HomeMy WebLinkAboutC-3459(A) - Cooperative Agreement; Installation of Median Landscaping on Jamboree Road Between Campus Drive and Bristol Drive� G 3 • CITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. s November 28, 2006 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Bill Patapoff, City Engineer 949 -644 -3321 orbpatapoff @city.newport- beach.ca.us SUBJECT: AMENDMENT NO. 1 TO AGREEMENT NO. D98 -096 WITH COUNTY OF ORANGE FOR THE IRVINE AVENUE ROADWAY WIDENING PROJECT FROM SOUTH BRISTOL STREET TO MESA DRIVE RECOMMENDATION: Approve Amendment No. 1 to Agreement No. D98 -096 with the County of Orange for additional responsibilities and cost sharing for the Irvine Avenue Widening project from South Bristol Street to Mesa Drive. • DISCUSSION: - The City and County share the street right -of -way on Irvine Avenue between South. Bristol Street and Mesa Drive. On April 9, 2002, the City and County entered into an Agreement defining the responsibilities and costs for widening Irvine. Avenue from four lanes to six lanes. The County is the lead agency for the design, right -of -way acquisition, and construction of this Measure M (partially funded) project. Each agency is responsible for the matching costs within its jurisdiction, except for the items identified in the proposed amendment. The most recent estimate for the Irvine Avenue construction is $6 million and right -of -way acquisition is appraised at $830,000. Some monies are included in this years Capital Improvement Program budget for this work. One reason why the amendment is needed is to add the construction of landscaped raised medians and a landscaped parcel of land adjacent to the street north of Mesa Drive (See Attachment 1). The County's plans showed these areas as striped center medians and a vacant dirt parcel owned by the County. In order to beautify this segment of the roadway, the City is required by the County to be responsible for the design, construction, and maintenance of these areas both in City and County jurisdictions. Funding for this improvement is proposed to be from the Santa Ana Heights Redevelopment Agency. • Amendment No. 1 to Agreement No. D906 with the County of Orange for the ` Irvine Avenue Roadway Widening Project from South Bristol Street to Mesa Drive November 28, 2606 Page 2 The second reason for the amendment is to define the cost sharing of the Mesa Drive • at the Irvine Avenue intersection. This intersection experiences heavy left turn movements from.westbound Mesa Drive to southbound Irvine Avenue and an additional left turn lane is warranted. In order to accomplish this, the west side of the intersection needs to be widened for through traffic. This widening requires additional right -of -way and the construction of new retaining walls and street improvements. The. County will reimburse the City for the design of these improvements this fiscal year. The City and County will each bear 50% of the right -of -way and construction costs to be budgeted next fiscal year. Latest estimates for this work are $440,000 for right -of -way acquisition and $335,000 for construction. Presently. the project construction drawings are 95 %. complete and the County is in the process of acquiring the needed right -of -way. Construction is scheduled to start in the summer of 2007. Environmental Review: Negative Declaration IP 02 -129 was certified by the Orange County Boar of Supervisors on March 8, 2005. Prepared by: Submitted by:.. • i atapoff,.P. St hen G. Badum City Engineer ublic Works Director. Attachment: Landscape Attachment 1 Amendment to Cooperative Agreement Executed Agreement No. D98 -096 n U ® SCALE 1":100' MEDIAN LANDSCAPE AREA — TO BE MAINTAINED BY CITY } i A MEDIAN LANDSCAPE AREA — TO BE OWNEDIMAINTAINED BY CITY t LANDSCAPE AREA RW PARCEL TO BE TRANSFERRED TO CITY t, e t RACE 80.0 t CENTER 1 .. CFm x '.. NEN3Y7RT 6AY ` ' ?ERR.M10E APAATM &`f!'R ORANGE COUNTY RESOURCES & DEVELOPMENT MANAGEMENT DEPARTMENT �.ILVIn�� /�vENlira .lrArlUSGPc'�E 4R'�gS `PsYTPt C1k M � t`3 T Z 1 u r Ell Amendment No. 1 to Agreement No. D98 -096 • AMENDMENT NO. 1 to AGREEMENT D98 -096 THIS AMENDMENT NO. 1 to AGREEMENT D98 -096, is made and entered into this day of 2006. 13Y AND BETWEEN ` THE CITY OF NEWPORT BEACH, a Municipal Corporation in the State of California hereinafter referred to as "CITY". AND THE COUNTY OF ORANGE, a political subdivision of the State of California, hereinafter referred to as "COUNTY ". WITNESSETH WHEREAS, Agreement No. 1398 -096; dated' April 9, 2002 between City and County, previously specified . responsibilities for the design, right -of -way acquisition, construction, construction and maintenance of improvements to Irvine Avenue between University Drive and Bristol Street, and Mesa drive at its intersection of Irvine Avenue and 500 feet westerly, hereinafter referred to as "PROJECT" and; . WHEREAS; CITY . and COUNTY wish. to specify additional responsibilities for the ownership and maintenance of specified elements of said PROJECT; and WHEREAS, PROJECT proposes to provide landscaping and irrigation improvements to a land parcel and to raised medians within unincorporated COUNTY limits hereinafter referred to as' "LANDSCAPING" and "MEDIAN LANDSCAPING," respectively .and WHEREAS, LANDSCAPING and MEDIAN LANDSCAPING areas are described in EXHIBIT A attached Hereto and by this reference made a part hereof; and • Page 1 of 4 • 0 Amendment No. 1 to Agreement No. D98 -096 • WHEREAS, PROJECT proposes to widen Mesa Drive at its intersection with Irvine Avenue, within unincorporated COUNTY limits, hereinafter referred to as "MESA DRIVE "; and WHEREAS, CITY and COUNTY possess full authority to *enter into this Amendment. NOW, THEREFORE, IT IS AGREED by and between the parties hereto as follows: A. CITY Shall: Prepare plans, specifications and estimate (PS &E) for LANDSCAPING and MEDIAN LANDSCAPING for incorporation into the PROJECT PS &E. B. COUNTY shall: Prepare a resolution, to be approved by the COUNTY Board of Supervisors, which deeds LANDSCAPING area, as described in EXHIBIT A, to the CITY upon completion of PROJECT. • C. PAYMENTS AND FINAL ACCOUNTING: 1. CITY shall bear one - hundred - percent (100 %) of costs for design and construction, of LANDSCAPING. 2.: CITY and COUNTY shall each bear fifty - percent (50 %). of costs for right -of -way acquisition and construction of MESA DRIVE. D. It is MUTUALLY UNDERSTOOD BY THE PARTIES HERETO THAT: 1. Upon acceptance of the PROJECT improvements by CITY, CITY shall accept ownership and maintenance responsibility for LANDSCAPING area as identified in EXHIBIT A. 2. Upon acceptance of the PROJECT improvements by CITY, CITY shall accept maintenance responsibility for MEDIAN LANDSCAPING area as identified in EXHIBIT A. 1 This amendment does not modify, waive, discharge, or terminate any terms of Agreement No. D98 -0% not described herein. Page 2 of 4 Amendment No. I to Agreement No. D98 -096 3. The parties acknowledge that each party and its counsel have reviewed this amendment and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this Amendment or any exhibits hereto. Page 3 of 4 A • • E i Amendment No. 1 to Agreement No. D98 -096 • IN WITNESS WHEREOF, the CITY has caused this amendment to be executed by its mayor and attested by its clerk, and COUNTY has caused this amendment to be executed by the Chairman on the Board of Supervisors and attested by its Clerk, all thereunto duly authorized by Minute Orders of the City Council and the Board of Supervisors, respectively, on the date written opposite their signatures. THE CITY OF NEWPORTBEACH, a municipal corporation Date: By: Mayor ATTEST: APPROVED AS TO FORM: City Clerk City Attorney • COUNTYOF.ORANGE, a political subdivision of the State of California Date: By. Chair, Board of Supervisors SIGNED AND CERTIFIEDTHAT A COPY OF THIS DOCUMENT HAS BEEN DELIVERED TO THE CHAIRMAN OF THE BOARD By: Darlene J. Bloom Clerk of the Board of Supervisors of Orange County, California Page 4 of 4 • • 0. ® MEDIAN LANDSCAPING AREA - OWNED BY COUNTY 1 SCALE P'100' COUNTY TO MAINTAIN CURB & GUTTER J CITY TO MAINTAIN LANDSCAPE ' LANDSCAPING AREA - RW PARCEL TO BE TRANSFERRED TO CITY t .. 