HomeMy WebLinkAboutX2021-2737 - Inspection Final Docs (7)STATE OF CALIFORNIA
PLUMBING
CEC-NRCI-PLB-01-E CALIFORNIA ENERGY @
CERTIFICATE OF I NSTALLATION N RCI.PLB-01-E
Plumbing (Page 1 of4)
P'ojectName: clearuyater at Newport Beach Enforcement Agencyl Permit Number:
2382-2021
Proied Address:' 101 Bayview Place City:
Newport Ca,
2ip code:
92662
A. GENERAT INFORMATION
DATE OF BUILDING PERIVIT
BUILDING TYPE E Nonresidential E High-Rire Residential E HotelTMot"l
PHASE OF
CONSTRUCTIO
N
I ruu* Construction ! nddition E Alteration
lf more than one person has responsibility for building construction, each person sholl prepore ond sign on lnstollotion
Certificote document opplicoble to the portion of construction for which they ore responsible; alternotively, the person
with chief responsibility for construction sholl prepore ond sign the lnstollotion Certificote document(s) for the entire
construction.
B. SCOPE OF RESPONSIBILITY
Date of approval by the enforcement agency of the Certificate of Compliance that
provides the specifications for this lnstallation Certificate.
Date:
ln the toble below identify oll opplicoble construction documents thot specify the feotures, moteriols, components,
monufoctured devices, or system performonce diognostic results required for the scope of responsibility for this
I nsto I lotio n Ce rtificate.
Document Title or
Description Applicable Sheets or Pages, Tables, Schedules, etc.
Date Approved By
the Enforcement
Agency
Plumbing Plans Plumbing Permit Rev3 June 26,2022
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020
STATE OF CALIFORNIA
PLUMBING
CEC-NRCI PLB O1.E Revised 01/20 @CALIFORNIA ENERGY COI\iI\i SSION
CERTIFICATE OF INSTALLATION N RCI-PLB-01.E
Plu m bing
t'o]""""'"' clearwater at Newport Beach 2382-2421
PrcjectAddr€ss: 101 Bayview place Newport Ca,92662
C. MANDATORY REqUIREMENTS FOR ALL CENTRAL DOMESTIC HOT WATER RECIRCULATION SYSTEMS
01
On systems that have a total capacity greater than 167,000 Btu/hr, outlets that require higher than service water
temperatures as listed in the ASHRAE Handbook have separate remote heaters, heat exchangers, or boosters to supply the
outlet with the hiBher temperature. (Section 110.3 (c)1)
02 Systems with circulating pumps or with electrical heat trace systems shall be capable of automatically turning off the system
(Section 110.3(c)2).
05
L,nfired storage tanks are insulated with an external R-12 or combination of R-16 internal and external lnsulation.
Alternatively, the heat loss of the tank surface based on an 80'F water-air temperature difference shall be less than 6.5 Btu
per hour per square foot. (Section 110.3(c)4).
06
All sections of the recirculation loop, and the first 5 feet of all branches off the loop are insulated, to the thicknesses
required by Table 120.3A, except for the following: (RA4.4.1)
. Piping installed in interior or exterior walls that is surrounded on all sides by at least linch of insulation.
. Piping installed in attics with a minimum of 4 inches (10 cm) of attic insulation on top.
. Piping that penetrates framing members shall not be required to have pipe insulation for the distance of the
framing penetration. Metal piping that penetrates metal framing shall use grommets, plugs, wrapping or other
insulating materialto assure that no contact i5 made with the metal framing. lnsulation shall butt securely against
allframing members.
. lnsulation is not required on the cold water line when it is used as the return.
07
Hot water pipes that are buried below grade are installed in a water proof and non-crushable casing or sleeve that allows for
installation, removal, and replacement ofthe enclosed pipe and insulation. (RA4.4.1)
08
lnsulation outside conditioned space is protected from damage, including that due to sunlight, moisture, equipment
maintenance, and wind. (RA4.4.1)
09 Pipe insulation fits tightly to the pipe. (RA4.4.1)
10
On insulated sections of pipe, no piping is visible due to insulation voids, and all elbows and tees are fully insulated
(RA4.4.1)
11
The recirculation pump is mounted on a vertical section of the return line, OR an automatic air release valve is installed on a
riser at least 12 inches in length, on the inlet side of the recirculation pump, no more than 4 feet from the pump. (Section
110.3(c)sA).
