COSTA MESA, and wish to
provide for maintenance following completion of the PROJECT;
and
WHEREAS, NEWPORT BEACH has offered to design, contract,
and inspect the installation of the school warning lights;
and
1
1 •
WHEREAS, installation of the facilities is categorically
exempt (Class 1, Section 15301) pursuant to the California
Environmental Quality Act of 1970 (CEQA); and
WHEREAS, NEWPORT BEACH, as Lead Agency under CEQA,
acknowledges that no environmental documents are required for
compliance with CEQA.
NOW, THEREFORE, IT IS AGREED by the parties hereto as
follows:
I. NEWPORT BEACH shall:
A. Be and is hereby designated as Project
Engineer, Contracting, and Construction Agent for the parties
to do and perform all things necessary in order to design and
construct said COSTA MESA portion of the Project, and to
execute and deliver all documents required in connection with
the construction and completion of said PROJECT, including
Certificate of Cost and Certificate of Completion for
PROJECT.
B. Submit for review and approval by DIRECTOR,
PROJECT plans and specifications including a construction
cost estimate which indicates the estimated shares of costs
to NEWPORT BEACH and COSTA MESA.
C. After approval of plans and specifications by
DIRECTOR, as specified herein, obtain informal bids and award
a contract to the lowest responsible bidder complying with
all State and local laws, subject to the provisions of
Section II, III, IV, V, and VI herein below.
E
D. Not issue change orders of PROJECT work
affecting COSTA MESA without first having obtained the
written concurrence of DIRECTOR.
E. During the period of construction, have
jurisdiction of the construction areas within COSTA MESA.
II. COSTA MESA shall:
A. Review and approve project plans and specs
prepared by NEWPORT BEACH, per Section I.B. above. Said
review and approval shall be as to design and construction
features affecting the construction, operation, and
maintenance of COSTA MESA's portion of PROJECT.
B. At all times during the progress of
construction of PROJECT have access to the work for the
purpose of inspection thereof and should COSTA MESA deem any
remedial measures to be necessary, COSTA MESA shall notify
NEWPORT BEACH thereof.
C. Reimburse NEWPORT BEACH for COSTA MESA's
proportionate share of the PROJECT cost as defined by
Sections III and IV.
D. Withhold approvals which are required herein
only for good cause.
III. COSTA MESA Funding Responsibilities
A. COSTA MESA's share of the PROJECT costs,
including administration design, construction, engineering
and inspection costs, shall be based on the total PROJECT
cost for that portion of the project within its boundaries as
3
! • •
the COSTA MESA - NEWPORT BEACH limits exist at the time NEWPORT
BEACH advertises the contract for the PROJECT.
B. COSTA MESA's share of the contract costs for
installation of the school warning lights shall be based on
the actual construction cost for the PROJECT, estimated to be
$24,000. Said share is estimated to be $11,000.
IV. Payments and Final Accounting
A. NEWPORT BEACH may, at its option, invoice
COSTA MESA for a deposit of their actual shares of the
contract cost based upon actual bid prices and upon
reasonable notice, and COSTA MESA shall pay said deposit.
However, said request for deposit shall not be made before
the award by NEWPORT BEACH of construction contract.
B. Upon completion of the PROJECT, NEWPORT BEACH
shall submit a final report for PROJECT and a certification
signed by the Traffic Engineer that all expenditures related
to PROJECT have been made and that all documents,
certificates and itemized bills are on file with NEWPORT
BEACH and that copies will be made available to COSTA MESA
upon request.
C. If the final report, as approved by the
parties hereto, indicates that the final cost to COSTA MESA
is greater than COSTA MESA's deposit, COSTA MESA shall
promptly reimburse NEWPORT BEACH for the difference between
COSTA MESA's final cost and the deposit. If the approved
final report indicates that the final cost to COSTA MESA is
4
' • r
less than COSTA MESA's deposit, NEWPORT BEACH shall promptly
reimburse COSTA MESA for the difference between the deposit
and COSTA MESA'S final cost.
V. Maintenance of facilities
A. The maintenance and operational costs for said
school warning lights shall be borne by the parties within
whose boundaries each is located.
VI. Hold Harmless
A. It is mutually agreed by the parties hereto
that neither COSTA MESA nor any officer or employee thereof
shall be responsible for any damage or liability occurring by
reason of anything done or omitted to be done by NEWPORT
BEACH under or in connection with any work, authority or
jurisdiction delegated to NEWPORT BEACH under this agreement.
It is also understood and agreed that, pursuant to Government
Code Section 895.4, NEWPORT BEACH shall fully indemnify and
hold COSTA MESA harmless from any liability imposed for
injury (as defined by Government Code Section 810.8),
occurring by reason of anything done by NEWPORT BEACH under
or in connection with any work, authority or jurisdiction
delegated to NEWPORT BEACH under this agreement.
B. That neither NEWPORT BEACH nor any officer or
employee thereof shall be responsible for any damage or
liability occurring by reason of anything done or omitted to
be done by COSTA MESA under or in connection with any work,
authority or jurisdiction not delegated to NEWPORT BEACH
5
under this agreement. It is also understood and agreed that,
pursuant to Government Code Section 895.4, COSTA MESA shall
fully indemnify and hold NEWPORT BEACH harmless from any
liability imposed for injury (as defined by Government Code
Section 810.8), occurring by reason of anything done or
omitted to be done by COSTA MESA under or in connection with
any work, authority or jurisdiction not delegated to NEWPORT
BEACH under this agreement.
IN WITNESS WHEREOF, COSTA MESA and NEWPORT BEACH have
caused this agreement to be executed by their Mayors and
attested by its Clerks, all thereunto duly authorized by
Minute Order of the City Councils on the date written
opposite their signatures.
City Council Approved On:
Date Mayor, CITY 0i1" NEWPORT BEACH
APPR6VED AS TO FORM:
/City Attorney
City Council Approved On..
h*u / /8, /9f/
Date
APPROVED AS TO FORM:
City Attorney
WP:A:BEACON.AGR
bb 10 -22 -91
ATTEST: �
G� C= ° -
City Clerk
May TY YOF COSTA MESA
ATTEST:
ity Clerk
M
}
r
i�Gi FO fk
E
0
CITY OF COSTA MESA
CALIFORNIA 9262 8-1200 P.O. BOX 1200
FROM THE OFFICE OF THE CITY CLERK
December 4, 1991
City Clerk Wanda Raggio
City of Newport Beach
3300 Newport Blvd.
Newport Beach, CA 92660
Re: New School Warning Lights on Irvine Avenue
in the Vicinity of Mariners School
Dear Mrs. Raggio:
i
DEC 5
CITY Ci ERK
clrl oT.
r�ewPORI gLACd ti^
Enclosed are two signed copies of the agreement between the
cities of Newport Beach and Costa Mesa, to install new school warn-
ing lights on Irvine Avenue in the vicinity of Mariners School.
The agreement was approved by the Costa Mesa City Council at its
regular meeting of November 18, 1991.
After the agreement has been signed by your Mayor, please
return a fully executed copy to this office for our records.