'r. PROPOSED IMPROVEMENTS - IRVINE AVENUE E PROPOSED IMPROVEMENTS - MESA DRIVE 1 PROPOSED RETAINING WALLS - MESA DRIVE -• °• °^ COUNTY/CITY BOUNDARY 'BACK BAY C CENTER t NEWPORT BAY TERRACE APARTMENTS O .,. 6 NEWPORT Y ® s IsRVINE AYENCR � C TRADE s01° t tR� OP OAPy';.�.. i O ORANGE COUNTY 14' OFFSET FROM RESOURCES & DEVELOPMENT MANAGEMENT DEPARTMENT EDGE of cwNEL TO BE OWNED � INED AMENDMENT NO. I TO AGREEMENT NO. D98 -096 BY COUNTY NEWPORT x� EXHIBIT A �° F °U�E IRVINE AVENUE ROADWAY WIDENING PROJECT SOUTHERLY OF MESA DRIVE TO SE BRISTOL STREET % • • 0. ii . . Cons with CKY Council Acton on: For mor infortaation, contact at -7 3L12 0 COOPERATIVE AGREEMENT For Jamboree Road Median Improvements from Bristol Street to Campus Drive This Agreement is made and entered into this 1 5f'' day of 2002, by and between the CITY OF NEWPORT BEACH ("Newport Beach') and fhe CITY OF IRVINE ( "Irvine "): RECITALS WHEREAS, the median reconstruction of Jamboree Road between Bristol Street and Campus Drive, is a project that involves Irvine and Newport Beach because the city boundary line exists along the centerline of the Project. CONTRACT TERMS AND CONDITIONS Newport Beach will supervise the construction of the Project to the best of its ability within the established budget and time frame, and shall implement and complete the Project under guidelines established by the Cities of Newport Beach and Irvine, and will follow all public bid and contract procedures. 2. The terms of this Agreement cover the administrative responsibilities of the parties with regard to the Project, but not the actual construction of the Project itself, although Newport Beach will cause the construction to be completed. Irvine has reviewed and signed the final design drawings and reviewed the engineer's construction cost estimate (Attachment "A'). Irvine shall receive a complete breakdown of the actual construction costs prior to invoicing, and shall be invoiced for its portion of the cost incurred by Newport Beach upon completion of the construction phase. 4. The total cost for the project is estimated at $286,000, which includes a 10% contingency. Subject to prior approval by Irvine of the award for the construction contract, Irvine will reimburse Newport Beach for Irvine's share of construction costs estimated at $77,800. The total cost for construction administration, survey, testing, and inspection is estimated at $39,000 of which Irvine would be responsible for $10,530. Newport Beach will invoice Irvine when the project is complete and Irvine shall make payment to Newport Beach within 30 days of the invoice. S. Additional consulting services affecting Irvine shall be reviewed and approved by Irvine. 6. Change orders affecting Irvine shall be reviewed and approved by Irvine prior to granting approval with the Contractor. The total landscaped area is approximately 23,380 square feet of which 5,920 square feet is within Irvine City limits. The total annual irrigation and maintenance costs are estimated at $6,700. Newport Beach will pay for irrigation and maintenance for the median planters. Irvine C- �y`,-j will reimburse 25% of that total cost to the City of Newport Beach, estimated at $1675. Irvine will be invoiced annually and payment is due within 30 days of the invoice. 8. Inspectors and/or engineers from both Cities will coordinate for spot construction inspections and a site walk prior to completion of the project, 9. As referenced in the Drawings, Special Provisions, Proposal and Contract for the Project, the "Owner" shall refer to Newport Beach and the contract responsibilities held by Newport Beach. 10. Newport Beach shall require that the independent contractor provide the necessary insurance coverage for construction work, as specified in Section 6 -1 of the Special Provisions and Section G of the Contract for the Project. Newport Beach and Irvine shall be named as additionally insured parties in the Special Provisions and Contract for the Project, and shall be insured for the amounts specified in Section 6 -1 of the Special Provisions and Section G of the Contract. 11. The following staff members, or as otherwise designated in writing by the City Manager of Irvine or the City Manager of Newport Beach, shall be the selected representatives of each City to act in each respective City's behalf with respect to this Agreement. Any notices, requests, approvals, or communications shall be given to each representative noted below: To Newport Beach: To Irvine: Bill Patapoff lames H. Eldridge Public Works Department Public Works Department P.O. Box 1768 P.O. Box 19575 Newport Beach, CA 92658 -8915 Irvine, California 92623 -9575 (949) 644 -3321 (949) 724 -7556 12. Each of the parties agrees to do all things in a timely manner reasonably necessary or convenient to carry out the spirit, intentions and objectives described in this Agreement whether or not expressly prescribed herein and no consent, agreement, approval, concurrence, decision, determination or action shall be unreasonably withheld by either party. 13. Any controversy or claim arising out of this Agreement or alleged breach thereof shall first be resolved through voluntary mediation or as otherwise designated in writing by the City Manager of Newport Beach or the City Manager of Irvine. Said City Managers shall be the selected representatives of each City to act in each respective City's behalf with respect to this Agreement. 14. Newport Beach shall indemnify, defend, save and hold harmless Irvine, its City Council, officers, and employees from and against any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims caused by the willful actions or active negligence of Newport Beach, its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys' fees and other reasonable costs incurred in defending any such claim. 15. Irvine shall indemnify, defend, save and hold harmless Newport Beach, its City Council, officers, and employees from and against any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims caused by the willful actions or active negligence of Irvine, its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys' fees and other reasonable costs incurred in defending any such claim. 16. This Agreement represents the entire understanding of the parties as to those matters contained herein, and no prior oral or written understanding shall be of any force or effect with respect to those matters covered in this Agreement. This Agreement shall be governed by and construed in accordance with the laws of the State of California, and construed as if drafted jointly by Irvine and Newport Beach. This Agreement may be amended at any time by the mutual consent of the parties by an instrument in writing. 17. The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by so executing this Agreement the parties hereto are formally bound to the provisions of this Agreement. This Agreement shall be made effective upon execution by both parties and shall remain in effect until project reimbursement is complete or both parties agree to amend or terminate it. IN WITNESS WHEREOF, Newport Beach and hvine have caused this Agreement to be executed by its duly authorized officers and representatives, respectfully, on this o1i6(. day of 2002. CITY OF NEWPORT BEACH By: Tod W. Ridg y, Mayor i By: City Clerk APPROVED AS TO FORM: j . By: City Attorney CITY OF IRVINE By: ' Lary APPROVED AS TO FORM: TO: Mayor and Members of the City Council FROM: Public Works Department 4P ;V /qu) C -JySi June i1, 2002 CITY COUNCIL AGENDA SUBJECT: JAMBOREE ROAD MEDIAN IMPROVEMENTS - NO. 3459 RECOMMENDATIONS: Approve the plans and specifications. 2. Allow Oakridge Landscape, Inc., to withdraw their bid. JUN 11 2002 3. Award Contract No. 3459 to Mega Way Lighting Inc., for the Total Bid Price of $250,055.73, and authorize the Mayor and the City Clerk to execute the contract. 4. Establish an amount of $25,000.00 to cover the cost of unforeseen work and testing. 