HomeMy WebLinkAboutM2023-0040 - MiscReport of Special Inspection Pmjcct N Add... Alan SChnllf, 34e is Lido Nord Number Type(s) Marine Piles Inspection Describe Inspection Made, including locations: 77 Continuous Marine Piles Scope of work - Remove and Relace Piles with new at the Pier & Platform and to Relocate Piles at the Floating Dock. Observed the placement of concrete marine piles per schedule and details on the approved plan. Schedule on sheet S-2 and details on sheet S-3. Piles installed by way of water jetting. Locations: Boat Dock Piles # 1 & 2 = 14"sq. x 21' Long, with min. 15' ft. embed. Piles # 3 & 4 = 14"sq. x 30' Long, with min. 15' ft. embed. Pile # 5 = 14"sq. x 34' Long, with min. 15' ft. embed. Locations: 1) Pile #1 installed today. 2) Pile #2 installed today. Work is complete for the areas listed. List Tests Made Total Inspection Time Each Day: List Items Requiring Correction, Include Uncorrected Items Previously Listed: To the best of my knowledge, the wnrk inspected was in accordance with the Building Department approved design drawings, specifications and applicable workmanship provisions of the IBC except as noted above. 9-28-23 Jon Newsom n-;,t-„,,,,U„ NB-0303 FORM S1 02, :"H Report of Special Inspection Pmjee, Name & Add..." Alan Schnur, 642 Via Lido Nord Permit Number Inspection Type(s) Marine Piles �jj Inspection Dates) 9-29-23 I V (Periodic Elcontinuous Describe Inspection Made, including locations: Marine Piles Scope of work - Remove and Relace Piles with new at the Pier & Platform and to Relocate Piles at the Floating Dock. Observed the placement of concrete marine piles per schedule and details on the approved plan. Schedule on sheet S-2 and details on sheet S-3. Piles installed by way of water jetting. Locations: Boat Dock Piles # 1 & 2 = 14"sq. x 21' Long, with min. 15' ft. embed. Piles # 3 & 4=14"sq. x 30' Long, with min. 15' ft. embed. Pile # 5 = 14"sq. x 34' Long, with min. 15' ft. embed. Locations: 1) Pile #'s 3 & 4 installed today. Work is complete for the areas listed. List Testa Made Total Inspection Time Each Day. Date Hours List Items Requiring Correction, Include Uncorrected Items Previously Listed: To the best of my knowledge, the work inspected was in accordance with the Building Department approved design drawings, specifications and applicable workmanship provisions of the 113C except as noted above. 9-29-23 Signed: ; 7X %��%ram �"� Date: Print Full N/ai»e: Jon Newsom Registration No. NB-0303 room s,ww. E"o Report of Special Inspection project Name & Address Alan Schnur, 642 Via Lido Nord Permit Number IV lMT 5- 0vAQ Inspection Type(s) Marine Piles Inspection Daic(s) 10-2-23 7yeriodic ❑Continuous Describe Inspection Made, including locations: Marine Piles Scope of work - Remove and Relace Piles with new at the Pier & Platform and to Relocate Piles at the Floating Dock. Observed the placement of concrete marine piles per schedule and details on the approved plan. Schedule on sheet S-2 and details on sheet S-3. Piles installed by way of water jetting. Locations: Boat Dock Piles # 1 & 2=14'sq. x 21' Long, with min. 15' ft. embed. Piles # 3 & 4=14"sq. x 30' Long, with min. 15' ft. embed. Pile # 5 = 14"sq. x 34' Long, with min. 15' ft. embed. Locations: 1) Pile #5 installed today. Work is complete for the areas listed. List Tests Made Total Inspection Time Each Day: Date Hours List Items Requiring Correction, Include Uncorrected Items Previously Listed: To the best of my knowledge, the work inspected was in accordance with the Building Department approved design drawings, specifications and applicable workmanship provisions of the IBC except as noted above. 10-2-23 Print FpdName: Jon Newsom Registration No. NB-0303 Foam sw±.:nu Report of Special Inspection Project Name & Address Alan Schnur, 642 Via Lido Nord Permit Number Inspection Type(s) Marine Piles Inspection Date(s) R/C ❑Periodic W611tifluous Describe Inspection Made. including locations: Epoxy Observed the installation of rebar dowels per schedule and details on the approved plan. Verified the hole depths and proper cleaning with a nylon brush and compressed air prior to the epoxy. Type of epoxy used Simpson xp, ESR 2508, expiration 2024. Schedule on sheet S2, Details on sheet S-4 / K. Location: 1) Pile Cap S-4 / K = (2) 5/8" threaded rods with min. 6" embed. Two per pile cap 2) Sea Wall Ledger = 4" x 8" Ledger with (4) 5/8" threaded rods with min. 6" embed. Work is complete for the areas listed. List Tests Made Total Inspection Time Each Day: Date Hours List Items Requiring Correction, Include Uncorrected Items Previously Listed: To the best of my knowledge, the work inspected was in accordance with the Building Department approved design drawings, specifications and applicable workmanship provisions of the IBC except as noted above. e 10-9-23 Print Fu4Name: Jon Newsom Registration No. NB-0303 FURM SI-62.:014