Loading...
HomeMy WebLinkAboutC-3014 - Cost Sharing for Construction, Sewer Improvements in Balboa BoulevardCITY OF NEWPORT BEACH OFFICE OF THE CITY CLERK P.O. BOX 1768, NEWPORT BEACH, CA 92658 -8915 (714) 644 -3005 TO: FINANCE DIRECTOR FROM: CITY CLERK DATE: September 23, 1994 SUBJECT: Contract No. C -3014 Description of Contract Construction of Sewer Improvements in Balboa Boulevard South of Coast Hi way and Cost Sharing Effective date of Contract September 14, 1994 Authorized by Minute Action, approved on August 22, 1994 Contract with County Sanitation Districts Nos. 5 and 6 Address P.O, Box 8127 Fountain Valley CA 92728 -8127 Amount of Contract (See Agreement) G(/GG %j'zG�GV Wanda E. Raggio ' U City Clerk WER:pm Attachment 3300 Newport Boulevard, Newport Beach C - 30/�4 AUG 2 21994 August 22nd, 1994 CITY COUNCIL AGENDA ITEM NO. 11 TO: Mayor & Members of the City Council FROM: Utilities Department SUBJECT: AGREEMENT FOR CONSTRUCTION OF SEWER IMPROVEMENTS IN BALBOA BOULEVARD SOUTH OF COAST HIGHWAY AND COST SHARING WITH THE COUNTY SANITATION DISTRICTS RECOMMENDATIONS: Approve an agreement with CSDOC for cost sharing and providing for construction of certain sewer improvements in Balboa Boulevard in conjunction with the Coast Highway Trunk Sewer Project. 2. Authorize the Mayor and City Clerk to execute the Agreement. 3. Require CSDOC to obtain a public works encroachment permit on behalf of their contractor for all project improvements and waive fees for same. DISCUSSION: The proposed CSDOC Coast Highway Trunk Sewer Project will provide for replacement and reconstruction of their large diameter gravity sewer in the south side of Coast Highway from 'The Arches Interchange" to the Bitter Point Pump Station at the entrance to the Tidelands Oil Fields. The City has had frequent maintenance problems and stoppages in the sewer pipelines in Balboa Boulevard between 45th Street and the 47th Street Pump Station. The City has also had maintenance problems with the Pump Station which is deteriorated and undersized. The pump station is a part of the City's 10 -year Sewer Pump Station Replacement Program. CSDOC has designed their proposed trunk sewer in a manner that will allow the City to abandon the 47th Street Pump Station. Their design also provides for the replacement of the City's sewer in Balboa Boulevard. Because CSDOC is proposing some significant sewer construction in the area, the City has an opportunity to coordinate work and complete it under the CSDOC contract. The City requested CSDOC to include the replacement of the Balboa Boulevard Sewer Main and the 47th Street Pump Station Abandonment in their Coast Highway Sewer Project. CSDOC agreed, and incorporated those improvements in the project plans and specifications. The City contracted separately with CSDOC's consulting engineer to prepare the additional plans and specifications for the City's facilities. r1 LA Page 2 CSDOC Cost Sharing Agreement Coast Highway Trunk Sewer Project August 22, 1994 The proposed Agreement provides for reimbursement to CSDOC for reconstruction of the City's sewer facilities. Replacement of the City's sewer facilities under this agreement will greatly reduce maintenance and cleaning. These improvements will also permanently eliminate one the City's twenty-four sewer pump stations. Elimination of the 47th Street Pump Station will reduce operating costs and maintenance costs. Funds are available in the capital projects portion of the Wastewater Enterprise Fund in account numbers 7533 - 98530001 and 7533- 98530203. The CSDOC Sewer Project is scheduled to be advertised for bids in September 1994. An award of the contract is expected in November, 1994, with proposed construction starting in mid - December, 1994. This schedule will allow completion of both City and CSDOC portions of the project before June, 1995. The Agreement is recommended for approval. ---�F� S'rAnifl4RT Jeff Staneart, P.E. Utilities Director JS: sdi Attachments: "Reimbursement Agreement between City of Newport Beach R CSDOC" REIMBURSEMENT AGREEMENT WITH CITY OF NEWPORT BEACH THIS AGREEMENT is made and entered into, to be effective the 14th day of septemher , 1994, by and between: COUNTY SANITATION DISTRICTS NOS. 5 AND 6 OF ORANGE COUNTY, CALIFORNIA, hereinafter referred to as "DISTRICT" AND CITY OF NEWPORT BEACH, a municipal corporation, hereinafter referred to as "CITY ". WHEREAS, the "DISTRICT" is replacing and rehabilitating a sewer pipeline and related facilities in the Pacific Coast Highway known as "Replacement of Pacific Coast Highway Gravity Sewer, between the Bitter Point Pump Station