5. Approve a Budget Amendment authorizing an increase of $100,300 to Account No. 7261- C5100580 from the unappropriated balance of the Transportation and Circulation Fund. DISCUSSION: At 11:00 A.M. on May 29, 2002, the City Clerk opened and read the following bids for this project: Oakridge Landscaping Inc., indicated they made several clerical errors in their bid and have asked to be allowed to withdraw their bid. Staff has reviewed the documentation supplied by the contractor and approves the contractors request IB DDER TOTAL BID AMOUNT Low Oakridge Landscape Inc. * $156,172.17 2 Mega Way Lighting Inc., dba Mega Way Enterprises $250,055.73 3 Pima Corporation $263,717.00 4 Nakao & Associates $266,466.00 5 Southland Construction $268,065.00 6 Nativ Engineering $274,449.40 7 S & M Landscape Inc. $279,370.65 * Corrected Bid Amount is $146,1Q8.81 Oakridge Landscaping Inc., indicated they made several clerical errors in their bid and have asked to be allowed to withdraw their bid. Staff has reviewed the documentation supplied by the contractor and approves the contractors request Subject Jamboree Roan Improvements -Award of contract No. 30 June 11. 2002 Page: 2 The lowest responsible Total Bid Amount is 4 percent below the Engineer's Estimate of $260,000. The lowest responsible bidder, Mega Way Lighting Inc., possesses a General "A" contractor's license as required by the project specifications. A check of Mega Way Lighting inc., references indicates they have satisfactorily completed various similar improvement projects for other Southern California agencies. This project provides for a cooperative project between the City of Newport Beach and the City of Irvine for design and installation of landscape improvements on the .Jamboree Road Medians between Bristol. Street North and Campus Drive. A Cooperative Agreement has been approved by both City Councils and signed by the Mayors of each city. Since the improvements are within both the City of Newport Beach and the City of Irvine, the City of Irvine has agreed to reimburse the City of Newport Beach for their portion of the construction costs, estimated at $77,800 for construction and $10,530 for administrative and inspection services. There are sufficient funds available in the following accounts for the work: Account Description Account Number Amount Transportation and Circulation 7261- C5100580 $200,232.73 Contributions (from City of Irvine) 7251- C5100580 74,823.00 Total: $275,055.73 Respectfully, .stJbmif 6d, PUBLIC WORKS DEPARTMENT Stephen G. Badum, Director By: J�z -/ -4- - Stephen 6. Luy, PA. Project Manager Attachment: Project Location Map Bid Summary Oakridge Landscape letter Draft Cooperative Agreement B5/PO/2002 13:38 94965 OAKRIDGE 0 PAGE 01 Llcr 999SCS May 30. 2002 To: City Of Newport Beach 3300 Newport Blvd. Newport Beach CA. 92658 Attn: Public Works Department Stephen J. luy Project Manager Regarding; Jamboree Rd. Median Improvements contract # 3459 Dear Mr Luy, Please consider this a forroal request that we be released from our bid on the above reference project and that our bid bond be returned. We made several substantial errors in the preparation of our bid. l .There was no bid item t6 cover the low voltage electrical wiring from the controller to the valves. We failed to include these costs in various other bid items. 2. There was no bid item fix lateral line piping. We failed to cover this work in the various other bid items. 3. Our unit price number 6 for the installation of moisture barrier covers the cost of material only. We failed to include the labor necessary to dig, install and backfill the moisture barrier. 4. We failed to bid item number 26. 5. In demolition item number 3 we failed to cover costs to fine grade and prep for new concrete. We respectfi lly request that we be released from our bid We sincerely apologize for any inconvenienced this has caused you or the City of Newport Beach. Sincere` ly, 4is�. �� Oakridge Landscalre Charles R. John CPO CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT TITLE JAMBOREE ROAD MEDIAN IMPROVEMENTS BID LOCATION: City Clerk's Office . City Hall CONTRACT NO.: 3459 DATE: 29•May02 TIME 11:00 ENGINEER'S ESTIMATE: $260,000.00 BY: Stephen Luy CHECKED: Shari Rooks DATE: 09-May02 PROJECT MANAGER: Stephen Luy f: WsersXpbwlsharedlcordract100 01 "BID SUMMARY 03459 Page I 0 Engines 's Estimate Oakrid a Landsca e, Inc. Mega Lighting Inc., dba Mega Enterprises Pima ration ITEM DESCRIPTION QUANT(TYJ UNIT AMOUNT UNIT AMOUNT UNIT I AMOUNT UNIT I AMOUNT I Mobilization 1 L.S. 11,766.00 11,766.00 2,500.00 2500.00 8,000.00 8,000.00 15,000.001 15,000.00 2 Traffic Control 1 L.S. 9,000.00 9000.00 4,515.00 4,515.00 15,000.00 I5,000.00 10,000.00 10000 3 Demolition 11,724 S.F. 1.25 14,655.00 0.50 5,862.00 1.27 14,889.48 1.00 11,72 4 Bore Under Exist. RoadwaY & Provide Conduit 11300 L.F. 20.00 26,000.00 19.00 24,700.00 16.00 20,800.00 25.00 32,500.00 5 Const. 4' Thick POC Stamped Colored Cone. 12,863 S.F. 6.00 77,178.00 3.57 45,920.91 4.50 57,883.50 5.00 64,315.00 6 Install Moisture Barrier 2,435 L.F. 1 3.00 7,305.00 0.21 511.35 3.25 7,913.75 3.00 7305.00 7 Construct Drain Inlet 1 E.A. 300.00 300.00 250.00 250.00 1,000.00 1,000.00 1,000.00 1,000.00 8 Install 6' PVC Drain 130 L.F. 7.00 910.00 5.00 650.00 10.00 1,300.00 10.00 1,300.00 9 Install R.P. Device 3 E.A. 2500.00 7,500.00 775.00 2,325.00 2,500.00 7,500.00 1250.00 3,750.00 10 Install Irrigation Controller 3 EA. 500.00 1,500.00 8,629.00 1,000.00 3,000.00 8,000.00 24,000.00 11 Install Elect. Main Connection Irr. Controller 1 EA. 1000.00 1,000.00 1 551.00 1,551.00 1,500.00 1,500.00 2,000.00 2 000.00 12 Install 1 117 Sch. 40 PVC Main line 1,170 L.F. 3.DO 3,510.00 1,697. 10.00 11 700.00 3.00 3,510.00 13 Install 2' Sch. 40 PVC Main Line 1,840 L.F. 3.50 6,440.00 0190 11656.00 10.00 18,400.00 6.00 11 040.00 14 Construct Trench and Patch Back 280 L.F. 20.00 5,600.00 10.00 2,800. 18.00 5,040.00 35.00 91800.00 15 Install Sprinkler Heads 255 1 E.A. 38.00 9,690.00 13.47 3,434.85 37.00 9,435.00 21.00 5,355.00 16 Install Remote Control Valves 11 E.A. 475.00 192.64 2,119.04 390.00 4,290.00 400.00 4,400.00 17 Install ick Coupler Valves 12 EA. 250.00 133.83 1,605.% 275.00 3,300.00 200.00 2,400.00 18 Install One Galion Shrubs 1,192 EA. 8.00 5.50 6,556.00 5.50 6.556.00 5.00 5,960.00 19 Install Five Gallon Shrubs 333 E.A. 18.00 14.66 4,881.78 17.00 5,661.00 20.00 6,660 20 Install Eldarica Pine W /Root Barrier 36 EA. 300.00 1 I 259.19 9,330.84 310.00 11,160.00 300.00 10, 21 Install Magnolia Grandifora W /Root Barrier 62 E.A. 150.00 94.74 5,873.88 225.00 13,950.00 80.00 4, %0. 22 Install Ground Cover 2,940 S.F. 0.50 0.47 1,381.80 0.65 1,911.00 1.50 4 410.00 23 Install Mulch 23,380 S.F. 0.20 0.07 1,636.60 0.50 11,690.00 020 4.676A0 24 Soil Preparation 23,380 S.F. 0.25 5,845.00 0.16 3,740.80 0.20 4,676.00 0.40 9,352.00 25 lProvide and Install Electrical Facilites 1 L.S. 15,000.00 15,000.00 1,100.00 1,100.00 1,500.00 1,500.00 5,000.00 5,000.00 26 1 Remove, Store and Reinstall Traffic Signs 1 L.S. 2 000.00 2,000.00 n/c 1 200.00 200.00 1,500.00 1,500.00 27 160-Day Plant Est. and Maint. Period 1 L.S. 4,800.00 4,800.00 880.00 880.00 1,800.00 1,800.00 1,000.00 1,000.00 EE 260,000.00 LOW 146108.81 2ND 250,055.73 3RD 263,717.00 Bid Amount;$156,172.17 f: WsersXpbwlsharedlcordract100 01 "BID SUMMARY 03459 Page I 0 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT TITLE JAMBOREE ROAD MEDIAN IMPROVEMENTS BID LOCATION: City Clerk's Office -City Hall CONTRACT NO.: 3459 DATE: 294ay02 TIME: 11:00 ENGINEER'S ESTIMATE: ;260,000.00 BY: Stephen Luy CHECKED: Shari Rooks DATE: 09-Ma 02 PROJECT MANAGER: Stephen Luy f: \users\pbw \Shared\contract 100 -01 \\SID SUMMARY C -3459 Page 2 I ®'n gym ®■mom 'I /1 II 111 !/ 111 41 111 moomm IIf 1/ 11/ II •: 11 : •: rl 1111�11 11/111 1111 1111 1111/ x/111 •/! /1 111 .111 11 11 f111 1If f1. 11T1y� �,1/.'� IIIIIIIIIIIIIiSlI 1 11 • I I• ! 1 11 1 1 MENEM i • 11 !I 1111! 11• ♦1 1 1 11 1 1 11 x1111 111 11 moom 1!1 II• 11 II 11 111 111 11 11 •• !1 11 1\111 11111 11 1/ f11f f11• 11 ♦I . 1• •I 11 !1 1• 1111 .111 11 : Iif 11 .111 f1 :14111 !! 11 !I1 !1 III If 1 /111 Ifl // 111 F11111/ =:;a.- 11 1 11 IMEM 1 f! /® 1 1 IIIIIIIIIIIII<•• 14 SEEM= mommul 11 :1111 11 ' 1111' I! :111 'I 1f :•1111 1f 411 II MEEP I1 .6111 SEEM : 11 000M // [ mmorm now= , • . • 11 I1 f l l i 11 11 11 / -1 •.11 / 1 11 I1 11 11 • : 11 . 