Loading...
HomeMy WebLinkAboutH2016-0068 - MiscJ I A l t Ur UALI -UKNIA ALTERATIONS - HVAC �kZUt(.0 -olz it GtGGF1R-AL1-03-E(Revised 03115) CALIFORNIA ENERGY COMMISSION � CERTIFICATE OF COMPLIANCE CF1R-ALT-03-E Alterations - HVAC CZ 1, 3 to 7 and 16 (formerly CF-IR-ALT-HVAC) (Page 1 of 1) Site Address: - Z2 Enforcement Agency: Date Prepared: Permit#: Equipment Type Equipment Efficiency New: Ducting, Plenums, Lineset Conditioned Thermostat Required R-value Floor Area (sq ft) ❑ Packaged System ❑ Evaporator Coil AFUE COP ❑ R-6 (CZ 1,3-7) Ducts Served by system D Setback ❑Split System 1OCondensing Unit K%EER ❑R-8t(CZ16)Ducts W500 sgft (If not already _HSPF ❑ RR-6 (all CZ's) Plenums present, must ❑ Furnace ❑ Lineset EER vuR-5 or R7.5 Lineset' I be installed) HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one of the options below. At permit application this form is allowed to be filled out by hand. For final inspection all forms are to be registered (no hand.filled forms allowed) and a copy left on site. 1. HVAC Changeout/Repair Required Compliance Documents to be left on site for Final: Can include new ducting All Equipment, CF1R-ALT-02-E Condenser Unit, Evaporator Coil, CF2R: MECH-01, MECH-20-HERS Air Handler/Furnace CF3R: MECH-20-HERS Installer Requirement: Duct leakage (<. 15%or, < 10%to outside, or seal all accessible leaks) Exempted from duct leakage testing if: ❑ 1. Duct system registered with HERS provider as previously sealed, or ❑ 2. There is less than 40 linear feet of duct in unconditioned space, or ❑ 3. Existing duct systems are constructed, insulated or sealed with asbestos (list manufacture date of building_ ❑ 2. New HVAC System Required Compliance Documents to be left on site for Final: All new equipment and All New Ducts' CF1R-ALT-02-E CF2R-MECH-01, MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24)-HERS CF3R-MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24)-HERS' Installer Requirement: Duct leakage <6°%, Fan Efficacy (.58W/CFM), Air Flow_ 350 CFM/ton (or Standards Table 150.0-C/ D alternative) 113. All New Ducts with Replacement Required Compliance Documents to be left on site for Final: Includes replacing or installing All New CF1R-ALT-02-E Ducts2 and one or more of the following: CF2R-MECH-01, MECH-20-HERS, MECH-(23 or 24)-HERS Condenser Unit, Evaporator Coil, Furnace CF3R-MECH-20-HERS, MECH-(23 or 24)-HERS Installer Requirement: Duct leakage <6%, Air Flow_ 350 CFM/ton (or Standards Table 150.0-C/ D alternative) ❑ Exempted from duct leakage testing I existing duct systems are constructed, insulated or sealed with asbestos. 114. New Ducting over 40 feet Required Compliance Documents to be left on site for Final: Adding or replacing ducts in unconditioned CF1R-ALT-02-E space but less than All New Ducts' CF2R: MECH-20-HERS CF3R: MECH-20-HERS Installer Required to: Duct leakage (< 15% or, <10%to outside, or seal all accessible leaks) ❑ Exempted from duct leakage testing I existing duct systems are constructed, insulated or sealed with asbestos. ' All new ducting R-8 required when more than 40 ft installed and R-6 when less than 40 ft installed. This includes in walls, between floors etc. ' A New Duct system is when the duct system is constructed of at least 75 percent new duct material, and up to 25 percent may consist of reused parts from the dwelling unit's existing duct system (e.g., registers, grilles, boots, air handler, plenums, duct material. a R-5 (1" thick insulation) for linesets 1" and less. R-7.5 (1.5" thick insulation) for linesets over 1 inch. Most mfg will require Suction line Diameter with insulation as the following 1.5-2T-2%", 2.5-3T-2Y", 3.5 to 4T-2%", ST-4%" Contractor (Documentation Author's /Responsible Designer's Declaration Statement) I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document. 3. Thatthe energy features and performance specifications for the design identified on this Certificate of Compliance conform to the requirements of Title 24, Parts 1 and 6 of the California Code of Regulations (CCR). 4. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the CCR. 5. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit applica ion. Responsible Designer Name: Respons' Design r ignature: Date Signed: License: 3£F% l.:r-i422 2-1�- / 1, Company: lf�l �t7.�S'�uwc.J Address: ys a3Sl �91p)S:%L C1K. City/State/2i9 n, TcJS'TXl 1��2%�t.`7i4"{!?L—b270 Phone: Fof assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300