and Newport Boulevard ", Contract No. 5 -37 -3 (hereinafter referred to as the "DISTRICT's Project "); and WHEREAS, the "CITY" wishes to reconstruct sewer appurtenances which have been designated as the "Balboa Boulevard Sewer Main Replacement from 45th Street to West Coast Highway and Abandonment of the 47th Street Pump Station Project" (hereinafter referred to as the "CITY's Project "), which is included as a separate portion of the "DISTRICT's Project'; and WHEREAS, the Parties mutually agree that combining the "DISTRICT's Project" with the "CITY's Project" into a "Combined Project" would minimize costs and construction impacts at the site; and WHEREAS, the "Combined Project" shall consist of the "DISTRICT's Project" improvements and the "CITY's Project" which shall be shown on separate construction drawings within the "DISTRICT's" Contract No. 5 -37 -3; and WHEREAS, "DISTRICT" and "CITY" desire to set forth their respective rights and obligations concerning the "Combined Project ". NOW, THEREFORE, the parties agree as follows: Page 1 Section 1: Project Design "DISTRICT" shall prepare, or cause to be prepared, plans and specifications for the "Combined Project ", including the "CITY's" portion of the "Combined Project ". The "CITY" shall be responsible for the design costs of the "CITY's Project ". "DISTRICT's" consultant shall incorporate "CITY's" design into the "Combined Project" plans and specifications. The "CITY" shall compensate "DISTRICT's" engineer directly. Section 2: "DISTRICT's" Responsibilities "DISTRICT" shall be solely responsible for the preparation and awarding of the contract pursuant to the applicable public bid requirements for the construction of the "Combined Project ". "DISTRICT" shall be responsible for the preparation of all legal documents, including the notice inviting bids, instructions to bidders, schedule of prices, and any related construction agreements, surety bonds and insurance certificates. "DISTRICT" shall be solely responsible for the administration and performance of the contract awarded to contractor for the construction of the "Combined Project ". Section 3: Right of Access "CITY" shall have the right of access to the construction site of the "Combined Project" at all times. Section 4: Costs A. "DISTRICT's" Costs "DISTRICT" shall pay all costs associated with the "DISTRICT's Project ", including excavation, construction, surveying, inspection and contract administration. B. "CITY's" Costs The "CITY" shall be responsible for all costs associated with design and construction of the "CITY's Project ", including engineering, design, excavation, construction, surveying, and inspection. The "CITY" shall provide the design to "DISTRICT's" consulting engineer for incorporation into the "Combined Project" plans and specifications. Page 2 0 0 The Parties agree that the estimated cost for the "CITY" portion of the "Combined Project" is $125,500.00. The final cost for the "CITY's" portion shall be based upon the actual Schedule of Prices and associated bid item(s) for the work to be done for the "CITY" and any applicable Change Orders thereto and then eight (8 %) percent shall be added to the cost to cover "DISTRICT's" administrative and inspection costs. Estimated costs are depicted on Exhibit "A ". Section 5: Environmental Impact Report/Permits "DISTRICT" shall act as Lead Agency and shall be responsible for full compliance with the provisions of the California Environmental Quality Act ( "CEQA ") for the "Combined Project ". For purposes of "CEQA ", all work hereunder shall be deemed a single project and reference will be made to " DISTRICT's" adopted Master Plan of Sewer Facilities -1989, as amended and supplemented, and related approved Environmental Impact Report. "DISTRICT" shall also obtain all necessary permits to construct the "Combined Project ". Section 6: Change Orders "CITY" shall be given the opportunity to review and approve all change orders issued by "DISTRICT" pertaining to the "CITY's Project" except for changed conditions requiring immediate action. In which case, "DISTRICT" inspector will review changed condition with "CITY" inspector, if they are on -site, however "DISTRICT'S" inspector shall have final say concerning decisions requiring immediate action. "CITY" will provide an inspector with authority to approve change orders during the time the contractor is working on "CITY's" portion of the facilities to be installed as a part of the "Combined Project ". Section 7: Payment A. "CITY" shall pay $20,000 of its share to "DISTRICT" following receipt of an invoice and shall remit