12 A check valve is located between the recirculation pump and the water heater. (Section 110.3(c)5B)
13
A hose bibb is installed between the pump and the water heating equipment with an isolation valve between the hose bibb
and the water heating equipment. (Section 110.3(c)5C).
14 lsolation valves are installed on both sides of the pump. one of the isolation valves may be the same isolation valve as in
item 12 above. (Section 110.3(c)5D).
15
The cold water supply piping and the recirculation loop piping is not connected to the hot water storage tank drain port
(section 110.3(c)SE).
16
A check valve is installed on the cold water supply line between the hot water system and the next closest tee on the cold
water supply. (Section 110.3(c)5F).
71
The hot water distribution system piping from the water heater(s) to the fixtures and appliances takes the most direct path
(RA 4.4.7.1)
18
lnstallation and operation instructions that provide detajls of the operation of the pump and controls are available at the
jobsite for inspection. (RA 4.4.7.1)
19
More than one circulation loop may be installed. Each loop shall have its own pump and controls. (RA4.4.8, RA 4.4.9, RA
4.4.1O],
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been
met.
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance lanuary 2020
(Page 2 of 4)
STATE OF CALIFORNIA
PLUMBING
-PLB-O,I-E @CALIFORN IA ENERGY COIVIVISSION
CERTI FICATE OF INSTALLATION N RCI-PLB-01.E
Plumbing (Page 3 of 4)
ProjedName: Clearwater at Newport Beach Enforcement Agencyi t"t''t *"023g2-2021
ProjectAddress: 1ol Bayview Place city: Newport Ca,''o
toou' 92662
E. Mandatory Measures for all Domestic Hot Water Distribution Systems
01 Equipment shall meet the applicable requirements of the Appliance Efficiency Regulations (Section l-l-0.3(b)1-)
02 Unfired Storage Tanks are insulated with an external R-12 or combination of R-15 internal and external lnsulation. (Section
110.3(c)a).
03
o All domestic hot water oipine shall be insulated as in Section 609.11 of the California Plumbins Code. ln
a
addition, the followine pipins conditions shall have a minimum insulation wall thickness of 1 inch or a minimum
insulation R-value of 7.7:
The first 5 feet (1.5 meters) of cold water pipes from the storage tank.
All piping with a nominal diameter of 3/4 inch (19 millimeter) and less than 1 inch.
All hot water with a nominal diameter less than % inch that is:.
o Associated with a domestic hot water recirculation system.
o From the heating source to the kitchen fixtures.
o From the heating source to storage tank or between tanks.
o Buried below grade.
Piping that penetrates framing members shall not be required to have pipe insulation for the distance of the
framing penetration. Piping that penetrates metal framing shall use grommets, plugs, wrapping or other insulating
material to assure that no contact is made with the metal framing. lnsulation shall butt securely against all framing
members.
Piping installed in interior or exterior walls that is surrounded on all sides by at least 1 inch of insulation.
Piping installed in crawlspace with a minimum of 2 inches (5 cm) of crawlspace insulation above and below.
Piping installed in attics with a minimum of 4 inches (10 cm) of attic insulation on top
a
a
a
a
a
a
04
a Pipe insulation shall meet the insulation protection requirements of Section 120.3(b)
o lnsulation exposed to weather shall be shielded from solar radiation.
o !nsulation on peps buried below grade must be installed in a water proof and non-crushable
casing or sleeve.
05 All elbows and tees shall be fully insulated. (RA4.4.1)
06 Where insulation is required, no piping shall be visible due to insulation voids, and all insulation shall fit tightly to the pipe.
(RA4.4.1)
07
For Gas or Propane Water Heaters: Ensure the following are installed (Section 150.0(n))
1. A dedicated 725V,2OA electrical receptacle connected to the electric panel with a 120/240V 3
conductor, 10 AWG copper branch circuit, within 3 feet from the water heater and accessible with no
obstructions;
a. The conductor shall be labeled with the work "Spare" on both ends; and
b. A reserved single pole circuit breaker space next to the circuit breaker next to the branch
circuit in A labeled "Future" 240V shall be provided.
2. A Category lll or lV vent, or a Type B vent with straight pipe between outside and water heater
3. A condensate drain no more than 2 inches higher than the base on water heater for natural draining
4. A gas supply line with capacity of at least 200,000 Btu/hr
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been
met.