11 11 11 11 11 1 11 111 1 \ 11 11 11 11 11 SEEM 1 I/ mmom •.I 1• �11 IIIIIIIIIIIII•�.•1 11 loom . 11 11 MINIM 111 111 1111 11111 !/ 1111 f1 11 4f I! •:. 11 1111 •1141 INNIF 111/ 1111 NNFFZ7 1: 1 hI :: 11 11 • 1 11 1 1 1 1 /I==m11 llllllll m I 1. �/ I� I 1. mml=� 1 11'1 IIIIIIIIIIIII� it 1 1 1 /1 1 1' �Rrn�•. MNNN • 11 ' 11 41.1 11 11111 1!/ 11 111 11 111 11 11111 11 1/ 11111 soon= \111 0000515 If 1H111 11111 ' 11 11 11111 ♦4111 IA111 .111l�. 1111 I� .. • . / / ® 1 . 11®�yiJ X�111 ►�11� ®C111.C48C� f: \users\pbw \Shared\contract 100 -01 \\SID SUMMARY C -3459 Page 2 I "Ila C 11 w MA WE 41 0 hN r JAMBOREE ROAD MEDIAN IMPROVEMEP BRISTOL STREET TO CAMPUS DRIVE I CONTRACT NO. 3459 oRAwme no. EXHIBIT A "DRAFT" 0 COOPERATIVE AGREEMENT For Jamboree Road Median Improvements from Bristol Street to Campus Drive This Agreement is made and entered into this day of , 2002, by and between the CITY OF NEWPORT BEACH ("Newport Beach') and the CITY OF IRVINE C'fie'): RECITALS WHEREAS, the median reconstruction of Jamboree Road between Bristol Street and Campus Drive, is a project that involves Irvine and Newport Beach because the city boundary line exists along the centerline of the Project. CONTRACT TERMS AND CONDITIONS 1. Newport Beach will supervise the construction of the Project to the best of its ability within the established budget and time frame, and shall implement and complete the Project under guidelines established by the Cities of Newport Beach and Irvine, and will follow all public bid and contract procedures. 2. The terms of this Agreement cover the administrative responsibilities of the parties with regard to the Project, but not the actual construction of the Project itself, although Newport Beach will cause the construction to be completed. Irvine has reviewed and signed the final design drawings and reviewed the engineer's construction cost estimate (Attachment "A'). Irvine shall receive a complete breakdown of the actual construction costs prior to invoicing, and shall be invoiced for its portion of the cost incurred by Newport Beach upon completion of the construction phase. 4. The total cost for the project is estimated at $286,000, which includes a 10% contingency. Subject to prior approval by Irvine of the award for the construction contract, Irvine will reimburse Newport Beach for Irvine's share of construction costs estimated at $77,800. The total cost for construction administration, survey, testing, and inspection is estimated at $39,000 of which Irvine would be responsible for $10,530. Newport Beach will invoice Irvine when the project is complete and Irvine shall make payment to Newport Beach within 30 days of the invoice. 5. Additional consulting services affecting Irvine shall be reviewed and approved by Irvine. 6. Change orders affecting Irvine shall be reviewed and approved by Irvine prior to granting approval with the Contractor. 7. The total landscaped area is approximately 23,380 square feet of which 5,920 square feet is within Irvine City limits. The total annual irrigation and maintenance costs are estimated at $6,700. Newport Beach will pay for irrigation and maintenance for the median planters. Irvine "DRAFT" 0 will reimburse 25% of that total cost to the City of Newport Beach, estimated at $1675. Irvine will be invoiced annually and payment is due within 30 days of the invoice. S. Inspectors and/or engineers from both Cities will coordinate for spot construction inspections and a site walk prior to completion of the project. 9. As referenced in the Drawings, Special Provisions, Proposal and Contract for the Project, the "Owner" shall refer to Newport Beach and the contract responsibilities held by Newport Beach. 10. Newport Beach shall require that the independent contractor provide the necessary insurance coverage for construction work, as specified in Section 6 -1 of the Special Provisions and Section G of the Contract for the Project. Newport Beach and Irvine shall be named as additionally insured parties in the Special Provisions and Contract for the Project, and shall be insured for the amounts specified in Section 6 -1 of the Special Provisions and Section G of the Contract. 11. The following staff members, or as otherwise designated in writing by the City Manager of Irvine or the City Manager of Newport Beach, shall be the selected representatives of each City to act in each respective City's behalf with respect to this Agreement. Any notices, requests, approvals, or communications shall be given to each representative noted below: To Newport Beach: Bill Patapoff Public Works Department P.O. Box 1768 Newport Beach, CA 92658 -8915 (949) 644 -3321 To Irvine: James H. Eldridge Public Works Department P.O. Box 19575 Irvine, California 92623 -9575 (949) 724 -7556 12. Each of the parties agrees to do all things in a timely manner reasonably necessary or convenient to carry out the spirit, intentions and objectives described in this Agreement whether or not expressly prescribed herein and no consent, agreement, approval, concurrence, decision, determination or action shall be unreasonably withheld by either party. 13. Any controversy or claim arising out of this Agreement or alleged breach thereof shall first be resolved through voluntary mediation or as otherwise designated in writing by the City Manager of Newport Beach or the City Manager of Irvine. Said City Managers shall be the selected representatives of each City to act in each respective City's behalf with respect to this Agreement. 14. Newport Beach shall indemnify, defend, save and hold harmless Irvine, its City Council, officers, and employees from and against any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims caused by the willful actions or active negligence of Newport Beach, its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys' fees and other reasonable costs incurred in defending any such claim. to "DRAFT"' 0 I5. Irvine shall indemnify, defend, save and hold harmless Newport Beach, its City Council, officers, and employees from and against any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims caused by the willful actions or active negligence of Irvine, its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys' fees and other reasonable costs incurred in defending any such claim. 16. This Agreement represents the entire understanding of the parties as to those matters contained herein, and no prior oral or written understanding shall be of any force or effect with respect to those matters covered in this Agreement. This Agreement shall be governed by and construed in accordance with the laws of the State of California, and construed as if drafted jointly by Irvine and Newport Beach. This Agreement may be amended at any time by the mutual consent of the parties by an instrument in writing. 17. The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by so executing this Agreement the parties hereto are formally bound to the provisions of this Agreement. This Agreement shall be made effective upon execution by both parties and shall remain in effect until project reimbursement is complete or both parties agree to amend or terminate it. IN WITNESS WHEREOF, Newport Beach and Irvine have caused this Agreement to be executed by its duly authorized officers and representatives, respectfully, on this day of .2002. CITY OF NEWPORT BEACH By: Tod W. Ridgeway, Mayor By: City Clerk APPROVED AS TO FORM: By: City Attorney :a]ig`Zai�lt] By: Larry Agran, Mayor By: City Clerk APPROVED AS TO FORM: 0 Attorney Pity. of Newport Beach NO. BA- 046 ' BUDGET AMENDMENT 2001 -02 AMOUNT: 5100,3o0.ao EFFECT ON BUDGETARY FUND BALANCE: 8 Increase Revenue Estimates ® Increase in Budgetary Fund Balance X Increase Expenditure Appropriations AND X Decrease in Budgetary Fund Balance Transfer Budget Appropriations No effect on Budgetary Fund Balance SOURCE: from existing budget appropriations from additional estimated revenues X from unappropriated fund balance EXPLANATION: This budget amendment is requested to provide for the follovring: To increase expenditure appropriations related to the Jamboree Road Median Improvement project, C -3459. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account 260 3605 REVENUE ESTIMATES (3601) Fund /Division Account EXPENDITURE APPROPRIATIONS (3603) Description Circulation & Transportation Description Signed: 16,i6 4' 2 ec�, Financial Approval: Admin7�Q: ctor Signed: 7YrMYG6�, AdAinistrati ve Approval Clty Manager Amount Debit Credit $100,300.00 $10D,300.00 . r -v Date ate Signed: City Council Approval: City Cleric Dare Description Division Number 7261 Circulation & Transportation Account Number C5100580 Jamboree Road Median Imrprovements Division Number Account Number Division Number Account Number Division Number Account Number Division Number Account Number Signed: 16,i6 4' 2 ec�, Financial Approval: Admin7�Q: ctor Signed: 7YrMYG6�, AdAinistrati ve Approval Clty Manager Amount Debit Credit $100,300.00 $10D,300.00 . r -v Date ate Signed: City Council Approval: City Cleric Dare ` % of Newport Beach BUDGET AMENDMENT 2001 -02 EFFECT ON BUDGETARY FUND BALANCE: Description Division Increase Revenue Estimates j X Account Increase Expenditure Appropriations 05100580 Jamboree Road Median Imrprovements Division Transfer Budget Appropriations SOURCE: Account Number from existing budget appropriations Number from additional estimated revenues X from unappropriated fund balance EXPLANATION: 41,E NO. BA- 046 AMOUNT: $00.300.00 Increase in Budgetary Fund Balance AND X Decrease in Budgetary Fund Balance No effect on Budgetary Fund Balance This budget amendment is requested to provide for the following: lum To increase expenditure appropriations related to the Jamboree Road Median Improvement project, C -3459. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account 260 3605 REVENUE ESTIMATES (3601) Fund/Division Account EXPENDITURE APPROPRIATIONS (3603) Description Circulation & Transportation Description Signed Financial Approval: Administrative Be IcZ esDictor Signed: 944 z. `5 ' Adrdinishrative Approvah City Manager Signed: 2!%( /�linl� �r� 41,r City Council Approval: City Clerk Amount Debit Credit $100,300.00 $100,300.00 Date ate ! /( Gk Date Description Division Number 7261 Circulation & Transportation Account Number 05100580 Jamboree Road Median Imrprovements Division Number Account Number Division Number Account Number Division Number Account Number Division Number Account Number Signed Financial Approval: Administrative Be IcZ esDictor Signed: 944 z. `5 ' Adrdinishrative Approvah City Manager Signed: 2!%( /�linl� �r� 41,r City Council Approval: City Clerk Amount Debit Credit $100,300.00 $100,300.00 Date ate ! /( Gk Date MAY 14 2001 TO: Mayor and Members of the City Council FROM: Public Works Department May 14, 2002 CITY COUNCIL AGENDA ITEM NO. 11 SUBJECT: COOPERATIVE AGREEMENT BETWEEN THE CITY OF IRVINE AND THE CITY OF NEWPORT BEACH FOR THE INSTALLATION OF MEDIAN LANDSCAPING ON JAMBOREE ROAD BETWEEN CAMPUS DRIVE AND BRISTOL STREET RECOMMENDATION: Approve the Cooperative Agreement (Agreement) between the City of Newport Beach (Newport Beach) and the City of Irvine (Irvine) for the installation of median landscaping on Jamboree Road between Campus Drive and Bristol Street, and authorize the Mayor and the City Clerk to execute the Agreement. DISCUSSION: Staff is requesting the City Council approve an Agreement for the installation of median landscaping along Jamboree Road between Campus Drive and Bristol Street. Because the City boundary line generally exists along the centerline of Jamboree Road this project involves the cities of Newport Beach and Irvine. Prior to construction of these improvements, the Agreement must be executed by both City Councils. Irvine's City Council will be meeting on May 14, 2002, to authorize its Mayor to sign the Agreement. The Agreement outlines the total installation costs and administrative roles and responsibilities for construction and maintenance of the project. The proposed improvements include the removal of existing median pavement and the installation of stamped colored concrete, trees, shrubs, ground cover, and irrigation systems. As outlined in the Agreement, Newport Beach will supervise the construction of this project within established budgets and time frames and will complete the project using guidelines established by both the cities of Newport Beach and Irvine. The final design drawings and cost estimates have been reviewed and approved by both cities. Construction is anticipated to start in June of 2002. The total cost for the project is estimated at $286,000, which includes a 10 percent contingency. Irvine will reimburse Newport Beach for Irvine's share of construction costs estimated at $77,800. The total cost for construction administration, survey, testing, and inspection is estimated at $39,000 of which Irvine would be responsible for $10,530. SUBJECT. COOPERA E RVI EMENT BETWEEN THE CITY OF INE CITY OF NEWPORT BEACH FOR THE IN TION OF MEDIAN LANDSCAPING ON AD BETWEEN CAMPUS DRIVE AND BRISTOL STREET May 14.2002 Page 2 The total landscaped area is appro)dnately 23,380 square feet and 5,920 square feet of that is within Irvine's city limits. Total annual irrigation and maintenance costs for the median planters are estimated at $6,700 and Newport Beach will pay these costs. Irvine will reimburse Newport for 25 percent of this total annual cost. i The Contract for this work will be awarded this fiscal year and funding is provided in the current Capital Improvement Program budget. Respectfully PUB iIUORKS DEPARTMENT Stephen G. Badum, Director By: Step J. Luy, .E. Project Manager Attachments: Agreement Project Location Map I COOPERATIVE AGREEMENT For Jamboree Road Median Improvements from Bristol Street to Campus Drive This Agreement is made and entered into this day of , 2002, by and between the CITY OF NEWPORT BEACH ("Newport Beach') and the CITY OF IRVINE ( "Irvine"): RECITALS WHEREAS, the median reconstruction of Jamboree Road between Bristol Street and Campus Drive, is a project that involves Irvine and Newport Beach because the city boundary line exists along the centerline of the Project. CONTRACT TERMS AND CONDITIONS 1. Newport Beach will supervise the construction of the Project to the best of its ability within the established budget and time frame, and shall implement and complete the Project under guidelines established by the Cities of Newport Beach and Irvine, and will follow all public bid and contract procedures. 2. The terms of this Agreement cover the administrative responsibilities of the parties with regard to the Project, but not the actual construction of the Project itself, although Newport Beach will cause the construction to be completed. Irvine has reviewed and signed the final design drawings and reviewed the engineer's construction cost estimate (Attachment "A'). Irvine shall receive a complete breakdown of the actual construction costs prior to invoicing, and shall be invoiced for its portion of the cost incurred by Newport Beach upon completion of the construction phase. 4. The total cost for the project is estimated at $286,000, which includes a 10 °A contingency. Subject to prior approval by Irvine of the award for the construction contract, Irvine will reimburse Newport Beach for Irvine's share of construction costs estimated at $77,800. The total cost for construction administration, survey, testing, and inspection is estimated at $39,000 of which Irvine would be responsible for $10,530. Newport Beach will invoice Irvine when the project is complete and Irvine shall make payment to Newport Beach within 30 days of the invoice. 5. Additional consulting services affecting Irvine shall be reviewed and approved by Irvine. 6. Change orders affecting Irvine shall be reviewed and approved by Irvine prior to granting approval with the Contractor. The total landscaped area is approximately 23,380 square feet of which 5,920 square feet is within Irvine City limits. The total annual irrigation and maintenance costs are estimated at $6,700. Newport Beach will pay for irrigation and maintenance for the median planters. Irvine % r will reimburse 25% of that total cost to the City of Newport Beach, estimated at $1675. Irvine will be invoiced annually and payment is due within 30 days of the invoice. S. Inspectors and/or engineers from both Cities will coordinate for spot construction inspections and a site walk prior to completion of the project. 