funds within sixty (60) days from date of award of the construction contract. Page 3 0 0 B. "CITY" shall pay "DISTRICT" the balance of its share of the costs for the "CITY's Project" during construction within thirty (30) days from receipt of "DISTRICT'S" invoices for same. Final invoices shall be paid within thirty (30) days after acceptance of the construction of the "CITY's Project" by "CITY ". The final invoice shall include all costs due pursuant to Section 4, subparagraph (B), above. "DISTRICT" agrees to invoice "CITY" proportionate to "DISTRICT" contractor's completion percentage of the work items to be reimbursed by "CITY ". The "CITY" reserves the right to withdraw from this agreement and decline to construct the "CITY's Project" if the "DISTRICT'S" costs are unacceptable to the "CITY" or for any other reason prior to the "DISTRICT's" award of the contract for the "Combined Project ". Section 8: Hold Harmless "DISTRICT" shall defend, indemnify and hold "CITY ", its elected and appointed officials harmless from any and all claims, damages, or demands arising out of " DISTRICT's" performance of its obligations under this agreement. "CITY" shall defend, indemnify and hold "DISTRICT" harmless from any and all claims, damages, or demands arising out of "CITY's" performance of its obligations under this agreement. Section 9: Insurance "DISTRICT" shall require the construction contractor for the "Combined Project" to maintain a policy of public liability insurance for personal injury and property damage, including motor vehicle operators, during all times of the contract in the amounts consistent with " DISTRICT's" policies for all construction agreements. Said policy shall name the "CITY ", the "DISTRICT ", their officers, agents and employees as additional insureds thereon. Section 10: Integration This Agreement represents the entire understanding of the "CITY" and the "DISTRICT" as to those matters contained herein. No prior oral or written understanding shall be of any force or effect with respect to those matters covered by this Agreement. This Agreement may not be modified, altered or amended except in writing by the "CITY" and the "DISTRICT ". Page 4 E 0 IN WITNESS WHEREOF, the Parties hereto have executed this Agreement on day and year first above written. rY0]69IR14 N APPROVED AS TO FORM: COUNTY SANITATION DISTRICT NO.5 OF ORANGE COUNTY, CALIFORNIA M By--/ Assistant Secretary, THOMAS L. WOODRUFF DISTRICT GENERAL COUNSEL QI of Directors Directors I'CITY" CITY OF NEWPORT BEACH By ATTEST: Claren rner, Mayor Wanda Raggio, CPT(7f Clerk APPROVED AS TO FORM: CITY ATTORNEY CITY OF NEWPORT BEACH B y J obin Clauson, Assistant City Attorney eng \5- 37- 3 \CSDOC 47th Rmbsmt Page 5 • ATTACHMENT "A" 0 "Replacement of Pacific Coast Highway Gravity Sewer, between Bitter Point Pump Station and Newport Boulevard "; and "Balboa Boulevard Sewer Main Replacement from 45th Street to West Coast Highway and Abandonment of the 47th Street Pump Station Project" Contract No. 5 -37 -3 The City of Newport Beach will pay the following estimated costs for the sewer facilities construction shown on Plan Sheets 1 through 4, titled, 'Balboa Boulevard Sewer Main Replacement from 45th Street to West Coast Highway and Abandonment of the 47th Street Pump Station Project ". Actual costs will be based on bids received. ESTIMATED COST 1. Construct 570 feet of 12 -inch PVC gravity sewer... $70,000.00 2. Construct 100 feet of 8 -inch VCP gravity sewer..... 9,000.00 3. Construct five 48 -inch diameter manholes ........... 20,000.00 4. Abandon 47th Street Pump Station structure ........ 7,500.00 5. Relocate existing 36 -inch CSDOC force main....... 19.000.00 SUBTOTAL $125,500.00 Contract Administration & Inspection (8 %) $10,000.00 TOTAL $135,500.00 eng \5- 37- 3 \CSDOC 47th Rmbsmt Page 6 Ah AmkL , . --- CITY OF NEWPORT BEACH Wanda Raggio, City Clerk P.O. Box 1768 Newport Beach, CA 92658 -8915 SEP CRy CLERN GS u. kEWPOR S JELf:+ Subject: Reimbursement Agreement re Replacement of Pacific Coast Highway Gravity Sewer, Phase 3, Contract No. 5 -37 -3 and Balboa Boulevard Sewer Main Replacement from 45th Street to West Coast Highway and Abandonment of the 47th Street Pump Station Project (City of Newport Beach's project) Enclosed herewith are four copies of subject agreement which was approved by the Boards of Directors of County Sanitation Districts Nos. 5 and 6 on September 14, 1994. Please sign and return two fully- executed copies of said agreement to the undersigned for our records. Penny K Assistant Board Secretary /pk Enclosures cc: Director of Engineering n -n.w. i