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020
STATE OF CALIFORNIA
PLUMBING
CEC-NRCI-PLB-01-E 01 @CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF I NSTALLATION NRCI-PLB-o1-E
Plumbing (Page 4 of 4)
Project Name: Clearwater at Newport Beach Enforcement Agency:Permit Number:
2382-202 '1
Project Address: 'l 0 l Bayview place City:Newpofi Ca,
Zio Code:92662
DOCUMENTATION AUTHOR'S DECLARATION STATEM ENT
1. I certify that this Certificate of lnstallation documentation is accurate and complete.
Documentation Author Name:Alfonso Toledo Documentation
Documentation Author Company Name:
AIVPAIV Parks lVechanical
Date Signed:90746Ca,
17036 Avalon Blvd.
Address:CEA/ HERS Certification ldentification (lf applicable):
City/State/Zi p
Carson Ca,90746 31 0-835-1 532
Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of lnstallation is true and correct.
2. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for
the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of
work identified on this Certificate of lnstallation and attest to the declarations in this statement (responsible builder/installer),
otherwise I am an authorized representative of the responsible builder/installer.
3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this
Certificate of lnstallation conforms to all applicable codes and regulations, and the installation conforms to the requirements
given on the plans and specifications approved by the enforcement agency.
4. I reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific
requirements for the scope of construction or installation identified on this Certificate of lnstallation, and I have ensured that
the requirements that apply to the construction or installation have been met.
5. I will ensure that a completed signed copy of this Certificate of lnstallation shall be posted, or made available with the building
permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand
that a completed signed copy of this Certificate of lnstallation is required to be included with the documentation the builder
provides to the building owner at occupancy.
Responsible Builder/lnstaller Name:
Alfonso Toledo
Responsible Builder/l
CompanyName: (lnstallingSubcontractororGeneralContractororBuilder/Owner)
AtvlPAM Parks Mechanical
Position With CompanV (Titf
Desiqner / Journeymen Plumber
Address: 17036 Avalon Blvd.CSLB License:
Carson Ca,90746
city/state/zip:
31 0-835-1 532
Phone Datesisned:
z-/z/
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020
aL,,l
STATE OF CALLFORNIA
HIGH RISE RESIDENTIAL/HOTEL/MOTEL CENTRAL HOT WATER SYSTEM DISTRIBUTION
CEC NRCIPLB-o2-E (Revised 01/20)CALIFORNIA ENERGY COI\,4I\4ISSION
CERTIFICATE OF INSTALLATION NRCI-PLB-02-E
High Rise Residential/Hotel/Motel Central Hot Water System Distribution (Page 1 of 3)
Clearwater at Newport Beach Permir Numb€r: 2gg2 - 2021
PrciectAddr's: 101 Bayview place ciq'Newport Beach, Ca .,r."0", 92660
A. DHW Distribution System
01 Water Heating System Name Central Hot Water Heatin stem
02 Distribution e k d Bran T
B. Multiple Dwelling Units - Recirculation Temperature Modulation Control Requirements
5 uirementsms that utilize this distribution e shall comply with these re
01 een installed that reduce the hot water supply temperature when hot water demand is determined to be low by the control system. The
namic control schedules based measurements of hot water demand
Controls have b
RA4.4.11)control stem may use a fixed control schedule or
o2
y temperature reduction (which is defined as the sum of temperature reduction by the control in each hou r within a 24-hour period)
shall be more than 50'F RA4.4.11
Daily hot water suppl
The responsible person's signature on this compliance document affirms that all applicable ,equirements in this table have been met
C. Multiple Dwelling Units - Recirculation Continuous Monitoring Systems Requirements
uirementsly with these restems that utilize this distribution e shall com
01 The water heating system must have a means of communicating with the remote monitorin s facility. (RA4.4.12)
02 The monitoring system must record no less frequently than hourly measurement of key system operation parameters, including hot water supply and
return temperatures, and status of gas valve relays. {RA4,4.12)
03 A current contract must be available that demonstrate the s tem will be monitored. (RA4.4.12
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met.