9. As referenced in the Drawings, Special Provisions, Proposal and Contract for the Project, the "Owner" shall refer to Newport Beach and the contract responsibilities held by Newport Beach. 10. Newport Beach shall require that the independent contractor provide the necessary insurance coverage for construction work, as specified in Section 6-1 of the Special Provisions and Section G of the Contract for the Project. Newport Beach and Irvine shall he named as additionally insured parties in the Special Provisions and Contract for the Project, and shall be insured for the amounts specified in Section 6-1 of the Special Provisions and Section G of the Contract. 11. The following staff members, or as otherwise designated in writing by the City Manager of Irvine or the City Manager of Newport Beach, shall be the selected representatives of each City to act in each respective City's behalf with respect to this Agreement. Any notices, requests, approvals, or communications shall be given to each representative noted below: To Newport Beach: Bill Patapoff Public Works Department P.O_ Box 1768 Newport Beach, CA 92658 -8915 (949) 644 -3321 To Irvine: James H. Eldridge Public Works Department P.O. Box 19575 Irvine, California 92623 -9575 (949) 724 -7556 12. Each of the parties agrees to do all things in a timely manner 'reasonably necessary or convenient to carry out the spirit, intentions and objectives described in this Agreement whether or not expressly prescribed herein and no consent, agreement, approval, concurrerice, decision, determination or action shall be unreasonably withheld by either party. 13. Any controversy or claim arising out of this Agreement or alleged breach thereof shall first be resolved through voluntary mediation or as otherwise designated in writing by the City Manager of Newport Beach or the City Manager of Irvine. Said City Managers shall be the selected representatives of each City to act in each respective City's behalf with respect to this Agreement. 14. Newport Beach shall indemnify, defend, save and hold harmless Irvine, its City Council, officers, and employees from and against any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims caused by the willful actions or active negligence of Newport Beach, its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys' fees and other reasonable costs incurred in defending any such claim. % • 15. Irvine shall indemnify, defend, save and hold harmless Newport Beach, its City Council, officers, and employees from and against any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims caused by the willful actions or active negligence of Irvine, its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys' fees and other reasonable costs incurred in defending any such claim. 16. This Agreement represents the entire understanding of the parties as to those matters contained herein, and no prior oral or written understanding shall be of any force or effect with respect to those matters covered in this Agreement. This Agreement shall be governed by and construed in accordance with the laws of the State of California, and construed as if drafted jointly by Irvine and Newport Beach. This Agreement may be amended at any time by the mutual consent of the parties by an instrument in writing. IT The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by so executing this Agreement the parties hereto are formally bound to the provisions of this Agreement. This Agreement shall be made effective upon execution by both parties and shall remain in effect until project reimbursement is complete or both parties agree to amend or terminate it. IN WITNESS WHEREOF, Newport Beach and Irvine have caused this Agreement to be executed by its duly authorized officers and representatives, respectfully, on this day of .2002. CITY OF NEWPORT BEACH CITY OF IRVINE By: Tod W. Ridgeway, Mayor By: City Clerk APPROVED AS TO FORM: rlk�� By: City Attorney By: Larry Agran, Mayor By: City Clerk APPROVED AS TO MU 01)18 1WAr-N ik\NNL Ell CITY JIBOREE ROAD MEDIAN IMPROVEMENTS BRISTOL STREET TO CAMPUS DRIVE CONTRACT NO- 3459 1 omwine No. EXHIBIT A COUNCIL AGENDA No. April 9, 2002 CITY COUNCIL AGENDA ITEM NO. 9. TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: COOPERATIVE AGREEMENT BETWEEN THE CITY OF IRVINE AND THE CITY OF NEWPORT BEACH FOR THE INSTALLATION OF MEDIAN LANDSCAPING ON JAMBOREE ROAD BETWEEN CAMPUS DRIVE AND BRISTOL STREET RECOMMENDATION: Approve the Cooperative Agreement between the City of Newport Beach (Newport Beach) and the City of Irvine (Irvine) for the installation of median landscaping on Jamboree Road between Campus Drive and Bristol Street, and authorize the Mayor and the City Clerk to execute the Agreement. DISCUSSION: Staff is requesting that the City Council approve a cooperative agreement for the installation of median landscaping along Jamboree Road between Campus Drive and Bristol Street. Because the City boundary line generally exists along the centerline of Jamboree Road this project involves the cities of Newport Beach and Irvine. Prior to construction of these improvements, a cooperative agreement must be executed by both City Councils. Irvine's City Council will be meeting on April 9, 2002, to authorize Its Mayor to sign the agreement. The cooperative agreement outlines the total installation costs and administrative roles and responsibilities for construction and maintenance of the project. The proposed improvements include the removal of existing median pavement and the installation of stamped colored concrete, shrubs, ground cover, and Irrigation control systems. As outlined in the Agreement, Newport Beach will supervise the construction of this project within established budgets and time frames and will complete the project using guidelines established by both the cities of Newport Beach and Irvine. The final design drawings and cost estimates have been reviewed and approved by both cities. Construction is anticipated to start in May of 2002. The total cost for the project is estimated at $264,000, which includes a 10 percent contingency. Irvine will reimburse Newport Beach for Irvine's share of construction costs 1 estimated at $72,700. The total cost for construction administration, survey, testing, and inspection is estimated at $36,000 of which Irvine would be responsible for $9,900. SUBJECT: COOPERATIEMENT BETWEEN THE CITY OF tRVINE ARE CITY OF NEWPORT BEACH FOR THE INSTALLATION OF MEDIAN LANDSCAPING ON JAMBOREE ROAD BETWEEN CAMPUS DRIVE AND BRISTOL STREET March 21.2002 Page 2 The total landscaped area is approximately 23,380 square feet and 5,920 square feet are within Irvine's city limits. Total annual irrigation and maintenance casts for the median planters are estimated at $2,700 and Newport Beach will pay these costs. Irvine will reimburse Newport for 25 percent of that total annual cost. The Project will be awarded this fiscal year and the budget provides a total of $200,000. $100,000 for the Citys share of this project is available In Account No. 7261 - 05100580 and $100,000 for Irvine's share is available in Account No. 7251 - 05100580. Respectfully submitted, `i PUBLIC WORKS DEPARTMENT Stephen G. Badum, Director By: Stephe J. Luy, P. E. Project Manager Attachments: Agreement Project Location Map s COOPERATIVE AGREEMENT For Jamboree Road Median Improvements from Bristol Street to Campus Drive This Agreement is made and entered into this day of , 2002, by and between the CITY OF NEWPORT BEACH ("Newport Beach') and the CITY OF IRVINE ( "Irvine's: RECITALS WHEREAS, the median reconstruction of Jamboree Road between Bristol Street and Campus Drive, is a project that involves Irvine and Newport Beach because the city boundary line exists along the centerline of the Project. CONTRACT TERMS AND CONDITIONS 1. Newport Beach will supervise the construction of the Project to the best of its ability within the established budget and time frame, and shall implement and complete the Project under guidelines established by the Cities of Newport Beach and Irvine, and will follow all public bid and contract procedures. 2. The terms of this Agreement cover the administrative responsibilities of the parties with regard to the Project, but not the actual construction of the Project itself, although Newport Beach will cause the construction to be completed. 3. Irvine has reviewed and signed the final design drawings and reviewed the engineer's construction cost estimate (Attachment "A'). Irvine shall receive a complete breakdown of the actual construction costs prior to invoicing, and shall be invoiced for its portion of the cost incurred by Newport Beach upon completion of the construction phase. 4. The total cost for the project is estimated at $264,000, which includes a 10% contingency. Subject to prior approval by Irvine of the award for the construction contract, Irvine will reimburse Newport Beach for Irvine's share of construction costs estimated at $72,700. The total cost for construction administration, survey, testing, and inspection is estimated at $36,000 of which Irvine would be responsible for $9,900. Newport Beach will invoice Irvine when the project is complete and Irvine shall make payment to Newport Beach witbin 30 days of the invoice. S. Additional consulting services affecting Irvine shall be reviewed and approved by Irvine. 6. Change orders affecting Irvine shall be reviewed and approved by Irvine prior to granting approval with the Contractor. 7. The total landscaped area is approximately 23,380 square feet of which 5,920 square feet is within Irvine City limits. The total annual irrigation and maintenance costs are estimated at 12,700. Newport Beach will pay for irrigation and maintenance for the median planters. Irvine % 0 will reimburse 25% of that total cost to the City of Newport Beach, estimated at $675. Irvine will be invoiced annually and payment is due within 30 days of the invoice. S. Inspectors and/or engineers from both Cities will coordinate for spot construction inspections and a site walk prior to completion of the project. 9. As referenced in the Drawings, Special Provisions, Proposal and Contract for the Project, the "Owner" shall refer to Newport Beach and the contract responsibilities held by Newport Beach. 10. Newport Beach shall require that the independent contractor provide the necessary insurance coverage for construction work, as specified in Section 6 -1 of the Special Provisions and Section G of the Contract for the Project. Newport Beach and Irvine shall be named as additionally insured parties in the Special Provisions and Contract for the Project, and shall be insured for the amounts specified in Section 6 -1 of the Special Provisions and Section G of the Contract. IT. The following staff members, or as otherwise designated in writing by the City Manager of Irvine or the City Manager of Newport Beach, shall be the selected representatives of each City to act in each respective City's behalf with respect to this Agreement. Any notices, requests, approvals, or communications shall be given to each representative noted below: To New Beach: Bill Patapoff Public Works Department P.O. Box 1768 Newport Beach, CA 92658 -8915 (949) 644 -3321 To Irvine: James H. Eldridge Public Works Department P.O. Box 19575 Irvine, California 92623 -9575 (949) 724 -7556 12. Each of the parties agrees to do all things in a timely manner reasonably necessary or convenient to carry out the spirit, intentions and objectives described in this Agreement whether or not expressly prescribed herein and no consent, agreement, approval, concurrence, decision, determination or action shall be unreasonably withheld by either party. 13. Any controversy or claim arising out of this Agreement or alleged breach thereof shall first be resolved through voluntary mediation or as otherwise designated in writing by the City Manager of Newport Beach or the City Manager of Irvine. Said City Managers shall be the selected representatives of each City to act in each respective City's behalf with respect to this Agreement. 14. Newport Beach shall indemnify, defend, save and hold harmless Irvine, its City Council, officers, and employees from and against any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims caused by the willful actions or active negligence of Newport Beach, its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys' fees and other reasonable costs incurred in defending any such claim. 40# I5. Irvine shall indemnify, defend, save and hold harmless Newport Beach, its City Council, officers, and employees from and against any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims caused by the willful actions or active negligence of Irvine; its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys' fees and other reasonable costs incurred in defending any such claim. 16. This Agreement represents the entire understanding of the parties as to those matters contained herein, and no prior oral or written understanding shall be of any force or effect with respect to those matters covered in this Agreement. This Agreement shall be governed by and construed in accordance with the laws of the State of Catifomia, and construed as if drafted jointly by Irvine and Newport Beach. This Agreement may be amended at any time by the mutual consent of the parties by an instrument in writing. 17. The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by so executing this Agreement the parties hereto are formally bound to the provisions of this Agreement. This Agreement shall be made effective upon execution by both parties and shall remain in effect until project reimbursement is complete or both parties agree to amend or terminate it IN WrMTESS WHEREOF, Newport Beach and hvine have caused this Agreement to be executed by its duly authorized officers and representatives, respectfully, on this day of .2002. CITY OF NEWPORT BEACH CITY OF IRVINE By: Tod W. Ridgeway, Mayor By: City Clerk APPROVED AS TO FORM: By: City Attorney By: Larry Agran, Mayor By: City Clerk 101716 OR- OAF CONTRACT NO. 3459 BRISTOL STREET TO CAMPUS DRIVE (32) C_3y55 April 9, 2002 CITY COUNCIL AGENDA TO: Mayor and Members of the City Council APR o s 2002 FROM: Public Works Department SUBJECT: COOPERATIVE AGREEMENT BETWEEN THE CI THE CITY OF NEWPORT BEACH FOR THE INSTALLATION OF MEDIAN LANDSCAPING ON JAMBOREE ROAD BETWEEN CAMPUS DRIVE AND BRISTOL STREET &,,"A , >to %- j-a3 RECOMMENDATION: Approve the Cooperative Agreement between the City of Newport Beach (Newport Beach) and the City of Irvine (Irvine) for the installation of median landscaping on Jamboree Road between Campus Drive and Bristol Street, and authorize the Mayor and the City Clerk to execute the Agreement. DISCUSSION: Staff is requesting that the City Council approve a cooperative agreement for the Installation of median landscaping along Jamboree Road between Campus Drive and Bristol Street. Because the City boundary line generally exists along the centerline of Jamboree Road this project involves the cities of Newport Beach and Irvine. Prior to construction of these improvements, a cooperative agreement must be executed by both City Councils. Irvine's City Council will be meeting on April 9, 2002, to authorize its Mayor to sign the agreement. The cooperative agreement outlines the total installation costs and administrative roles and responsibilities for construction and maintenance of the project. The proposed improvements include the removal of existing median pavement and the installation of stamped colored concrete, shrubs, ground cover, and irrigation control systems. As outlined in the Agreement, Newport Beach will supervise the construction of this project within established budgets and time frames and will complete the project using guidelines established by both the cities of Newport Beach and Irvine. The final design drawings and cost estimates have been reviewed and approved by both cities. Construction is anticipated to start in May of 2002. The total cost for the project is estimated at $264,000, which includes a 10 percent contingency. Irvine will reimburse Newport Beach for Irvine's share of construction costs estimated at $72,700. The total cost for construction administration, survey, testing, and inspection is estimated at $36,000 of which Irvine would be responsible for $9,900. SUBJECT: COOPERATI REEMENi BETWEEN THE CITY OF IRVINE #E CITY OF NEWPORT BEACH FOR THE INST TION OF MEDIAN LANDSCAPING ON JAMBOREE ROAD BETWEEN CAMPUS DRIVE AND BRISTOL STREET March 21, 2002 Page 2 The total landscaped area is approximately 23,380 square feet and 5,920 square feet are within Irvine's city limits. Total annual irrigation and maintenance costs for the median planters are estimated at $2,700 and Newport Beach will pay these costs. Irvine will reimburse Newport for 25 percent of that total annual cost. The Project will be awarded this fiscal year and the budget provides a total of $200,000. $100,000 for the City's share of this project is available in Account No. 7261- C5100580 and $100,000 for Irvine's share is available in Account No. 7251- C5100580. Respectfully submitted, PUBLIC WORKS DEPARTMENT Stephen G. Badum, Director By: /Z4� zz StephenrJ. Luy, P. E. v Of Project Manager Attachments: Agreement Project Location Map COOPERATIVE AGREEMENT For Jamboree Road Median Improvements from Bristol Street to Campus Drive This Agreement is made and entered into this day of 2002, by and between the CITY OF NEWPORT BEACH ( "Newport Beach ") and the CITY OF IRVINE ("Irvine "): RECITALS WHEREAS, the median reconstruction of Jamboree Road between Bristol Street and Campus Drive, is a project that involves Irvine and Newport Beach because the city boundary line exists along the centerline of the Project. CONTRACT TERMS AND CONDITIONS Newport Beach will supervise the construction of the Project to the best of its ability within the established budget and time frame, and shall implement and complete the Project under guidelines established by the Cities of Newport Beach and Irvine, and will follow all public bid and contract procedures. 2. The terms of this Agreement cover the administrative responsibilities of the parties with regard to the Project, but not the actual construction of the Project itself, although Newport Beach will cause the construction to be completed. 3. Irvine has reviewed and signed the final design drawings and reviewed the engineer's construction cost estimate (Attachment "N'). Irvine shall receive a complete breakdown of the actual construction costs prior to invoicing, and shall be invoiced for its portion of the cost incurred by Newport Beach upon completion of the construction phase. 4. The total cost for the project is estimated at $264,000, which includes a 10% contingency. Subject to prior approval by Irvine of the award for the construction contract, Irvine will reimburse Newport Beach for Irvine's share of construction costs estimated at $72,700. The total cost for construction administration, survey, testing, and inspection is estimated at $36,000 of which Irvine would be responsible for $9,900. Newport Beach will invoice Irvine when the project is complete and Irvine shall make payment to Newport Beach within 30 days of the invoice. 5. Additional consulting services affecting Irvine shall be reviewed and approved by Irvine. 6. Change orders affecting Irvine shall be reviewed and approved by Irvine prior to granting approval with the Contractor. The total landscaped area is approximately 23,380 square feet of which 5,920 square feet is within Irvine City limits. The total annual irrigation and maintenance costs are estimated at $2,700. Newport Beach will pay for irrigation and maintenance for the median planters. Irvine � e will reimburse 25% of that total cost to the City of Newport Beach, estimated at $675. Irvine will be invoiced annually and payment is due within 30 days of the invoice. 8. Inspectors and/or engineers from both Cities will coordinate for spot construction inspections and a site walk prior to completion of the project. 9. As referenced in the Drawings, Special Provisions, Proposal and Contract for the Project, the "Owner' shall refer to Newport Beach and the contract responsibilities held by Newport Beach. 10. Newport Beach shall require that the independent contractor provide the necessary insurance coverage for construction work, as specified in Section 6 -1 of the Special Provisions and Section G of the Contract for the Project Newport Beach and Irvine shall be named as additionally insured parties in the Special Provisions and Contract for the Project, and shall be insured for the amounts specified in Section 6 -1 of the Special Provisions and Section G of the Contract. 11. The following staff members, or as otherwise designated in writing by the City Manager of Irvine or the City Manager of Newport Beach, shall be the selected representatives of each City to act in each respective City's behalf with respect to this Agreement. Any notices, requests, approvals, or communications shall be given to each representative noted below: To Newport Beach: Bill Patapoff Public Works Department P.O. Box 1768 Newport Beach, CA 92658 -8915 (949) 644 -3321 To Irvine: James H. Eldridge Public Works Department P.O. Box 19575 Irvine, California 92623 -9575 (949) 724 -7556 12. Each of the parties agrees to do all things in a timely manner reasonably necessary or convenient to carry out the spirit, intentions and objectives described in this Agreement whether or not expressly prescribed herein and no consent, agreement, approval, concurrence, decision, determination or action shall be unreasonably withheld by either party. 13. Any controversy or claim arising out of this Agreement or alleged breach thereof shall first be resolved through voluntary mediation or as otherwise designated in writing by the City Manager of Newport Beach or the City Manager of Irvine. Said City Managers shall be the selected representatives of each City to act in each respective City's behalf with respect to this Agreement. 14. Newport Beach shall indemnify, defend, save and hold harmless Irvine, its City Council, officers, and employees from and against any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims caused by the willful actions or active negligence of Newport Beach, its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys' fees and other reasonable costs incurred in defending any such claim. a e 15. Irvine shall indemnify, defend, save and hold harmless Newport Beach, its City Council, officers, and employees from and against any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims caused by the willful actions or active negligence of Irvine, its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys' fees and other reasonable costs incurred in defending any such claim. 16. This Agreement represents the entire understanding of the parties as to those matters contained herein, and no prior oral or written understanding shall be of any force or effect with respect to those matters covered in this Agreement. This Agreement shall be governed by and construed in accordance with the laws of the State of California, and construed as if drafted jointly by Irvine and Newport Beach. This Agreement may be amended at any time by the mutual consent of the parties by an instrument in writing. 17. The persons executing this Agreement on behalf of the parties hereto wan-ant that they are duly authorized to execute this Agreement on behalf of said parties and that by so executing this Agreement the parties hereto are formally bound to the provisions of this Agreement. This Agreement shall be made effective upon execution by both parties and shall remain in effect until project reimbursement is complete or both parties agree to amend or terminate it. IN WITNESS WHEREOF, Newport Beach and Irvine have caused this Agreement to be executed by its duly authorized officers and representatives, respectfully, on this day of , 2002. CITY OF NEWPORT BEACH By: Tod W. Ridgeway, Mayor By: City Clerk APPROVED AS TO FORM: By. City Attorney CITY OF IRVINE By: Larry Agran, Mayor By: City Clerk AS TO FORM: BRISTOL STREET TO CAMPUS DRIVE