Loading...
HomeMy WebLinkAboutF2022-0579 - Misc?- 0 2-2- a-5-71 214 4r, 13-0e4-,_-j t 1"r e:�_ & 15- Z (I C 14)2 YL-:, CITY OF NEWPORT BEACH CONIMUNrrY DE. VFLOPNHNT DEPARTMENT BUELDWGDMS10N I oo Civic Center Drive, I P,O, Box1768 1 Newport Beach, CA 9265&8915 www.newportbeechca.gov newportbeechca.gov 1 (949) 644-3200 FM SppjNjmER NWA 13D SYSTEM ROUGH INSPECT ION CHECKUST YES 51_ser Construction and Location Angroval a. Drain valve b. Bawow device (single check) c. Bell activation device d. Inspector's test valve a. Riser sized per approved plans 2. Pressure Test _ a. System tested at operating pressure for 2 hours ❑ b. Pressure gauge Installed 3. Sorinkler Heads shall not be Installed in the ftnas odor to the fiffin ss being cemented k-place (temporary test dug;l a. Installation and spacing of temporary test plugs ❑ 4. RkbA a. Material installed per plan El b. Hangers per codes/prevent upward movement 0 c. All CPVC piping shall be installed by persons who have been ❑ certified by the manufacturer for installation of CPVC Piping d. Piping protected from damage S. A24 a. Wiring installed per code b. Boxes Installed at proper locations El NOTE, CPVC plastic pipe In the garage shall not be exposed. Sprinklers that are listed as 'Quick Response" or "Residential' must be used. CORRECTIONS AND NOTES: FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPRO 1. PERMIT* r1_0 BY: DATE—' 23 Fc3rrns;\Flrm sprinkler NFPA 180 System -Rough Inspection Checklist 05/12/2015 WT CrrY OF NEWPORT BEACH. 0.- COMMUNTrY DEWLOPWM DEPARTBEM AunpiNGDWIMON 100 Civic Center Drive I P.O. box 17M Newport Beach, CA 92658-8915 www.newporftachca.gov 1 (949) 644-3200 FM SPRINTU". N"A 13D SYSTEM FINAL CRECKUST MES11DENTL4L) YES NO 1. Water meter proper size ❑El 2. Fire sprinkler system Installed per the approved plans El 3. All construcHon covers removed -from sprinkler heads El F1 4. Cover plates are NOT to be installed, but shall be available on the jobsite f-1 El 5. All tape and paint removed ffm sprinkler heads El Ej 6. Finish trfm installed around sprinkler heads El 7. Proper signage posted at all required locations 8- Flow test conducted and bell tested El El 9. Location of inspector's testing valve In approved location Ej n 10. Clearances around sprinkler heads and riser - no obstructions El r-1 11. Operating pressure gauge installed at riser showing proper water pressure [] El 12. Back flow pFeventer installed F-1 D 13. System installed per manufacturers specifications El 11 NOTES: FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVED. PERMfT A BY. DATF— Forrm\ Fre.913rin1der URA 13D System - FINAL Chaddist REIDEDMAL 05/%Z/M15