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020
STATE OF CAL]FORN]A
HIGH RISE RESIDENTIAL/HOTEL/MOTEL CENTRAL HOT WATER SYSTEM DISTRIBUTION
CEC-NRCI-PLB 02-E (Revised 01/20)CALIFORNIA ENERGY COI\,{MISS ON
CERTIFICATE OF INSIALLATION NRCI-PLB-02-E
High Rise Residential/Hotel/Motel Central Hot Water System Distribution (Page 2 of 3)
' Clearwater at N ort Beach 2382 - 2021' 10'1 Ba iew Place rt Beach, Ca'fte*''o"og2660
D. Multiple Dwelling Units - Demand Recirculation Requirements
Systems that utilize this distribution type shall com with these requirements:
01 emand", meaning that the pump begins to operate shortly before, or immediateJy after, hot water draw begins, and stops when
ture reaches a certain threshold value. (RA4.4.13)
The system operates "on-d
the return water tem ra
o2
, the controls shall allow the pump to operate until the water temperature at the thermosensor rises to one of the
following values: (RA4.4.1.3)
. Not more than 10"F ( 5.6'C) above the initial temperature of the water in the pipe; or
After the pu mp has been activated
. Not more than 102'F 38.9"C)
03 e controls shall limit pump operation to a maximum of 10 minutes following any activation. This is provided ln the event that the normal means ofTh
shutti offthe pump have failed. (RA4.4.13
o When a dedicated return line has been installed the pump, controls and thermo-sensor are lnstalled at the end of the supply portion of the
recirculation loop; or
o The pump and controls are installed on the dedicated return line near the water heater and the thermo-sensor is installed in an accessible tocation
as close to the end ofthe supply portion ofthe recirculation loop as possible; orr When the cold water line is used as the return, the pump, demand controls and thermosensor shall be installed in an accessible location at the
pically under a sink)end of su ortion of the hot water distribution line
05 uired on the cold water line when it is used as the return.(RA4.4.13)lnsulation is not r
06 or sensor controls shall be anstalled and, if powered, each control has standby power of l Watt or less. Controls may be located in individual units or
y be activated by wired or wireless mechanisms, includin on sensors/ door switches and flow switches. (RA4.4.13)
Manual
buttons, motion the loo Controls ma
The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met
E. Multiple Dwelling Units - Non-Demand Control Recirculation systems Requirements
uirementsly with these reSystems that utilize this distribution e shall com
e active control shall be either: timer, temperature, or time and temperature. Timers shall be set to less than 24 hours. The temperature sensor shall beTh
umpconnected to the ing and to the controls for the
The responsibl e person's signature on this compliance document affirms that all applicable requirements in this table have been met.
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020
04
Pump and control placement shall meet one ofthe following criteria: (RA4.4.13)
01
STAIE OF CALIFORNIA
HIGH RISE RESIDENTIAL/HOTEL/MOTEL CENTRAL HOT WATER SYSTEM DISTRIBUTION
CEC-NRCI-PLB-02 E (Revised 01/20)CALIFORNIA ENERGY COMIt,{ISS]ON
CERTIFICATE OF INSTALLATION
High Rise Residential/Hotel/Motel Central Hot Water System Distribution (Page 3 of 3)
Clearwater at Newport Beach t",.. ",-0",,23g2 _ 2021
Projedaddrc$: 101 Bayview Place cityNewport Beach, Ca ,,r..0",g2660
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of lnstallation documentation is accurate and complete
Documentatiof Author Name
Alfonso Toledo
Documentation Author Company Name
AMPAI\,4 Parks Mechanical
DateSigned 02t02t2024
17036 Avalon Blvd
cEA/HERs certif ication ldentiflcation (lf applicable)
ctv/state/zip
Carson Ca, 90746 310-835-1532
RESPONSIBLE PER5ON'S DECLARATION STATEMENT
I certiJy the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of lnstallation is true and correct.
(responsible builder/installer), otherwise lam an authorized representative ofthe responsible builder/installer.
codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by the enforcement agency,
identified on this Certificate of lnstallation, and I have ensured that the requirements that apply to the construction or installation have been met.
to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of tnstallation is required to be included with the
documentation the builder provides to the building owner at occupancy.
ResponsibleBuilder/rnstalle'N"r", AlfOnSO TOledo Responsible Builder/l
(lnsta llinB Subco ntra ctor or General Contractor or Builder/Owner)
AN,IPAM Parks Mechanical
Position wi!h Company {Title)igner / Journeymen Plumber
17036 Avalon B vd
Cily/state/Zip
Carson Ca, 90746 31 0-835-1532
o""t""".' o2rozrzo24
CA Building Energy Efficiency Standard5 - 2019 Nonresidential Compliance lanuary 2020
N RCI-PLB-o2-E
Document3tion Author Signature: