HomeMy WebLinkAboutC-3593(A) - PSA for Big Canyon Creek Restoration Project03593 AMENDMENT NO. THREE TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. FOR BIG CANYON CREEK RESTORATION THIS AMENDMENT NO. THREE TO PROFESSIONAL SERVICES AGREEMENT, is entered into as of this M day of DbhW , 2009, by and between the CITY OF NEWPORT BEACH, a Municipal Corporation ( "CITY "), and VA CONSULTING, INC., a California Corporation whose address is 17801 Cartwright Road, Irvine, California, 92614 ( "CONSULTANT "), and is made with reference to the following: RECITALS: A. On December 11, 2007, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT," for engineering design services for the Big Canyon creek Restoration Project, hereinafter referred to as 'PROJECT." B. CITY and CONSULTANT have entered into one separate AMENDMENT of the AGREEMENT, the latest dated January 27, 2009. C. CITY desires to enter into this AMENDMENT NO. THREE to reflect additional services not included in the AGREEMENT or prior AMENDMENT, to extend the term of the AGREEMENT to December 31, 2010 and to increase the total compensation D. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. E. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. TWO" as provided here below. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of the AGREEMENT shall be extended to December 31, 2010, 2. ADDITIONAL SERVICES TO BE PERFORMED In addition to the services to be provided pursuant to the AGREEMENT and AMENDMENT NO. ONE, CONSULTANT shall diligently perform all the services described in AMENDMENT NO, TWO, including but not limited to, all work set forth in the Scope of Services attached hereto as Exhibit 1 and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 3. COMPENSATION City shall pay Consultant for the services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached to the AGREEMENT. Consultant's total amended compensation for all work performed in accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed Eight Hundred Ten Thousand, Eight Hundred Seventy -Four Dollars and no1100 ($810,874.00) without prior written authorization from City. 3.1 The amended compensation reflects Consultant's additional compensation for additional services to be performed in accordance with this AMENDMENT NO. THREE, including all reimbursable items and subconsultant fees, in an amount not to exceed Eighty -Five Thousand, Seven Hundred Ninety Dollars and no /100 ($85,790.00), without prior written authorization from City. 4. INTEGRATED CONTRACT Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain unchanged and shall be in full force and effect. 2 IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. TWO on the date first above written. APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY By: nette D. rea'uqgmp, Assistant City Attorney ATTEST: By: �L-CPrM__ Leilani I. Brown, City Clerk Attachment CITY O. NEWPOTBEACH, A Munficiaal Cora'rZon Edward D. Selich; Mayor CONSULTANT: VA CONSULTING, INC. B: Y a hid, resident and C.E.O. /A� OoCiZ��76 Michael S. Carter, Secretary and C.F.O. Exhibit 1 — Additional Services to be Performed '43 EXHIBIT 1 VAI CONSULTING September 10, 2009 Mr. Mark Reader, P.E. Project Manager Public Works Department City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 -3884 Dear Mr. Reader: This letter is a change order request for additional engineering design services related to the Big Canyon Creek Restoration Project (Project) (Professional Services Agreement dated December 11, 2007). This change order supersedes our previous letter dated August 31, 2009. These additional services include on -call services that were not Included in the original scope of work or Addendum 1 for the final design of the project. The services provided include excavation of a boring hole to provide access to groundwater for sampling and analysis, revisions to the Operations and Maintenance Plan to include procedures required to avoid impacts to biologically sensitive habitats, additional services required for permit and environmental document processing, and dividing the project plans into two phases to meet Coastal Commission requirements. A detailed scope of services is provided in Section I and fees in Section II of this letter. Also a breakdown of VA's hours and tasks is included as Attachment A. We will provide our services on a time - and - materials, not -to- exceed basis in accordance with the attached fee schedule (Exhibit A). SCOPE OF SERVICES Boring Holes Excavation Geosoils, Inc. drilled a hand auger boring hole adjacent to the access road along the northerly slopes of Big Canyon, in the vicinity of the existing spillway to provide CH2MHill access to groundwater. Because this operation was successful, the Geosoils fee is $500 and further drilling with a drill rig for groundwater sampling is not required. The proposal from Geosoils is included with this letter as Attachment B. VA Consulting, Inc. carpet a Office Orange County Division 6400 Oak Canyon, Suite 150 Irvine, CA 92618 Phone 949.474.1400 Fox 949.261 AU2 xwmpavn oeoa eeoancom- eor-0mac�..�m,aaa.mc Mr. Mark Reader, P.E. Big Canyon Creek Restoration September 10, 2009 Page 2 of 7 2. Update Environmental Documents and Permits Applications Resource agencies requested additional information and revisions to the environmental documents and permits beyond the original project scope and Addendum 1. In response to these requests, WRA provided additional figures showing greater detail regarding habitat impacts and creation. WRA provided an Alternatives Analysis, project impact analysis, Biological Monitoring Plan, and additional Salt Marsh Bird's Beak information to the resource agencies. WRA reviewed the project Operations and Maintenance Plan and provided text which describes the long -term maintenance procedures required to avoid impacts to sensitive habitats, including wildlife and vegetation. Per the request of CDFG and the Coastal Commission, WRA installed 5 groundwater monitoring wells with piezometers and data loggers at each well location to measure water level, conductivity and temperature at 30- minute intervals. The total WRA fee for this task is $4,273. The proposal from WRA is included with this letter as Attachment C. VA incorporated the language provided by WRA to address biologically sensitive resources in Big Canyon into the Operations and Maintenance Plan for use in obtaining regulatory permits. VA provided peer review of the additional language for project compatibility and incorporated the language into the Operations and Maintenance Plan text The total VA fee for this task is $3,092. VA purchased the data loggers and provided them to WRA for installation at each groundwater monitoring well location. The total VA cost for this item is $8,475. 3. Project Coordination and Meetings (WRA) Additional project coordination and stakeholder meetings for design review and permit approval was conducted after permit application materials were formally submitted. This scope of work provides.for the additional conference calls, meettng preparations, and project management time. The total WRA fee for this task is $2,500. The proposal from WRA is included with this letter as Attachment C. 4. Electrical Systems Design The temporary irrigation systems needed for the establishment of proposed tidal and restoration planting will require a power source in lieu of solar power, as originally proposed to the City. W.A. Doby Engineering, Inc. has provided a station plan, station single line diagram, Service Pedestal elevations and Installation details, SCE equipment Connection details, construction details, and electrical construction specifications. The total W.A. Doby fee for this task is $3,750. The proposal from W.A. Doby is included as Attachment D. : w�¢exiT/J_cwaFMa+,nmoswita,asac ,,, fv -'''G _ _:. n ' -: • u.. „ `�._ 1�' "' `� p� ' .;( a. °.:.: �w�umi:^_k.� L , -, ° - ?"5' t ', _ —. Mr. Mark Reader, P.E. Big Canyon Greek Restoration September 10, 2009 Page 3 of 7 5. Temporary Irrigation Water Line The temporary irrigation of restoration planting will require a potable water source. IMA prepared the design and layout of a pressure mainline and backflow preventer from the hot tap point of connection at an existing potable water source, along the proposed sewer maintenance road to the proposed freshwater pond. The IMA cost for this task is $4,500. The proposal from IMA is included as Appendix E. 6. Project Coordination and Meetings (Ron Yeo) Additional project coordination and meetings were required to address City comments on the Project plans. This task provides for coordination and meeting time required for Ron Yeo (architect) to complete the architectural aspects of the Project. The total Ron Yeo fee for this task is $1,200. Construction Phasing The City requested that the Project Plans be divided into two separate plan sets, one for each Phase of construction, in order to satisfy the California Coastal Commission request that the proposed freshwater pond be established before construction in the existing freshwater marsh takes place. At the time Addendum I was written, the proposed freshwater pond was at a conceptual level, with no elevation studies or grading design completed. The additional cost of providing two separate plans sets was not included in the original contract, nor was it included in Addendum 1. In order to create two complete but separate construction phases, two unique grading plans were developed, each providing flood control protection of the proposed freshwater pond. The Phase 1 grading base was developed with the original base file and modified to include a staging area in the vicinity of the proposed interpretive area, the proposed freshwater pond, and the proposed sewer maintenance road. Grading for the staging area was developed using the proposed interpretive area roadruay and modified to balance the Phase 1 site with regards to cut and fill quantities. An iterative approach was required to arrive at a final Phase 1 project that was balanced. As such, the grading for the staging area was refined three times in order to balance the site. The proposed flood control conveyance grading will impact the existing freshwater marsh, therefore the flood control conveyance could not be part of the Phase 1 plans. The flood control conveyance contours were deleted from the Phase 1 basefile and the contours along the berm between the proposed flood control conveyance and proposed freshwater pond were revised to allow Big Canyon Creek to continue to flow to the existing freshwater marsh after Phase 1 construction is completed. in order to ensure that storm water would not damage the new freshwater pond during a major storm event, a Phase 1 hydraulic analysis was conducted. Grading along the northerly trail of the proposed freshwater pond was adjusted to ensure that 100 -year storm flows would not KA ^roem�a'rywamwmuntoos,.a4 +M�rmt_os.9oanoc s �t Mr, Mark Reader, P.E. Sig Canyon Creek Restoration September 10, 2009 Page 4 of 7 overtop the berm and damage the pond based on the results of the Phase 1 hydraulic analysis. The Phase 2 grading base was developed with the original base file and modified to include the proposed tidal marsh, proposed Back Bay Drive realignment, proposed interpretive area, proposed freshwater marsh, and proposed flood control conveyance. Contours in the vicinity of the Phase 1 staging area and along the berm between the proposed freshwater marsh and proposed flood control conveyance were revised for continuity between the two phases. A Phase 2 hydraulic analysis was conducted to ensure that 100 -year storm water flows would not enter the freshwater pond during a 100 -year storm event and that storm water flows would be non - erosive in the proposed flood control conveyance. In order to provide plans that could be used separately for each phase of construction, two additional rough grading plan sheets were created and each of the remaining six rough grading plan sheets were significantly revised. Two additional cross sections and detail sheets were created to clarify each phase of the grading plan. Creating a new rough grading sheet required setting up viewports in paperspace that were consistent with the index map, updating titre block information, adding the appropriate constructions notes to the construction notes list, labeling construction items with the appropriate construction note numbers, adding a curve and line data table, labeling curves and lines the with appropriate label, addition of annotations, adding typical section notatlon, and formatting line weights, line types, and line type scales. Revisions to the rough grading sheets included changes to the construction notes and labels, revisions to the annotations; revisions to typical section notation, and revisions to viewports to be consistent with the Index map. Creating a new cross - section and detail sheet requires drafting the sections and details, annotating the sections and details, referencing in the appropriate files into the sheet, creating viewports to show the sections and details and the appropriate scale, and formatting line weights, line types, and line type scales. Each phase of construction requires a separate erosion control plats; therefore three additional erosion control plan .sheets were developed. Creating a new erosion control sheet required setiing up vlewports in paperspace, updating title block information, adding erosion control features, adding erosion control notes, construction notes, and details as required, and formatting line weights, fine types, and line type scales. The invasive species removal plan had to be divided into two separate plans corresponding to each construction Phase; therefore two additional invasive species removal plan sheets were created. Creating the additional im+asive species removal sheets required updating title block information, updating legend information, and updating invasive species removal phase hatching to be consistent with project phasing. The restoration planting pian had to be divided into two separate plans corresponding to each phase of construction; therefore two restoration plans had zrw, vecronrs- wed +�un,mcads_spc.,ymc,mx_w,aaess c .aS 4s3 + Mr. Mark Reader, P.E. Big Canyon Creek Restoration September 10, 2009 Page 5 of 7 to be developed and six additional planting plan sheets were created. The Phase 1 Restoration Plan was developed to include planting in areas that would experience invasive species removals prior to the construction of Phase 1 and areas that would be graded as part of Phase 1 construction. The Phase 2 Restoration Plan was developed to include planting in areas that would experience invasive species removals prior to the construction of Phase 2 and areas that would be graded as part of Phase 2 construction. Development of the Phase 1 and Phase 2 Restoration Plans required changes to the planting plan base file, specifically revising the polygons for the different habitat types. Revisions to the planting plant sheets included revising viewports to be consistent with the index map and updating reference files. Additional revisions include plan check comments from the City that require duplicating planting information from the project specifications on each of the planting plan sheets. Dividing the project plans into two separate plan sets required revisions to three AutoCAD base files and the addition of 15 sheets to the Project Plans. This task also includes revisions to the freshwater pond configuration after the revised grading design was completed to accommodate requests for mitigation site avoidance made by California Department of Fish and Game. The original pond size /acreage was established to provide a 1:1 freshwater habitat replacement. This task also provides for the time spent by VA staff to divide the project specifications into two phases, per the request of the City. The total VA fee for this task is $34,000. 8. Structural Submittal The City requested that the structural sheets from the Project Plans be submitted to the Building and Safety Department As a separate submittal from the entire Project Plan set: One- title sheet and one index map was created for each Phase Of construction for a total of 4 additional plan streets. In addiboh, the Phase 2 plan submittal was divided into two plans sets: one for Public Works Department Components and one for Building and Safety Department Components. The Public Works Department Components Plahs Include Rough Grading Plans, Street Improvement Plans, Quad Box Structural Plans., Erosion Control Plans, Invasive Species Removal Plans, Restoration Planting Plans, Wettand Planting Plans, and Interpretive Signage Plans. The Building and Safety Department Components Plans include the Precise Grading Plans,, Architectural Plans, and Miscellaneous Structures Plans. Revisions were required on a total of 20 sheets in order to create the separate plan set for Building Department Review. The Hydraulic and Structural Calculation Package (Phase 1 and 2) was also revised in order to create a separate structural calculations package for Building and Safety Department Review. Revisions to 10 pages of the calculations and the creation of one new title sheet were required. The VA fee for this task is $9,000. 9. Subterranean Wetland Deletion As part of Addendum 1, VA provided engineering design activities to include a subterranean wetland in the construction plans as a treatment facility for selenium. During a telephone conference call, the Regional Water Quality x�nokauw »_ao�ax_eyca,w�a t�,aoe.aa f .. Mr. Mark.Readpr, P.E. Big Canyon Creek Restoration September 10, 2009 Page 6 of 7 Control Board expressed concerns that subterranean wetlands have not been tested for treatment of selenium, and may worsen the condition In Big Canyon. The City decided that the subterranean wetland would be deleted from the project plans to be included as a later Phase or a future pilot project. Additional engineering design and grading was required to ensure that low flows from the Jamboree culvert would drain to the existing Big Canyon Creek without the subterranean wetland. Revisions to the restoration planting plan were required to provide planting in the location of the deleted subterranean wetland. The rough grading plan sheet depicting the subterranean wetland was revised to properly annotate the revised project configuration. An additional cross - section was added to the sections and details sheet to clarify the revised grading at the location of the deleted subterranean wetland. Revisions to two base files and two plan sheets were required to eliminate the subterranean wetland. The total VA fee for this task is $2,000. 10. Past Resource Agency Meetings and Coordination The original contact and Addendum 1 funds for meetings and coordination were depleted in May of 2009. This task provides for VA participation in 8 resource agency meetings and 20 hrs of coordination time required for the approval of the environmental documents and permits that have occurred between May of 2009 and the present. This task also includes meeting and coordination time required to initiate the electrical and water supply line design tasks. Meetings and coordination relating to project design are not a part of this task. The total VA cost for this task is $8,588. 11. Future Meetings and Coordination This task provides for future meetings, coordination, and information requests by the City for the Phase '1B and Phase 2 portions of the Project. This task provides. for 24 additional hours of meeting and coordination time. The total VA cost for this .task is $3;912. IL FEES 1. Boring Holes Excavation .............................................. ..............................$ 500 2. Update Environmental Documents and Permit Applications .......................$ 15,840 3. Project Coordination and Meetings ( WRA) ................... ..............................$ 2,500 4. Electrical System Design ..........................:.................. ..............................$ 3,750 5. Temporary Irrigation Water Line ................................ ..............................$ 4,500 6, Project Coordination and Meetings (Ron Yeo) .............. ..............................$ 1,200 7. Construction Phasing......... .......................................... ..............................$ '34,000 zwgcmma..aornamurzoa, �wev,mc.ratm,00aax Mr. Mark Reader, P.E. Big Canyon Creek Restoration September 10, 2009 Page 7 of 7 8. Structural Submittal... ............................. ................................................... $ 9,000 9. Subterranean Wetland Deletion ................................... ..............................$ 2,000 10. Past Resource Agency Coordination ............................ ..............................$ 8,588 11. Future Meetings and Coordination ............................... ..............................$ 3,912 TOTALFEES ................ ...... — ................................................ ............................ $ 85,790 If you have any questions or require additional information, please feel free to contact Dan Villines or me at (949) 474 -1400 or John Wolter at (951) 340 -0030. Sincerely, Max P. Vahid, P.E. President and CEO MPV /kam Enclosure— Exhibit A — VA Fee Schedule/ Attachments A through G cc: Dan Villines, John Wolter, Contracts X+PIOf09l9fl dLLV/9vi•�(,_&QG�RiM fl9,0�Da e EXHIBIT A VA CONSULTING, INC. FEE SCHEDULE 2009 Staff Classification Civil Engineering and Planning Services President......................................................... ............................... Division President/Division Manager ............... ............................... Sr. Vice President/Vice President/ Exec. Director ........................... Director........................................................... ............................... Senior Project Manager ................................... ............................... ProjectManager ............................... .......................................... Assistant Project Manager .............................. ............................... Senior Project Engineer /Senior Design Supervisor /Senior Planner Project Engineer /Design Supervisor ................ ............................... Senior Design EngineerlSenior Designer ....... ............................... Design Engineer/Planner ................................ ............................... Designer... ..................................................... .............................. Assistant Engineer /Assistant Planner ............. ............................... Research and Processing Coordinator ........... ............................... Senior CADD Technician ............................... ............................... JuniorEngineer .............................................. ............................... CADDTechnician ........................................... ............................... EngineeringIntern .......................................... ............................... Office Support/ C14rical .................................... ............................... Field 'Survey and Mapping Services Director of Survey and Mapping .......................... Manager of Field Survey...... ................... ............... Stlxvy and Mapping Associate ............................. Survey and Mapping Technician ........................... 3 -Man GPS Crew ................... ............................... 2-Man. GPS Grew.. ................. ............................... 1 -Man GPS Crew Hourly Rate ............................ ............................... $1.58 ..: ....... ................. . ............................ .... $130 .............................. ............................... $95 ........................... $75 ................. ............ I ........... ......... ....... Stsecial Services Litigation.......... ........,.............................. ..., ...... I ................ 4....... Notes: I ....................1 ".. $235 .......................... $205 .......................... $175 ..................:.... $450 1. Invoices Will be prepared for all services through the end of each calendar month. Invokers are due and payable on,presentatlon. 2. Overture, when requested bythe olient, will be surcharged at a rate of 1W,6 of the standard" rates. Sundays and holidays wtll besurchargad at it rate of'1 -= of the standard hourly rates. 3. Reprograph.", messenger service„ havef (tndu ft lodging and meals), and otter direct expemas will be charged at cost plus 1045. The.eervloes of outside consultants will be charged at cost plus 15% to saver adminisuationad evedwW. 4, in -house reprcgraphlos charges: B&W Bond copies $1,00/sgft, color aoMS5.001sq.ft. S. Weep Will be bited at standard mileage rates so by IRS. 2" rates currently listed at $0,55 per mile. xhwgenun_. umnam.,;cras_egc.ro»�cnetn9�umsm G -OCIIE nwi.Y I sm, aftvw 89 mefaJa °olatwX.N X..n ww.m elN uaa+ez[au« +xp xtasJ tl IKAYK'lYlltl iw iw m are n H sa ox . . - �w.aaaao XW sNtlIWIV.XXRa o u u _. .ivaV•a'Jt wrn 1 .... 9UMUWcy' Pa A:Wicq FUnN fPnwy4TYN Iwu [ .. ... ._ .. ..... ._ dulrbkakVMV'aU .,...._ Rw![9�ii+b4wVa antl E r ti6+reWeflWaiiunmaalwawa i .._ . naaaXWw.i1+.Wa•Manl ..... ... IwW+O Y:aPNAusfuia41T6 N j am [ 'rY - ......_..........._. Iw. d' oo+ qm9 �. aR „ma�WwuvJiipi�uyd.a6,lpnem[wwtln a~ ;, to ""' aia� :n9�i:o:ianu[<ao�wgvme�nnhoWwal 1 a __._._ - GwsiS'+ �efX�ewe+ uaa+nwoNaan�aotme�eEuawma,nwwdn ien �a _ -.. .. abis r ..IrA%w67awa PtJikleF '�tlliawlwilwtMia�L4NH�BtaW WeWWW UI �[ 4N- s t.. [.. .. lwyjdnawiAVnnlyJWwaf OAq=9iaaWa 8 V ♦___'.t' � ....♦ . -... .. .._... YflB'Me'W�MNM+J UwNxPtjtleV 2xW mSwgnitle ' �_ .__ __.� _ ... .. Gwaw lliuRi RaP34 aP8 Ms�W]IVWm4aJ'lgM'E�Ma Yitw gMMM N[Y p _ .- 1a:BalYnP9 wMNiWiWSnW W +NtlMa10a4fqucR2M ¢R iM E 1 .. NW6apL414eMpl WaWW9V+SUIl XPJi WaM NSyWW si♦9 � :Zii .•.. 1a°GaaW Wbaula lapw6 ZMW M1iiWFN S4 b I(q 2 ._ WU6'wLLMtlPP.'[6 iP+aN (tW ... VfY6MSSVYCIawUSSnW PVMwY1 Iai1W W:iNaWn:1Y l � _ ,n, r _ . .. iasw amoWtl6 aaW] � '( afs c s ' ".a:anawn ... _.. aeNlaWt: uu eoamlaao45.m'.d a . V9N WWI Ss�abµW� i � r i tebnV6vti t"MVM�^+RYnbi a. wi x avype WJM aG n9aaava9 waHbaNq O; u .�, oi.•_.. wdmVNaWbWarYtaaW t'ganq Wn a i ':t V • i - : � i0 nW8�Wtll atl�9a•3^W Eawb MgRtl .... ..... PI '� r [ - :MI9W6 We a.eia.n=®msa +aa♦wx arw Rin[9ae tl 91M .' ]3'IaW9iijp NmvDwF3ZnW wYSW 91 pM 'z J3nWS WdpMiMuopu]2ew4x WtiVippl 4: ' a a. r .. flIWLPI ai p a - � a � . .pa nV6am=ag.e5w�: ava4ao-W4ti+2: "�� �� �� . a i � Ia - sduwu6 W^w JVd'eaZmava ^ =•wanay � :i ulf w cpnpvVb 6wp:p ymtl2vevVe wr•vuaan 9l P:Sn : I f i BauwV6 gawq Wrotl: s•euewrwanane 9Y 9il 491wSyq =tl: nWgWeMetl e" ro[ a• it . �ni 1 � ♦9tl1nV6hNW9uZmtlivnyj wiigay'vp[ b p' s �. f9tl aaMS ZSb+9 uGaaC'tenVaRUaJiY' i IP I ..•.v � ... .... L p•J WV6 i?WFJ V&ey: vaOppwS+Ap . • x o asfiewawNNdasKe I •v t t ss' �a a Wf i : Waawaa, atlamw•nt � X uiJ tlA smaaVe:mwwawo�r .f a oorls io m m ._ v ,- —_ � � .. .. se.naaly o9'f wa r PtrK P usw P m os o o o o �o � umwm� vwaa ruX =a6lmmP =c WL'[f . 94!'C[.. L - _0 4 it P _ e '. O iP P l Xa%ax6lWOaM. WeM Uallehu.I N+�a wyl'1 s. Wix V � r MooP�N�uan,]ivaw+il3t � .. .. ivwwaV0wr9=+nnn�eYaaax: ' ..... .. WW tlM It U qZ P2. � 0 uFlup wapS6 RaYw9 M _tlXN oeaalT :w -- e u c teo h. `- c M e flaWl.?Kw°w°S _ '>a ♦ I sin r. - .. ... .. NY•'iaaPnob wa :+'fa ... 1 lvnµvtl a • ,a ..... : sT'^•WVN�Swbb ag V=CaK aa� ., ' ' .... WtlrmM W� W nwgWr Mva4tW'nva. W W t ... uq Wuifn Mow+vaaua:o]a a .s .. M v ... W WuclaM9w wRaswWWww . L6awdwo�whaavan.k �i P' i ... ... _ •W Wall "T % 'aFwMa -yay nwi.Y I sm, aftvw 89 mefaJa °olatwX.N X..n ww.m elN uaa+ez[au« +xp xtasJ tl IKAYK'lYlltl ATf,46 /k6 r.P, 3812 E. La Palma Avenue • Anaheim, CA 92607 • (714) 632 -0151 • FAX (714) 632 -0745 May 15, 2009 VA Consulting, Inc. 17801 Cartwright Road Irvine, California 92614 Attention: Mr. Dan Villines W.O. 5595 -At -OC Subject: Change Order Request No. 2, Big Canyon Creek Restoration, Upper Newport Bay, Newport Beach, Orange County, California Dear Mr. Villines: GSI respectfully requests a change order to the contract for geotechnical services addressing the Big Canyon Creek Restoration, Upper Newport Bay, Newport Beach, Orange County, California. This change order was created in response to your recent request by for groundwater sampling at the site. It should be noted however, that the actual sampling will be performed by others. GSI will be responsible for excavating the boring holes only. Two methods of drilling are provided as options In this change order. The first option includes four (4) hours for a geologist with a hand auger and is estimated to be approximately $500, Ibis option would provide one (1) hand auger boring, up to 16 feet in depth, or until groundwater is encountered. The second option includes four (4) hours with a hollow stem drill rig as well as a supporting geologist and is estimated at $1,400.00. This option is provided in case the, first option is not successful, due to refusal or excessive depth to groundwater. The opportunity to be of service is sincerely appreciated. If you should have any questions, please do not hesitate to contact our office. Respectfully submitted, GeoSoils, Inc. 46 q. - Shaun Wi kins Project Geologist SHW /BBS/jh Distribution: (2) Addressee t5en Shahrvini' Vice President, GE 2286 i. ewaIoorvonrr.4AS c014SUtraM78 Big Canyon Creek Restoration Project Phase II: Permitting and Design Services & California Environmental Quality Act Documentation VA Consulting Project No. 373.0400 SCOPE OF WORK AND ESTIMATED BUDGET CHANGE ORDER Prepared for: John Wolters VA Consulting, Inc. 17801 Cartwright Road Irvine, California 92614 September 9, 2009 PURPOSE The purpose of this Scope of Work is to describe tasks required to complete for work described in the December 17, 2008 change orders submitted to VA by WRA ( "Permitting and Design Services" and "California Environmental Quality Act Documentation "). Due to project changes, phasing, and agency requests, the scope of work described in the December 2008 change orders expanded and additional funds are required to compensate for additional work already conducted by WRA. This out -of -scope work focused on providing resource agency personnel with additional project documentation, project impact analyses and installation of hydrology monitoring wells. This Scope of Work also describes workto be conducted by WRA, Inc. to assist the City of Newport Beach in completing Phase IA of the Big Canyon Creek Restoration Project. Wli work will focus on landscaping drawings, specifications and cost estimates; preparation and receipt of agency permits; construction management services to implementthe Plan; and coordination and meetings with agency and City staff. Finally, this Scope of Work describes hydrology well monitoring tasks to be conducted by WRA for a 2 -year monitoring period. WORK PRODUCTS Additional funds are required to compensate for unanticipated work associated with the following work products described in the December 17, 2008 change orders: Permitting and Design Services Change Order Task 3: Update Environmental Documents and Permit Applications Task 5.• Project Coordination and Meetings WRA will add additional tasks to the December 17, 2008 Permitting and Design Services Change Order and will provide the following work product: 2169-G Cos Froncisvo Blvd., San Rnh78i. c.4 94901 (415) 454 -M68 lei (415) 454 -0129 fox irdo@Lvm•co.com www.im-coxom Task 6: Phase IA Construction Documents Task 7: Phase IA Permit Applications Task 8: Phase IA Construction Observation Task 9 Well Monitoring & Reporting SCOPE OF WORK Permitting and Design Services Change Order Task 3: Update Environmental Documents and Permit Applications Edits and additions to permit documents beyond the scope of the December 2008 change order were required before final submittal to resource agencies. WRA incorporated agency and stakeholder comments into permit application materials and generated additional figures to show more details of all habitat impacts and creation as a result of Project. Additional Project documentation was required to satisfy resource agency information requests afterpermit submittal, including an Alternatives Analysis, project impacts analyses, sections of the Project's Operations and Management and Biological Monitoring Plans, and coordination of salt marsh bird's beak information with the agencies. WRA prepared all requested documentation and provided it to the resource agency personnel for review. WRA coordinated with agency personnel via phone calls and email with the objective of formal permit approval. WRA performed background research, obtained an access permito California Department of Fish and Game (DFG) lands adjacent to the project boundary, and installed 5 monitoring wells as requested by the California Coastal Commission and DFG. Task 5: Project Coordination and Meetings Additional project coordination and stakeholder meetings for design review and permit approval was conducted after permit application materials were formally submitted. WRA will provide a project summary and assemble Phase IB and Phase Il materials for the City's records. This scope of work provides for additional meetings attended by WRA staff vita conference call, and provides for preparation and follow-up time for each meeting for work related to Phase IA implementation. Task 6: Phase LA Permit Applications WRA will work with the City to develop a vegetation management plan to implement Phase IA of the Big Canyon Creek Restoration Project and that optimizes weed removal and native plant restoration while avoiding major resource agency permits. WRA will prepare materials to apply for and gain receipt of resource agency permits for Phase IA. We will coordinate with resource agency personnel via phone calls and email& to secure receipt of permits. Task 7: Phase IA Construction Documents & Cost Estimates Construction Documents We will review existing plans and documents that describe the habitat enhancement and restoration components that will be performed as part of Phase IA. We will perform one site visit to document site conditions. As part of this site visif, we will estimate the quantity, size (if applicable) and locations of Invasive plants to be removed and use this information to define the scope of work for the contractor. We may change the recommended habitat enhancement and restoration actions based on our understanding of the biological conditions on -site and the potential for successful restoration. We will only make changes that are permitted within the current project definition. We will prepare construction drawings and supplemental technical specifications for the habitat enhancement and restoration components of Phase IA. Construction drawings and specifications will be prepared for the following project components: Demolition, invasive Plant Removal and Site Preparation • Erosion Control • Planting Irrigation We will prepare the construction documents for the following submissions. You will have the opportunity to review each submission and provide us with written comments. We will review your comments and incorporate them into the subsequent revision. At your request, we will prepare additional submissions. Additional submissions are considered extra work and will be billed on a time and material basis. 100% Draft Completion Set - Drawings and Specifications 100% Final Completion set - Drawings and Specifications Cost Estimates We will prepare a detailed estimate of the cost of construction and update in correspondence with the following submittal. This will allow you to make decisions during the design phase that effect the cost of your project. The cost estimate that corresponds the final 100% will be intended for use in comparing and evaluating the bids for construction. Construction Cost Estimate - 100% Draft Completion Set Construction Cost Estimate - 100% Final Completion Set Task. 8: Phase IA Construction Observation Assistance with Acquisition and Negotiation of Bids for Cohstruction We will assist you in obtaining, evaluating, and negotiating bids for construction. We will perform the following services: • Prepare the final opinion of construction cost • Provide a list of qualified contractors • Prepare the invitation letter for the bidders • Prepare a unified bid form for distribution and use by bidders Compilation, comparison, and evaluation of the bids • Assistance in negotiations with a candidate contractor Construction Observation Services WRA will provide construction observation services for during the construction phase of the project. We will perform site visits in order to provide information to the contractor regarding the interpretation of the contract drawings and specifications. We will also review the contractor's work to see if It is being performed in accordance with the contract drawings and specifications. During this phase of the project we will prepare field reports, evaluate and respond to submissions and requests for information thatwe receive fromthe contractor, and assist in evaluating change orders. This proposal includes time for field visits and office support. The list below summarized the scheduled site visits that are included in this scope of work. At your request WRA will extend the amount of time allocated for office support and perform additional site visits on a time and material basis. We have experienced thatthe quality of the constructed project increases significantly when WRA provides construction observation services and our clients have told us that this service provides significant value to their overall project. Schedule Meeting and Site Visits during Construction Observation • (1) Pre -bid Meeting • (1) Preconstruction Meeting • (2) Site Visits - Preparation & Demolition • (1) Site Visits - Seeding & Erosion Control (2) Site Visits - Irrigation (4) Site Visits - Planting • (2) Site Visits - Punch List and Final Walk -thru • 40 hours of office support (approximately 3 -hours per field visit) As -built Documentation We will prepare an as -built report for distribution to the necessary regulatory agencies. We will quantify the restoration efforts by making field measurements of the area or length of the restoration elements. The report will include a description of the construction restoration elements, photographs of the constructed restoration elements, and as -built grading, planting, or irrigation plans if required. We will also perform baseline inventory of the restoration elements for use in subsequent restoration performance monitoring. Task 9: Well Monitoring & Reporting To fulfill hydrology monitoring requests by resource agencies, WRA will perform periodic site visits to check on monitoring well function and to retrieve data collected on installed data loggers. Site visits will occur every two months for an initial six months, and will occur approximately every six months thereafter for a total of 2 years of monitoring. Travel and car rental expenses are included in the cost of this task. Each yearwe will prepare a short annual report to summarize data collected between October 16 of the previous year through October 15 of the current year. Annual reports will be submitted to the City no later than December 1 of each year SCHEDULE Work will begin upon receipt of approval of this proposal. Permits will be submitted to resource agencies by October1, 2009. Final project planning will proceed with the goal to begin vegetation management activities in mid- Decerimber, 2009. Well monitoring will occur within the first week of the following months: November 2009, January 2010, March 2010, November 2010, March 2011, November 2011. AssUMPTims The following assumptions were used in the development of this Scope of Work: • All assumptions in the Big Canyon Creek Restoration Project Phase il: Permitting and Final Design Services Scope of Work and Estimated Budget (Revised )(October 27, 2007), Permitting and Design Services ( December 2008) and California Environmental Quality Act Documentation (December 2008) apply to this change order. ESTIMATED COST Estimated costs are subject to change based on specific conditions that arise during the conduct of this work. The client will be informed if additional fees will be incurred and the reasons for any such increase. The client will be billed monthly on a time and materials basis for work completed to date in accordance with the attached Rate Schedule. The proposed budget Is $113,600 and is detailed in the attached cost estimate. TERMS AND CONDITIONS All terms and conditions in the approved contract dated December 10, 2007 wilt apply to this Change Order. PROJECT:B40r1XaTeebeWaP Reptt EW,pvlRgvN'lgMmbvt2M iW DAPh9bn 9. Yp151.R EiMbOPReAbvMP+Pnh.8�9feYleA A Pnlf p W aN KOpe 4E MetlINS B FO+da Yk >,wwu aeun+nl+ M:E iCHEEYIE '_TGNIJwuF1'1X6 RfOUf JPAH/n SYU Va Sb 4meun IAN 1aA0* 1170 S+i$e C.pp S $0 T. Faer w EW t35 3x Vrv+ {ta5 t0 P, 6ien 9133 SD GBemWpb 61 99 i. pp6nR 70 50 pwu lvMmp %4^%' M.W. 18 1.16 Mn. A+eetl. s ac ksMVCp+r N 6 +aE SS.9W BcwNU $+06 511068 S81iNtzK/me0e 08W9rotlp8Tw 9 m $2?B9E 9erym Te[!N[Iin sm SES 6P.95E lmtlR+pe Gpg'nw 99P s13QD 09 rpu4YCldn 989 90 ea +Stlxm ab: s9 EMn+ea o5PdlPrkPOP+vrbn- Gieoeaupport 913981 wasa9tl+xerc nxi E Om Tpq CaA f119,800 Tn4 P+Ypiimegq Xwea 'A�PeBfld Sella ayapry 6p LeMrYpe 9Wer lwdxgX W6 w:etlry E+Pr'ies 41 � 1'f JD Saerbn i¢UNWn pea w Tsrnnkun Tegn.gxn ryGlce S..eee 11 .y' 6T30^ SYx W 72 swwa 6 @SU wgCM1AMe1 4 d 16 O+nsWwa IMAM EYII! RMM.4 R FAmplmCer4M d ]2 PlmryRaw 8 so nD 8ppienwm 0 OI 8ug1MnW 8pelr<wn B '9 Bt6+YNM -lp]µ pAR 0 16 SWORSIpn -pyy. Pbtl E 8 13 FkNLM EYIim+k t N fl PMpe W CaBnWwlpApJNrn 9kRPtlgO+, P1P0pI.MeetM R1 lE L`oIWYEbnllaar+Om- $MNpli'Ij q JO o5PdlPrkPOP+vrbn- Gieoeaupport w AaNEflohmunYm 18 ]? B.NMI MpNwlp SXe NP]Iel a] 90 p1bPnP>+Oa' M�w14ePa1f21 d9 TpOf 1aW6 8 0 0 0 0 0 0 m 0 60 M 213 Te0§fi6Pww+ FSYeRM Tdtl LPA fi10•BNeEO Tam mnrMA4 klsgehmq�ae�a EryY _ +IHNI P� Rere 9ypbnPprc E�afyWUy'a0a f'i0/EAI +PEdMW a. phPruq.;men.9yn Sg10048YT lt) 9. M9 Mglil4fl.� F1Y9 P[ryg�M 0rl PWwbp 091 PNVYAeFb[i9.1 TaR CSI pxXq LGI( m. IaVSV W[ oMw. P ei Thal Cow 1' RMfb CbY TfLiMf 3X17 TNrt9Mn! S 6, 1E rm zB 52B 5]8 S 21W ON 1 N Sib 9i�9N 333 3�2 sly 320 s199p� 71 5',110 Y3B axe 9]8 S2P. 52X 528 1 �8u 613; 523 5` 313 583W Y� TCN S..21i ST74 512.9x3 9J,p35 E ;916 SJ eBe 5 637060 060 $i6R 51592 99535 E3 ]C 9J,0]9 iA4: 9�bm�r Set x33 52.38 M 69 Sf Sd 7. id Tax83�4Y 525,9e2 i ?4:$ 99.162 W s3� S:: tR ivx9EUp¢n b+: e18 91! 901 511 >.B]0 1& 23 90 S 6, 1E rm zB 52B 5]8 S 21W ON 1 N Sib 9i�9N 333 3�2 sly 320 s199p� 71 5',110 Y3B axe 9]8 S2P. 52X 528 1 �8u 613; 523 5` 313 583W Y� TCN S..21i ST74 512.9x3 9J,p35 E ;916 SJ eBe 5 637060 060 $i6R 51592 99535 E3 ]C 9J,0]9 iA4: 9�bm�r Set x33 52.38 M 69 Sf Sd 7. id Tax83�4Y 525,9e2 i ?4:$ 99.162 W s3� S:: tR ivx9EUp¢n b+: e18 91! 901 511 >.B]0 Attachment #09 -02.6 (8/10109) Construction Document Engineering fees indicated on page.1 are based on the following scope criteria: Scope of Work: A) Site will require a new SCE service and Metered Service Pedestal for site power. B) Site will be equipped with future irrigation pumps C) Site will not be equipped with a PLC / RTU at this time. D) Site will be equipped with cabinet for future installation of irrigation equipment electrical power and controls. I:) Site will not require design of area lighting. F) No closed circuit surveillance system equipment included in design. G) No access control and intrusion alarm system equipment included in design. 11) No stand -by generator or manual transfer switch and generator receptacle included in design. 1) No chemical analyzers included in design. J) No solar powered charging system included in design. K) Autocadd compatible backgrounds will be provided to W.A.D.E. for adding electrical design. (background showing existing architectural /mechanical equipment). Construction Document Engineering fees outline: A) Station plan to include ($1650): a) Locate, size, show installation requirements, and coordinate new S.C.E. utility service. b) Design new SCE service transformer provisions and primary and secondary ducts including pull boxes for utility service. c) Locate service pedestal and design service grounding. A) Show all power conduit feeder routing, sizing, and connections for future irrigation equipment e) Show all control signal circuit feeder design for future irrigation equipment connections. B) Station Single Line Diagram ($800) a) Provide Single line diagram and electrical load calculation. b) Provide SCE service connection, and station grounding. c) Identify all conduit and wiring for site. d) Provide complete conduit and conductor schedule. e) Provide voltage drop and short circuit calculations as required. C) Notes, Symbol List, Details, and Elevations. ($700) a) Provide Service Pedestal and elevations and.installationdetails. b) Provide SCE equipment connection details as required. c) Provide construction details as required. d) Provide construction notes, symbol list, abbreviations, etc. D) Electrical Construction Specifications - CS) book form ($600). E) Attend Pre Construction design meeting(s). ( Not Included), F) District plan check corrections (as required for completion. Page 2 of 3 Attachment (continued) #09 -026 Construction Administration Engineering fees outline: Not included in this proposal Scope of Service — General Conditions: A) Electrical Specifications to be issued in CSI fommat "Book Form" - printing RIO binding by others - an MS Word file will be provided by WADE. B) Construction documents to include all required responses to City plan check comments and questions, including City recommended revisions as pertaining to current identified scope of project. (8110/09) C) Construction Document Fees includes a Registered CA State Electrical Engineer stamp and signature of approval. D) Completed Autocadd Version 14 to 2006 electronic drawing files will be furnished by WADE to VA Consulting for plorting, printing, and distribution. E) Autocadd Version 14 or 2004 site piping layouts and background drawing files will be furnished to WADE by VA Consulting. F) Important Note: At the time of issuing this Fee Proposal -W.A. Doby Engineering carries the following insurance coverages: $1,000,000/2,000,000 Professional Liability. Msurancc coverage. $1,000,000 Automotive Insurance coverage. $1,000,000 Workmen's Compensation coverage. All work asked to be performed by W:A. Doby Engineering that is not included or outlined in this fee proposal will be charged at our standard hourly rate based on a time and material. Standard Hourly Rates for W.A. Doby Engineering Ina: Site visit Principal Engineer Design Engineer Engineering Inspector Draftsman Secretarial Office $500.00 per trip (not to exceed 5 hours). $165.00 per hour. • $135:00 per hour. $135.00 per hour. - $85.00 per hour. - $46.40 per hour. - $42.00 per hour. Page 3 of 3 ima will provide specification of a prefabricated structure for the electronic equipment. ima will provide Irrigation Design and system calculations for the installation of temporary use irrigation system(s) to establish approximately 5 acres of planting areas. The areas may be of three separate uses and may be installed in a phased construction. All work shall be accomplished simultaneously with indication of construction phase lines. Pond water qualky equipment and controls arc not included. Duration of the work as a continuous effort is anticipated to he three months or less between September and December of 2009. SCHEDULE I SCOPE OF WORK ,11VIO Ij t• ui olkv f.V Y a TASK 1 Meet with the Civil Engineer to receive the information prepared to date for die development of the facilities. Discuss with VA Staff to gain understandmg of the specific program, schedule and deliverables to be provided by ima, TASK 2 Prepare preliminary calculations and pond seepage & evaporation requirements review with VA Engineers. Prepare Level Control operational functioning system TASK 3 Design the equipment andlayout for the water line, and code required equipment for review with VA Engineers: TASK 4 Design the system, equipment and layout of the water RO equipment, layout and enclosure for review with VA Engineers. TASK 5 Design the automatic water make up system for the fresh water pond. TASK 6 Design power requirements & RO water discharge requirements. TASK 7 Automatic irrigation controls shall be arranged for use with electrical source provided by VA Engineers. TASK 8 Overhead sprinkler units will be arranged with on -bpde piping and fixed riser units with a sprinkler spacing appropriate for establishing the seeded areas. TASK 9 Subterranean systems will be designed as appropriate in lieu of overhead systems. TASK 10 Tree bubbler systems shall be documented as required for planting establishment. TASK I I Irrigation and water equipment schedules, details and written specifications shall be included with design documentation. TASK 12 Irrigation controller scheduling information shall be provided on plans as required to configure irrigation scheduling program(s). TASK 13 Meet with VA Engineers up to three times to review the design and layout information. TASK 14 Meet with the Cit1 of Newport Beach up to two times to discuss the design and layout of the work. TASK 15 Revise the layoutaud equipment design up to two times to accommodate comments for the Public Agency. SCHEDULE2 FEES BIG CANYON WATER LINE AND TEMPORARY IRRIGATION SYSTEM NEWPORT BEACH, CALIFORNIA LANDSCAPE ARCHITECTURAL SERVICES August 11, 2009 Fees are hump sum for the services described ahnve. Reimbursable expenses are in addition to the fee amount. STAGE I IRRIGATION DESIGN SERVICES FEE: Water source line design and layout/Equipment Schedule and Details $4,500.00 Irrigation design and layout/Equipmenr Schedule and Details $3,000.00 Fresh water pond automatic make up /RO /Equipment Schedule /Details $6,000.00 TOTAL LUMP SUM FEE $13,500.00 RELM13 1jZSABT.IR EXPENSES: Reproductions, CADD plots, mileage, travel costs, shipping expenses are in addition to the fee amount at cost. „,f \. 0 D 5' @ano M@wfig mc Z?) okicirk.'(d c,rigiriecrs VA CONSULTING, INC. 17801 Cartwright Rd. Irvine, CA 92614 REFERENCE: Big Canyon Restoration Project Electrical Systems Design W.A.D.E. JOB # 09-026 VA JOB # ATTENTION: Mr. Roger Chung, P.E. Dear Roger: FEE PROPOSAL August 10, 2009 The following is a FIXED FEE, Electrical Engineering Fee Proposal for the above referenced project. See attached "Scope of Work” and "Fee Outline" for services to be rendered. L CONSTRUCTION DOCUMENTS: a. Electrical Construction Documents $ 3,150.00 b. Electrical Construction Specifications $ 600.00 c. Printing,.Plotting, Shipping, Handling T&M SUB—TOTAL $ 3,750.00 2. CONSTRUCTION ADMINISTRATION: Not Included in scope of service Sincerely, Michael L. Milani President, W.A. Doby Engineering, Inc. GRAND TOTAL $ 3,750.00 Pagel of 3272 N. "E" St., Suite E, San Bernardino, California 92405 Telephone (909) 881-4200 Faxslmile (909) 881-4223 ilfur will provide specification of a prefabricated structut e for the electronic equipnlent. rata, will provide Irrigation Design and system calculations for the installation of temporary use irrigation system(s) to establish approximately 5 acres of planting areas. The areas may be of three separate uses and may be installed in a phased construction. All work shall be accomplished simultaneously with indication of cons tructioil phase lines. Pond water quality! equipment ,and controls :ire nor included. Duration of the work as a continuous effort- is anticipated to be three months or less between September and December of 2009. SCHEDULE 1 SCOPE OF WORIC RVAIRNI 82 11914NIATI 1 MON:11th • TASK 1 Meet with the Civil Engineer to receive the .information prepared to date for the development of the facilities. Discuss with VA Staff to gain understanding of the specific program, schedule and deliverables to be provided by initt. TASK Z Prepare preliminary calculations and pond seepage & evaporation requirements review with VA Engineers, Prepare. Level Control operational functioning system "TASK 3 Design the equipment and layout for the water Iine, and code required equipment for review with VA Engineers. TASK 4 Design the system, equipment and layout of the water RO equipment, layout and enclosure for review with VA. Engineers. TASK, 5 Design the automatic water male up system for the fresh water pond. TASK 6 Design power- requirements & .RO water discharge requirements. TASK 7 Automatic irrigation controls shall be arranged for use with electrical source provided by VA Engineers. `TASK 8 Overhead sprinlder units will be arranged with on -grade piping and fixed riser units with a sprinkler spacing appropriate for establishing the seeded areas. TASK 9 Subterranean systen;s will be designed as appropriate in lieu of overhead systems. TASK 10 'Ree bubbler systems shall be documented as required for planting establishment. CITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 7 October 13, 2009 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Robert Stein 949 - 644 -3311 or rstein - newportbeachca.00v SUBJECT: BIG CANYON CREEK RESTORATION PROJECT - APPROVAL OF AMENDMENT NO. 2 TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. RECOMMENDATIONS: 1. Approve Amendment No. 2 to Professional Services Agreement with VA Consulting, Inc., of Irvine, California, for design and permit application services at a contract price of $85,790 and authorize the Mayor and City Clerk to execute the Agreement. 2. Approve a Budget Amendment transferring $85,790 from Account No. 7014 - 05002001 to Account No. 7014- C5100709. 3. Approve staffs recommendation to stop work on current project and work with the Regulatory Agencies and our consultant team to re -scope the project into a much more modest plan for restoring disturbed area in the canyon, removing invasive species, and pursuing various means to reduce selenium concentrations entering the canyon to below 13 ppb to meet RWQCB TMDL requirements. BACKGROUND: The restoration project as originally conceived in 2002 was very modest. It originally involved upgrading the existing parking area, removing some invasive plants, replanting lower quality habitat areas with native species, and improving the trail system. Over the past five years, the project design evolved to address a number of issues in the canyon. In 2004, a canyon restoration plan was developed that proposed dredging at the mouth of Big Canyon to re- establish the historical tidal influence into the canyon. This proposed change entailed changing the restoration design to relocate Back Bay Drive around the recreated mouth of the canyon and creating a new freshwater marsh further upstream in the canyon. Additional parking, restroom facilities, covered outdoor seating area, educational signage and habitat interpretive areas were added. Big Canyon Creek Restoration — Approval of Amendment 2 to Professional Services Agreement with VA Consulting, Inc. October 13, 2009 Page 2 In 2008, high concentrations of selenium were found within Big Canyon Creek. The high selenium concentrations were found in the water column, sediments, and animal tissue with especially high concentrations discovered in the existing freshwater marsh located just upstream of Back Bay Drive. The high concentrations in the freshwater marsh were suspected by the Regional Water Quality Control Board (RWQCB) to occur because of the stagnant conditions in the marsh. As the proposed upstream freshwater marsh would create similar conditions for creating and accumulating high selenium concentrations, the proposed project design was further reviewed. After consultation with the resource agencies, a solution was proposed to revise the plan to construct a new freshwater pond offline from the creek. This freshwater pond would need to be filled with a source of water not contaminated with selenium. Staff suggestion to use reclaimed water was rejected by the RWQCB. The idea of using groundwater was also eliminated based on testing which found selenium in the groundwater. With these options eliminated, only potable water was left as a candidate. This option is the most expensive and also requires the removal of chloramines from the potable water. The recent requirements for a new, off -line pond as well as the use of potable water prompted high level discussions among City staff on the overall viability of the project. The decision to continue to move ahead was in part based on the availability of outside funding for construction of a restoration project in the canyon with $1.5 million from The Irvine Company and a promise of $2.5 million from the Wildlife Conservation Board. With the preparation of the construction documents nearing completion, new issues and questions have now been raised by the regulatory agencies on the project's protection measures for a very rare plant that grows in the mudflats called the Salt Marsh Bird's Beak (Bird's Beak), the largest remaining colony being located near the mouth of Big Canyon. This very rare and endangered plant species requires a briny water mixture of bay water and freshwater marsh water to survive. While the restoration plan can be modified to leave the embankments of the existing Back Bay Road in place in order to protect the environment of the Bird's Beak, in the past two months, the resource agencies have also asked for more pre- construction surveys and monitoring of the mudflat areas around the Bird's Beak (as well as canyon habitat as a whole). The resource agencies have also proposed extensive monitoring conditions during construction activities that would be reviewed by the resource agencies for evidence of habitat impacts to the Bird's Beak. That review could conceivably require modification of the project design mid - construction with the potential for delay or increased construction costs. Additionally, the resource agencies have requested post - construction monitoring and documenting of the Bird's Beak and other habitat changes over the next five years where plant growth targets would have to be met. Costs for the monitoring and assessments alone will likely exceed $250,000. With the cost estimate to construct the project as requested approaching $8 million, and only $4 million of construction funding identified so far, staff is questioning the viability of the project. The project has evolved past the original vision and cost, as well as the expertise of City staff and would now require hiring biologists, groundwater hydrologists, and water quality specialists from the private sector to continue the effort. Big Canyon Creek Restoration — Approval of Amendment 2 to Professional Services Agreement with VA Consulting, Inc. October 13, 2009 Page 3 And while the City and its consultants have been in close contact with the resource agencies over the course of planning and designing of this restoration project since its inception, resource agencies have not committed to issuing all required permits until well into this rainy season. Taking a step back and re- looking at this project, most of the project concerns center on the existing freshwater marsh (shown in the attached figure). This marsh is almost entirely within California Department of Fish and Game (DFG) property. This marsh was a mitigation site so it cannot be removed without providing an alternate mitigation site. DFG has indicated that pond turtles exist in the marsh; however, the last time a turtle was sighted is unknown. The marsh is also the location of some of the highest selenium concentrations within the whole 154 square mile Newport Bay Watershed. The marsh also provides freshwater for the Salt Marsh Bird's Beak located on the mudflats west of Back Bay Road. DFG, U.S. Fish and Wildlife Service and the California Coastal Commission have now taken a very keen interest in ensuring that the freshwater /saltwater balance required by the Bird's Beak is not upset. The ramifications of relocating or modifying the freshwater marsh were not recognized five years ago. In light of all the developing information and corresponding mitigation, monitoring and cost, staff has determined that a fresh approach to restoration activities in the canyon is warranted. As a first step, the City has requested that its permit applications to the resource agencies be withdrawn. Staff has also directed our consultants to hold off on any remaining design work. At this juncture, the following tasks are suggested. 1. As there is funding earmarked from The Irvine Company litigation settlement for constructing a restoration project, our consultants can work with the existing drawings and information to fashion a modest vegetation maintenance plan for restoring disturbed area in the canyon adjacent to Jamboree Road. The project would be structured so that only a permit clearance from the California Coastal Commission would be required. The project could potentially kick off this January. Construction cost for this project would be approximately $300,000. 2. The City will meet with the resource agencies next month to work out alternatives for restoring the canyon, especially for addressing the selenium issue. The City would propose addressing the upstream over - irrigation practices by possibly constructing an inline, below -grade filter to reduce selenium concentrations entering the canyon to below 13 ppb (currently at about 50 ppb) to meet RWQCB TMDL requirements. 3. As DFG owns the marsh, the City would look to DFG staff to take the lead on how to deal with all the issues related to its marsh especially with regard to the selenium contamination. DFG biological and ecological experts are in a better position than the City to assess how the marsh can be modified to reduce selenium problems without disturbing biological resources like the Bird's Beak. Additionally, DFG could work with the biologists from the other resource agency Big Canyon Creek Restoration — Approval of Amendment 2 to Professional Services Agreement with VA Consulting, Inc. October 13, 2009 Page 4 in fashioning a cost effective monitoring program using resource agency expertise. CONSULTANT COSTS VA Consulting (VA) submitted a change order request on July 16, 2009 to perform new tasks to address the flurry of regulatory and design issues that would need to be resolved before the targeted advertisement date of September 9, 2009. City staff requested the consultant to continue moving forward with key tasks in parallel with the processing of the change order request for Council consideration in order to meet our construction window. As the deadline for advertising the project approached, the change order request was modified twice in light of changing project requirements. These changes repeatedly delayed bringing the change order to Council. As a result of a lot of last minute maneuvering, staff now finds itself having to request funds to reimburse VA for extra tasks that have now been completed. These tasks include: • Conducting coordination meetings and conference calls with the resource agencies. • Preparing an operations and maintenance plan describing long term maintenance procedures to protect sensitive habitats as a permit condition by the Army Corps of Engineers. • Preparing additional figures to show more detail for all habitat creation resulting from this project as a permit condition by the Department of Fish and Game. • Revising the mitigated negative declaration per comments of the resource agencies. • Repackaging the project into Phase 1 and Phase 2 tasks as a permit condition by the California Coastal Commission such that Phase 1 tasks are focused on establishing the freshwater pond and constructing OCSD facilities. • Preparing a biological monitoring plan. • Assessing if groundwater could be used for filling the proposed freshwater pond. • Preparing a California Endangered Species Act Incidental Take Permit for the Salt Marsh Bird's Beak. • Installing groundwater monitoring wells (a condition for protecting the Salt Marsh Bird's Beak). • Modifying drawings and specifications to include a water supply line and temporary irrigation system (including power for the automatic fill device and irrigation controller) to the freshwater pond. • Modifying the freshwater pond configuration to accommodate new habitat mitigation requirements as a permit condition by the Department of Fish and Game. • Modifying the selenium treatment subterranean wetland as recommended by the Regional Water Resource Control Board. The fee for these and other additional tasks (see Attachment A) to be covered under the second amendment to the contract is $85,790. The original contract compensation was $435,159 (66% from non -City funds) and the fee for the 18t amendment was Big Canyon Creek Restoration — Approval of Amendment 2 to Professional Services Agreement with VA Consulting, Inc. October 13, 2009 Page 5 $289,925 (100% from non -City funds). This 2nd amendment will bring VA's contract and the Big Canyon Creek Restoration Project to closure. Funding Availability: With approval of the budget amendment, funding is available from the following account. Account Description Account Number Amount General Fund 7014- C5100709 $85,790.00 Prepared by: Robert Stein Assistant City Engineer Total: $85,790.00 Submitted bv: Attachments: PSA with VA Consulting, Inc. Amendment 2 Scope of Services prepared by VA Consulting, Inc. AMENDMENT NO. TWO TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. FOR BIG CANYON CREEK RESTORATION THIS AMENDMENT NO. TWO TO PROFESSIONAL SERVICES AGREEMENT, is entered into as of this day of ' 2009, by and between the CITY OF NEWPORT BEACH, a Municipal Corporation ( "CITY "), and VA CONSULTING; INC., a California Corporation whose address is 17801 Cartwright Road, Irvine, California, 92614 ( "CONSULTANT'), and is made with reference to the following: RECITALS: A. On December 11, 2007, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT," for engineering design services for the Big Canyon creek Restoration Project, hereinafter referred to as "PROJECT." B. CITY and CONSULTANT have entered into one separate AMENDMENT of the AGREEMENT, the latest dated January 27, 2009. C. CITY desires to enter into this AMENDMENT NO. TWO to reflect additional services not included in the AGREEMENT or prior AMENDMENT, to extend the term of the AGREEMENT to December 31, 2010 and to increase the total compensation D. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. E. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. TWO" as provided here below. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM ��Wyj 1i 11 CC �F im In addition to the services to be provided pursuant to the AGREEMENT and AMENDMENT NO. ONE, CONSULTANT shall diligently perform all the services described in AMENDMENT NO. TWO, including but not limited to, all work set forth in the Scope of Services attached hereto as Exhibit 1 and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 3. COMPENSATION City shall pay Consultant for the services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached to the AGREEMENT. Consultant's total amended compensation for all work performed in accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed Eight Hundred Ten Thousand, Eight Hundred Seventy -Four Dollars and no /100 ($810,874.00) without prior written authorization from City. 3.1 The amended compensation reflects Consultant's additional compensation for additional services to be performed in accordance with this AMENDMENT NO. TWO, including all reimbursable items and subconsultant foes, in a ;cu::, r c: to ==11 Eighty-Five Thousand, Seven Hundred Ninety Dollars and no /100 ($85,790.00), without prior written authorization from City. 4. INTEGRATED CONTRACT Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain unchanged and shall be in full force and effect. K IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. TWO on the date first above written. APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY A By: D_ Oefucoamp, Assistant City Afttrney ATTEST: Leilani I. Brown, City Clerk CITY OF NEWPORT BEACH, A Municipal Corporation Z Edward D. Selich, Mayor CONSULTANT: VA CONSULTING, INC. M Max P. Vahid, President and C.E.O. Michael S. Carter, Secretary and C.F.O. Attachment: Exhibit 1 — Additional Services to be Performed 3 VAI CONSIJUI.NG September 10, 2009 Mr. Mark Reader, P.E. Project Manager Public Works Department City of Newport Beach 3300 Newpori Boulevard Newport Beach, CA 92663 -3884 Dear Mr. Reader: This letter is a change order request for additional engineering design services related to the Big Canyon Creek Restoration Project (Project) (Professional Services Agreement dated December 11, 2007). This change order supersedes our previous letter dated August 31, 2009. These additional services include on -call services that were not included in the original scope of work or Addendum 1 for the final design of the project. The services provided include excavation of a boring hole to provide access to groundwater for sampling and analysis, revisions to the Operations and Maintenance Plan to include procedures required to avoid impacts to biologically sensitive habitats, additional services required for permit and environmental document processing, and dividing the project plans into two phases to meet Coastal Commission requirements. A detailed scope of services is provided in Section I and fees in Section II of this letter. Also a breakdown of VA's hours and tasks is included as Attachment A. We will provide our services on a time - and - materials, not -to- exceed basis in accordance with the attached fee schedule (Exhibit A). SCOPE OF SERVICES Boring Holes Excavation Geosoils, Inc. drilled a hand auger boring hole adjacent to the access road along the northerly slopes of Big Canyon, in the vicinity of the existing spillway to provide Cl access to groundwater. Because this operation was successful, the Geosoils fee is $500 and further drilling with a drill rig for groundwater sampling is not required. The proposal from Geosoils is included with this letter as Attachment B. VA Consulting, Inc. Corporate Office Orange County Division 6400 Oak Canyon, Suite 150 Irvine. CA 92619 Phone 949.474.1400 Fax 949.261.9482 x.' 1Pio19[ tCY l3JN0.YM,ixCOaS_ngLevyq�Geet,klf GO@.doc Mr. Mark Reader, P.E. Big. Canyon Creek Restoration September 10, 2009 Page 2 of 7 2. Update Environmental Documents and Permits Applications Resource agencies requested additional information. and revisions to the environmental documents and permits beyond the original project scope and Addendum 1. In response to these requests, WRA provided additional figures showing greater detail regarding habitat impacts and creation. WRA provided an Alternatives Analysis, project impact analysis, Biological Monitoring Plan, and additional Salt Marsh Bird's Beak information to the resource agencies. WRA reviewed the project Operations and Maintenance Plan and provided text which dv.SCr4t the f�iig -t6n�: n�a to i�.. prou,dl:res CegilI I t0 a'JGId IRipaia5 t0 sensitive habitats, including wildlife and vegetation. Per the request of CDFG and the Coastal Commission, WRA installed 5 groundwater monitoring wells with piezometers and data loggers at each well location to measure water level; conductivity and temperature at 30- minute intervals. The total WRA fee for this task is $4,273. The proposal from WRA is included with this letter as Attachment C. VA incorporated the language provided by WRA to address biologically sensitive resources in Big Canyon into the Operations and Maintenance Plan for use in obtaining regulatory permits. VA provided peer review of the additional language: for project compatibility and incorporated the language into the Operations and Maintenance Plan text. The total VA fee for this task is $3,092. VA purchased the data loggers and provided them to. WRA for installation at each groundwater monitoring well location. The total. VA cost. for this item is .$8,475. 3. Project Coordination and Meetings.(WRA) Additional. project coordination and stakeholder meetings for design review and permit approval was conducted after permit application materials were. formally submitted. This scope of work provides for the additional conference calls, meeting preparations, and project management time. The total' WRA fee for this task is $2,500. The proposal from WRA is included with this letter as Attachment C.. 4. Electrical Systems Design The temporary irrigation systems needed for the establishment of proposed tidal and restoration planting will require a power source in lieu of solar power, as originally proposed to the City. W.A. Dotty Engineering, Inc. has provided a station plan, station single. line diagram, Service Pedestal elevations and installation details, SGE equipment connection detail's, construction details, and electrical. construction specifications. The total W.A. Doby fee—for this task is $3,750. The proposal. from W.A. Doby is included as Attachment Q. %'.Ni01u11'3]] OdLUNlInM1I1JfF $:BIgLa- „1'4MJ88N_0$tOp9dv” dill cx. -_., d�GL Qe.g3`.E ° cta,:p r m t'.i kw.' Id I$ 1 1 q Rn Mr, Mark Reader, P.E. Big Canyon Creek Restoration September 10, 2009 Page 3 of 7 5. Temporary Irrigation Water Line The temporary irrigation of restoration planting will require a potable water source. IMA prepared the design and layout of a pressure mainline and backtlow preventer from the hot tap point of connection at an existing potable water source, along the proposed sewer maintenance road to the proposed freshwater pond. The IMA cost for this task is $4,500. The proposal from IMA is included as Appendix E. G. Project Coordination and Meetings (Ron Yeo) Additional project coordination and meetings were required to address City comments on the Project plans. This task provides for coordination and meeting time required for Ron Yee (architect) to complete the architectural aspects of the Project. The total Ron Yee fee for this task is $1,200. Construction Phasing The City requested that the Project Plans be divided into two separate plan sets, one for each Phase of construction, in order to satisfy the California Coastal Commission request that the proposed freshwater pond be established before construction in the existing freshwater marsh takes place. At the time Addendum 1 was written, the proposed freshwater pond was at a conceptual level, with no elevation studies or grading design completed. The additional cost of providing two separate plans sets was not included in the original contract, nor was it includedfn.Addendum 1. In order to create two complete but separate construction phases, two unique grading plans were developed,, each providing flood control protection of the proposed freshwater pond. The Phase 1 grading base was developed with the original base file and modified to include a staging area in the vicinity of the proposed interpretive area, the proposed freshwater pond, and the proposed sewer maintenance road. Grading for the staging area was developed using: the proposed interpretive area roadway and modified to balance the Phase 1 site with regards to out and fill quantities. An iterative approach was required to arrive at a final Phase '1 project that was balanced. As such, the grading for the staging area was refined three times in order to balance the site, The proposed flood control conveyance grading will impact the. existing freshwater marsh, therefore the flood control conveyance could not be part of the Phase 1 plans. The flood control. conveyance contours were deleted from the Phase t basefile and the contours along the berm between the. proposed flood control conveyance and proposed freshwater pond were revised to allow Big Canyon Creek to continue to flow to the existing freshwater marsh after Phase 1 construction is completed. In order to ensure that storm water would not damage the new freshwater pond during a major storm event, a Phase 1 hydraulic analysis was conducted. Grading along the northerly trail of the proposed freshwater pond was adjusted to ensure that 100 -year storm flows would not z�n,gPmoq_gqoP.aammhao� afdraoyanere�mxoos:ar d 2 M- ........ ks _. may, pR— to ee MR- 'M � x-r.'. 3. xi1 1, fitU1, fn, .'yc _ _ ...,s.. a.r. 3. 5......... 1Fr a._ _ _ _ Mr. Mark Reader, P.E. Big, Canyon Creek Restoration septemper 10, 2009 Page 4 of 7 overtop the berm and damage the pond based on the results of the Phase f hydraulic analysis. The Phase 2 grading base was developed with the original base fife and modified to include the proposed tidal marsh, proposed Back Bay Drive realignment, proposed interpretive area, proposed freshwater marsh, and proposed flood control conveyance. Contours in the vicinity of the Phase t staging area and along the berm between the proposed freshwater marsh and proposed flood control conveyance were revised for continuity between the two phases. A Phase 2 hydraulic: analysis was conducted to ensure that 100 -year storm water ;lows would not emel the freshv�atoi pond during a 100 -rear stone cvcnt and that storm water flows would be non - erosive in the proposed flood control conveyance. In order to provide plans that could be used separately for each phase of construction, two additional rough grading plan sheets were created and each of the remaining six rough grading plan sheets were significantly revised. Two additional cross- sections and detail sheets were created to clarify each phase of the grading plan. Creating a new rough grading sheet required setting up vfewports in paperspare that were consistent with the index map, updating title block information, adding the appropriate constructions notes to the construction motes list, labeling construction items with the appropriate construction note numbers, adding a curve and line data table, labeling curves and lines the with appropriate label;. addition of annotations, adding typical section notation, and formatting line weights, line types, and line type scales. Revisions to. the rough gradirig.sheets included changesto the construction notes and labels, revisions to the annotations; revisions to typical section notation, and revisions to yfewports:to be consistent with the index 'map. Creating a new cross- section and detail sheet requires drafting the sections and details, annotating the sections and details; referencing in the appropriate files into the sheet, creating viewports to show the sections and details and the appropriate. scale, and formatting line weights, line types, and line type scales; Each phase of construction requires a separate erosion control plan; therefore three additional erosion: control'p.lan sheets .were developed. Creating 'a new erosion control sheet required setting up viewports in paperspace, updating title block information, adding erosion control features, adding erosion control notes, construction notes, and details as required, and formatting line weights, line types, and line type scales. The invasive species removal plan had to be divided into two separate plans corresponding to each construction Phase; therefore two additional invasive species removal plan sheets were created. Creating the additional invasive . species removal sheets required updating'titie block information, updating legend information, 'and updating invasive species removal phase hatching to be, consistent with project phasing. The. restoration planting plan :had to be divided into two separate plans corresponding to each phase of construction; therefore two restoration plans had KeY,oiecLwr.�o+oti�nema (ins- e�pcen�e:+c�cek?s +[iw9dx t- INr. Mark Reader, P.E. Big Canyon Creek Restoration September 1.0, 2009 Page ri of 7 to be developed and six additional planting plan sheets were created. The Phase 1 Restoration Plan was developed to Include planting in areas that would experience invasive species removals prior to the construction of Phase 1 and areas that would be graded as part of Phase 1 construction. The Phase 2 Restoration Plan was developed to include planting in areas that would experience invasive species removals prior fio the construction of Phase 2 and areas that would be graded as, part of Phase .2 construction. Development of the Phase 1 and Phase 2 Restoration Plans required changes to the planting plan base file, specifically revising the polygons for the different habitat types. Revisions to the planting plant sheets included revising viewports to be ( Conslsfrenr with the index mop and undatii- reference flies- Additionpi mOsion� include plan check comments from the City that require duplicating planting information from the project specifications on each of the planting plan sheets. Dividing the project plans into two separate plan sets required revisions to three AUfoCAD base files and the addition of 15 sheets to the Project Plans. This task also includes revisions to the freshwater pond configuration after the revised grading design was completed to accommodate requests for mitigation site avoidance made by California Department of Fish and Game. The original pond size/acreage was established to provide a 1:1 freshwater habitat replacement. This task also provides for the time spent by VA staff to divide the project specifications into two phases; per the request of the City. The total VA fee for this task is $34,000. 8. Structural Submittal The City requested that the structural sheets from the Project. Plans be submitted to the Building and Safety Department as a separate submittal from the entire Project Plan set. One title sheet and one index. map was created for each Phase of .construction for a, total of 4 additional plan sheets., In addition, the Phase 2 plan submittal was divided into two plans sets: one for Public Works Department Components and one for Building and 'Safety Department Components. Top Public Works Department Components Plans include Rough Grading Plans, Street Improvement Plans, Quad Box Structural Plans, Erosion Control Plans, Invasive Species Removal Plans, Restoration Planting Plans, Wetland Planting Plans, and Interpretive Signage. Plans. The Building and Safety Department Components Plans include the .Precise Grading Plans„ Architectural Plans, and Miscellaneous Structures Plans. Revisionsi were required on a total of 20 sheets in order to create the separate plan set for Building Department; Review. The Hydraulic and Structural Calculation Package (Phase 1 and 2) was also revised in order to create a. separate structural calculations package for Building arid Safety Department Review. Revisions to 10 pages of the calculations and the creation of one new title sheet were required. The VA fee. for this task is $9,000. 9. Subterranean Wetland Deletion As part of Addendum subterranean wetland selenium. During a XINMBC155]i] OapP.Mrt1KA0i9WGnpt{',re5k , p910pJRiF 1,. VA provided engineering design activities to include a in the .construction plans as a treatment facility for telephone conference call., the Regional Water Quality -'.l F„". .7 A "V, Mr. -Mark Reader, P.E. Big Canyon Greek Restoration September t0; 2008 Wage 6 of 7 Control Board expressed concerns that subterranean wetlands have not been tested for treatment of selenium, and may worsen the condition in Big Canyon, The Citv decided that the subterranean wetland would be deleted from the project plans to be included as a later Phase or a future pilot project. Additional engineering design and grading was required to ensure that low flows from the Jamboree culvert would drain to the existing Big Canyon Creek without the subterranean wetland. Revisions to the restoration planting plan were required to provide planting in the location of the deleted subterranean wetland. The rough grading plan sheet depicting the subterranean wetland was revised to properly annotate the revised project configuration. An additional cross - section was added to the ,erti2: s ar.ri detaDs h ^et fn clarity the revised grading at the location of the deleted subterranean wetland Revisions to two base files and two plan sheets were required to eliminate the subterranean wetland. The total VA fee for this task is $2,000. 10. Past Resource Agency Meetings and Coordination The original contact and Addendum 1 funds for meetings and coordination were depleted in May of 2009. This task provides for VA participation in 8 resource agency meetings and 20 hrs of coordination time required for the approval of the environmental documents and permits that have occurred between May of 2009 and the present. This task also includes meeting and coordination time required to initiate the electrical and water supply line design tasks. Meetings and coordination relating to project design are not a part of this task. The total VA cost for this task is $8,583. 11. Future Meetings and Coordination This task provides for future meetings, coordination;. and information requests by the City for the Phase '1"B and Phase 2 portions of the Project. This task provides for 24 additional hours of meeting and coordination time. The total VA cost for this .task is $3,912, II. FEES 1. Boring Holes Excavation.........,....... ............. ........... ... a................. .,.,..._....,.$ 500 2. Update Environmental Documents and Permit Applications ......................$ 151840 3. Project Coordination and Meetings ( WRA) ........ ........ ...........:.................$ 2,500 4. Electrical System Design. .... t_ .... _ ........ ....... ............. .............. ...... ........ $ 3,750 5, Temporary Irrigation Water Line,...... ......................... ..........._..................$ 4,500 6. Project Coordination and Meetings (Roil Yeo) ............. ........................i....:$ 1,200 7, Construction Phasing ........... .........................::..:...... ..............................$ 34;000 XiPrgrzinsi3; wndeaMMrnvs e+n= e�reev cseaoaax r �>t '-'i ,t qtr *,( f'��ep� r <ir :;-¢',•�..� -.., ,J� .. }�U. !`^ I .: { - ,�„'` -j�l; if.!;. =;tip r._._.. ... Mr. Mark neader. E Big Canyon Greek Restoration September 10, 2009 Page 7 of 7 8. Structural Suhrnit\8. ........... ...... —.................. ....... —...... ..... ...... 91000 9. Subterranean Wetland Deletion ........................ . 2`00$ 70� Past Resource Agency Coordination ......... ....................... .--- .... ..—.—$ 0,588 11, Future Meetings and Coordination ......... .......... ... ^^ ................. —.... ... $ 3.912 TOTALFEES ......... ....... . ................... ....... ~ ............ ................ ................. ... * 85,730 If yo" have any questions or require uddki^ou| iA|Unnahoo, please feel free to 000kani Uuo Vi|hoesormoa/(949)474'14O8or John Wolter at(8S\)34O-0O80` Sincerely. Max P.Vuhid,P£ President and CEO MPV/1(am Enclosure— Exhibit A—\/A Fee Schedule/ Attachments & through E; cc: Dan Villines, John Wolter, Contracts EXHIBIT A VA CONSULTING, INC. FEE SCHEDULE staft Classification 1. Wil EtIgineering and Planning Services President...... ..................................... ....... ...... ~............... Division President/Division Manager ......... ........ --..... -'- Sr. Vice President/Vice President/ Exec. Director . ..... .-..� Director.......................... ....... -....... ,^-.-'''--^ ... -',~ Senior Project ^ ...... ........ . ................ ....................... Project Mannger,..-.-...--,----`'--^`^~~---� Assistant Project Manager ............. ^ ........ ....... .............. ........ Senior Project Eng-trieer/Senlor Design Supervisor/Senior Planne Project Senior Design Engineer/Senior Designer ........... .......... , ...... ..... Design Engineer/Planner ................... ...................... ................... wcs. ... . ................... .................. .... . ...... .~~^'^'-'^.... Assistant. Engineer/Assistant Planner ............. ......... ................... .`e,nn.ww.".�v~vo""/ov°''."n""�"^`'`~~~~-^^-`-`^~ Senior CA0DTkhnitiao ............. ............................ ............. .~� Junior ~~--.r~.^^....~`-~,^^-'~-^'^ CAW Technician ........ '............................................................... � E.`.^~.~. ..................................... off",==pp".�qe^"^x^+!;�!... ^~.°^-.~^~~^^—`'^� Field Survev and Mapping Services 1-&08nGPS.Chew.^ ...... .... ...... ......... ,..,,,^'.,. ......... ­` ........ .'~-~~.~°°.—~~........ Special Services Litigation `~^^`~^''^~`^^"^"^`^^`''`.°'�^^~—^'--^'—~~~-,~...-~........ $450 Notes: 1- ,rv�a/m*°a|bupri3geV lot all umnicw^ through the end of each calendar Month. |nmolm are ghd . 2. Overtime, e U�!4u�hu9�d p^a��o�13��«dme��d�dh6harT�tm�oyou�wa�mu�u*s wWbeoonba0*$'a| nnuo n,17A of. oestmndao/ hourly rates. o. ||b ���Ou, 4. In-house repruttraphim rhavnes.:4W.00nu"upIv�$1.mvsq-fL8n0/oWm $80N0t, 4. mildsoa Will be Wed at slandaid Milear felzE; W.by IRS. ZWO fates curWRIV listed el $0 65 per Milb- -- - -' - ' ATiAENMEtR.A Cky gMewP?��Seseh Ei0 Cepen Leek ReetaeXOePre{ed' E9TICiFTEO FEES4PJ PEMES. %rT- f4eIiM -6-r -8 3812 E. La Palma Avenue - Anaheim, CA 92807 • (714) 632 -0151 ^ FAX (714) 632 -0745 May 15, 2009 VA Consulting, Inc. 17801 Cartwright Road Irvine. Califomin 92814 Attention: Mr. Dan Viilines W.0,5595 -A1 -OC Subject: Change Order Request No. 2, Big. Canyon Creek Restoration, Upper Newport Bay, Newport Beach, Orange County, California Dear Mr. Villines: GSI respectfully requests a change order to the contract for geotechnical services addressing the Big Canyon Creek Restoration, Upper Newport Bay, Newport Beach, Orange County, California. This change order was created in response to your recent request by for groundwater sampling at the site. It should be noted however, that the actual sampling will be performed by others. GSI'will be responsible for excavating the boring holes only. Two methods of drilling are provided as options in this change order.. The first option includes four (4) hours for a geologist with a 'hand' auger and is estimated to be approximately $500. This option would 'provide one (1) hand auger.boring, up to 15 feet in depth, or until groundwater is encountered. The: second option includes four (4) hours with a hollow stem drill rig as well as a- supportl:ng geologistand:is estimated at $1,400.00. This, option is provided in case the first option is not successful, due to refusal or excessive depth to groundwater. The:opportunity to. be of:service is sincerely appreoiated. If you should have any questions, please do not hesitate to contact our office. Respectfully submitted, GeoSoils, Inc. Shaun Wi kins Project Geologist SHW /BBS /jh Distribution: (2) Addressee inn Shahrvini f Vice President, GE 2296 €nth @UN M'E.N iti. CON&(MAIM Big Canyon Creek Restoration Project Phase II Permitting and Design Services & California Environmental Quality Act Documentation VA Consulting Project No. 373.0400 SCOPE OF WORK AND ESTIMATED BUDGET CHANGE ORDER Prepared for. John Wolters VA Consulting, Inc. 17801 Cartwright Road Irvine, California 92614 September 9, 2009 PURPOSE The purpose of this Scope of Work is to describe tasks required to complete for work described in the December 17, 2008 change orders submitted to VA by WRA ('Permitting and Design Services" and "California Environmental .Quality Act Documentation").. Due to project changes, phasing, and agency requests, the scope of work described in the December 2008 change orders expanded and additional funds are required to compensate for additional work already conducted. by WRA.. This out -of -scope work focused on providing resource agency personnel with additional project documentation, project impact analyses. and installation of hydrology. monitoring wells. This Scope of Work also describes Work to be conducted by WRA, Inc. to assist the City of Newport Beach in completing Phase IA of the Big Canyon Creek Restoration Project. WRA`s work will focus on landscaping drawings, specifications and cost estimates; preparation and receipt. of agency, permits; construction management services to implementthe<Plan; and coordination and meetings with ageney.and City staff. Finally, this Scope of Work describes hydrology well monitoring tasks to be conducted by WRA for a 2 -year monitoring period. WORK PRODUCTS Additional funds are required to compensate for unanticipated work- associated with the following Work products described in the December 17, 2008 change orders: Permitting and Design Services Change Order Task 3., Update Environmenfal,Documents and Perm, it Applications Task 5.: Project Coordination Medtings WRA will add additional tasks to the December IT,`2008 Permitting and Design Services Change Order'and will .provide thefollowing work product: 21 59mG Frat Fiandsco @lyd., San Rgloe, CA 94901 (41'5) 454 -88US lei (4 15, 454 -0129 tax irkftm- ca.com WwW:W(fl-" :Ce1i1 Task 6: Phase lA Construction Documents Task 7: Phase 1A Permit Applications Task 8: Phase )A Construction Observation Task 9: Well Monitoring & Reporting SCOPE OF WORK Permitting and Design Services Change Order Task 3: Update Environmental Documents and Permit Applications Edits and additions to permit documents beyond the scope of the December 2008 change order were required before final submittal to resource agencies. WRA incorporated agency and stakeholder comments into permit application materials ana generated additional figures to show more details of all habitat impacts and creation as a result of Project. Additional Project documentation was required to satisfy resource agency information requests after permit submittal, including an Alternatives Analysis, project impacts analyses, sections of the Project's Operations and Management and Biological Monitoring Plans, and coordination of salt marsh bird's beak information with the agencies. WRA prepared all requested documentation and provided it to the resource agency personnel for review. WRA coordinated with agency personnel via phone calls and email with the objective of formal permit approval. WRA performed background research, obtained an access permit to California Department of Fish and Game (DFG) lands adjacent to the project boundary, and installed 5 monitoring wells as requested by the California Coastal Commission and DFG. Task 5: Project Coordination and Meetings Additional project coordination and stakeholder meetings:fordesign review and.permit approval was conducted after permit application .materials were formally submitted. WRA will provide a project summary and,as.semble. Phase IS and Phase I] materials for the City's records. This scope of work provides for additional meetings attended by W RA staff via conference call,; and provides for preparation and, follow -up time for each meeting for work related to.Phase IA implementation. Task 6: Phase IA Permit Applications WRA will work with the City to develop a vegetation management plan to implement Phase. IA of the Big Canyon Creek Restoration Project and that optimizes weed removal and native• plant restoration while avoiding major resource.ageney permits. WRA will prepare materials to apply for and gain receipt of resource agency permits for Phase IA. We will coordinate with resource agency personnel via phone calls and emails to secure receipt of permits. Task 7 : Phase IA Construction. Documents & Cost Estimates Construction Documents We will review existing.plans and documents thatclescribe the habitat enhancementand restoration components that will be: - -pert. ormed:as part of Phase IA,: We will perform onesite visit to document site conditions. As part. of this site visit, .We .will estimate the, quahtlry; we (if applicable) And locations of invasive plants to beremoved and use this information to define the scope of work for the.contractor. We may change the recommended habitat enhancement and restoration actions based on our understanding' of the biological conditions on= site'and the potential for successful restoration. We will only make changes that are permitted within the current project.definftion. We will prepare construction drawings and supplemental technical specifications for the habitat enhancement and restoration components of Phase IA. Construction drawings and specifications will be prepared for the following project components: Demolition, Invasive Plant Removal and Site Preparation Erosion Control Planting Irrigation We will prepare the construction documents for the following submissions. You will have the opportunity to review each submission and provide us with written comments. We will review your comments and incorporate them into the subsequent revision. At your request, we will prepare additional submissions. Additional submissions are considered extra work and will be billed on a time and material basis. 100% Draft Completion Set - Drawings and Specifications 100% Final Completion set - Drawings and Specifications Cost Estimates We will prepare a detailed estimate of the cost of construction and update in correspondence with the following submittal. This will allow you to make decisions during the design phase that effect the cost of your project. The cost estimate that corresponds the final 100% will be intended for use in comparing and evaluating the bids for construction. Construction Cost Estimate - 100% Draft Completion Set Construction Cost Estimate - 100% Final Completion Set Task 8: Phase lA Construction Observation Assistance with Acquisition and Negotiation of Bids for Construction We will assist you in obtaining, evaluating, and negotiating bids for construction. We will perform the following services Prepare the.final opinion of construction cost Provide a list of qualified contractors • Prepare the invitation letter for the bidders Prepare a unified, bid form for. distribution and use by bidders • Compilation, comparison, and evaluation of the bids Assistance in negotiations with a. candidate contractor Construction Observation Services WRA will provide construction observation services for during the construction phase of the project, We will perform site visits in order to provide information to the contractor regarding the interpretation of the contract drawings and specifications. We Will: also review the contractors worts to see if it is being performed in accordance with the contract drawings: and specifications. During this phase of the project we will prepare field reports, evaluate and'respond to submissions and requests for information that we receive from the contractor', and assist in evaluating change orders, This proposal includes time for field visits and office support. The list below summarized the scheduled site visits that are included. in this scope of work. At your request WRA will extend the amount of time allocated for office support and perform additional :site visits on a time and material basis. We have experienced thatthe quality of the constructed project increases significantly when WRA provides construction observation services and our clients have told us that this service provides significant value to their overall project. Schedule Meeting and Site Visits during Construction Observation (1) Pre -bid Meeting (1) Preconstruction Meeting (2) Site Visits:- Preparation & Demolition (1) Site Visits - Seeding & Erosion Control (2) Site Visits - irrigation (4) Site Visits - Planting (2) Site Visits - Punch List and Final Walk -thru 40 hours of office support (approxirnate)y 3 -hours per field visit) As -built Documentation We will prepare an as -built report for distribution to the necessary regulatory agencies. We will quantify the restoration efforts by making field measurements of the area or length ofthe restoration elements. The report will include a description of the construction restoration elements, photographs of the constructed restoration elements,. and as -built grading, planting, or irrigation plans if required. We will also perform baseline inventory of the restoration elements for use in subsequent restoration performance monitoring. Task 9: Well Monitoring & Reporting To fulfill hydrology monitoring requests by resource agencies, WRA will perform, periodic site visits to check on monitoring well function and to retrieve data collected on installed data loggers. Site visits will occur every two months for an initial six months, and will occur approximately every six months thereafter for a total of 2 years of monitoring. Travel and car rental expenses are included in the cost of this task. Each year we will prepare a short annual report to summarize data collected between October 16 of the,previous year through October 15 of the current year. Annual reports will be submitted, to the City no later than December 1 of each year. SCHEDULE Work will begin upon receipt of approval of this proposal. Permits will be submitted to resource agencies by October 1., 2009. Final project planning will proceed with the goal to begin vegetation management activities in mid - December, 2009. Well monitoring will occur within the first week of the following months: November 2009, January 2010, March 2010, November 2010, March 2011, November 2011. ASSUMPTIONS The following assumptions were used in the development of this Scope of'Work: All assumptions in the Big Canyon Creek Restoration Project Phase It: Permitting and Final Design Services Scope of Work and Estimated. Budget (Revised)(October 27, '2007.), Permittingand Design Services (December 2008) and California Environmental Quality Act Documentation (December 2008) apply to this change order. ESTIMATED COST Estimated costs are subject to. change based on specific conditions that arise during the conduct of this work. The client will be.informed if additional fees will be incurred and the reasons for any such increase. The client will. be billed monthly on a time and materials basis for work completed to date in accordance with the attached Rate Schedule. The proposed budget is $113,600 and is detailed in the attached cost estimate. TERMS AND CONDITIONS All terms and conditions in the approved contract dated December 10, 2007 will apply to this Change Order. JOB xa;. 1# " PROJEC.CBY/'OCnyepjk W..S 1RUNcs BYtljvl Rep�6J' SBp1MIM 9. MJ9 1851 EstlNarm casT TSEM FM00- M x USdete: c*v.pw.m +nuim:PamnMNa'wns S: hlo)e.Y.C.bNiwlM Ld NeN4g9 a 6. TInxNPnrMMeNMlerm i 1. Rueaw CplNrucJeY.IJUMPmM1 C54 S — t1 S3 , � Sii916 16 r6 S2E 66,dtC S25 iI WJ 1 TS 0 34 e w 15u 9 B 9 E 9 IS 40 A9 18 1. 72 5112 F tes 5'. bn5 rt iM5 K 612] 1170 S 5216 FY182G SIN $1W 170]E Sl. Man 2a SmaP 'Sa ll 1"a 588 ST526 Sao sal so 16 i1 nC t6 ]2 GIB �xger'.vrt ill al S at 11 9: VtvXMWbr'vq blk Vmt lB) 65 RMYPkP.ohm •S EeYPw NIb) SB eemaaa>rc�R! w ToW HeJrs B 0 0 B p 0 p 196 Q 56 f54 :19 )O1 163 6 Y $6 -'r Topp Exparme ®Ymale6 T%M Cas EkPEµSE9 Tme 6Ne L&il BiH ad.CTV SMet [ %marylwr;Imtisax'id , My EBB G to PYNfiig Plans. YHgY'ron Pklre 5W4kmeM66W�cedauo 6YCCrYIan- 100NPm PYSPIIW9 WN:f1nN %91eCm1 E#'quk B. FNet I0. fXiNti W t!i 4,YR K�9ar�. s:wM Mwvl?_p3 S4 WU'[(6i Rapw..Inwrdsaw.ttP IS! Aav %RaSbl R1 real PerpnE C., Ma- (MOg Nl.a Tel. F1'. ,C, S12FG 51414 52$ S20 Ssb 1'B 62S :2d szs ue 536 e 2 :2a 6156 toy S2 S 55 ax se z v± ensn S SPS b8.:::0 SI,'36 6'.S i2 b Eaa S'e ST3.Y20 S13,Y41 590 5'2.Px S S3 , 628. Sii916 62e $J 0tl! S2E 66,dtC S25 iI WJ 1 TS O s2 26,; s2 IC9. OM 15u 534 a �JS 53,p36 ias lil BYMaiel $61389 n 5�s 450 _ t53 ' E £ i3 0 550 150 I5. 6 am .150 n Is 36 5 40 _ in Tel. F1'. ,C, S12FG 51414 52$ S20 Ssb 1'B 62S :2d szs ue 536 e 2 :2a 6156 toy S2 S 55 ax se z v± ensn S SPS b8.:::0 SI,'36 6'.S i2 b Eaa S'e ST3.Y20 S13,Y41 590 5'2.Px S S3 , 628. Sii916 62e $J 0tl! S2E 66,dtC S25 iI WJ Y'N C zX s2 26,; s2 t)6: S3 ,!c $ta5 534 a $29 53,p36 ias lil BYMaiel $61389 ,11: S3 , Sa fig4 B11.2�4 5461f ?(! JR iC9 iJSSA S+1% >4u S2£ °'a 51,91$ Ba_t62 Y'N $4 pis n, sa.zaz r�ss.uuw sxvz�e 5139 ^t S1 R666 Uc g1%.DOR@@Mg Y @Q b� W.11,01Afirig ek�ctriclol engineers VA CONSULTING, INC. 17801 Cartwright Rd. Irvine, CA 92614 REFERENCE: Big Canyon Restoration Project Electrical Systems Design W.A.D.E, JOB # 09-026 VA JOB # ATTENTION: Mr. Roger Chung, P.E. Dear Roger: FEE PROPOSAL August 10, 2009 The following is a, FIXED FEE, Electrical Engineering Fee Proposal for the above referenced project. See attached "Scope of Work'' and "Fee Outline" for services to be rendered. 1. CONSTRUCTION DOCUMENTS: 4. Electrical Construction Documents b. Electrical Construction Specifications c. Printing, Plotting, Shipping, Handling SUB—TOTAL 2. CONSTRUCTION ADMINISTRATION:. Not Included in scope of service GRIMD TOTAL Sincerely, Michael L. Warn President, W.A. DobyRogincering, Inc. $ 3,150.01D $ 600,00 T&M $ 3,750.00 $ 3,750.00 Page I of 3 327Z ff. "V St., Suffe E, Sin Gernardino,.Calffornfa 92485 TWphone (909) 881-4200 Faxs1mile (969) 681-4223 Attachment #09 -026 (8/10109) Construction Document Engineering fees indicated on page 1 are based-on the following scope criteria: Scope of Work: A) Site will require a new SCE service and Metered Service Pedestal for site power. B) Site will be equipped with future irrigation pumps C) Site will not be equipped with a -PI.0 / RTU at this time. I3) Site will be equipped with cabinet for future installation of irrigation equipment electrical power anti controls. E) Site will not require design of area tighring. I-) No clused circuit surveiilancc system equipm(AuL included in design. G) No access control and intrusion alarm system equipment included in design. 11) No stand -by generator or manual transfer switch and generator receptacle included in design. 1) No chemical analyzers included in design. J) No solar powered charging system included in design_ K) Autocadd compatible backgrounds will be provided to W.A.D.E. for adding electrical design. (background showing existing architectural /mechanical equipment). Construction Document Engineering fees outline: A) :Station plan to include ($"1550): a) Locate, size, show installation requirements, and coordinate new S.C.E. utility service. b) Design new SCE service transformer provisions and primary and secondary ducts including pull boxes for utility service, c) Locate service pedestal and design service grounding:. .d) Show all power conduit feeder routing, sizing, and connections for future irrigation equipment: e) Show all control signal circuit feeder design for future irrigation equipmerrtconnections, B) Station Single :Line Diagram ($500) a) Provide Single line diagram and electrical load calculation. b) Provide SCE service connection, and station grounding. e) Identify all conduit and wiring for site. d) Provide complete conduit and conductor schedule. e) Provide voltage drop and short circuit calculations as required. C) Notes, Symbol List, Details, and Elevations. ($700) a) Provide Service Pedestal arid elevations and. installation details. b) Provide SCE equipment connection details as required. c) Provide constriction details as required. d) Provide construction notes, symbol list, abbre'viat'ions, etc. D) Electrical Constriction Specifications - CS1 book form ($600). E) Attend Pre Construction design mceting(s). (Not Included). F) District plan. check corrections (as required for completion, Page 2 of 3 Attachment (continued) #M0'26 Construction Administration Engineering fees. outline: Not included in this proposal Scope of Service — General Conditions: A) Electrical Specifications to be issued in CSI format "Book Form" - printing and binding by others -- an MIS Word fie will be provided by WADE. B) Construction documents to include all required responses to City plan check comments and questions, including City recommended revisions as pertaining to current identified scope of project. ('8l1 OIOQ) C) Construction Document Fees includes a Registered CA State Electrical Engineer stamp and signature of.approval D) Completed Autocadd Version 14 to 2006 electronic drawing files will be furnished by WADE to VA Consulting for plotting, printing, and distribution. E) Autocadd Version. 14 or 2004 site piping layouts and background drawing files will be furnished to WADE by VA Consulting. F), Important Note: At the time of issuing this F"ee Proposal - W.A. Doby Engineering carries the following insurance coverages: $1,000,000/2,000;000 Ptofessional Liability Insurance coverage. $1;000;000 Automotive insuance coverage. $1,000,000 Workmen's Compensation coverage. All work asked to be performed by W.A. Doby Engineering that is not included or outlined in this fee proposal will be charged at out standard hourly rate based on a, time and material. Standard Hourly Rates for W.A. Doby Engineering Inc.: Site Visit Principal Engineer Design Engineer Engineering Inspector Draftsman Secretarial Office $500,00 per trip (not to exceed 5 hours). - $165.00 per hour. - $135:00 per hour. - $135,00 per hour. - $85.00 perhour. - $48:00 per hour. - $42:00 per hour: Page 3 of 3 la 0 MASTER PLANNING I- DEVELOPMENT SERVICES LANDSCAPE ARCHITECTURE PROPOSAL BIG CANYON WATER LINE AND TEMPORARY IRRIGATION SYSTEM NEWPORT BEACH, CALIFORNIA LANDSCAPE ARCMTECTURAL SERVICES August 11, 2009 Owner CiLY of Newport 11(�Ick Address! 3300 Newporr Blvd. Newport Bencli, (,q 92603 Phone: 949 -6443109 Client: VA Consulting Contact: Robin Flayes Address: 6400 Oak Canyon, Suite ISO Irvine,.CA 926I8 Phone: 949-474-1401, extension 2.53 Fax: 949-261-8482 Ernail• rhattes a—iconsultinginc.com PROTECT SCOPE OF SERVICE The project is a mitigation project in the vicinity of Upper Newport Bay at the inland side of Jamboree Road. The Owner and maintenance group, for the project is die City of NdwpoftiBeach. The overall site area of the work, is about twenty acres. A part of the total area will be included in ima work. The specific areas included at this time are as indicated on the Plan provided by VA.Eugincers on FridavAugot 7, 2009. Generally the areas include two to three, areas of native Plan, ol for plant material establishment. Additionally there is a fresh water .. ungs requiring irrigation pond for, bird use, the layout of the areas has been designed and engineered by others. The plant material palette and layout has been design A �, ed byLSA. AN of this information will be pr06d by VA Engineers furima use prior to the commencement of snuff work; AU back ground and base sheet development will be provided by VA Engineers for inla use as CADD fifes. VA Engineers- will provide the coordination and interaction with the Public Agencies.as required except that ima will attend meetings that directly' ffect Ona, work, i7no will prepare.design and layout of an irrigation water source pressure mainline -from.the hot tap point of cormettion to an existing potable water line in Jamboree Road, along L46 adigriment of the new access road, to the pond and landscape areas. inin will calculate therequirements of the makeup line to be a fill sourcefor the.pand. iow design to include the backflow prtwenter and water Reverse Osmosis (RO) systernfor the fresh water pond. 2500 Michelson dr 949:254:0023 wwwjmadesiqnxom S.k t2s 949.250.0043 f Irvine cx 93612 hua will provide specification of a prefabricated structure for the electronic etluipmeu.t . ivig will provide Irrigation. Design and - system calculations for the installation of temporary use irrigation system {s) to establish approximately 5 acres of planting areas. The areas may be of three separate uses and may be installed in a phased construcdon. All work shall be accomplished simultaneously with indication of constiarction phase lines. Pond W:ater quality equipment and controls are not included. Duration of the work as a continuous effort is anticipated ro be three months or less between September and December of 2009. SCHFDULE 1 SCOPE OF WORK TASK 1 Meet with the Civil Engineer to receive the information prepared to date for the development of the facilities, Discuss with VA Staff to gain understanding of the specific program, schedule and deliverables to be provided by ima. TASK Prepare 'prelim nar}' calculations and pond seepage & evaporation requirements review with VA. Engineers. Prepare Level Control operational functioning system "TASK 3 Design the egiiipmeritand layout for. the water line, anti code required equipment for review, with VA Engineers TASK 4 DesignAie system, equipment and layout of the water RO equipment, layout and enclosure for review with VA Engineers. TASI{ 5 Design the automatic: water make up system for. the fresh water pond. TASK G Design power requirements & RO water discharge requirements. TASK Automatic irrigation controls shall be arranged for use with electrical source provided by \7A Engineers: TASKS Overhead sprinkler units -rill be arranged with on- grade piping and fixed riser units xiith a sprinkler spacing appropriate for establishing the seeded areas: TASK 9 Su.btetranedn'.sgsteirts will be designee) as appropriate in lieu of overhead systems. TASK 1'0 Tree bubbler systems shall .be docuruented as required for. planting establishment. TASK -I 1. Inigation.and water equipment schedules, details and written specificationsshall be included with design doccinmitation. 1AR. K 12 Irrigation controllerscheduling u'tfrarmation shall be provided on plans as required to configure irrigation scheduling program(s). TASK 13 Meet with VA Engineers up to three times to review the design and layout infornmcirnt. TASK 14 Meet with the City of Newport Reach up to two times to discuss the design and lavutoof the work. TASK 15 Revisethel apoata lid LEI uipment design upto two tirnestoaecotmmod ate mnments for the Public AgencF. k t SCHEDUU 2 FEES BIG CANYON RATER LINE AND TEMPORARY IRRIGATION SYSTEM NEWPORT BEACH, CALIFORNIA LANDSCAPE ARCHITECTURAL SERVICES August 11, 2009 Pecs are lump sum Ivor s:hc sewices described above. Pcianiniruble expenses are in addition to die tee amp'unt. STAGE t. IRRIGATION DESIGN SERVICES FEE; Water source line design and layout/Egttipment Schedule. and Details Irrigation design and layout /Equipment Schedule and Details $3,000.00 Fresh water Frond automatic makeup /RO /Equipment Schedule /Details $6,000.00 TOTAL LUMP SUM FEE $13,500.00 RUMBUIiSABLE E:XPENSES:. Reproductions; C;ADD Blots, mileage, travel. costs, slipping expenses are in addition to the fee amount at cost. City of Newport Beach BUDGET AMENDMENT 2009 -10 EFFECT ON BUDGETARY FUND BALANCE: Increase Revenue Estimates Increase Expenditure Appropriations AND qX Transfer Budget Appropriations SOURCE: from existing budget appropriations from additional estimated revenues from unappropriated fund balance EXPLANATION: This budget amendment is requested to provide for the following: NO. BA- 10BA -017 AMOUNT: $e5,79o.ao Increase in Budgetary Fund Balance Decrease in Budgetary Fund Balance fX1 No effect on Budgetary Fund Balance To transfer expenditure appropriations from the Proposition 50 Areas of Biological Significance account to the Big Canyon Creek Restoration account to cover the cost of amendment no. 2 to the professional services agreement with VA Consulting Inc. for design and permit application services. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account REVENUE ESTIMATES (3601) Fund /Division Accou nt EXPENDITURE APPROPRIATIONS (3603) Description Description Description Division Number 7014 Misc & Studies Account Number C5002001 Prop 50 ASBS Protection Division Account Division Account Division Account Signed Signed Signed Number 7014 Misc & Studies Number C5100709 Big Canyon Creek Restoration Number Number Number Number Amount Debit Credit $85,790.00 $85,790.00 Approval: Administrative Services Director Date 61 ptikle Approval: City Man ger Date City Council Approval: City Clerk Date AMENDMENT NO. TWO TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. FOR BIG CANYON CREEK RESTORATION PROJCT THIS AMENDMENT NO. TWO TO PROFESSIONAL SERVICES AGREEMENT, is entered into as of this Ath day of , 2009, by and between the CITY OF NEWPORT BEACH, a Municipal Corpo ation ("CITY"), and VA CONSULTING, INC., a California Corporation whose address is GalifeFigia, 92614 ("CONSULTANT"), and is made with reference to the following: 6400 Oak Canyon, Suite 150 Irvine, CA 92618 RECITALS: A. On December 11, 2007, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT", for engineering design services for the Big Canyon Creek Restoration Project, hereinafter referred to as "PROJECT". B. CITY and CONSULTANT have entered into one separate AMENDMENT of the AGREEMENT, the latest dated January 27, 2009. C. CITY desires to enter into this AMENDMENT NO. TWO to reflect additional services not included in the AGREEMENT or prior AMENDMENT and to extend the term of the AGREEMENT to December 31, 2010. D. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. E. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. TWO", as provided here below. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. In addition to the services to be provided pursuant to the AGREEMENT and AMENDMENT NO. ONE, CONSULTANT shall diligently perform all the services described in AMENDMENT NO. TWO, including but not limited to, all work set forth in the Scope of Services attached hereto as Exhibit 1 and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 2. City shall pay Consultant for the services on a time and expense not -to -exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached to this AMENDMENT NO. TWO for all work performed pursuant to this Amendment. Consultant's compensation for all work performed in accordance with this AMENDMENT NO. TWO, including all reimbursable items and subconsultant fees, shall not exceed Eighty One Thousand Seven Hundred Sixty One Dollars and no/100 ($81,761.00) without prior written authorization from City. 3. The term of the AGREEMENT shall be extended to December 31, 2010. 4. Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. TWO on the date first above written. APPROVED AS TO FORM: By: A ,"'- C _ o r Mynette D. Beauchamp Assistant City Attorney for the City of Newport Beach ATTEST: By: �Y&- V, '�n' Leilani Brown City Clerk f' Attachments: Exhibit A — Scope of Services CITY OFf'AEWPQRT BEACH, A Mu 'eipal Cprp ration By. dward D. Se ch Mayor for the City of Newport Beach VA CONSULTING, INC.: By: Max i E�Ksident and C.E.O. By: /"/\ &j, Michael S. Carter Secretary and C.F.O. EXHIBIT 1 VAI CONSULTING April 16, 2009 Mr. Mark Reader Project Manager City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 Dear Mr. Reader: This letter is a change order request for additional engineering design services for the Big Canyon Restoration Project (Project) located in the City of Newport Beach (City), California (Professional Services Agreement dated December 11, 2007). This change order supersedes our previous letter dated April 15, 2009. As you are aware, the City has requested that additional material sampling and testing be undertaken within Big Canyon. These additional services are related to establishing the base- line selenium levels within Big Canyon prior to implementation of the proposed Project. Upon approval of this change order request, VA will retain CH2M Hill to provide the sampling and testing services in accordance with its scope -of -work (Exhibit "B"). A summary of the overall scope of services included in this request is provided in Section I and fees are provided in Section II of this letter. VA will provide our services on a time -and - materials, not -to -exceed basis in accordance with the attached fee schedule (Exhibit "A"). SCOPE OF SERVICES Phase II — Preliminary Source Tracking and Selenium Monitoring CH2M Hill will collect samples and conduct testing in accordance with their scope -of -work (Exhibit "B"). 2. Administration, Coordination, and Sub -Consultant Management This task provides for subconsultant management, coordination, and review of subconsultant work -product as the Project progresses. The total VA fee for this task is $3,893 and will be billed on a time -and -materials basis. VA Consulting, Inc. Corporate Office Orange County Division 6400 Oak Canyon, Suite ISO !-vine. CA 9261 X Phone 949.474.1400 Fax 949.261.8482 XW1LJiX;1SW3 R100VkdR)'1X04 0ry9CTny0ftCrftk 04ifi0D.cW. Mr. Mark Reader City of Newport Beach April 16, 2009 Page 2 of 2 11. FEES 1. Phase II — Preliminary Source Tracking and Selenium Monitoring ............$77,868 2. Administration, Coordination, and Sub -Consultant Management ................$3,893 TOTALFEES.......................................................................................................$81,761 Please indicate your approval of this change order request by signing in the space provided below and returning a copy to our office. If you have any questions regarding this request, please feel free to contact Dan Villines or me at (949) 474-1400. Sincerely, Max P. Vahid, P.E. President and CEO MPV/kam Enclosure cc: Dan Villines Contracts X IPiq�x:Ls��7� 61IXY�UMnin'CU•1_OigCiny—Cre* U41609.(jrC EXHIBIT "A" VA CONSULTING, INC. FEE SCHEDULE 2009 Staff Classification Civil Engineering and Planning Services Hourly Rate President......................................................................................................................... $190 Division President/Division Manager...............................................................................$173 Sr. Vice President/Vice President/ Exec. Director........................................................... $163 Director........................................................................................................................... $160 SeniorProject Manager..................................................................................................$155 ProjectManager..............................................................................................................$147 AssistantProject Manager..............................................................................................$142 Senior Project Engineer/Senior Design Supervisor/Senior Planner.................................$137 Project Engineer/Design Supervisor................................................................................$132 Senior Design Engineer/Senior Designer........................................................................$122 DesignEngineer/Planner................................................................................................ $117 Designer.........................................................................................................................$110 Assistant Engineer/Assistant Planner..............................................................................$100 Research and Processing Coordinator..............................................................................$95 SeniorCADD Technician.................................................................................................. $90 JuniorEngineer.................................................................................................................$85 CADDTechnician..............................................................................................................$80 EngineeringIntern.............................................................................................................$70 OfficeSupport/Clerical......................................................................................................$69 Field Survey and Mapping Services Director of Survey and Mapping......................................................................................$158 Managerof Field Survey...................................................................................................... $130 Surveyand Mapping Associate............................................................................................. $95 Surveyand Mapping Technician............................................................................................ $75 3 -Man GPS Crew................................................................................................................. $235 2 -Man GPS Crew................................................................................................................. $205 1 -Man GPS Crew................................................................................................................. $175 Special Services Litigation............................................................................................................................... $450 Notes: 1. In-house reprographics charges: B&W Bond copies $1.00/sq.ft, Color Bond $6.00/sq.ft. 2. Mileage will be billed at standard mileage rates set by IRS. 2009 rates currently listed at $0.55 per mile. XWro1K1s%373 Oruxrncm,mlcai_otgCanyorvCr ek &11COD.dw. G-OUE EXHIBIT "B" Dan Villines, P.E. Director of Water Resources VA Consulting, Inc. "17801 Cartwright R0,1d Irvine, CA 92614 Dear Mr. Villines: CH2M HILL is pleased to provide this cost proposal for a scope of work to conduct the Big Canyon Wash selenium monitoring and source tracking in Newport Beach, California. The monitoring and tracking will be conducted in Big Canyon [-'Nash and along its tributaries. CH2M HILL will collect up to 21 water samples for selenium speciation from Big Canyon Wash freshwater pond outlet, mid -pond, inlet, and below Jamboree Road. CH2M HILI. will collect up to three samples for water colunUi particulate selenium from three of the water quality sampling sites. CH2M HILL will collect algae, benthic and water column invertebrates, fish, and bird eggs from the Nahire park pond for total selenium analysis. CH2M HILL will compare the results with the 2008 sampling and bird eggs will be compared to concentrations found in other parts of the Newport Bay watershed. Bird eggs will be opened and embryos evaluated for effects characteristic of selenium toxicosis before sending them to the laboratory for chemical analyses. CH2M HILL will collect flow estimates from up to ten locations for the area from the eastern end of the Big Canyon golf course to just downstream of Back Bay Drive at the western end of Big Canyon Creek Nature Park. Flow estimates will be conducted at the time of surface water duality sample collection. Plow will be estimated by measuring average depth, cross- section width, and velocity (using standard hw-id-held field velocity meter). It is estimated that the sample collection, and analysis and reporting for the Big Canyon Wash selenium source -tracking; program will take three months to complete. The detailed scope and budget art attached and a summary of the tasks and estimated costs are as folioves. CH2M HILL 2485 Natomas Park Drive Suite 600 A,., Sacramento, CA 95833 Tel 916.920-0300 .11100- Fax 916-920.8463 April 76, 21109 Dan Villines, P.E. Director of Water Resources VA Consulting, Inc. "17801 Cartwright R0,1d Irvine, CA 92614 Dear Mr. Villines: CH2M HILL is pleased to provide this cost proposal for a scope of work to conduct the Big Canyon Wash selenium monitoring and source tracking in Newport Beach, California. The monitoring and tracking will be conducted in Big Canyon [-'Nash and along its tributaries. CH2M HILL will collect up to 21 water samples for selenium speciation from Big Canyon Wash freshwater pond outlet, mid -pond, inlet, and below Jamboree Road. CH2M HILI. will collect up to three samples for water colunUi particulate selenium from three of the water quality sampling sites. CH2M HILL will collect algae, benthic and water column invertebrates, fish, and bird eggs from the Nahire park pond for total selenium analysis. CH2M HILL will compare the results with the 2008 sampling and bird eggs will be compared to concentrations found in other parts of the Newport Bay watershed. Bird eggs will be opened and embryos evaluated for effects characteristic of selenium toxicosis before sending them to the laboratory for chemical analyses. CH2M HILL will collect flow estimates from up to ten locations for the area from the eastern end of the Big Canyon golf course to just downstream of Back Bay Drive at the western end of Big Canyon Creek Nature Park. Flow estimates will be conducted at the time of surface water duality sample collection. Plow will be estimated by measuring average depth, cross- section width, and velocity (using standard hw-id-held field velocity meter). It is estimated that the sample collection, and analysis and reporting for the Big Canyon Wash selenium source -tracking; program will take three months to complete. The detailed scope and budget art attached and a summary of the tasks and estimated costs are as folioves. Task Se Monitoring and Initial Source Tracking No. of Samples (if applicable) Estimated Cost Project Administration (including; 1 site meeting for 2 staff, and 1 teleconference) Sample Collection $ 9,192 $ 24,894 Laboratory Analysis - Water Quality Laboratory Analysis- Selenium Species ?7 $ 5,250 Lnhoratory Analysis- Particulate fraction Selenium Laboratory Analysis - biota 3 $ 480 20 --- - - $ 6,100 Total Laboratory Analyses - - -- $ 16,345 Subcontractor overhead charge: 10% $ 1,635 Embryo Analysis 5 $ 1,584 Sample Preparation and Pick-up $ 1,660 -- Sample Pick-up _ $ 100 Reporting $ 22,458 $77,868 sincerely, Ron Weddle Contracts Managor BIG CANYON WASH WETLANDS RESTORATION PROJECT SELENIUM MONITORING PHASF 11 — PRELIMINARY SOURCE TRACKING and SELENIUM MONITORING PROJECT Introduction Big Canyon Wash is a small tributary drainage to Upper Newport Bay that drains a watershed of approximately 2 square miles (Figure 1). The majority of the watershed (approximately 96%) is highly developed with homes, commercial areas, a golf course, cemetery, and other urban features. The 60 -acre undeveloped portion of Big Canyon Wash (Big Canyon Creek Nature Park) has been identified by the Southern California Wetlands Recovery Project (SCWRP) as an important resource that is in need of restoration. The City of Newport Beach was directed by the City Council to move forward with restoration efforts in the canyon (Weston, 2007). Weston Solutions was hired to establish baseline water quality conditions in the canyon and to assess appropriate design elements that could be incorporated into the restoration plan to address identified existing or future water quality issues (Weston, 2007). The resultant study conducted by Weston Solutions (2007) showed that water column concentrations throughout the lower part of Big Canyon west of Jamboree Road exceed the California Toxics Rule (CTR) freshwater chronic criterion for selenium of 5 micrograms per liter (ug/L) under both wet and dry conditions. In addition, investigations by Southern California Coastal Research Project (SCCWRP; Sutula et al., 2008) have indicated that selenium concentrations in soils in the lower portion of Big Canyon Wash (near Back Bay Drive) exceed the selenium screening value for substantial ecological risk of 4 milligrams per kilogram (mg/kg) dry weight (Presser et al. 2004). Selenium is a bioaccumulative compound that has been associated with reproductive impairment in fish and birds. Ecological risk screening values for selenium are shown in Table 1. Table 1. Ecological Risk Screening Levels for Selenium Media Ecological Risk Level m Freshwater None <2 pg/L Sediment <2 2-4 Diet (fish& bird_ s) Fish Tissue <4 Bird E�Tissue (Source: Presser et al., 2004) Marginal I Substantive 2-5 lg/L >5 }�g/L 2-4 >4 _ 3-7 >7 4-6 6-10 >10 The sources of selenium in the watershed have not all been identified. The steep cliffs that rim Big Canyon Wash are formed primarily of the Miocene Monterey Formation. This formation is a known source of selenium in California and is a likely source of selenium in Big Canyon. Selenium may have also accumulated in the canyon bottom soils, especially in the freshwater marsh areas. The changes in canyon hydrology and the areas tributary to Big Canyon Wash as the watershed has developed have likely contributed to the mobilization of selenium. Urban landscape irrigation, the construction of an 18 -hole golf course in the up - gradient part of the canyon east of Jamboree Road (Figure 1), Big Canyon Reservoir, and storm drain systems that discharge to the canyon, have changed the canyon's flow regime from ephemeral to perennial. This has resulted in significant changes in habitat and has likely contributed to the high selenium concentrations that have been found in the soils and water in the canyon. A baseline monitoring study in the Big Canyon Creek Nature Park was recently completed by CH2M HILL. From June 9-11, 2008, CH2M HILL staff collected samples of water, sediment, and biota from different areas within the nature park to evaluate selenium concentrations and potential impacts in the food webs in the area. Samples were collected from the up -gradient portion of the canyon just west of Jamboree Road, in the freshwater marsh and riparian areas in the upper and middle sections of the canyon, and in the fresh and salt water marshes in the lower part of the canyon. Biological samples collected and submitted for analysis included algae, dragonfly larvae, crayfish, mosquito fish, fathead minnows, and African clawed frogs. No nesting birds were observed at the time and therefore, no bird eggs were collected. Several of the water column samples were also submitted for selenium speciation analysis. The data collected indicate that selenium concentrations in sediment and the biota in the park are extremely high — an order of magnitude higher than the concentrations measured in biota in the San Diego Creek watershed — despite the fact that the total selenium concentrations in the surface waters in Big Canyon Creek are similar to those measured in the lower part of San Diego Creek (Table 2). The selenium concentrations in water, sediment, and tissue collected from Big Canyon Creek Nature Park all exceeded the ecological risk screening values shown in Table 1. Selenium concentrations in sediment as high as 122 mg/kg dry weight (dw) were found in the lower freshwater marsh ponds. Fish tissue concentrations in this area range from 58-64 mg Se/kg dw, and algae and dragonfly larvae selenium concentrations exceed 30 mg/kg dw. Selenium concentrations in sediment and biota were elevated throughout the park, even in the middle and upper sections of the canyon. Selenium concentrations in sediment at these locations, though not as elevated as that seen in the lower freshwater marsh ponds, are still elevated well above screening levels (20-27 mg Se/kg dw; Figure 4) and algae, crayfish, fish (fathead minnow and mosquito fish), and frogs were also extremely high (35-57 mg/kg dw). Table 2. Comparison of Median Selenium Concentrations in Surface Waters in San Diego Creek Basin No. 2 and the BigCan on Creek Nature Park IVledi._ , Water : hom 15 /L 19, 19 /L Creek Sediment 0.5 mg/kg dry weight 54 mg/kg dr weight Macroinverte brates 7 mg/kg dry weight 32 m /k dry weight Fish 7 mg/kg dry weight 57 mg/kg dry weight Selenium speciation data indicate that the selenium in the surface flows that enter the nature park from upstream of Jamboree Road is composed of a significant amount of the more bioavailable inorganic form of selenium known as selenite (Se IV) than the flows in the San Diego Creek watershed. Approximately 21 percent (%) of the selenium in the baseflow in the canyon was composed of selenite, 78% was selenate (Se VI), and less than I% was organic selenium (primarily, methylselenic acid). Since the majority of selenium in groundwater is in the form of selenate (this is supported locally by the data collected from storm drain #1 [LBCW-SD#1], which flows year round due to groundwater leakage into the storm drain, the presence of so much selenite in the flows at the upper end of the park indicate that it is likely that conversion of selenate to selenite is occurring upstream of the park. Within the nature park, the percentage of selenite continues to increase downstream with 30- 40% of the selenium in the lower freshwater marsh ponds being composed of selenite. The percentage of organic selenium also increases from less than 1 % at the upper end of the park to nearly 3% in the ponds. The presence of the relatively high proportions of selenite in the surface waters in the park is the most likely reason for the extremely high concentrations of selenium in sediment, algae, invertebrates, frogs, and fish. The concentrations of selenium in the fish and frogs are well into to the range of selenium concentrations that are associated with deformities (teratogenesis) in fish and birds. It is likely that turtles and some birds may be similarly affected. It is therefore, very important that the sources of selenium in the surface water flows that enter the park, and the mechanism(s) for the conversion of selenate to selenite that occur(s) up -gradient of the park, be identified so that steps may be taken to try to control, mitigate, or eliminate them before the surface waters enter the park. The sources of selenium also need to be identified so that the plans for the nature park restoration can be modified, if necessary, to incorporate selenium treatment or source controls, or, if impairment due to selenium continues to occur under post -restoration conditions, additional remediation options can be considered. Potential Sources of Water, Selenium, and Selenium Conversions in the Big Canyon Watershed Sources within the Nature Park There are seven storm drains that have been identified in the nature park. Five of these drains are located on the north side of the canyon and two on the south side. The westernmost storm drain on the north side of the canyon (SD#1) appears to flow perennially and has a small catchment area at its discharge point. Water flows from the catchment into the riparian area located along the northern side of the lower part of the canyon. Given the volume of the flow from this drain, it is likely that the drain is intercepting groundwater. The selenium concentration measured in the water from this drain during the recent baseline monitoring investigation was 13 µg/L. Based on CH2M HILL's recent reconnaissance and sampling in the nature park, one other flowing storm drain (SD#3) was identified along the north side of the canyon. The selenium concentration in the water flowing from this drain was very low (<5 µg/L). Groundwater may also surface within the canyon itself, though CH2M HILL staff did not see any obvious signs of groundwater seepage while they were conducting the baseline monitoring investigation. However, baseflow in the creek has not been sequentially measured from the up -gradient to the down gradient end of the creek to determine if rising groundwater is contributing to the surface flows. Big Canyon Golf Course The Big Canyon Golf Course and Country Club is located upstream of the nature park between Jamboree Road and MacArthur Boulevard (Figure 1). This privately owned and operated golf course was constructed in Big Canyon Wash in the late sixties/early seventies and opened in 1971. Several lakes and creeks can be seen on the course (Figure 2). According to golf course personnel (Jeff Beardsley, Big Canyon Country Club greens supervisor, personal communication, May 20, 2008) there was no visible water present when the golf course was constructed. Currently, surface flows enter the golf course at three main locations east of MacArthur Boulevard (Figure 2). Mr. Beardsley has estimated the flows from each of these drainages. The northernmost stream enters the golf course through a 30 - inch pipe at a flow rate of about 25 gallons per minute (gpm) and drains the northern "port" streets area of Newport Hills Estates. The middle stream enters the course through a 72 -inch pipe at a rate of approximately 100 gpm and drains the southern port streets area of Newport Hills Estates. The southernmost stream flows onto the course at a rate of about 90-100 gpm through a 72 -inch pipe; the drainage extends up to Big Canyon Reservoir and drains this area and the residential areas located just west of the reservoir. Additional water flows from storm drains from the residential areas located within and adjacent to the Big Canyon golf course. All of this water flows through the golf course into their ponds and riparian areas. The flows join near the west end of the golf course, just east of the maintenance building, then exit the course and flow through a large culvert that extends underneath Jamboree Road to the nature park (Figure 2). Mr. Beardsley has estimated that approximately 300 gpm in surface water exits the golf course and enters the nature park (faxed map received August 6, 2008). Mr. Beardley has also observed that irrigation from upstream residences in the morning hours results in noticeable increases in the surface water flows that enter the golf course. The surface water that enters the golf course is not used for irrigation, but feeds the lakes and creeks that dot the course. The course uses approximately 60% reclaimed water from the Irvine Ranch Water District and 40% potable water from the Green Acres project to irrigate their greens. The lakes on the golf course may be converting selenate to selenite, which would explain the high concentrations of selenite in the surface waters entering the Big Canyon Nature Park. Tributary Streams to Big Canyon Creek As previously noted, three main drainages (Big Canyon Wash north, middle and south branches) appear to conduct surface flows from the upstream areas through the Big Canyon golf course where they join prior to continuing down into the nature park and Upper Newport Bay. The south branch passes through the Harbor View Nature Park which appears to contain a riparian corridor. If the surface waters in this branch of the creek contain selenium, there may be some conversions of selenate to selenite occurring in this part of the tributary. There also may be other areas within the three tributaries where selenium conversions could occur if selenium is present within surface water flows. Big Canyon Reservoir The Big Canyon Reservoir is a 23 -acre facility that was constructed in 1958 as a drinking water reservoir and has a capacity of 195 million gallons (George Murdock, City of Newport Beach, personal communication, May 15, 2008). The reservoir is owned and operated by the City of Newport Beach Utilities Department and was recently fully covered (as of September 2004) to prevent water loss from evaporation and contamination from airborne pollutants. Though the reservoir is asphalt -lined and underlain by a five-foot deep clay layer, it does leak and a system of underdrains and piezometers around the reservoir track the rate and amount of leakage. This slow leakage from the reservoir likely contributes to groundwater recharge. The water table at the base of the reservoir dam is around eight (8) feet below grade (George Murdock, City of Newport Beach, personal communication, May 15, 2008). Pacific View Memorial Park Pacific View Memorial Park cemetery and mortuary (Figure 1) opened in 1958 in Corona del Mar. The 45 -acre facility includes private garden estates, sloping lawns and abundant landscaping. Irrigation of the park grounds may contribute to groundwater recharge and selenium mobilization in the area. Two fountains and two artificial streams on the grounds constantly recycle water so there is no infiltration from those systems (Cathy Wadsworth, office manager, Pacific View Memorial Park, personal communication, May 19, 2008). Residential and Commercial Landscape Irrigation Approximately 96% of the Big Canyon watershed has been developed for urban use with homes, schools, and commercial operations. Much of the urban area is heavily landscaped and irrigated providing another source of infiltrating water to the watershed; however, the magnitude of the contribution of this source to surface and groundwater flow in Big Canyon Wash is not known. Shallow Groundwater Upstream of Big Canyon Creek Nature Park A perched shallow water table underlies the site of the old Ford Aeronutronic property located north of Ford Road, between Jamboree Road and MacArthur Boulevard (Geomatrix, 2008). A groundwater divide bisects the site and in the southern portion of the site, groundwater flows almost due west to the northwestern quadrant of the golf course. Groundwater likely surfaces somewhere either on the golf course or just on the west side of Jamboree Road in the Nature Park. Water quality samples collected from the monitoring wells at the site have not yet been analyzed for selenium concentrations. There is also a high water table in the Spyglass Hill area beneath the Newport Hills Estates area (the port streets) located upstream of the nature park near the Big Canyon Reservoir (George Murdoch, City of Newport Beach, personal communication, May 15, 2008). The shallow groundwater from this area also likely contributes to the surface and subsurface flows that enter the golf course and ultimately, the nature park. Unidentified Sources There may be other sources of water and groundwater to Big Canyon Wash and the golf course that are not readily identifiable. The source investigation should determine if all potential sources of selenium and their relative contributions to selenium loads in the canyon have been identified. Proposed Scope of Work A combination of sampling water, algae, and biota in Big Canyon Wash and flow estimates throughout the Big Canyon watershed will be conducted to evaluate the potential sources and loads of pollutants entering the drainage. Water samples (Se speciation) will be collected from the Big Canyon Wash freshwater pond outlet, mid -pond, inlet, and below Jamboree Road. In addition, algae, benthic and water column invertebrates, fish, and bird eggs will be collected from the pond for total selenium analysis. These samples will be compared to the results of the 2008 sampling effort and bird eggs will be compared to concentrations found in other parts of the Newport Bay watershed. Bird eggs will be opened and embryos evaluated for effects characteristic of selenium toxicosis before sending them to the laboratory for chemical analyses. Since it appears that the golf course ponds may play an important role in the conversion of selenate to the more bioavailable selenite before the surface flows 6. enter the nature park, the selenium source tracking investigation should also focus on identifying the following: ■ Sources of water that may enter the golf course grounds, both as surface flows and subsurface flows (former Ford plant, Spyglass Hill area, tributary drainages to Big Canyon creek); ■ Surface water flow paths through the golf course to Big Canyon Creek; ■ Selenium concentrations, selenium species, and flow estimates in surface flows before they enter the golf course; ■ Selenium concentrations, and selenium species in the creeks and ponds on the golf course; flow estimates where appropriate; ■ Selenium concentrations, selenium species, and flow estimates in the surface waters that enter the golf course (Big Canyon Wash north, middle, and south branches) and exiting the golf course, under Jamboree Drive. Investigation of Big Canyon Wash Hydrology and Pollutant Sources and Loads The flow regimes in the Big Canyon watershed need to be defined in terms of groundwater contributions or losses (gaining reaches or losing reaches of the creek) in baseflows, and water sources and pollutant transport mechanisms. Storm drains and urban runoff are readily identifiable sources of flow to the drainage, but it is not known whether rising groundwater conditions occur within the nature park, the golf course, or elsewhere in the watershed. In order to determine the groundwater contributions and pollutant sources and loads in the Big Canyon drainage, estimates of flow must be added to water quality sampling. Water quality and selenium analyses have already been conducted on water column samples collected from the nature park in June 2008 by CH2M HILL. However, sampling of the creeks and ponds on the golf course has not yet been conducted and the flows in the creek in the nature park and the golf course have not yet been measured to determine dry season baseflow conditions. Sample Collection and Analysis Samples must be collected and processed in accordance with Surface Water Ambient Water Monitoring Program (SWAMP) protocols. Analytical laboratory results must be reported in SWAMP database format. Original analytical laboratory reports, including quality assurance/quality control reports and chain -of -custody documents, should also be submitted in electronic format as Adobe Acrobat pdf files. Field observations should include the presence or absence of algae or water plants, riparian vegetation along creek areas, benthic and water column invertebrates (e.g., chironomid larvae [blood worms], dragonfly or mayfly larvae, waterboatmen [corixids], or crayfish), amphibians (frogs or turtles), fish, and birds. Any groundwater seeps or springs should also be identified. Sample sites and stream transects/gauging stations should be located using GPS coordinates. The water quality samples should be collected from the locations shown on Figure 2 (up to 21 samples if there is water at all the sample sites) plus the three samples from the lower Nature Park pond and should be analyzed for the listed groups of constituents (Table 3). In addition, three samples will be collected for water column particulate selenium from three of the water quality sampling sites (locations to be determined, based on obvious availability of particulates in the water at the time of sampling). The particulate fraction samples and all dissolved fraction samples will be filtered in the laboratory within 24 hours of sample collection. Algae, benthic and water column invertebrates, fish, and bird eggs will be collected from the Nature Park pond in the lower canyon, as available. It is anticipated that three to five samples may be collected from each of these four main tissue types (12 to 20 biota samples, total). Table 4 provides the individual parameters for each group of constituents for water and tissue. Table 3. Water Quality Samples and Flow Estimates by Location SAMPLE LOCATION NO. OF SAMPLES Flow Estimate Tissue Total Selenium Water Quality Parameters Selenium Species INFLOW 1 1 1 1 1 INFLOW 2 1 1 1 1 INFLOW 3 1 1 1 1 INFLOW 4 1 1 1 1 INFLOW 5 1 1 1 1 INFLOW 11 1 1 1 1 INFLOW 15 1 1 1 1 OUTFLOW 1 1 1 1 LAKE 1 1 1 1 LAKE 3 1 1 1 LAKE 4 1 1 1 LAKE 5 1 1 1 LAKE 6 1 1 1 RIPARIAN 1 1 1 1 1 RIPARIAN 2 1 1 1 1 RIPARIAN 3 1 1 1 1 Golf Course Irrigation Water 1 1 1 Lower Nature Park Pond 3 20 3 3 QA/QC Duplicates 1 1 1 Total Samples 21 11 20 21 21 The following Table 4 lists the recommended analytical parameters for the water column and biota tissue samples and Table 5 lists the analytical methods and detection limits: Table 4. Analytical Parameters Water Column Samples Tissue Samples Water Quality Parameters Total Recoverable Se Total Dissolved Selenium Total Selenium Total Recoverable Selenium ICP -MS w/DRC Particulate fraction selenium (groundwater samples) Trace Metals (Cd, Cu, Cr, Ni, Pb, Zn) Trace Metals (Cd, Cu, Cr, Ni, Pb, Zn) Hardness (as CaCO3) HPLC -ICP -MS w/DRC Total Dissolved Solids SeVI Total Suspended Solids Percent (%) Solids Dissolved Oxygen Dissolved Organic Carbon Organic Se pH <0.1 pg/L Temperature Selenium species NA Selenate Selenite Methylselenitic acid Selenomethionine Selenoc anite Table 5. Recommended Analytical Methods and Detection Limits for Selenium in Water Constituent Analytical Method Method Detection Limit Total Recoverable Se ICP -MS w/DRC" <0.5 /L Dissolved Se ICP -MS w/DRC <0.5 µg/l_ (groundwater samples) Selenium Species: HPLC -ICP -MS w/DRC SeVI <0.1 µg/l_ SeIV <0.1 µg/l_ Organic Se <0.1 pg/L Selenomethionine Selenocyanate Methyl selenic acid * Dynamic Reaction Cell (DRC)- lowers detection limits and eliminates matrix interferences ICP -MS w/DRC: Inductively Coupled Plasma Mass Spectrometry with Dynamic Reaction Cell HPLC -ICP -MS w/DRC: High Performance Liquid Chromatography -Inductively Coupled Plasma- Mass Spectrometry with Dynamic Reaction Cell Stream Flow estimates Ten locations are currently proposed for flow estimates for the area from the eastern end of the Big Canyon golf course to just downstream of Back Bay Drive at the western end of Big Canyon Creek Nature Park. Flow estimates will be conducted at the time of surface water quality sample collection. Flow will be estimated by measuring average depth, cross-section width, and velocity (using standard hand- held field velocity meter). Reporting It is estimated that the sample collection, and analysis and reporting for the Big Canyon Wash selenium source -tracking program will take three months to complete. Estimated Sampling, Analytical, and Reporting Costs The proposed scope of work is based on existing information and CH21VI HILL staff's professional best judgment. Actual conditions in the field may differ and require adjustments to the number and type of samples and sample locations. The actual number of stream flow estimates and biota samples and their locations will be determined in the field and should be based on existing stream flow conditions and biota availability. Therefore, all costs should be considered preliminary and subject to change based on the actual number of samples collected, field conditions, consultant fees, and laboratory rates for the recommended analyses. The following tasks and costs have been estimated: Table 6. Tasks and Estimated Costs Task No. of Samples (if applicable) Estimated Cost Se Monitoring and Initial Source Tracking Project Administration (including 1 site meeting for 2 staff, and 1 teleconference) $ 9,192 Sample Collection $ 24,894 Laboratory Analysis - Water Quality 21 $ 5,250 Laboratory Analysis - Selenium Species 21 $ 4,515 Laboratory Analysis- Particulate Fraction Selenium 3 $ 480 Laboratory Analysis - biota 20 $ 6,100 Total Laboratory Analyses $ 16,345 Subcontractor overhead charge: 10% $ 1,635 Embryo Analysis 5 $ 1,584 Sample Preparation and Pick-up $ 1,660 Sample Pick-up $ 100 Reporting $ 22,458 SUBTOTAL $77,868 10 References Byron, E. and G. Santolo, 2008, Big Canyon Wash Wetlands Restoration, Baseline Selenium Results, draft report dated July 25, 2008, prepared by CH2MHi11 for the City of Newport Beach and the Santa Ana Regional Water Quality Control Board. Presser, T., D. Piper, K. Bird, J. Skorupa, S. Hamilton, S. Detwiler and M. Huebner, 2004, The Phosphoric Formation: A Model for Forecasting Global Selenium Sources in the Environment. In J. Hein, ed., Life Cycle of the Phosphoria Formation: From Deposition to the Post -Mining Environment. Elsevier Publications. Sutula, M., J. Brown, and E. Fetscher, 2008, Habitat Value of Urban Wetlands, final report dated March 5, 2008, prepared by the Southern California Coastal Water Research Project for the Los Angeles Regional Water Quality Control Board, Grant Agreement No. 04-090-554-0. Weston Solutions, Inc., 2007, Big Canyon Creek Flow and Water Quality Assessment. Report prepared for WRC Consulting Services, Inc. Weston Solutions, Inc., 2008, Big Canyon wet weather results unpublished data. Figure 1. Location map of Big Canyon Wash and vicinity. { f 74 - 'NI ;'NI '- low a�. �..:may � >� �i •1� �' ` `��..g� *'', _ x, � - ?. ,+�• .n .� 4. yr.: j}' p� ! h.'fi fLLjT �; ���: fi�' �,�pu �I i�. �jpi t 7 k- is 1,._�,,.�•� 1 .. � `4�z �y ri � � (� � � •y •''r�,_,."� n • w ..5 f r y� jL cl �/ ,. � �� • „ a�j,1j ^ y ' T' icy � � q � j r k l ♦ i ; R • 6 � l Lf A' TO: FROM: SUBJECT: CITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 9 April 28, 2009 HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Public Works Department Mark Reader, Project Manager 949 - 644 -3311 BIG CANYON CREEK RESTORATION PROJECT - APPROVAL OF AMENDMENT NO. 2 TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. FOR SELENIUM MONITORING RECOMMENDATIONS: 1. Approve Amendment No. 2 to Professional Services Agreement with VA Consulting, Inc. for on -site selenium monitoring and upstream selenium source tracking for the Big Canyon Creek Restoration Project for a total fee of $81,761 and authorize the Mayor and City Clerk to execute the Agreement. 2. Approve a Budget Amendment transferring $41,761 from 7014- C5100969 (Irrigation Smart Controller Program) to Account No. 7014- C5100709 (Big Canyon Creek Restoration); and recognizing $40,000 from a contribution from the County of Orange Nitrogen Selenium Management Program and appropriating $40,000 to Account No. 7251- C5100709. BACKGROUND: VA Consulting Inc. (VA) is completing the final construction documents and permit applications for the Big Canyon Creek Restoration Project. The concept design for the restoration as envisioned in the Feasibility Report has changed in important ways in order to address elevated concentrations of selenium that have been found in the sediments, water column and tissue samples of invertebrates and fish. The measured water column selenium concentration in some cases exceed by a factor of ten, the California Toxic$ Rule freshwater chronic criterion of 5 micrograms per liter. The City and Regional Water Quality Control Board (RWQCB) have been working together on the Big Canyon Creek Restoration project since 2004. The RWQCB has partially funded the preparation of the feasibility study and final construction documents. When the selenium problem became apparent last summer (2008), the City and RWQCB began discussions on how to address this issue while keep the project on track to begin construction in Fall 2009. As selenium treatment technology is still in its initial development stages with pilot projects indicating that treatment could be very costly, RWQCB and City staff have agreed to move in a deliberate manner to monitor the extent of selenium problem; Big Canyon Creek Restoration — Approval of Amendment No. 2 to Professional Services Agreement with VA Consulting, Inc. April 28, 2009 Page 2 find, as possible, the selenium sources; and continue research on potential mitigation solutions. With this approach, the RWQCB can issue the required 401 permit for this project Under this contract amendment, VA will complete the baseline monitoring by having its subconsultant, CI-112M Hill, collect bird eggs from Big Canyon and analyze the tissue for evidence of selenium toxicosis. Water column and sediment samples in adjacent areas will also be collected and analyzed for selenium. Additionally, CH2M Hill will collect surface water, water from groundwater seeps and sediment samples in upstream areas to try and ascertain potential sources of selenium. With the completion of the baseline survey and upstream source identification program, the results will be a guide to identify selenium treatment source controls or remediation options and allow us to document improvements once these controls are in place. Funding Availability: The City's current CIP budget includes general funds set aside to match an expansion of the smart irrigation controller program which is part of the Newport Coast runoff reduction program. While the City has been awarded a Proposition 84 grant, State funds are currently frozen and no date has been given on when these funds will be available. At the time Proposition 84 funds become available, the smart irrigation controller program will advance primarily with grant funds. The status of match funding will be reviewed by staff and presented for Council consideration as needed once more information is available. It is recommended that $41,761 be transferred from the smart irrigation controller program to the Big Canyon Creek restoration project for monitoring and tracking of selenium. Also, the County of Orange will contribute $40,000 from its Nitrogen Selenium Management Program (NSMP) for this sampling and analysis work. Upon approval of the recommended Budget Amendment, sufficient funds will be available in the following accounts for this project: Account Description Big Canyon Creek Restoration Orange County NSMP Contribution Prepared by: Mark Reader Project Manager Account Number Amount 7014- C5100709 $41,761 7251- C5100709 40,000 Total: $81,761 Submitted by: Attachment: Amendment to PSA with VA Consulting Inc. Scope of Services prepared by VA Consulting Inc, nd CH2MHill. aoum Director AMENDMENT NO. TWO TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. FOR BIG CANYON CREEK RESTORATION PROJCT THIS AMENDMENT NO. TWO TO PROFESSIONAL SERVICES AGREEMENT, is entered into as of this day of ' 2009, by and between the CITY OF NEWPORT BEACH, a Municipal Corporation ( "CITY "), and VA CONSULTING, INC., a California Corporation whose address is 17801 Cartwright Road, Irvine, California, 92614 ( "CONSULTANT "), and is made with reference to the following: RECITALS: A. On December 11, 2007, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for engineering design services for the Big Canyon Creek Restoration Project, hereinafter referred to as "PROJECT ". B. CITY and CONSULTANT have entered into one separate AMENDMENT of the AGREEMENT, the latest dated January 27, 2009. C. CITY desires to enter into this AMENDMENT NO. TWO to reflect additional services not included in the AGREEMENT or prior AMENDMENT and to extend the term of the AGREEMENT to December 31, 2010. D. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. E. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. TWO ", as provided here below. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. In addition to the services to be provided pursuant to the AGREEMENT and AMENDMENT NO. ONE, CONSULTANT shall diligently perform all the services described in AMENDMENT NO. TWO, including but not limited to, all work set forth in the Scope of Services attached hereto as Exhibit 1 and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 2. City shall pay Consultant for the services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached to this AMENDMENT NO. TWO for all work performed pursuant to this Amendment. Consultant's compensation for all work performed in accordance with this AMENDMENT NO. TWO, including all reimbursable items and subconsultant fees, shall not exceed Eighty One Thousand Seven Hundred Sixty One Dollars and no /100 ($81,761.00) without prior written authorization from City. 3. The term of the AGREEMENT shall be extended to December 31. 2010. 4. Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. TWO on the date first above written. APPROVED AS TO FORM: By: A4 -�-- ( _ _ H o Mynette D. Beauchamp Assistant City Attorney for the City of Newport Beach ATTEST: By: Leilani Brown City Clerk Attachments: Exhibit A — Scope of Services CITY OF NEWPORT BEACH, A Municipal Corporation By: Edward D. Selich Mayor for the City of Newport Beach VA CONSULTING, INC.: By: Max P. Vahid President and C.E.O. Michael S. Carter Secretary and C.F.O. EXHIBIT 1 VAI CONSULTING April 16, 2009 Mr. Mark Reader Project Manager City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 Dear Mr. Reader: This letter is a change order request for additional engineering design services for the Big Canyon Restoration Project (Project) located in the City of Newport Beach (City), California (Professional Services Agreement dated December 11, 2007). This change order supersedes our previous letter dated April 15, 2009. As you are aware, the City has requested that additional material sampling and testing be undertaken within Big Canyon. These additional services are related to establishing the base- line selenium levels within Big Canyon prior to implementation of the proposed Project. Upon approval of this change order request, VA will retain CH2M Hill to provide the sampling and testing services in accordance with its scope -of -work (Exhibit "B "). A summary of the overall scope of services included in this request is provided in Section I and fees are provided in Section If of this letter. VA will provide our services on a time -and- materials, not -to- exceed basis in accordance with the attached fee schedule (Exhibit "A "). SCOPE OF SERVICES Phase I I — Preliminary Source Tracking and Selenium Monitoring CH2M Hill will collect samples and conduct testing in accordance with their scope -of -work (Exhibit "B "). 2. Administration, Coordination, and Sub - Consultant Management This task provides for subconsultant management, coordination, and review of subconsultant work - product as the Project progresses. The total VA fee for this task is $3,893 and will be billed on a time- and - materials basis. VA Consulting, Inc. Coipiome Office Orange County Division 6400 Oak Canyon, Suite 150 Irvine. CA 92618 Phone 949.474.1400 Fax 949.261.8482 XIR[.WA373 W0&0dn rc,COn..rtpCnm 'eek_of i4[9.a .. Mr. Mark Reader City of Newport Beach April 16, 2009 Page 2 of 2 II. FEES Phase II — Preliminary Source Tracking and Selenium Monitoring --------- ...$77,868 2. Administration, Coordination, and Sub - Consultant Management ................$3,893 TOTALFEES ................................................ ............................... ........................$81,761 Please indicate your approval of this change order request by signing in the space provided below and returning a copy to our office. If you have any questions regarding this request, please feel free to contact Dan Villines or me at (949) 474 -1400. Sincerely, Max P. Vahid, P.E. President and CEO MPVJkam Enclosure cc: Dan Villines Contracts xwinae�sr? amwmmroa, egev.,aiGew. a�cmmc EXHIBIT "A" VA CONSULTING, INC. FEE SCHEDULE 2009 Staff Classification Civil Engineering and Planning Services President.............................................................. ............................... Division President/Division Manager .................... ............................... Sr. Vice President/Vice President/ Exec. Director ............................... Director................................................................ ............................... Senior Project Manager ....................................... ............................... ProjectManager ................................................... ............................... Assistant Project Manager ................................... ............................... Senior Project Engineer /Senior Design Supervisor /Senior Planner..... Project Engineer /Design Supervisor ..................... ............................... Senior Design Engineer /Senior Designer ............. ............................... Design Engineer / Planner ..................................... ............................... Designer............................................................. ...........................I ".. Assistant Engineer /Assistant Planner ................... ............................... Research and Processing Coordinator ................. ............................... Senior CADD Technician ..................................... ............................... JuniorEngineer .................................................... ............................... CADD Technician Hourly Rate ....................... $190 ....................... $173 ..................... $163 ....................... $160 ........................................................... ............................... EngineeringIntern .......................................................... ............................... Office Support/Clerical ................................................... ............................... Field Survev and Marmina Services Director of Survey and Mapping .......... ............................... Manager of Field Survey ........................ ............................... Survey and Mapping Associate ............. ............................... Survey and Mapping Technician ............ ............................... 3 -Man GPS Crew ................................... ............................... 2-Man GPS Crew ................................... ............................... 1 -Man GPS Crew ................................... ............................... Special Services Litigation . ............................... Notes: 1. In -house reprographics charges: B &W Bond copies $1.00 /sq.tt, Color Bond $6.00/sq.ft. .......I ........ $155 ................ $147 ................ $142 ................ $137 ................ $132 ................ $122 ................ $117 .............. $110 ................ $100 ................. $95 .................. $90 .................. $85 .............. I... $80 .................. $70 .................. $69 ........... $158 ........... $130 ........ $95 .............. $75 ............ $235 ............ $205 ............ $175 2. Mileage will be billed at standard mileage rates set by IRS. 2009 rates currently listed at $0.55 per mile. ....... $450 x!A 13 � _s%rMar+.k_ --CW � G -OCAS EXHIBIT "B" Dan Villines, P.E. Director of Water Resources VA Consulting, hx. 17501 Cm-1 - vrihht ROild Irvine, C A 92614 Dear Mr. Villines: CH2A4 HILL is pleased to provide this cost proposal for a scope of work to conduct the Big Canyon wash selenium monitoring and source tracking in Newport Beach, California. Thi• monitoring and tracking will be conducted in Big Canyon Wash and along its tributaries. CH2M HILL will collect LIP to 21 water samples for selenium speciation from Big, Canyon Wash freshwater pond outlet, mid -pond, inlet, and below Jamboree Road. CH2M HILL, will collect up to three samples for water column particulate selenium from three of the water quality sampling sites. CH2M HILL will collect algae, benthic and water column invertebrates, fish, and bird eggs from the Nahrre Park pond for total selenium analysis. CH2M HILL will compare the results with the 2008 sampling and bird eggs will be compared to concentrations found in other parts of the Newport Bay watershed. Bird eggs will be opened and embryos evaluated for effects characteristic of selenium toricosis before sending them to the laboratory for chemical analyses. CH2M HILL will collect flow estimates from up to ten locations for the area from the eastern end of the Big Canyon golf course to just downstream of Back Bay Drive at the western end of Big Canyon Creek Nature Park. Flow estimates will lie conducted) at the time of surface water quality sample collection. Flow will be estimated by measuring average depth, cross - section width, and velocity (using standard hand -held field velocity meter). It is estimated that the sample collection, and analysis and reporting for the Big Canyon Wash seleniunn source - hacking Program will take three months to complete. T'he detailed scope and budget are attached and a sununary of Lhe tasks and estimated costs are aS follows. CH2M HILL 2,185 NWORxes P8rk 01 r S.Ne WO Sacramento, CA 95833 Tel 8816- Fax 928.6463 April 16, 2009 Dan Villines, P.E. Director of Water Resources VA Consulting, hx. 17501 Cm-1 - vrihht ROild Irvine, C A 92614 Dear Mr. Villines: CH2A4 HILL is pleased to provide this cost proposal for a scope of work to conduct the Big Canyon wash selenium monitoring and source tracking in Newport Beach, California. Thi• monitoring and tracking will be conducted in Big Canyon Wash and along its tributaries. CH2M HILL will collect LIP to 21 water samples for selenium speciation from Big, Canyon Wash freshwater pond outlet, mid -pond, inlet, and below Jamboree Road. CH2M HILL, will collect up to three samples for water column particulate selenium from three of the water quality sampling sites. CH2M HILL will collect algae, benthic and water column invertebrates, fish, and bird eggs from the Nahrre Park pond for total selenium analysis. CH2M HILL will compare the results with the 2008 sampling and bird eggs will be compared to concentrations found in other parts of the Newport Bay watershed. Bird eggs will be opened and embryos evaluated for effects characteristic of selenium toricosis before sending them to the laboratory for chemical analyses. CH2M HILL will collect flow estimates from up to ten locations for the area from the eastern end of the Big Canyon golf course to just downstream of Back Bay Drive at the western end of Big Canyon Creek Nature Park. Flow estimates will lie conducted) at the time of surface water quality sample collection. Flow will be estimated by measuring average depth, cross - section width, and velocity (using standard hand -held field velocity meter). It is estimated that the sample collection, and analysis and reporting for the Big Canyon Wash seleniunn source - hacking Program will take three months to complete. T'he detailed scope and budget are attached and a sununary of Lhe tasks and estimated costs are aS follows. Task Se Itoring and Initial Source Tracking Project .4dministratil�n (including; I site meeting,, fol Istaff, and I teleconference) Sample Collection I'a I;C) —rato r v_A I —,,, I I V,-i i I —C1 Q) L-1 i I v Laboratoi Y Anal.Y.qis - Sojenium Spi�cw,5 Laboratory Analysis- Particulate fraction Selenium Laboratory Analysis - hinta Total Laboratory Ana]yses Subcontractor overhead chirgo: 10%' . .... ..... I., --- ---- Embr.yo Analysis Sample Preparation and Pick-up . ... .... . . ....... 11 TOTAL Sincerely, Ron Weddle Contracts ManagOr N,. of Sa-nn pl e qCost l"Si ate .1 (if 6iL S 9,192 20 'S 250 $ 4,515 $ 480 S 6.100 16,345 1,635 1,584 . .... ..... S 1,660 — --------- $ 100 $ 22,458 __ 577,868 BIG CANYON WASH WETLANDS RESTORATION PROJECT SELENIUM MONITORING PHASE 11 — PRELIMINARY SOURCE TRACKING and SELENIUM MONITORING PROJECT Introduction Big Canyon Wash is a small tributary drainage to Upper Newport Bay that drains a watershed of approximately 2 square miles (Figure 1). The majority of the watershed (approximately 96 %) is highly developed with homes, commercial areas, a golf course, cernetery, and other urban features. The 60 -acre undeveloped portion of Big Canyon Wash (Big Canyon Creek Nature Park) has been identified by the Southern California Wetlands Recovery Project (SCWRP) as an important resource that is in need of restoration. The City of Newport Beach was directed by the City Council to move forward with restoration efforts in the canyon (Weston, 2007). Weston Solutions was hired to establish baseline water quality conditions in the canyon and to assess appropriate design elements that could be incorporated into the restoration plan to address identified existing or future water quality issues (Weston, 2007). The resultant study conducted by Weston Solutions (2007) showed that water column concentrations throughout the lower part of Big Canyon west of Jamboree Road exceed the California Toxics Rule (CTR) freshwater chronic criterion for selenium of 5 micrograms per liter (pg /L) under both wet and dry conditions. In addition, investigations by Southern California Coastal Research Project (SCCWRP; Sutula et al., 2008) have indicated that selenium concentrations in soils in the lower portion of Big Canyon Wash (near Back Bay Drive) exceed the selenium screening value for substantial ecological risk of 4 milligrams per kilogram (mg /kg) dry weight (Presser et al. 2004). Selenium is a bioaccumulative compound that has been associated with reproductive impairment in fish and birds. Ecological risk screening values for selenium are shown in Table 1. Table 1. Ecological Risk Screening Levels for Selenium Media Ecological Risk Level (mg/ q dw T None Marginal Substantive _ Freshwater <2 AIL 2 -5 /L >5 /L Sediment <2 2 -4 _ >4 Diet fish & birds " 3 -7 >7 Fish Tissue <4 4-6 >6 .- ..._... Bird Egg Tissue -- <6 -- - 6 -10 >10 (Source: Presser et al., 2004) The sources of selenium in the watershed have not all been identified. The steep cliffs that rim Big Canyon Wash are formed primarily of the Miocene Monterey Formation. This formation is a known source of selenium in California and is a likely source of selenium in Big Canyon. Selenium may have also accumulated in the canyon bottom soils, especially in the freshwater marsh areas. The changes in canyon hydrology and the areas tributary to Big Canyon Wash as the watershed has developed have likely contributed to the mobilization of selenium. Urban landscape irrigation, the construction of an 18 -hole golf course in the up- gradient part of the canyon east of Jamboree Road (Figure 1), Big Canyon Reservoir, and storm drain systems that discharge to the canyon, have changed the canyon's flow regime from ephemeral to perennial. This has resulted in significant changes in habitat and has likely contributed to the high selenium concentrations that have been found in the soils and water in the canyon. A baseline monitoring study in the Big Canyon Creek Nature Park was recently completed by CH2M HILL. From June 9 -11, 2008, CH2M HILL staff collected samples of water, sediment, and biota from different areas within the nature park to evaluate selenium concentrations and potential impacts in the food webs in the area Samples were collected from the up- gradient portion of the canyon just west of Jamboree Road, in the freshwater marsh and riparian areas in the upper and middle sections of the canyon, and in the fresh and salt water marshes in the lower part of the canyon. Biological samples collected and submitted for analysis included algae, dragonfly larvae, crayfish, mosquito fish, fathead minnows, and African clawed frogs No nesting birds were observed at the time and therefore, no bird eggs were collected. Several of the water column samples were also submitted for selenium speciation analysis. The data collected indicate that selenium concentrations in sediment and the biota in the park are extremely high — an order of magnitude higher than the concentrations measured in biota in the San Diego Creek watershed — despite the fact that the total selenium concentrations in the surface waters in Big Canyon Creek are similar to those measured in the lower part of San Diego Creek (Table 2). The selenium concentrations in water, sediment, and tissue collected from Big Canyon Creek Nature Park all exceeded the ecological risk screening values shown in Table 1. Selenium concentrations in sediment as high as 122 mg /kg dry weight (dw) were found in the lower freshwater marsh ponds. Fish tissue concentrations in this area range from 58 -64 mg Se /kg dw, and algae and dragonfly larvae selenium concentrations exceed 30 mg /kg dw. Selenium concentrations in sediment and biota were elevated throughout the park, even in the middle and upper sections of the canyon. Selenium concentrations in sediment at these locations, though not as elevated as that seen in the lower freshwater marsh ponds, are still elevated well above screening levels (20 -27 mg Se /kg dw; Figure 4) and algae, crayfish, fish (fathead minnow and mosquito fish), and frogs were also extremely high (35 -57 mg /kg dw). Table 2. Comparison of Median Selenium Concentrations in Surface Waters in San Diego Creek Basin No. 2 and the Biq Canyon Creek Nature Park Water 15 p /L 19 /L Sediment 0.5 m /k d weight 54 /k m d wei ht Macroinvertebrates 7 m /k d weight 2 m fk d wei ht 7 m /k d weight 57 k d m / weight Selenium speciation data indicate that the selenium in the surface flows that enter the nature park from upstream of Jamboree Road is composed of a significant amount of the more bioavailable inorganic form of selenium known as selenite (Se IV) than the flows in the San Diego Creek watershed. Approximately 21 percent ( %) of the selenium in the baseflow in the canyon was composed of selenite, 78% was selenate (Se VI), and less than 1% was organic selenium (primarily, methylselenic acid). Since the majority of selenium in groundwater is in the form of selenate (this is supported locally by the data collected from storm drain #1 [LBCW- SD #1], which flows year round due to groundwater leakage into the storm drain, the presence of so much selenite in the flows at the upper end of the park indicate that it is likely that conversion of selenate to selenite is occurring upstream of the park. Within the nature park, the percentage of selenite continues to increase downstream with 30- 40% of the selenium in the lower freshwater marsh ponds being composed of selenite. The percentage of organic selenium also increases from less than I% at the upper end of the park to nearly 3% in the ponds. The presence of the relatively high proportions of selenite in the surface waters in the park is the most likely reason for the extremely high concentrations of selenium in sediment, algae, invertebrates, frogs, and fish. The concentrations of selenium in the fish and frogs are well into to the range of selenium concentrations that are associated with deformities (teratogenesis) in fish and birds. It is likely that turtles and some birds may be similarly affected. It is therefore, very important that the sources of selenium in the surface water flows that enter the park, and the mechanism(s) for the conversion of selenate to selenite that occur(s) up- gradient of the park, be identified so that steps may be taken to try to control, mitigate, or eliminate them before the surface waters enter the park. The sources of selenium also need to be identified so that the plans for the nature park restoration can be modified, if necessary, to incorporate selenium treatment or source controls, or, if impairment due to selenium continues to occur under post- restoration conditions, additional remediation options can be considered. Potential Sources of Water Selenium and Selenium Conversions in the Big Canyon Watershed Sources within the Nature Park There are seven storm drains that have been identified in the nature park. Five of these drains are located on the north side of the canyon and two on the south side. The westernmost storm drain on the north side of the canyon (SD #1) appears to flow perennially and has a small catchment area at its discharge point. Water flows from the catchment into the riparian area located along the northern side of the lower part of the canyon. Given the volume of the flow from this drain, it is likely that the drain is intercepting groundwater. The selenium concentration measured in the water from this drain during the recent baseline monitoring investigation was 13 µg /L. Based on CH2M HILL's recent reconnaissance and sampling in the nature park, one other flowing storm drain (SD #3) was identified along the north side of the canyon. The selenium concentration in the water flowing from this drain was very low ( <5 µg /L). Groundwater may also surface within the canyon itself, though CH2M HILL staff did not see any obvious signs of groundwater seepage while they were conducting the baseline monitoring investigation. However, baseflow in the creek has not been sequentially measured from the up- gradient to the down gradient end of the creek to determine if rising groundwater is contributing to the surface flows. Big Canyon Golf Course The Big Canyon Golf Course and Country Club is located upstream of the nature park between Jamboree Road and MacArthur Boulevard (Figure 1). This privately owned and operated golf course was constructed in Big Canyon Wash in the late sixties /early seventies and opened in 1971. Several lakes and creeks can be seen on the course (Figure 2). According to golf course personnel (Jeff Beardsley, Big Canyon Country Club greens supervisor, personal communication, May 20, 2008) there was no visible water present when the golf course was constructed. Currently, surface flows enter the golf course at three main locations east of MacArthur Boulevard (Figure 2). Mr. Beardsley has estimated the flows from each of these drainages. The northernmost stream enters the golf course through a 30- inch pipe at a flow rate of about 25 gallons per minute (gpm) and drains the northern "port" streets area of Newport Hills Estates. The middle stream enters the course through a 72 -inch pipe at a rate of approximately 100 gpm and drains the southern port streets area of Newport Hills Estates. The southernmost stream flows onto the course at a rate of about 90 -100 gpm through a 72 -inch pipe; the drainage extends up to Big Canyon Reservoir and drains this area and the residential areas located just west of the reservoir. Additional water flows from storm drains from the residential areas located within and adjacent to the Big Canyon golf course. All of this water flows through the golf course into their ponds and riparian areas. The flows join near the west end of the golf course, just east of the maintenance building, then exit the course and flow through a large culvert that extends underneath Jamboree Road to the nature park (Figure 2). Mr. Beardsley has estimated that approximately 300 gpm in surface water exits the golf course and enters the nature park (faxed map received August 6, 2008). Mr. Beardley has also observed that irrigation from upstream residences in the morning hours results in noticeable increases in the surface water flows that enter the golf course. The surface water that enters the golf course is not used for irrigation, but feeds the lakes and creeks that dot the course. The course uses approximately 60% reclaimed water from the Irvine Ranch Water District and 40% potable water from the Green Acres project to irrigate their greens. The lakes on the golf course may be converting selenate to selenite, which would explain the high concentrations of selenite in the surface waters entering the Big Canyon Nature Park. Tributary Streams to Big Canyon Creek As previously noted, three main drainages (Big Canyon Wash north, middle and south branches) appear to conduct surface flows from the upstream areas through the Big Canyon golf course where they join prior to continuing down into the nature park and Upper Newport Bay. The south branch passes through the Harbor View Nature Park which appears to contain a riparian corridor. If the surface waters in this branch of the creek contain selenium, there may be some conversions of selenate to selenite occurring in this part of the tributary. There also may be other areas within the three tributaries where selenium conversions could occur if selenium is present within surface water flows. Big Canyon Reservoir The Big Canyon Reservoir is a 23 -acre facility that was constructed in 1958 as a drinking water reservoir and has a capacity of 195 million gallons (George Murdock, City of Newport Beach, personal communication, May 15, 2008). The reservoir is owned and operated by the City of Newport Beach Utilities Department and was recently fully covered (as of September 2004) to prevent water loss from evaporation and contamination from airborne pollutants. Though the reservoir is asphalt -lined and underlain by a five -foot deep clay layer, it does leak and a system of underdrains and piezometers around the reservoir track the rate and amount of leakage. This slow leakage from the reservoir likely contributes to groundwater recharge. The water table at the base of the reservoir dam is around eight (8) feet below grade (George Murdock, City of Newport Beach, personal communication, May 15, 2008). Pacific View Memorial Park Pacific View Memorial Park cemetery and mortuary (Figure 1) opened in 1958 in Corona del Mar. The 45 -acre facility includes private garden estates, sloping lawns and abundant landscaping. Irrigation of the park grounds may contribute to groundwater recharge and selenium mobilization in the area. Two fountains and two artificial streams on the grounds constantly recycle water so there is no infiltration from those systems (Cathy Wadsworth, office manager, Pacific View Memorial Park, personal communication, May 19, 2008). Residential and Commercial Landscape Irrigation Approximately 96% of the Big Canyon watershed has been developed for urban use with homes, schools, and commercial operations. Much of the urban area is heavily landscaped and irrigated providing another source of infiltrating water to the watershed; however, the magnitude of the contribution of this source to surface and groundwater flow in Big Canyon Wash is not known. Shallow Groundwater Upstream of Big Canyon Creek Nature Park A perched shallow water table underlies the site of the old Ford Aeronutronic property located north of Ford Road, between Jamboree Road and MacArthur Boulevard (Geomatrix, 2008). A groundwater divide bisects the site and in the southern portion of the site, groundwater flows almost due west to the northwestern quadrant of the golf course. Groundwater likely surfaces somewhere either on the golf course or just on the west side of Jamboree Road in the Nature Park. Water quality samples collected from the monitoring wells at the site have not yet been analyzed for selenium concentrations. There is also a high water table in the Spyglass Hill area beneath the Newport Hills Estates area (the port streets) located upstream of the nature park near the Big Canyon Reservoir (George Murdoch, City of Newport Beach, personal communication, May 15, 2008). The shallow groundwater from this area also likely contributes to the surface and subsurface flows that enter the golf course and ultimately, the nature park. Unidentified Sources There may be other sources of water and groundwater to Big Canyon Wash and the golf course that are not readily identifiable. The source investigation should determine if all potential sources of selenium and their relative contributions to selenium loads in the canyon have been identified. Proposed Scope of Work A combination of sampling water, algae, and biota in Big Canyon Wash and flow estimates throughout the Big Canyon watershed will be conducted to evaluate the potential sources and loads of pollutants entering the drainage. Water samples (Se speciation) will be collected from the Big Canyon Wash freshwater pond outlet, mid -pond, inlet, and below Jamboree Road. In addition, algae, benthic and water column invertebrates, fish, and bird eggs will be collected from the pond for total selenium analysis. These samples will be compared to the results of the 2008 sampling effort and bird eggs will be compared to concentrations found in other parts of the Newport Bay watershed. Bird eggs will be opened and embryos evaluated for effects characteristic of selenium toxicosis before sending them to the laboratory for chemical analyses. Since it appears that the golf course ponds may play an important role in the conversion of selenate to the more bioavailable selenite before the surface flows enter the nature park, the selenium source tracking investigation should also focus on identifying the following: • Sources of water that may enter the golf course grounds, both as surface flows and subsurface flows (former Ford plant, Spyglass Hill area, tributary drainages to Big Canyon creek); • Surface water flow paths through the golf course to Big Canyon Creek; • Selenium concentrations, selenium species, and flow estimates in surface flows before they enter the golf course; • Selenium concentrations, and selenium species in the creeks and ponds on the golf course; flow estimates where appropriate; • Selenium concentrations, selenium species, and flow estimates in the surface waters that enter the golf course (Big Canyon Wash north, middle, and south branches) and exiting the golf course, under Jamboree Drive. Investigation of Big Canyon Wash Hydrology and Pollutant Sources and Loads The flow regimes in the Big Canyon watershed need to be defined in terms of groundwater contributions or losses (gaining reaches or losing reaches of the creek) in baseflows, and water sources and pollutant transport mechanisms. Storm drains and urban runoff are readily identifiable sources of flow to the drainage, but it is not known whether rising groundwater conditions occur within the nature park, the golf course, or elsewhere in the watershed. In order to determine the groundwater contributions and pollutant sources and loads in the Big Canyon drainage, estimates of flow must be added to water quality sampling. Water quality and selenium analyses have already been conducted on water column samples collected from the nature park in June 2008 by C112M HILL. However, sampling of the creeks and ponds on the golf course has not yet been conducted and the flows in the creek in the nature park and the golf course have not yet been measured to determine dry season baseflow conditions. Sample Collection and Analysis Samples must be collected and processed in accordance with Surface Water Ambient Water Monitoring Program (SWAMP) protocols. Analytical laboratory results must be reported in SWAMP database format. Original analytical laboratory reports, including quality assurance /quality control reports and chain -of- custody documents, should also be submitted in electronic format as Adobe Acrobat pdf files. Field observations should include the presence or absence of algae or water plants, riparian vegetation along creek areas, benthic and water column invertebrates (e.g., chironomid larvae [blood worms], dragonfly or mayfly larvae, waterboatmen [corixids], or crayfish), amphibians (frogs or turtles), fish, and birds. Any groundwater seeps or springs should also be identified. Sample sites and stream transects /gauging stations should be located using GPS coordinates. The water quality samples should be collected from the locations shown on Figure 2 (up to 21 samples if there is water at all the sample sites) plus the three samples from the lower Nature Park pond and should be analyzed for the listed groups of constituents (Table 3). In addition, three samples will be collected for water column particulate selenium from three of the water quality sampling sites (locations to be determined, based on obvious availability of particulates in the water at the time of sampling). The particulate fraction samples and all dissolved fraction samples will be filtered in the laboratory within 24 hours of sample collection. Algae, benthic and water column invertebrates, fish, and bird eggs will be collected from the Nature Park pond in the lower canyon, as available. It is anticipated that three to five samples may be collected from each of these four main tissue types (12 to 20 biota samples, total). Table 4 provides the individual parameters for each group of constituents for water and tissue. Table 3. Water Q ality Samples and Flow Estimates by Location SAMPLE LOCATION SAMPLES Flow Estimate Tissue Total . Selenium . Water Quality Parameters Selenium Species INFLOW 1 1 1 1 1 INFLOW 2 1 1 1 1 INFLOW 3 1 1 1 1 INFLOW 4 1 1 1 1 INFLOW 5 1 1 1 1 INFLOW 11 1 1 1 1 INFLOW 15 1 1 1 1 OUTFLOW 1 1 1 1 LAKE 1 1 1 1 LAKE 3 1 1 1 LAKE 4 1 1 1 LAKE 5 1 1 1 LAKE 6 1 1 1 RIPARIAN 1 1 1 1 1 RIPARIAN 2 1 1 1 1 RIPARIAN 3 1 1 1 1 Golf Course Irrigation Water 1 1 1 Lower Nature Park Pond 3 20 3 3 QA/QC Duplicates 1 1 1 Total Samples 21 1 11 1 20 21 21 The following Table 4 lists the recommended analytical parameters for the water column and biota tissue samples and Table 5 lists the analytical methods and detection limits: Table 4. Analytical Parameters Water Column Samples Tissue Samples Water Quality Parameters Total Recoverable Se Total Dissolved Selenium Total Selenium Total Recoverable Selenium ICP -MS w /DRC Particulate fraction selenium (groundwater samples) Trace Metals (Cd, Cu, Cr, Ni, Pb, Zn) Trace Metals (Cd, Cu, Cr, Ni, Pb, Zn) Hardness (as CaCO3) HPLC - ICP -MS w /DRC Total Dissolved Solids SeVI Total Suspended Solids Percent ( %) Solids Dissolved Oxygen Dissolved Organic Carbon Organic Se pH <0.1 µg /L Temperature Selenium species NA Selenate Selenite Methylselenitic acid Selenomethionine Selenoc anite Table 5. Recommended Analytical Methods and Detection Limits for Selenium in Water Constituent Analytical Method Method Detection Limit Total Recoverable Se ICP -MS w /DRC* <0.5 /L Dissolved Se ICP -MS w /DRC <0.5 pg /L (groundwater samples) Selenium Species: HPLC - ICP -MS w /DRC SeVI <0.1 gg /L SeIV <0.1 Ng /L Organic Se <0.1 µg /L Selenomethionine Selenocyanate Methyl selenic acid * Dynamic Reaction Cell (DRC)- lowers detection limits and eliminates matrix interferences ICP -MS w /DRC: Inductively Coupled Plasma Mass Spectrometry with Dynamic Reaction Cell HPLC - ICP -MS w /DRC: High Performance Liquid Chromatography - Inductively Coupled Plasma- Mass Spectrometry with Dynamic Reaction Cell Stream Flow estimates Ten locations are currently proposed for flow estimates for the area from the eastern end of the Big Canyon golf course to just downstream of Back Bay Drive at the western end of Big Canyon Creek Nature Park. Flow estimates will be conducted at the time of surface water quality sample collection. Flow will be estimated by measuring average depth, cross - section width, and velocity (using standard hand- held field velocity meter). Reporting It is estimated that the sample collection, and analysis and reporting for the Big Canyon Wash selenium source - tracking program will take three months to complete. Estimated Sampling, Analytical, and Reporting Costs The proposed scope of work is based on existing information and CH2M HILL staff's professional best judgment. Actual conditions in the field may differ and require adjustments to the number and type of samples and sample locations. The actual number of stream flow estimates and biota samples and their locations will be determined in the field and should be based on existing stream flow conditions and biota availability. Therefore, all costs should be considered preliminary and subject to change based on the actual number of samples collected, field conditions, consultant fees, and laboratory rates for the recommended analyses. The following tasks and costs have been estimated: Table 6. Tasks and Estimated Costs Task No, of Samples (if applicable) Estimated Cost Se Monitoring and Initial Source Tracking Project Administration (including 1 site meeting for 2 staff, and 1 teleconference) $ 9,192 Sample Collection $ 24,894 Laboratory Analysis - Water Quality 21 $ 5,250 Laboratory Analysis - Selenium Species 21 $ 4,515 Laboratory Analysis- Particulate Fraction Selenium 3 $ 480 Laboratory Analysis - biota 20 $ 6,100 Total Laboratory Analyses $ 16,345 Subcontractor overhead charge: 10% $ 1,635 Embryo Analysis 5 $ 1,584 Sample Preparation and Pick -up $ 1,660 Sample Pick -up $ 100 Reporting $ 22,458 SUBTOTAL $77,868 10 References Byron, E. and G. Santolo, 2008, Big Canyon Wash Wetlands Restoration, Baseline Selenium Results, draft report dated July 25, 2008, prepared by CH2MHi11 for the City of Newport Beach and the Santa Ana Regional Water Quality Control Board. Presser, T., D. Piper, K. Bird, J. Skorupa, S. Hamilton, S. Detwiler and M. Huebner, 2004, The Phosphoria Formation: A Model for Forecasting Global Selenium Sources in the Environment. In J. Hein, ed., Life Cycle of the Phosphoria Formation: From Deposition to the Post - Mining Environment. Elsevier Publications. Sutula, M., J. Brown, and E. Fetscher, 2008, Habitat Value of Urban Wetlands, final report dated March 5, 2008, prepared by the Southern California Coastal Water Research Project for the Los Angeles Regional Water Quality Control Board, Grant Agreement No. 04- 090 - 554 -0. Weston Solutions, Inc., 2007, Big Canyon Creek Flow and Water Quality Assessment. Report prepared for WRC Consulting Services, Inc. Weston Solutions, Inc., 2008, Big Canyon wet weather results unpublished data. City of Newport Beach NO. BA- 09BA -051 BUDGET AMENDMENT 2008 -09 AMOUNT: $s1,7s1.00 EFFECT ON BUDGETARY FUND BALANCE: X Increase Revenue Estimates Increase in Budgetary Fund Balance X Increase Expenditure Appropriations AND X Decrease in Budgetary Fund Balance X Transfer Budget Appropriations I No effect on Budgetary Fund Balance SOURCE: X from existing budget appropriations X from additional estimated revenues from unappropriated fund balance EXPLANATION: This budget amendment is requested to provide for the following: To transfer expenditure appropriations from the Irrigation Smart Controller Program to the Big Canyon Creek Restoration Project and to increase revenue estimates and expenditure appropriations due to a contribution from the Orange County Nitrogen Selenium Management Program for the Big Canyon Creek Restoration Project. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account REVENUE ESTIMATES (3601) Fund/Division Account 250 4889 EXPENDITURE APPROPRIATIONS (3603) Description Description Contributions - Governmental Award Signed: Signed: Signed: Approval: Administrative Services Director Administrative Approval: City Manager City Council Approval: City Clerk Amount Debit Credit F $40,000.00 $41,761.00 Automatic System Entry. $40,000.00 $41,761.00 �Z7J Date Date Date Description Division Number 7251 Contributions - Capital Account Number CS100709 Big Canyon Creek Restoration Division Number 7014 General Fund - Misc Capital Account Number C5100969 Irrigation Smart Controller Program Division Number 7014 General Fund - Misc Capital Account Number C5100709 Big Canyon Creek Restoration Signed: Signed: Signed: Approval: Administrative Services Director Administrative Approval: City Manager City Council Approval: City Clerk Amount Debit Credit F $40,000.00 $41,761.00 Automatic System Entry. $40,000.00 $41,761.00 �Z7J Date Date Date synYB) AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. FOR BIG CANYON CREEK RESTORATION PROJECT THIS AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT, is entered into as of thisday of u 200, by and between the CITY OF NEWPORT BEACH, a Municipal Corporat n ("CITY"), and VA CONSULTING, INC. a California Corporation whose address is 17801 Cartwright Road, Irvine, California, 92614 ("CONSULTANT"), and is made with reference to the following: RECITALS: A. On December 11, 2007, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT", for engineering design services for the Big Canyon Creek Restoration project, hereinafter referred to as "PROJECT". B. CITY desires to enter into this AMENDMENT NO. 1 to reflect additional services not included in the AGREEMENT and to extend the term of the AGREEMENT to December 31, 2009. C. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. D. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. 1, as provided here below. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. In addition to the services to be provided pursuant to the AGREEMENT, CONSULTANT shall diligently perform all the services described in AMENDMENT NO. 1 including, but not limited to, all work set forth in the Scope of Services attached hereto as Exhibit A and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 2. City shall pay Consultant for the services on a time and expense not -to -exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached to the AGREEMENT. Consultant's compensation for all work performed in accordance with this AMENDMENT NO. 1, including all reimbursable items and subconsultant fees, shall not exceed TWO HUNDRED EIGHTY-NINE THOUSAND, NINE HUNDRED TWENTY-FIVE Dollars and no/100 ($289,925.00) without prior written authorization from City. 3. The term of the AGREEMENT shall be extended to December 31, 2009. r0� 4. Except as expressly modified herein, all other provisions, terms, and covenants set forth in the AGREEMENT shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. 1 on the date first above written. APP OVED AS TO FOR - City Attorney for the City of Newport Beach ATTEST: By:Aao-"_�1N1ti� Leilani Brown, City Clerk Attachments: Exhibit A — Scope of Services CITY OF EWPORT BEA H, A Mur/14 Corgbr•,atiok Ivrayor- u for the City of Newport Beach CONSULTANT: VA CONSULTING, INC. By: ®rporate icer) Title: President and CEO Print Name: Max P. Vahid By: / (Financial Officer) Title: Secretary and CFO Print Name: Michael S. Carter F:\users\cat\shared\ContractTemplatesPublishedonlntranet\FORMPSAAmendment.doc VAI CONSULTING December 30, 2008 Mr. Mark Reader, P.E. Project Manager Public Works Department City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663-3884 Dear Mr. Reader, EXHIBIT A This letter is a change order request for additional engineering design services related to the Big Canyon Creek Restoration Project (Project) (Professional Services Agreement dated December 11, 2007). The change order supersedes our previous letter dated December 19, 2008. These additional services include engineering design and plan revisions required for converting the upper sediment basin into a larger freshwater pond as well as the incorporation of a new sediment basin at the Jamboree Road culvert outlet. Also included in this proposal is the preparation of a preliminary engineer's opinion of probable construction costs, services required for selenium monitoring and testing within the Project watershed, and development of the Salt Marsh Bird's Beak Monitoring Plan. During the course of the Project to date, VA Consulting, Inc. (VA) has also provided on-call services that were not included in our original scope of work for the final design of the Project. A detailed scope of services is provided in Section I and fees in Section II of this letter. Also a breakdown of VA's hours and tasks is included as Attachment A. We will provide our services on a time -and -materials, not -to -exceed basis in accordance with the attached fee schedule (Exhibit A). SCOPE OF SERVICES Requested Tasks Revised Freshwater Pond and Sediment Basin VA will prepare grading plans to change the location of the sediment basin and freshwater pond. The size of the revised freshwater pond (or ponds) will be large enough to satisfy requirements of the regulatory agencies. VA also understands that the revised freshwater ponds will be maintained with potable water and will incorporate a liner system. VA Consulting, Inc. Corporate Office Orange County Division 17801 Cartwright Road Irvine, CA 92614 Phone 949.474.1400 Fax 949.261.8482 X:\Projects\373_0400\Admi n\C001 _BigCanyonCreek_121708R EV ISED3f. doc Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 30, 2008 Page 2 of 7 VA will also investigate the use of reclaimed water rather than potable water to maintain the freshwater ponds. Therefore, this task includes the design of the necessary water supply line and the design of the pond liner system. VA will design a new sediment basin at the Jamboree culvert outlet and will perform the hydraulic calculations required to design the sediment basin spillway and energy dissipater features. The design will incorporate a subterranean wetland as requested by the Regional Water Quality Control Board (RWQCB). VA will also investigate capturing creek low -flows and groundwater at the Jamboree Road outlet to Big Canyon as a means of selenium management. Captured flow would be piped to the bay such that selenium concentrations would be diluted with bay waters. These revisions will require changes to 13 existing plan sheets and the addition of four new sheets to the Project Plans. This task also includes the preparation of two conceptual designs as requested by the City on June 3 and November 14, 2008. A third conceptual design will be developed upon clarification of Project habitat, goals, which will be defined by the regulatory agencies at the forthcoming meeting. The total VA fee for this task is $43,008 and will be billed on a time -and -materials basis. WRA will participate in the placement and configuration of the upper freshwater pond and the new sediment basin. WRA will prepare documents summarizing impacts to existing habitat in Big Canyon as a result of the proposed expansion of the freshwater marsh to be distributed to resource agency personnel after review by the City of Newport Beach. WRA will also review the existing environmental documentation and permits, and perform any revisions that are necessary to reflect the new freshwater pond and sediment basin configurations. WRA will prepare landscape architectural drawings and specifications for the wetland portions of the revised plans and will participate in telephone conferences to coordinate these changes up to the limits of their budgetary allocation. A breakdown of WRA hours and tasks is included as Attachment B of this letter. The total WRA fee for this task is $42,856and will be billed on a time - and -materials basis. The Department of Fish and Game has requested more detailed mapping of vegetation within Big Canyon. LSA will provide vegetation mapping using the Orange County Habitat Classification System. A breakdown of LSA tasks, budgets, and fee schedule are included as Attachment C to this letter. The total LSA fee for this task is $4,600 and will be billed on a time -and -materials basis. LSA will revise restoration planting areas to address the changes to habitats due to the new configuration of the upper freshwater pond and sediment basin. LSA will revise the Invasive Species Removal Zones and Phasing to reflect the changes in grading impacts and will revise the Restoration Plan Specifications to reflect the changes in habitat types and plant and seed mixes as required. LSA will revise the Invasive Species Removal Specifications to reflect the changes to the invasive species zones and phasing, and will participate in coordination meetings required for these changes up to the limits of their budgetary allocation. A breakdown of LSA tasks, budgets, and fee schedule are included as Attachment D to this letter. The total LSA fee for this task is $4,900 and will be billed on a time -and -materials basis. XAProjects\373_0400\Admin\C001 _BigCanyonCreek_121708R EVI SED3f. doc Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 30, 2008 Page 3 of 7 Geosoils will provide an additional subsurface investigation at the site of the new sediment basin and provide addendum documentation addressing the revised freshwater pond and new sediment basin. GSI has indicated that the Feasibility Study plan for the access road and culvert extension required only minor grade changes in the area, without significant alterations to existing grades. Thus, shallow hand -auger explorations were performed in this area consistent with the nature of the proposed improvements. The presently proposed sediment basin in this area, however, will require excavations and fills that alter existing grades by approximately 10 to 15 feet. Therefore, the deeper exploration methods as proposed in this request are needed to determine the slope stability of in-situ materials, potential settlement of fills, possible remediation of fill foundations, and quantity of spoilage material that may require off-site disposal. A breakdown of Geosoils hours and tasks is included as Attachment E of this letter. The total Geosoils fee for this task is $7,504 and will be billed on a time -and -materials basis. Please be advised that the final Project configuration has not been defined through input from the regulatory agencies. This forthcoming input may alter the Project configuration to an extent that the fee for this task may need to be increased. If a fee increase is warranted, VA will notify the City of the causal Project configuration changes and will also provide the incremental increase in cost for this task. 2. Preliminary Operation and Maintenance Plan Based on past permit processing activities, VA understands that the regulatory agencies have requested the inclusion of an operation and maintenance plan with their respective permit applications. VA will determine the periodic operation and maintenance activities for all Project components. The results of this determination will be summarized in a preliminary Operations and Maintenance Plan for use in obtaining the required regulatory permits for the Project. The total VA fee for this task is $5,976 and will be billed on a time -and -materials basis. 3. Preliminary Opinion of Probable Construction Costs VA will prepare a preliminary quantity estimate for the items of work depicted on the Project Improvement Plans including the relocated freshwater pond and new sediment basin. The quantity estimates will be itemized along with corresponding units of measurement. VA will then create an opinion of probable construction costs from the quantity estimate by applying VA's in-house unit cost data or as published in the current cost date manuals. The total VA fee for this task is $6,511 and will be billed on a time -and -materials basis. The Acorn group will provide preliminary quantities and costs for the interpretive and regulatory signage panels. The total Acorn Group fee for this task is $100 and will be billed on a time -and -materials basis. WRA will provide preliminary quantities and costs for the tidal and freshwater wetland plantings. The total WRA fee for this task is $1,000 and will be billed on a time -and -materials basis. XAProjects\373_0400\Admin\C001 _BigCanyonCreek_121708R EV ISED3f.doc Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 30, 2008 Page 4 of 7 LSA will provide quantities and costs for the riparian and upland plantings, as well as for the proposed invasive species removals. The total LSA fee for this task is $1,000 and will be billed on a time -and -materials basis. Please be advised that the final Project configuration has not been defined through input from the regulatory agencies. This forthcoming input may alter the Project configuration to an extent that the fee for this task may need to be increased. If a fee increase is warranted, VA will notify the City of the causal Project configuration changes and will also provide the incremental increase in fee for this task. 4. Selenium Monitoring CH2MHill has conducted water column, sediment, and biological sampling for analysis for the presence of selenium. Biological sampling included the collection of algae, macro -invertebrates, bird eggs, fish, and other specimen. CH2MHill produced a report of their findings which has been submitted to the City for review. At the direction of the City, the fees for these services have been invoiced against tasks and budgets established in VA's initial Project authorization. The total CH2MHill fee for this task is $73,111 and will be billed on a time -and -materials basis. 5. Salt Marsh Bird's Beak Technical Report and Monitoring Plan WRA has prepared and submitted to the California Department of Fish and Game (CDFG) a technical report with an in-depth analysis of the Salt Marsh Bird's Beak population in the vicinity of the restoration project. The report identifies the magnitude and extent of potential impacts that could result from the implementation of the Project. The total WRA fee for this task is $1,944 and will be billed on a time -and -materials basis. At the request of CDFG a monitoring plan will be developed to incorporate avoidance and monitoring measures for the Salt Marsh Bird's Beak Plant. WRA will develop a soil salinity monitoring program, a hydrology monitoring program, a Bird's Beak seed collection plan, and performance criteria to determine the success of impact avoidance to the Bird's Beak population during the monitoring period. Due to the fact that the monitoring plan is not yet developed, the implementation cost is not yet known. Therefore implementation of the monitoring plan is not included in this cost. The total WRA fee for this task is $5,161 and will be billed on a time -and -materials basis. It is understood that changes to the plans will be required by CDFG upon conclusion of their review of the WRA report. It is also understood that CDFG has requested the preparation of a surface water hydrology study to demonstrate that the project will not significantly alter surface drainage patterns to the habitat located on the southerly side of the project, downstream of the existing Back Bay Drive. Therefore this task provides for changes to four plan sheets that presently depict Project areas in the vicinity of the existing Salt Marsh Bird's Beak population and the additional hydrology study. The total VA fee for this task is $15,013 and will be billed on a time -and -materials basis. X:\Projects\373_0400Wdmin\C001 _BigCanyonCreek_121708R EV I SED3f.doc Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 30, 2008 Page 5 of 7 6. Revisions to Feasibility Study Design The original scope of services for the Project was to provide Final Engineering based on the Project as depicted in the Feasibility Study. VA proceeded to design the project based on the Feasibility Study as specified. This resulted in a base grading plan and supporting hydraulic analyses that were presented to the City on February 15, 2008. While proceeding with design activities, revisions were required that significantly altered the configuration of the saltwater and freshwater components of the facility and overall hydraulic performance of the facility as originally defined in the Feasibility Study. These revisions were made to address comments issued by CDFG, the Regional Water Quality Control Board, and the City of Newport Beach. The total VA fee for this task is $19,042 and will be billed on a time -and -materials basis. 7. Easement Mapping and Legal Description VA Consulting will provide mapping of all the existing easements within Big Canyon as described in the Preliminary Title Report Order Numbers 153425 and 153425a by Stewart Title dated October 22, 2008 and October 23, 2008 respectively, provided by the City. VA Consulting will also prepare (1) legal description and plat for the sewer line and sewer maintenance road along the easterly property line at Jamboree Road within APN 440-092-079. The total VA fee for this task is $4,960 and will be billed on a time -and -materials basis. 8. Mitigated Negative Declaration As a result of continuing final design activities, further definition of environmental conditions, and impacts associated with the Project have been defined. As such, changes in the Project configuration and functions are forthcoming. In response to these changes, the Existing Project CEQA document, i.e. the Mitigated Negative Declaration, will require changes of such an extent that a new CEQA document is anticipated. This task includes the preparation of a Mitigated Negative Declaration for the revised Project. A breakdown of WRA hours and tasks is included as Attachment F of this letter. The total WRA fee for this task is $11,564 and will be billed on a time -and -materials basis. 9. Subconsultant Management, Coordination, and Work Review This task provides for subconsultant management, coordination, and review of subconsultant work -product as the Project progresses. The total VA fee for this task is $5,689 and will be billed on a time -and -materials basis. 10. Project Management, Meetings, and Coordination Project management, meetings, and coordination activities to -date have depleted our original budget authorization for these activities. This task provides for an additional 120 man-hours of project management activities related to the oversight and management of the various Project subconsultants and coordinating the transfer of information between subconsultants, VA and the City. X:\Projects\373_0400\Admin\C001 _BigCanyonCreek_121708R EV ISED3f. doc Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 30, 2008 Page 6 of 7 This task also provides for an additional 120 man-hours for the purpose of preparing for and attending meetings as requested by the City. The total VA fee for this task is $35,986 and will be billed on a time -and -materials basis. Il. FEES Reauested Tasks 1. Revised Freshwater Pond & Sediment Basin.............................................$102,868 2. Preliminary Operation and Maintenance Plan ............................................$ 5,976 3. Preliminary Opinion of Probable Cost ........................................................$ 8,611 4. Selenium Monitoring..................................................................................$ 73,111 5. Salt Marsh Bird's Beak Technical Report and Monitoring Plan ...................$ 22,118 6. Revisions to Feasibility Study Design.........................................................$ 19,042 7. Easement Mapping and Legal Description .................................................$ 4,960 8. Mitigated Negative Declaration..................................................................$ 11,564 9. Subconsultant Management, Coordination, and Work Review ...................$ 5,689 10. Project Management, Meetings, and Coordination ..................................... 35,986 TOTALFEES.....................................................................................................$289,925 If you have any questions or require additional information, please feel free to contact Dan Villines or me at (949) 474-1400 or John Wolter at (951) 340-0030. Sincerely, '"Max P. Vahid, P.E. President and CEO M PWkam Enclosure — Exhibit A / Attachments A through F cc: Dan Villines John Wolter Contracts XAProjeds\373_0400Wdmi n\C001 _BigCanyonCreek_12170BREV IS ED3f. doc EXHIBIT A VA CONSULTING, INC. FEE SCHEDULE Staff Classification Civil Engineering and Planning Services Hourly Rate President......................................................................................................................... $190 Division President/Division Manager...............................................................................$173 Sr. Vice President/Vice President/ Exec. Director............................................................$163 Director........................................................................................................................... $160 SeniorProject Manager...................................................................................................$155 ProjectManager..............................................................................................................$147 Assistant Project Manager..............................................................................................$142 Senior Project Engineer/Senior Design Supervisor/Senior Planner.................................$137 Project Engineer/Design Supervisor................................................................................$132 Senior Design Engineer/Senior Designer........................................................................$122 DesignEngineer/Planner................................................................................................$117 Designer.........................................................................................................................$110 Assistant Engineer/Assistant Planner..............................................................................$100 Research and Processing Coordinator..............................................................................$95 SeniorCADD Technician.................................................................................................. $90 JuniorEngineer.................................................................................................................$85 CADDTechnician..............................................................................................................$80 EngineeringIntern.............................................................................................................$70 OfficeSupport/Clerical......................................................................................................$69 Field Survey and Mapping Services Director of Survey and Mapping......................................................................................$158 Managerof Field Survey...................................................................................................... $130 Survey and Mapping Associate............................................................................................. $95 Surveyand Mapping Technician........................................................................................... $75 3 -Man GPS Crew................................................................................................................. $235 2 -Man GPS Crew................................................................................................................. $205 1 -Man GPS Crew................................................................................................................. $175 Special Services Litigation.............................................................................................................................. $450 Notes: 1. Invoices will be prepared for all services through the end of each calendar month. f . 2. Overtime, when requested by the client, will be surcharged at a rate of 135% of the standard hourly rates. Sundays and holidays will be surcharged at a rate of 170% of the standard hourly rates. 3. Reprographics, messenger service, travel (including lodging and meals), and other direct expenses will be charged at cost plus 10%. The services of outside consultants will be charged at cost plus 15% to cover administration and overhead. 4. In-house reprographics charges: B&W Bond copies $1.00/sq.ft, Color Bond $6.00/sq.ft. 5. Mileage will be billed at standard mileage rates set by IRS. 2008 rates currently listed at $0.585 per mile. X:\Projects\373_04001Admin\C001_BigCanyonCreek_121708REVISED3f.doc G -OU E AT-rAc.AM&Arr E- ITEM N T COST EXTENSION' FIELD EXPLORATION Field Geologist/Engineer $100.00 6.0 $600.00 Bucket -Auger Drill Rig $225.00 6.0 $1 X0.00 Mileage $35.00 LABORATORY TESTING .Maximurn Dry Density $150.00 1 $150.00 Moisture/ Dry Density $20.00 6 20.004 $120.00 Sieve Analysis $150.00 2 0000 $300.00 Expansion Index $135.00 2 $270.00 Atterberg Limits 2 $225.00 R -Value Test $232.50 1 $232.50 Direct Shear $150.00 1 $150.00 General Corrosivity Test (Resistivity, pH, Soluble Salt) $150.00 1 $150.00 ANALYSIS AND REPORT PREPARATION/MISC. Principal Geologist/Engineer 1 60 D11 $-160.DD 4.0 $ E3:4:0:0 =0 Staff GeoiogisVEngineer $100.00 14.0 $1,400.00 Technical Illustrator $69.00 H 4.0 E4 $276.00 Technical Typist $65.00 3.0 $195.00 Reproduction/Office Services/Misc. Exp. $300.00 PREVIOUS MEETINGS ATTENDED BY PROJECT MANAGERS Project Engineer/Geologist $130.00 7 $910.00 Staff Engineer/Geologist $100.00 2 $200.00 VAConsulting, Inc. Big Canyon Creek Rentoration'Newport Beach R|*:d:\°p1ftc\ssoo\5snua1.00r - - -- ~ VVD.55S5'A1-OC May 27,20O8 Page -F M. Josselyn Senior Technician GIS Technician JOB NO: 13075-2 PROJECT: Big Canyon Restoration Plan W RA RATE SCHEDULE Effective January 2009 $240 per hour $98 $89 Bud et Prepared: 12/11/Ud I)y NF,vv Rate Amount M. Josselyn $240 $1,680 Senior Technician $98 $8,820 ESTIMATED COST $89 $712 Expenses $352 Time Assignment in Hours ---------------------------------------------- Sen GIS Expenses Labor Total Task Description MJ Tech Tech 1. Revision of Initial Study 3 30 4 $110 $4,016 $4,126 2. Public and Agency Comment Responses 3 25 $22 $3,170 $3,192 3. Final CEQA Documentation 1 15 4 $110 $2,066 $2,176 4. Project Coordination and Meetings 20 $110 $1,960 $2,070 Total Hours 7 90 8 Total Expense $352 Total Labor $11,212 Estimated Total Cost $11,564 EXPENSES Task 1. Revision of Initial Study 2. Public and Agency Comment Responses 3. Final CEQA Documentation 4. Project Coordination and Meetings Total Copy . Post/ Total Plus 10% Costs Tele 100 $100 $110 20 $20 22 100 $100 110 100 $100 110 220 100 $320 $352 Staff Rate Amount M. Josselyn $240 $1,680 Senior Technician $98 $8,820 GIS Technician $89 $712 Expenses $352 Estimated Total Cost $11,564 m i m v m m m cn 90 m x ro m z cn m C0 m O m n O cn -4 m -I D m .o 0 it D n m z h i as Ks Descrlptlon - A Revised Freshwater Pond and Sediment Basin VA Consulting 1 Development of 3 Conceptual Plans ---- -- ---- - -- 2 Upper Freshwater Pond Grading- _ 3 Sediment Basin Grading 16 4 Subterranean Wetland Design and Details 16 5 Sediment Basin EnergyDissipater Design 12 6 Sediment Basin Spillway Design 4 7 Additional Rough Grading Sheet ro - -- -----.. .. 8 Sheet RG2-Index and Construction Not --es _ _ 30 9 Sheet RG5-Revise Rough Grading Plan _;-0- 10 010 Sheet RG6- Revise Rough Grading Plan 10 11 Sheet RG8- Add Upper Pond and Sediment Basin Se_c_ti010 12 Sheet RG9- Revise Sediment Basin Access Ramp 10 13 Sheet RG1_0-_Add Sediment Basin Spillway _Profile 10 14 Sheet RG11- Add Sediment Basin Spillway Section_ 10 15 She -et -4G-1 4- Revise Sewer Maintenance Road 10 16 Sheet RG 15- Revise Storm Drain Pipe Extension _ ;0 17 Sheet IS_2- Revise Invasive Species Removal Phasing 0 heet 18 SRP3- Revise Restoration Planting Plan 8 19 Sheet RP4- Revise Restoration Planting Plan _8 ---- -_...------------------- 20 Sheet RP6-Revise Restoration Planting Plan 8 21 Sheet RPB -Revise Restoration Planting Plan 8 22 Water SupplyLine Plan 6 23 Water Supply Line Details 0 24 Pond Liner Details 0 0 WRA -- ---- 1 Assistance With Revised Freshwater Pond Configuration 2 Impact Summary _3 Update Environmental Documents and Permit Applications _....---_____ .------ ----.__.. 4 Update Wetland Planting Plans _ 5 Meetings and Coordination 1 Vegetation Mapping 2 Vegetation Mapping Reimbursable Expenses Update date Restoration Planting Areas 4 Update Invasive Species Removal Zones and Phasing 5 Update Restoration Plans Specifications 6 Update Invasive Species Removal Specifications 7Meetings and Coordination 8 Update Plans and Specifications Reimbursable Expenses Geosoils 21 Laboratory testing. 3 Analysis and Report Preparation_ 4 Meetings and Coordination B Preliminary Operation and Maintenance Plan VA Consulting 1 Plan Text 2 Plan Figures - C Preliminary Opinion of Probable Construction Cost VA Consulting 1 Quantity Estimate 2 Cost Associated with Quantity Acorn Group -- - --- 1 lCost Estimate WRA 1 Cost Estimate LSA 1 Cost Estimate xw,q«aaz3 oaoow„q�Tecnoo�:w��nsca.i E:�,.�m �e,.p,ie,zzsoe.N: Expenses Subconsultants Total hrs Fees hrs Fees $0 .. - - -- 40 12 $5,290 $0 - - - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 -- - - 12 14 ------ 6 4 8 - _ _... 6 8 8 8 8 8 8 8 8 --------5----- 5 5 -----$1,546 $1,546 $1,872 -- $814 $570 $930 --- - $750 $930 $930 $930 $930 $930 $930 $930 $930 $628 $0 $0 $0 -- $0 -- ---- $0 $o $628 $628 - $0 $0 $� -- - _--- '-.--- - 5 -. -$628 5 ---.----- 52 - - 52 $628 $6,370 ---- $6.370 --- -- -$0 - - - - -------- $9,023 $3,401 ------- $o -------- - ----- 52--- $6.370 $9,023 $3,401 $6,702 $20.810 $2,920 $4,500 $6,702 $20,810 $2,920 $4,500 $100 $100 ----- $960 $960$960 ----$1.0---- ,080 08 ---. $960 ..$1.080 ,080 ------ -- $840 - - --- $840 - - - - $100 _ - _--- - $100 $1,985 $1,985 - - $1,598 $2,811 ---- --- $1,598 $2,811 $1,110 $1,110 $0: 0 ' $59,860 347 ' $102,868 _.-.-$0 $0 26 20 $3,500 $2,476 $0 0 $0 46 $5,976 $4,883 $1,628 $0 $0 37 12 $100 $100 $1,000 $1,000 $1,000 $1,000 a i_� now, , _, D 1 2 3 4 Selenium Monitoring CH2MHill Project Administration Sample Collection - Sediment & Tissue Laboratory Analysis Reporting 54950 $0 58,471 $22,836 $20,332 $21,472 $8,471 $22,936 $20332 $21,472 1 2 _ 3 4 Revision of Initial Study E 1 2 1 2 3 Salt Marsh Bird's Beak Technical Report and K0. --- Technical Report Monitoring Plan -- VA Consulting Site Visit Hydrology Study 10 Tidal Marsh Grading 17 Sheet RG3- Revise Grading Plan A Sheet RG4- Revise Grading Plan )2 Sheet RP1- Revise Restoration Planting Plan 0 $0 0 $73,111 0 $73,111 $0 $0 $0 $0 $0 $0 $0 $3,192 - $2,176 $1,944 - - --_--- $1.944 -_---$5,161 $1,140 $6,347 $2,604 $1,592 $1,110 $1,110 $1,110 $5,161--- 8 49 20 15 10 10 10 4 5 6 7 ---- - ---------- Sheet RP2- Revise Restoration Planting Plan !o '0 I - Subconsultant Management, Coordination, and F 1 2 3 4 Revisions to Feasibility Study Design 9 Revise Tidal & Freshwater Marsh and Pond Grading Update Hydraulic Analyses 18 Revise Circulation Plan 12 Revise Interpretive Area Grading '6 ?6 $0 0 $7,105 122 $22,118 54 32 30 30 $6,998 $4,232 $0 _-_-$0 $0 $0 3 $3,906 8 $3,906 G Easement Mapping and Legal Description? 0 50 146 - 519,042• VA Consulting 1 Mapping of Existing Easements Within Big Canyon--_ -- __._.__. -_ 2 One Legal Description For Sewer Line and Access Road o $o 1 s $3,040 - 0 --- $0 -- 12 $1,920 H Mitigated Negative Declaration WRA 54950 $0 -__$4,126 1 2 _ 3 4 Revision of Initial Study Public and Agency Comment Responses Final CEQA Document $4,126 -_ _._ $3,192 - $2,176 - $3,192 - $2,176 Project Coordination and Meetings - - --_--- $2,070 $2,070 I - Subconsultant Management, Coordination, and $0' . 0 ' -$11;564 0 S11;564 1 2 -- --- - ----------- Management Coordination 1 ---------- 10 10 $1,461 - $1,461 $0 $0 3 Work Review I 8 $0 20 $2,768 -i J 1 2 Project Management, Meetings, and Coordination) Project Management Meetings 1 40 $5,669 $12,864 _ -_ $12,864 --- $0 _ $0 92 92 3 -- Coordination ? - --:-- - ---------1 $0 74 $10,258 I 1 01 1 1,0391 I $0 x -.i.-73_0- 73 Oa00 NkT.hDoc:wepwts Cc E­e.m,n,., 2z 8 - m z LU a a V O a c 0 a C LJ Me. z C� G Ii w M cl z a z C) Fn LU a cc /LL O VJ w U) z LU CL x w Cl) w LU U- 0 w a H w ON o aD U) C) d N r Y. d an d m tD r co m m O O d Ern T (fl e tai Ni O EA C') ER (O (fl O N N Efl ER Ei} N (fi O) t y Q rh! lL EH Ln l��, Ci O F- S s; m r co O co g til m co (O N Lo �O 1 rL �X imi`.,} W,,k, CO 00 O O r N C2 to LO O 6a m Q [ g,ey i5 7 N oo m: 9 fiS cn N M Efll N (ODO "t N N co, LO col EH T }L N O to M o<. CD L to mayy. CD . L y, C:) N tO CD N ,Uy Lt T; CD t n� CO(O ' Rt Q T d LD y. cncn rte; i I= Lu w E 3 ti U) O LL 1 O O Q CC4 CL rri t. c Q_ i 5'f CL CSC 4 x: O *+ _ cz O E C IO.Z3'; a F � O C (z c 4 NS- l� U rry: LL U OU •C as O O .'i.�. U C N i cd 00 co W §: CJ s c a o ter. �> C UJ a) c � ctS m m C-) C W c c x wco U, V N w(z 0) W i 2 t0 E :.� Q ern\ co Y N co d' Lo CO 1-- 00Ll r a� F - z w U Q i 4- Q uj 'o a ti a o N � � O � y O� Q U Q� N o c aj U 0) co 0 z CL a Q z O a F - w 0 w cc O LL w U z w a x LU ca w w LL 0 w Q F— N w Y N 6 c 0 z CL 0 H ci 0 z U O a O Z O W CC a U a0 a a U) 0% U m t ��r 0 0 0 0 0 O � 4 i' O ba (0 69 00 CD 64 V 61> O O C 64 12 63 O IM', 00 00 00 OO (O k t r L l � to ;ei a CD ryrPrr C 4�4 (: o a s. W CO V N c0 co t t t1. co 1'p CD z ff? �Yti -� f (ny.. LIJ: �'ti'�A a O 4C•i(. RO * cif in L U) CL O , C (� a •._ N ;'re, cGl.S CC O (ll Q' Via' xr pmt N O CO 3 C>o U x S i w >O = . V O Y (D Op (.0 f"'r WAo,� � C (D o 'weO to L to O T U D... U a. O "O w Q c 0- O 0 U) O U) C 4 f > i . O > .O O -a W '?4, in co n m cll E O > N > (ll .6 o NC'7 d CO f�i CITY OF NEWPORT BEACH CITY COUNCIL SUPPLEMENTAL STAFF REPORT Supplemental Agenda Item No. 12 January 13, 2009 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3322 or rstein @city.newport - beach.ca.us SUBJECT: Big Canyon Creek Restoration Project - Approval of Amendment No. 1 to Professional Services Agreement with VA Consulting, Inc. Revised Amendment No. 1 to Professional Services Agreement with VA Consulting, Inc., of Irvine, California, for design services at a contract price of $289,925 and authorize the Mayor and City Clerk to execute the Agreement. The attached amendment was reviewed and approved by the City Attorney's Office and replaces the draft amendment included with the City Council staff report for this item. Prepared by: Bob Stei Assistant City Engineer Submitted by: ;pWn G. Badum blic Works Director AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. _.... - FOR "BIG - CANYON CREEK "RESTORATION "PROJECT THIS AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT, is entered into as of this _ day of 200, by and between the.CITY OF NEWPORT BEACH, a Municipal Corporation ( "CITY "), and VA CONSULTING, INC. a California Corporation whose address is 17801 Cartwright Road, Irvine, California, 92614 ( "CONSULTANT "), and is made with reference to the following: RECITALS: A. On December 11, 2007, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for engineering design services for the Big Canyon Creek Restoration project, hereinafter referred to as "PROJECT ". B. CITY desires to enter into this AMENDMENT NO. 1 to reflect additional services not included in the AGREEMENT and to extend the term of the AGREEMENT to December 31. 2009. C. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. D. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. 1, as provided here below. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. In addition to the services to be provided pursuant to the AGREEMENT, CONSULTANT shall diligently perform all the services described in AMENDMENT NO. 1 including, but not limited to, all work set forth in the Scope of Services attached hereto as Exhibit A and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 2. City shall pay Consultant for the services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached to the AGREEMENT. Consultant's compensation for all work performed in accordance with this AMENDMENT NO. 1, including all reimbursable items and subconsultant fees, shall not exceed TWO HUNDRED EIGHTY -NINE THOUSAND, NINE HUNDRED TWENTY -FIVE Dollars and no /100 ($289,925.00) without prior written authorization from City. 3. The term of the AGREEMENT shall be extended to December 31, 2009. 4. Except as expressly modified herein, all other provisions, terms, and covenants set forth in the AGREEMENT shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. 1 Sri the date first above written APP OVED AS TO FOR jr City Attorney for the City of Newport Beach ATTEST: Leilani Brown, City Clerk Attachments: Exhibit A — Scope of Services CITY OF NEWPORT BEACH, A Municipal Corporation By: Mayor for the City of Newport Beach CONSULTANT: By: (Corporate Officer) Title: Print Name: By: (Financial Officer) Title: Print Name: F fusers\ cat\ shared\ ContractTemp latesPublishedonIntranet\F ORMPSAAmendment.doc n 1 CONSULTING December 30, 2008 Mr. Mark Reader, P.E. Project Manager Public Works Department City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 -3884 Dear Mr. Reader, EXHIBIT A This letter is a change order request for additional engineering design services related to the Big Canyon Creek Restoration Project (Project) (Professional Services Agreement dated December 11, 2007). The change order supersedes our previous letter dated December 19, 2008. These additional services include engineering design and plan revisions required for converting the upper sediment basin into a larger freshwater pond as well as the incorporation of a new sediment basin at the Jamboree Road culvert outlet. Also included in this proposal is the preparation of a preliminary engineer's opinion of probable construction costs, services required for selenium monitoring and testing within the Project watershed, and development of the Salt Marsh Bird's Beak Monitoring Plan. During the course of the Project to date, VA Consulting, Inc. (VA) has also provided on -call services that were not included in our original scope of work for the final design of the Project. A detailed scope of services is provided in Section I and fees in Section II of this letter. Also a breakdown of VA's hours and tasks is included as Attachment A. We will provide our services on a time - and - materials, not -to- exceed basis in accordance with the attached fee schedule (Exhibit A). SCOPE OF SERVICES Requested Tasks Revised Freshwater Pond and Sediment Basin VA will prepare grading plans to change the location of the sediment basin and freshwater pond. The size of the revised freshwater pond (or ponds) will be large enough to satisfy requirements of the regulatory agencies. VA also understands that the revised freshwater ponds will be maintained with potable water and will incorporate a liner system. VA Consulting, Inc. Corporate Office Orange County Division 17801 Cartwright Road Irvine, CA 92614 Phone 949.474.1400 Fax 949.261.8482 X: \ProjeM\373_0400Wdmin \CO01 BigCanyonCreek _121708RENSED3tdoc Off� rvtne o RaI ees in: unho'A7lrage ,' -1 1 11 Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 30, 2008 Page 2 of 7 VA will also investigate the use of reclaimed water rather than potable water to maintain the freshwater ponds. Therefore, this task includes the design of the necessary water supply line and the design of the pond liner system. VA will design a new sediment basin at the Jamboree culvert outlet and will perform the hydraulic calculations required to design the sediment basin spillway and energy dissipater features. The design will incorporate a subterranean wetland as requested by the Regional Water Quality Control Board (RWQCB). VA will also investigate capturing creek low -flows and groundwater at the Jamboree Road outlet to Big Canyon as a means of selenium management. Captured flow would be piped to the bay such that selenium concentrations would be diluted with bay waters. These revisions will require changes to 13 existing plan sheets and the addition of four new sheets to the Project Plans. This task also includes the preparation of two conceptual designs as requested by the City on June 3 and November 14, 2008. A third conceptual design will be developed upon clarification of Project habitat, goals, which will be defined by the regulatory agencies at the forthcoming meeting. The total VA fee for this task is $43,008 and will be billed on a time - and - materials basis. WRA will participate in the placement and configuration of the upper freshwater pond and the new sediment basin. WRA will prepare documents summarizing impacts to existing habitat in Big Canyon as a result of the proposed expansion of the freshwater marsh to be distributed to resource agency personnel after review by the City of Newport Beach. WRA will also review the existing environmental documentation and permits, and perform any revisions that are necessary to reflect the new freshwater pond and sediment basin configurations. WRA will prepare landscape architectural drawings and specifications for the wetland portions of the revised plans and will participate in telephone conferences to coordinate these changes up to the limits of their budgetary allocation. A breakdown of WRA hours and tasks is included as Attachment B of this letter. The total WRA fee for this task is $42,856and will be billed on a time - and- materials basis. The Department of Fish and Game has requested more detailed mapping of vegetation within Big Canyon. LSA will provide vegetation mapping using the Orange County Habitat Classification System. A breakdown of LSA tasks, budgets, and fee schedule are included as Attachment C to this letter. The total LSA fee for this task is $4,600 and will be billed on a time - and - materials basis. LSA will revise restoration planting areas to address the changes to habitats due to the new configuration of the upper freshwater pond and sediment basin. LSA will revise the Invasive Species Removal Zones and Phasing to reflect the changes in grading impacts and will revise the Restoration Plan Specifications to reflect the changes in habitat types and plant and seed mixes as required. LSA will revise the Invasive Species Removal Specifications to reflect the changes to the invasive species zones and phasing, and will participate in coordination meetings required for these changes up to the limits of their budgetary allocation. A breakdown of LSA tasks, budgets, and fee schedule are included as Attachment D to this letter. The total LSA fee for this task is $4,900 and will be billed on a time - and - materials basis. X:\Proieds \373_04o0\Admin\CD01 6igCany .Creek_121708REVISED3I.doe �Qf}Sces fn :�f rrne Ccu•ana � PaCm Deser t Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 30, 2008 Page 3 of 7 Geosoils will provide an additional subsurface investigation at the site of the new sediment basin and provide addendum documentation addressing the revised freshwater pond and new sediment basin. GSI has indicated that the Feasibility Study plan for the access road and culvert extension required only minor grade changes in the area, without significant alterations to existing grades. Thus, shallow hand -auger explorations were performed in this area consistent with the nature of the proposed improvements. The presently proposed sediment basin in this area, however, will require excavations and fills that alter existing grades by approximately 10 to 15 feet. Therefore, the deeper exploration methods as proposed in this request are needed to determine the slope stability of in -situ materials, potential settlement of fills, possible remediation of fill foundations, and quantity of spoilage material that may require off -site disposal. A breakdown of Geosoils hours and tasks is included as Attachment E of this letter. The total Geosoils fee for this task is $7,504 and will be billed on a time - and - materials basis. Please be advised that the final Project configuration has not been defined through input from the regulatory agencies. This forthcoming input may alter the Project configuration to an extent that the fee for this task may need to be increased. If a fee increase is warranted, VA will notify the City of the causal Project configuration changes and will also provide the incremental increase in cost for this task. 2. Preliminary Operation and Maintenance Plan Based on past permit processing activities, VA understands that the regulatory agencies have requested the inclusion of an operation and maintenance plan with their respective permit applications. VA will determine the periodic operation and maintenance activities for all Project components. The results of this determination will be summarized in a preliminary Operations and Maintenance Plan for use in obtaining the required regulatory permits for the Project. The total VA fee for this task is $5,976 and will be billed on a time - and - materials basis. 3. Preliminary Opinion of Probable Construction Costs VA will prepare a preliminary quantity estimate for the items of work depicted on the Project Improvement Plans including the relocated freshwater pond and new sediment basin. The quantity estimates will be itemized along with corresponding units of measurement. VA will then create an opinion of probable construction costs from the quantity estimate by applying VA's in -house unit cost data or as published in the current cost date manuals. The total VA fee for this task is $6,511 and will be billed on a time - and - materials basis. The Acorn group will provide preliminary quantities and costs for the interpretive and regulatory signage panels. The total Acorn Group fee for this task is $100 and will be billed on a time - and - materials basis. WRA will provide preliminary quantities and costs for the tidal and freshwater wetland plantings. The total WRA fee for this task is $1,000 and will be billed on a time - and - materials basis. X:TrojeVs1373_0400NC6iMC001 BigCanyon0T eV.12170BREViSED31.doc Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 30, 2008 Page 4 of 7 LSA will provide quantities and costs for the riparian and upland plantings, as well as for the proposed invasive species removals. The total LSA fee for this task is $1,000 and will be billed on a time - and - materials basis. Please be advised that the final Project configuration has not been defined through input from the regulatory agencies. This forthcoming input may alter the Project configuration to an extent that the fee for this task may need to be increased. If a fee increase is warranted, VA will notify the City of the causal Project configuration changes and will also provide the, incremental increase in fee for this task. 4. Selenium Monitoring CH2MHill has conducted water column, sediment, and biological sampling for analysis for the presence of selenium. Biological sampling included the collection of algae, macro- invertebrates, bird eggs, fish, and other specimen. CH2MHill produced a report of their findings which has been submitted to the City for review. At the direction of the City, the fees for these services have been invoiced against tasks and budgets established in VA's initial Project authorization. The total CH2MHill fee for this task is $73,111 and will be billed on a time - and - materials basis. 5. Salt Marsh Bird's Beak Technical Report and Monitoring Plan WRA has prepared and submitted to the California Department of Fish and Game (CDFG) a technical report with an in -depth analysis of the Salt Marsh Bird's Beak population in the vicinity of the restoration project. The report identifies the magnitude and extent of potential impacts that could result from the implementation of the Project. The total WRA fee for this task is $1,944 and will be billed on a time- and - materials basis. At the request of CDFG a monitoring plan will be developed to incorporate avoidance and monitoring measures for the Salt Marsh Bird's Beak Plant. WRA will develop a soil salinity monitoring program, a hydrology monitoring program, a Bird's Beak seed collection plan, and performance criteria to determine the success of impact avoidance to the Bird's Beak population during the monitoring period. Due to the fact that the monitoring plan is not yet developed, the implementation cost is not yet known. Therefore implementation of the monitoring plan is not included in this cost. The total WRA fee for this task is $5,161 and will be billed on a time- and - materials basis. It is understood that changes to the plans will be required by CDFG upon conclusion of their review of the WRA report. It is also understood that CDFG has requested the preparation of a surface water hydrology study to demonstrate that the project will not significantly alter surface drainage patterns to the habitat located on the southerly side of the project, downstream of the existing Back Bay Drive. Therefore this task provides for changes to four plan sheets that presently depict Project areas in the vicinity of the existing Salt Marsh Bird's Beak population and the additional hydrology study. The total VA fee for this task is $15,013 and will be billed on a time- and - materials basis. X\Projec1s\373 040MAdrrm1 0001_ B1gCanyonCreek _121708REVISED3f.doc cesaq-;7rvtrie ,Corona PatinQeset# , Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 30, 2008 Page 5 of 7 6. Revisions to Feasibility Study Design The original scope of services for the Project was to provide Final Engineering based on the Project as depicted in the Feasibility Study. VA proceeded to design the project based on the Feasibility Study as specified. This resulted in a base grading plan and supporting hydraulic analyses that were presented to the City on February 15, 2008. While proceeding with design activities, revisions were required that significantly altered the configuration of the saltwater and freshwater components of the facility and overall hydraulic performance of the facility as originally defined in the Feasibility Study. These revisions were made to address comments issued by CDFG, the Regional Water Quality Control Board, and the City of Newport Beach. The total VA fee for this task is $19,042 and will be billed on a time - and - materials basis. 7. Easement Mapping and Legal Description VA Consulting will provide mapping of all the existing easements within Big Canyon as described in the Preliminary Title Report Order Numbers 153425 and 153425a by Stewart Title dated October 22, 2008 and October 23, 2008 respectively, provided by the City. VA Consulting will also prepare (1) legal description and plat for the sewer line and sewer maintenance road along the easterly property line at Jamboree Road within APN 440- 092 -079. The total VA fee for this task is $4,960 and will be billed on a time - and - materials basis. 8. Mitigated Negative Declaration As a result of continuing final design activities, further definition of environmental conditions, and impacts associated with the Project have been defined. As such, changes in the Project configuration and functions are forthcoming. In response to these changes, the Existing Project CEQA document, i.e. the Mitigated Negative Declaration, will require changes of such an extent that a new CEQA document is anticipated. This task includes the preparation of a Mitigated Negative Declaration for the revised Project. A breakdown of WRA hours and tasks is included as Attachment F of this letter. The total WRA fee for this task is $11,564 and will be billed on a time - and - materials basis. 9. Subconsultant Management, Coordination, and Work Review This task provides for subconsultant management, coordination, and review of subconsultant work - product as the Project progresses. The total VA fee for this task is $5,689 and will be billed on a time - and - materials basis. 10. Project Management, Meetings, and Coordination Project management, meetings, and coordination activities to -date have depleted our original budget authorization for these activities. This task provides for an additional 120 man -hours of project management activities related to the oversight and management of the various Project subconsultants and coordinating the transfer of information between subconsultants, VA and the City. X: Wrgeds\373_ 060014dnin\ CO01_ BigCanyonCreek __121708REVISED3f.doc Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 30, 2008 Page a of 7 This task also provides for an additional 120 man -hours for the purpose of preparing for and attending meetings as requested by the City. The total VA fee for this task is $35,986 and will be billed on a time- and - materials basis. II. FEES Requested Tasks 1. Revised Freshwater Pond & Sediment Basin ...................... .......................$102,868 2. Preliminary Operation and Maintenance Plan .............. ..............................$ 5,976 3. Preliminary Opinion of Probable Cost .......................... ..............................$ 8,611 4. Selenium Monitoring ..$ 73,111 5. Salt Marsh Bird's Beak Technical Report and Monitoring Plan ...................$ 22,118 6. Revisions to Feasibility Study Design ........................... ..............................$ 19,042 7. Easement Mapping and Legal Description ................... ..............................$ 4,960 8. Mitigated Negative Declaration .................................... ..............................$ 11,564 9. Subconsultant Management, Coordination, and Work Review ...................$ 5,689 10. Project Management, Meetings, and Coordination ...... ............................... 1 35,986 TOTALFEES ............................................... ............................... .......................$289,925 If you have any questions or require additional information, please feel free to contact Dan Villines or me at (949) 474 -1400 or John Wolter at (951) 340 -0030. Sincerely, Aa C < �M P: Vahid, P.E. President and CEO MPV /kam Enclosure — Exhibit A / Attachments A through F cc: Dan Villines John Wolter Contracts X.\Proie0s1373_O400VWmiMCO01 BigCanyonCweek 121708REVISE03f.doc EXHIBIT A VA CONSULTING, INC. FEE SCHEDULE 411111111116- Staff Classification Civil Engineering and Planning Services Hourly Rate President.................................................................................... ............................... $190 Division President/Division Manager ..................... ............................... ...........................$173 Sr. Vice President/Vice President/ Exec. Director .. ............................... ...........................$163 Director............................................................................................ ............................... $160 SeniorProject Manager ......................................... ............................... ...........................$155 ProjectManager .................................................... ............................... ...........................$147 AssistantProject Manager .................................... ............................... ...........................$142 Senior Project Engineer /Senior Design Supervisor /Senior Planner ...... ...........................$137 Project Engineer /Design Supervisor ...................... ............................... ...........................$132 Senior Design Engineer /Senior Designer .............. ............................... ...........................$122 Design Engineer /Planner ...................... ............................. ............................... ..............$117 Designer.......................................................................................... ............................... $110 Assistant Engineer /Assistant Planner .................... ............................... ...........................$100 Research and Processing Coordinator... _ . .... ............... .......................... ....................... $95 SeniorCADD Technician ...................................................................... ............................$90 JuniorEngineer .................................................................................. ............................... $85 CADDTechnician .................................................................................. ............................$80 EngineeringIntern ................................................................................. ............................$70 OfficeSupport /Clerical .......................................................................... ............................$69 Field Survey and Mapping Services Director of Survey and Mapping ....................................... ............................... Manager of Field Survey ....................... Survey and Mapping Associate ............ Survey and Mapping Technician .......... 3 -Man GPS Crew ... ............................... 2-Man GPS Crew, ................................. 1 -Man GPS Crew ............................ Special Services Litigation ................. ................ $158 ................................... I......... $130 ................ ............................... $95 ................ ............................... $75 .............. ............................... $235 .............. ............................... $205 .............. ............................... $175 ......................................... ............................... $450 Notes: 1. Invoices will be prepared for all services through the end of each calendar month. 1 2. Overtime, when requested by the client, will be surcharged at a rate of 1350/ of the standard houry rates. Sundays and holidays will be surcharged at a rate of 170% of the standard hourly rates. 3. Reprographics, messenger service, travel (including lodging and meals), and other direct expenses will be charged at cost plus 10 %. The services of outside consultants will be charged at cost plus 15% to cover administration and overhead. 4. In -house reprographics charges: B &W Bond copies $1.00/sq.ft, Color Bond $6.00 /sq.ft. 5. Mileage will be billed at standard mileage rates set by IRS. 2008 rates currently listed at $0.585 per mile. %V'mi�+A�T3_B<WVgm'uNC00! Bip[AnyonC,cer_t2»rBgEViSEWi.000 G -OCHE AiACHMENTA Cily of NewpoM Beach Bly Canyon Creek Restoration Pmpacl ESTIMATED FEES A EXPENSES (2 or 2) _ _O _Sgb_nlom MOnXOrMQ IfVgbd Mmngrglbn — See> eSnnrtiCM'nnM PeTI ] 6s' arreM 6 irseue ___ - .,In .1 FY1 E S II M nh SI_tl'a Bask Te[M1nlcnl Repent and MonNOn_rg Pli_n_ - _ rirlYxuiHµrrr t A4vv y _ _ _ _ t!ss _ _ irsu VAC .... thn9__ 3 W MAY Sluuy � _ 6]hrvrllW. a 51 Iinuw hoNryl Pevrx [rtlm, uri - sfy aaL MrrSF Penw w >4nl,w♦Fni _ M PV ?xya,ee geuduwn . _ .. __ .1 _ _ _ , r ir.e, •. _ N _ to - _ . _ _ _ _ S,are _u _m' .. "MC`TT .2uT apps.: SulnaMl Sepio,i N.9MMSro P••a®XIIY SIU•y Oes19_ _. _ ''f p p G9$.k. -raT .. ' :.. "K � 4.., °,• -.. 'F": 9.' -. 'Y xx '` -sisav iv '.' S>1os _ "'i3e 'da _. _ _ 1 siW YFlWWMrMNenary PCnp,arnr,..y 0.o NPLNO1jeu PMINCirCNYM VYn InpprMre Nea OreJry '•..3. o w _;al. Y�:S •19M W ___ ' _ "a _1' fooe NLG �� � D__ N _ _ __ o ro i +:i -.: -. - a.-<I - _ - swww__s.clio_nT O Eaymml Meppllrp mp LpYOJwlpllon YA CmsuNlnp 1Map t Ie.9e. . UmnrpW Eocaoo, smrrnras WM,in C , - Uwn Fn "kM lu4 erG lweeS: FlUa1 _ __ _ _ In 9J I y�yp M V �' Hl- 1140 ie.� N Ni�peud Nrytliv Oe[IarNbo WRA e ]_FmM_C__EOA nmm mo •mew crrmm..M lM;awwe, _ � pmrmenl — - -- RLR - 19. -- _ R- ICedW,Wlbn eM �__ a p n g _ F, V-ia& _ f3J111 $1.. Alk ' :suhblN 36_ca.n H 1 S be YMIM_Ne a�lTl11R �dl.Qfilhn.. ana Wnrk Ruv W_aRiWrM _ ... IMM,mMegN - r StYI p - 1!aVl - — J P!•i??� M;_� moot N6NInp, eM Caar6lwtlon S,aNr IeMMFm9errvnl 2 _ Mer eeYgt _ _ -____. __ _ _ N e6 4' • , teW uxwl LI N Ni U� S 3_581 SJS� r �- _11p _ 11 h k _ r S96 SO TOTAL HOUNS p 392 91 0 0 p 0 0 6Po 0 116 0 0 1099 _ TOTAL FEES TOTAL SAir _ f1v11WS WAIT --ee. -rl - 1,^41M3+)ti .. hry'..6llV 10 ID 6Ve N]594 .6169 "rnKl6p. N %0 Sp '.1j166 30 se6q F Sp vSl fdbKtT..3313A S9 60 -.. $)]189 J'° 611} 60 SfIXI S)O NII c,YJp SO "At9'' 50 %ROi 61J6,Itl ...: w ap - _IDJ9 SA8r8Pb ATTACHMENT City al Nowporl Beach Big Canyon Creek Restoration Wgect ESTIMATED FEES 8 EXPENSES 1 .1 21 Lealu OmrJPllon __ AR JF nr V 1 nG SeE menl BaJrl roN P': OPp6 VP '.a;. Iy R' ?: IrV6. EPE PE 'Sa[ aP _appp: '. {Ibrq IYC lrynnrer Srbtulwluinr iWl M1rs M1rs M _ _VR..' me M ,rM M 6 w, V4C II g- � - _ Oa .14umry ry r ! olia."BPmEO.d�_ 5R6mMMBwn Gr erlmy P . r __.. __ _ _ m 65n ^_ 4�Y6 to W au_ .I' {ymJ Erulerl.r..n wmwM Dp6yam op., "' I 4 fir re W r. udn r _ } _ ($ass, A�ebel Rpu Grt 'WCI __ OWaWJS�Re..6CR .......— _ _ .. ... We.am G_m_ sn6eemvsv, N salty 6adrq rLn (� P }reer RGe. R_w4e rbrye Plan _ I a _ _ ID }" W6O Foss b l W W Y) _ M W _ _ [ WN fP Ya _ � MS[SmaM Oaan Seullun a __ _ e _ IJSIee1RG10. MJ Sy:mere gynr SpdRaY RpIM 6 a Res _ _.. _ - SrieeM My SuW W A`+IPMUrY SbI_mm ' __ _ _ _ .. _ .. .. _ fW � _ _ as as _ _ _ _ _ Wy -Wy _____ 95nre RG ou we 5. Nm er x _ ._ _..... _ __ _. _ .. _ _ � _. Ma S Rwlse ra 0 k Pie Erb .un Emts,e ] Oy _ _ _ _ MIS} HW.rbleafW_MmwN W_enn9 ._.. —a �.. _... _ _ se _ IeW _..._� -- Poin SMN HP4 HevIW R961Narkn Peen,, 6pe W -'liel r _I RI S'IWI RPI�Rp.lse 6p pialbnPWib9 PYn es. $M1eH PW N_�MtrwN.ori PWJne PYn - Pannone Pow, 1 Wre W asis w.o 8 a,,,, ura Plefl • 6 —. __... Welty Sagpy61nR O6wb r _ YTb la rona Lm.r n.wa F1N W _... xam . -. - WlA ArYtl uWrm RRVVJFrWwRe Pd9C ... gnre bn - .. _ zlwwa W Woa _. _. saw. r —. ..__ -__ LMr __ _— VPdei.WeWM pyrYmg P,me - .__. .._. - .. _ —__ _ _ __. _. _ _ se _ v. - - yae awrwrypaw Co.— e�:e� smd-.o _ r ve,,Pnnn elm._.. M6lryRr Rnnrgpv�Egep6n. pnAgnrgn PlemiipMSae - � __ _ __ _f_I __ __ _ sIOJ _3VRflplel'an ]llwelR __ a 5 ll�le Vlreon,oP, m61wnwalS eanp pRYYy tlpww Pepwryyn Wre sprcprrumne gib} - yIMIF[ueln. ] eq6 aMC.wrunrrwi f® __ Sp+mISnIMSReNrouyMp_EyNneen 6M] Geafolh I FeaEa on, • —.. aedewR aaurq— _ _ _ „'• ` _.- ei _. J o., a o.— �.. sl. o. . s,awe Ssseeg — e _ _ -areas seer -I r n Pl.n — U J —_- al or Im, so 6 }1TfYDhe'18 V t II g I 9uhbW SvctlpnB eflmlw�opininnmwohahb 13... _ a o 'p' ': T i -JO 0 Y a a61 1 —r— _ 'a5 a% .0 U CP 55916 JO _._ IComany a R slat: a cwaearebd Mm6_wwL v files - I Cm E6fimae I Cw Faunae —ESP. sr 4ie 16ipe E_a_nlu_a __ _ ATTACHMENT B WRA Big Canyon Creek Restoration Project ESTIMATED FEES & EXPENSES FOR DESIGN AND PERMITTING Note: Total includes tasks 1, 3, and :5 .02; prip u imironmental e with Revised Freshwater Pond Configuration 3 601 83 63 $8,940 urnmary 12 25 0 37 $3,401 Documents and Permit Applications 601 8 110 68 $6,592 41 Update Wetland Planting Plans 2 56 122 19 132 331 $20.678 5 Meetings and Coordination 5 5 10 55 201 $2,865 6 Cost Estimate I 1 10 1 $1,000 7 Salt Marsh Bird's Beak Techincal Memo 6 5 so $1,944 8 Salt marsh Bird's Beak Monitoring Plan 45 8 53 $5.122 TOTAL HOURSJ 14 87 56 137 127 60 461 TOTAL FEES $3,3 $�9,179 $6,496 $13,704 $12,446 $5,357 $ $50,961 R h = MUM 0SW M��W M" g, " R Note: Total includes tasks 1, 3, and :5 ATTACHMENT C LSA Associates, Inc. Big Canyon Creek Restoration Project ESTIMATED FEES & EXPENSES FOR VEGETATION MAPPING .Tasks "' i 11) . ..... t 11 escrip von, � 71GIS, �,ExpensiiO rs Al M 1 Vegetation Mapping 10 10 221 42 $4,500 2 Reimbursables $100 1 - TOTAL HOURS 10 10 22 421 TOTAL FEES $1,500 $1,130 $1,870 $100 $4,600 f 6,�-( - S150 If Mzsl i 77 s - Note: Total includes a portion of task 1 ATTACHMENT D LSA Associates, Inc. Big Canyon Creek Restoration Project ESTIMATED FEES & EXPENSES FOR UPDATING PLANS AND SPECIFICATIONS T- ski p Description ` 4 `t' �i" k p AB, Expenses Total ° hrs hr5. +ilK hf6 d t {. Fees 1 Restoration Planting Areas 8 _ 8 $e60 2 Invasive Species Removal Zones and Phasing e 8 $sso 3 Restoration Plan Specifications 4 4 8 $1,080 4 Invasive Species Removal Specifications 8 e $960 5 Meetings and Coordination 4 2 e, $840 6 Reimbursables $100 7 Cost Estimate 8 8 $1,000 TOTAL HOURS 8 38 46 TOTAL FEES $1,200 $4,600 $100 $5,900 $150' . ,.._$120xs`"eati^? - ` •`.:,hu,�= ;w''sr:.1�.�;:;;« Notr: Total includes a portion from task 1 and all of task 3 Y� \PmlrvNe \7)0 (NIITFm \Tar�M1nr¢1Pennrl¢1!`nel C¢Nmele.lemnlsin \'Jf0l1R W¢ 1'J!'l1 /f1111P i r A- f-T.Ac"M6Aq E ITEM RATE .. HR_or UNIT .; COST. EXTENSION FIELD EXPLORATION Field Geologist/Engineer $100.00 6.0 $600.00 Bucket -Auger Drill Rig $225.00 6,0 $1,350.00 Mileage $35.00 $1,9B5.00 LABORATORY TESTING Maximum Dry Density $150.00 1 $150.OD Moisture! Dry Density $20.00 6 $120.00 Sieve Analysis $150.00 2 $300.00 Expansion Index $135.00 2 $270.00 Atterberg Limits $112.50 2 $225.00 R -Value Test $232.50 1 $232.50 Direct Shear $150.00 1 $150.00 General Corrosivity Test (Resistivity, pH, Soluble Salt) $150.00 1 $150.00 $1,597.50 ANALYSIS AND REPORT PREPARATION /MISC. Principal Geologist/Engineer $160.00 4.0 $640.00 Staff Geologist/Engineer $100.00 14.0 $1,400.00 Technical Illustrator $69.00 4.0 $276.00 Technical Typist $65.00 3.0 $195.00 Reproduction /Office Services /Misc. Exp. $300.00 $2,811.00 PREVIOUS MEETINGS ATTENDED BY PROJECT MANAGERS Project Engineer /Geologist $130.00 7 $910.00 Staff Engineer /Geologist $100.00 2 $200.00 $ 1, 110.00 3• TOTAL'!;" $7,,503 $0 VA Consulting, Inc. Big Canyon Creek Restoration - Newport Beach Re: d: \wp10 \oc \5500\5595a1.cor W.O. 5595 -Ai -OC May 27, 2008 Page 2 /j T7/1UJA e1V T P JOB NO: 13075 -2 PROJECT: Big Canyon Restoration Plan Task Description 1. Revision of Initial Study 2. Public and Agency Comment Responses 3. Final CEOA Documentation 4. Project Coordination and Meetings Total Hours Total Expense Total Labor WRA RATE SCHEDULE Effective January 2009 M. Josselyn Senior Technician GIS Technician Time Assignment in Hours San GIS MJ Tech Tech 3 30 3 25 1 15 20 7 90 $240 per hour $98 $89 Expenses Labor Total 4 $110 $4,016 $4,126 $22 $3,170 $3,192 4 $110 $2,066 $2,176 $110 $1,960 $2,070 8 $352 $11,212 EXPENSES Task Copy . Post( Total Plus 10% Costs Tale 1. Revision of Initial Study 1DD $100 $110 2. Public and Agency Comment Responses 20 $20 22 3. Final CEQA Documentation 100 $100 110 4. Project Coordination and Meetings 100 $100 110 Total 220 100 $320 $352 Staff M.Josselyn Senior Technician GIS Technician Rate Amount $240 $1,680 $98 $8,820 $89 $712 $352 ATTACHMENT G The Acorn Group Big Canyon Creek Restoration Project ESTIMATED FEES & EXPENSES FOR COST ESTIMATE N \Ornbn��1'11i 11lM\F V�\TaM(Inn< \Fenn�a \MeI F<Ilmaln.InmNn�nlf90f1F nh 11131 /iooe CITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 12 January 13, 2009 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Robert Stein rstein(cilcity. newport- beach. ca. us 949 - 644 -3311 SUBJECT: BIG CANYON CREEK RESTORATION PROJECT - APPROVAL OF AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. RECOMMENDATIONS: 1. Approve Amendment No. 1 to Professional Services Agreement with VA Consulting, Inc., of Irvine, California, for design services at a contract price of $289,925 and authorize the Mayor and City Clerk to execute the Agreement. 2. Approve a budget amendment recognizing contributions in the amount of $60,000 from County of Orange Coastal Impact Assistance Program (CIAP), $60,000 from The Irvine Company, and $169,925 from the Irvine Ranch Conservancy and appropriating $289,925 to Account No. 7251- C5100709 for Big Canyon Creek Restoration Project. DISCUSSION: On December 11, 2007, City Council approved a professional services agreement with VA Consulting, Inc. for $435,159 to prepare the final construction drawings and obtain permits from regulatory agencies. By March 2008, VA Consulting had submitted 65% complete drawings to the City for review. In April 2008, detailed results of water quality testing in Big Canyon Creek were released showing elevated concentrations of selenium in the creek sediments and water column. In July 2008, the RWQCB was adamant that follow -up testing should be performed by CH2MHill. As the County of Orange agreed to fund most of the costs for testing, the City directed VA consulting to hire CH2MHill to perform follow -up testing. (This monitoring program was completed in July and invoiced against the City's design agreement with VA Consulting. This extra work is included as a new task in the VA amendment attached to this report.) The follow -up testing confirmed the high selenium concentrations, not only in sediments and water column, but in tissue samples of invertebrates, amphibians and fish. Given this information and the need for RWQCB input on how to address the high selenium concentrations, the City suspended work on Big Canyon Creek Restoration — Approval of Amendment 1 to Professional Services Agreement with VA Consulting, Inc. January 13, 2009 Page 2 the construction documents while meetings were held with the Regional Water Quality Control Board (RWQCB) and selenium experts to discuss options. On November 18, 2008, a meeting was held among City, RWQCB, California Department of Fish and Game (CDFG), Coastal Commission and Coastal Conservancy to discuss how to move the project forward in a manner that would address the selenium concern as well as another environmental issue involving a plant called the Salt Marsh Bird's Beak. The agreement is outlined below. 1. The new restoration design will include a treatment system at the outlet of the Jamboree Road culvert to reduce the levels of selenium and other toxic constituents such as pesticides. As the selenium treatment process will be a pilot project, the amount of selenium that will be removed is not known. (Note that staff is discussing an option with the resource agencies to capture all stream and groundwater flows and piping these flows directly to the Bay.) It is not expected that the pilot project alone will be sufficient to remove selenium to safe levels. It is expected that the City will be involved in a long -term program to reduce selenium loads to the Big Canyon Restoration project area by gradually reducing over - irrigation that occurs in the upstream watershed, reviewing means to eliminate selenium from entering the water runoff and /or constructing a treatment system. 2. Given that selenium levels will likely still exceed water quality standards even with the pilot selenium removal installation, the RWQCB is not allowing creek water to be used as the source of water for a future freshwater pond as originally planned. After many discussions, the resources agencies have agreed with a proposal to create a freshwater "pool" that would be filled with potable water. (City staff is still exploring the option of using reclaimed water.) Once the pool is filled, additional water would only be needed to make up for evaporation or other minor losses. This pool would be lined to prevent selenium contaminated groundwater from exfiltrating into the pool. In order to protect the lining from being eroded during storm events, the pool will be located out of the flood zone. 3. The parties agreed that a new reconfigured design could move forward in parallel with a: • selenium source tracking and monitoring program and • long -term selenium mitigation program. The selenium source tracking and monitoring program has been initially estimated to cost $200,000. Staff will do further research on this and then prepare a report for City Council consideration. One of the long -term selenium programs would entail encouraging residents to reduce overwatering. Such a program could last ten years or more with annual costs of $50,000. Neither of these tasks is a part of this contract amendment. Big Canyon Creek Restoration —Approval of Amendment Ito Professional Services Agreement with VA Consulting, Inc_ January 13, 2009 Page 3 4. CDFG raised the issue of the impacts on the existing Salt Marsh Birds Beak due to the proposed dredging for the new tidal marsh and re- alignment of Back Bay Drive. CDFG was concerned that the current fresh water and salt water mix, which supports Salt Marsh Birds Beak habitat, would be changed due to the proposed alignment of Back Bay Drive and the relocation of culvert outlets further inland. VA's environmental consultant, WRA prepared a technical report with an in -depth analysis of the Salt Marsh Birds Beak population in the vicinity of the Restoration Project. CDFG replied to the WRA technical report and requested further documentation to demonstrate that the project will not significantly alter surface drainage patterns to the habitat located on the southerly side of the project in the vicinity of the existing Salt Marsh Birds Beak habitat. CDFG has also requested that a pre- and post - project monitoring plan be developed to measure fresh water and salinity effects associated with the project. The tasks needed to resolve these issues and develop the monitoring plan are presented in VA Consulting's proposal for additional services. It is anticipated that the completion of these tasks will negate the need for a California Endangered Species Act permit as has been requested by CDFG. The Big Canyon Creek Restoration Project also involves preparing a reimbursement agreement with OCSD for design service cost for a OCSD maintenance road. In order to complete the reimbursement agreement, an easement for this maintenance road needs to be completed as well resolving questions of existing easements within Big Canyon needs to be resolved. The fee for VA's services for this task is $5,000 which will be included in the reimbursement agreement with OCSD. To date, VA Consulting has spent about $415,000 of its contract which includes preparation of the 65% construction drawings, performing selenium monitoring tasks (new task) and assisting City staff in working with the jurisdictional agencies to review new design options to deal with the selenium issue. Under this contract amendment, VA would modify the design concept, conduct supplemental biological and geotechnical surveys, ensure protection of the Salt Marsh Bird's Beak, design a selenium removal basin, revise the construction drawings to relocate a freshwater pond out of the flood zone, and prepare a new CEQA Mitigated Negative Declaration. Funding Availability: The County of Orange will contribute $60,000 in CIAP funds to for the selenium water quality sampling and analysis. The Irvine Company will contribute $60,000 for the preparation of the final construction documents. The Irvine Ranch Conservancy will contribute $169,925 for the preparation of the final construction documents. Account Description Orange County CLAP Irvine Company Contribution Irvine Ranch Conservancy Contribution Account Number Amount 7251- C5100709 $ 60,000 7251- C5100709 60,000 7251- C5100709 16 9, 925 Total: $289,925 Big Canyon Creek Restoration — Approval of Professional Services Agreement with VA Consulting, Inc. January 53, 2009 Page 4 Funding for the construction of the project is anticipated from the Wildlife Conservation Board ($2.5 million Proposition 50 Grant Funding Request) and The Irvine Company ($2.2 million). Prepared by: Robert Ste fn Assistant City Engineer Submitted ,,.Stephen G. Badum Public Works Director Attachment: PSA with VA Consulting, Inc. Scope of Services prepared by VA Consulting Inc Big Canyon Creek Restoration Exhibit AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC. FOR BIG CANYON CREEK RESTORATION PROJECT THIS AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT, is entered into as of this day of , 200_, by and between the CITY OF NEWPORT BEACH, a Municipal Corporation ( "CITY "), and VA CONSULTING, INC. a California Corporation whose address is 17801 Cartwright Road, Irvine, California, 92614 ( "CONSULTANT "), and is made with reference to the following: RECITALS: A. On December 11, 2007, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for engineering design services for the Big Canyon Creek Restoration project, hereinafter referred to as "PROJECT ". B. CITY desires to enter into this AMENDMENT NO. 1 to reflect additional services not included in the AGREEMENT and to extend the term of the AGREEMENT to December 31, 2009. C. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. D. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. 1, as provided here below. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. In addition to the services to be provided pursuant to the AGREEMENT, CONSULTANT shall diligently perform all the services described in AMENDMENT NO. 1 including, but not limited to, all work set forth in the Scope of Services attached hereto as Exhibit A and incorporated herein.by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 2. City shall pay Consultant for the services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached to the AGREEMENT. Consultant's compensation for all work performed in accordance with this AMENDMENT NO. 1, including all reimbursable items and subconsultant fees, shall not exceed TWO HUNDRED EIGHTY -NINE THOUSAND, NINE HUNDRED TWENTY -FIVE Dollars and no /100 ($289,925.00) without prior written authorization from City. 3. The term of the AGREEMENT shall be extended to December 31, 2009. 4. Except as expressly modified herein, all other provisions, terms, and covenants set forth in the AGREEMENT shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. 1 on the date first above written. APPROVED AS TO FORM: City Attorney for the City of Newport Beach ATTEST: M Leilani Brown, City Clerk Attachments: Exhibit A — Scope of Services CITY OF NEWPORT BEACH, A Municipal Corporation Mayor for the City of Newport Beach CONSULTANT: M (Corporate Officer) Title: Print Name: By: (Financial Officer) Print Name: F: luserslcatlsharedl ContractTemplatesPublishedonlntranet lF OR MPSAAmendment. doc EXHIBIT A ONSU TINE Decernbje 19, 2008 Mr. Mark Reader, P.E. Project Manager Public Works Depariment City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 -3884' Dear Mr. Reader, This letter is a change order request for additional engineering design services related to the Big Canyon Creek Restoration Project (Project) (Professional Services Agreement dated December 11, 2007). The change order supersedes our previous letter dated December 17, 2008. These additional services include engineering design and plan revisions required for converting the upper sediment basin into a larger freshwater pond as well as the incorporation. of a new sediment basin at the Jamboree Road culvert outlet. Also included in this proposal is the preparation of a preliminary engineer's opinion of probable construction costs, the design of an ovennrater pier, services required for selenium monitoring and testing within the Project watershed, and development of the Salt Marsh Bird's Beak Monitoring Plan. During the course of the Project to date, VA Consulting, Inc. (VA) has also provided on -call services that were not included in our original scope of work for the final design of the Project. A detailed scope of services is provided in Section I and fees in Section II of this letter. Also a breakdown of VA's hours and tasks is included as Attachment A, We will provide our services on a time -and- materials, not -to- exceed basis in accordance with the attached fee schedule (Exhibit A). SCOPE OF SERVICES Requested Tasks Revised Freshwater Pond and Sediment Basin VA will prepare grading plans to change the location of the sediment basin and freshwater pond. The size of the revised freshwater pond (or ponds) will be large enough to satisfy requirements of the regulatory agencies. VA also understands that the revised freshwater ponds will be maintained with potable water and will incorporate a liner system. VA . nnsuliln „, ruc. Or.:nyc. Cnnwy L`ixivi,m 1% 01 f'urPxi >h: Rnatl CA 92614 Phonr'k!`LI I =i.I L'Ai XiPro; ez15�3' i3, 0< OOl/¢ �min�0001_ Ltig( :an��mfrPCk_127)OBREl9$Efi3e.Jx Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 19, 2008 Page 2 of 7 VA will also investigate the use of reclaimed water rather than potable water to maintain the freshwater ponds. Therefore, this task includes the design of the necessary water supply line and the design of the pond liner system. VA will design a new sediment basin at the Jamboree culvert outlet and will perform the hydraulic calculations required to design the sediment basin spillway and energy dissipater features. The design will incorporate a subterranean wetland as requested by the Regional Water Quality Control Board (RWQCB). VA will also investigate capturing creek low -flows and groundwater at the Jamboree Road outlet to Big Canyon as a means of selenium management. Captured flow would be piped to the bay such that selenium concentrations would be diluted with bay waters. These revisions will require changes to 13 existing plan sheets and the addition of four new sheets to the Project Plans. This task also includes the preparation of two conceptual designs as requested by the City on June. 3 and November 14, 2008. A third conceptual design will be developed upon clarification of Project habitat, goals, which will be defined by the regulatory agencies at the forthcoming meeting. The total VA fee for this task is $43,000. WRA will participate in the placement and configuration of the upper freshwater pond and the new sediment basin. WRA will prepare documents summarizing impacts to existing habitat in Big Canyon as a result of the proposed expansion of the freshwater marsh to be distributed to resource agency personnel after review by the City of Newport Beach. WRA will also review the existing environmental documentation and permits, and perform any revisions that are necessary to reflect the new freshwater pond and sediment basin configurations. WRA will prepare landscape architectural drawings and specifications for the wetland portions of the revised plans and will participate in telephone conferences to coordinate these changes up to the limits of their budgetary allocation. A breakdown of WRA hours and tasks is included as Attachment B of this. letter. The total WRA fee for this task is $31,717. LSA will revise restoration planting areas to address the changes to habitats due to the new configuration of the upper freshwater pond and sediment basin. LSA will revise the Invasive Species Removal Zones and Phasing to reflect the changes in grading impacts and will revise the Restoration Plan Specifications to reflect the changes in habitat types and plant and seed mixes as required. LSA will revise the Invasive Species Removal Specifications to reflect the changes to the invasive species Zones and phasing, and will participate in coordination meetings required for these changes up to the limits of their budgetary allocation. The total LSA fee for this task is $2,215. Geosoils will provide an additional subsurface investigation at the site of the new sediment basin and provide addendum documentation addressing the revised larger freshwater pond and new sediment basin. GSI has indicated that the Feasibility Study plan for the access road and culvert extension required only minor grade changes in the area, without significant alterations to existing grades. Thus, shallow hand -auger explorations were performed in this area consistent with the nature of the proposed improvements. The presently proposed sediment basin in this area, however, will require excavations and fills that alter existing grades by approximately 10 to 15 feet. Therefore, the deeper %iPrq¢a3t377 04WAdr irMO91_N9C&NMC,eek_ 121708REVISEWcdx . .' Mr. Mark Reader, F.E. Big Canyon Creek Restoration December 19, 2003 Page 3 of 7 exploration methods as proposed in this request are needed to determine the slope stability of in -situ materials, potential settlement of fills, possible remediation of fill foundations, and quantity of spoilage rnaterial that may require off -site disposal. The total Geosoils fee for J-lis task is $7,504. Please be advised that the final Project configuration has not been defined through input from the regulatory agencies. This forthcoming input may alter the Project configuration to an extent that the fee for this task may need to be increased. If a fee increase is warranted, VA will notify the City of the causal Project configuration changes and will also provide the incremental increase in cost for this task. 2. Preliminary Operation and Maintenance Plan Based on past permit processing activities, VA understands that the regulatory agencies have requested the inclusion of an operation and maintenance plan with their respective permit applications. VA will determine the periodic operation and maintenance activities for all Project components. The results of this determination will be summarized in a preliminary Operations and Maintenance Plan for use in obtaining the required regulatory permits for the Project. The total VA fee for this task is $6,000. . 3. Preliminary Opinion of Probable Construction Costs VA will prepare a preliminary quantity estimate for the items of work depicted on the Project Improvement Plans including the relocated freshwater pond and new sediment basin. The quantity estimates will be itemized along with corresponding units of measurement. VA will then create an opinion of probable construction costs from the quantity estimate by applying VA's in -house unit cost data or as published in the current cost date manuals. The total VA fee for this task is $6.500. The Acorn group will provide preliminary quantities and costs for the interpretive and regulatory signage panels. The total Acorn Group fee for this task is $100. WRA will provide preliminary quantities and costs for the tidal and freshwater wetland plantings. The total WRA fee for this task is $1,000. LSA will provide quantities and costs for the riparian and upland plantings, as well as for the proposed invasive species removals. The total LSA fee for this task is $1,000. Please be advised that the final Project configuration has not been defined through input from the regulatory agencies. This forthcoming input may alter the Project configuration to an extent that the fee for this task may need to be increased. If a fee increase is warranted, VA will notify the City of the causal Project configuration changes and will also provide the incremental increase in fee for this task. XTrolecu Q73 1LC069UminACOCY 6igl: 9nyniC2el:_;21"/CURCVLS[USe.tlOc Mr. Mark Reader, P.E. Big Canyon Creek Restoration December 19, 200E Page § of 7 4. Selenium Monitoring CH2MHili has conducted water column, sedirrient, and biological sampling for analysis for the presence of selenium. Biological sampling included the collection of algae, macro - invertebrates, bird eggs, fish, and other specimen. CH2MH1ll produced a report of their findings which has been submitted to the City for review. At the direction of the City, the fees for these services have been invoiced against tasks and budgets established in VA's initial Project authorization. The total CH2MHill fee tot this task is $73,111. 5. Salt Marsh Bird's Beak Technical Report and Monitoring Plan WRA has prepared and submitted to the California Department of Fish and Game (CDFG) a technical report with an in -depth analysis of the Salt Marsh. Bird's Beak population in the vicinity of the restoration project. The report identifies the magnitude and extent of potential impacts that could result from the implementation of the Project. The total WRA fee for this task is $1,944. At the request of CDFG a monitoring plan will be developed to incorporate avoidance and monitoring measures for the Salt Marsh Bird's Beak Plant. WRA will develop a soil salinity monitoring program, a hydrology monitoring program, a Bird's Beak seed collection plan, and performance criteria to determine the success of impact avoidance to the Bird's Beak population during the monitoring period. Due to. the fact that the monitoring plan is not yet developed, the implementation cost is not yet known. Therefore implementation of the monitoring plan is not included in this cost. The total WRA fee for this task is $5,834. It is understood that changes to the plans will be required by CDFG upon conclusion of their review of the WRA report. It is also understood that CDFG has requested the preparation of a surface water hydrology study to demonstrate that the project will not significantly alter surface drainage patterns to the habitat located on the southerly side of the project, downstream of the existing Back Bay Drive. Therefore this task provides for changes to four plan sheets that presently depict Project areas in the vicinity of the existing Salt Marsh Bird's Beak population and the additional hydrology study. The total VA fee for this task is $15,000. 6. Revisions to Feasibility Study Design The original scope of services for the Project was to provide Final Engineering based on the Project as depicted in the Feasibility Study. VA proceeded to design the project based on the Feasibility Study as specified. This resulted in a base grading plan and supporting hydraulic analyses that were presented to the City on February 15, 2008. While proceeding with design activities, revisions were required that significantly altered the configuration of the saltwater and freshwater components of the facility and overall hydraulic performance of the facility as originally defined in the Feasibility Study. These revisions were made Xn}••q >�K= g49_000Sd�C�rviiV }CA1 BipGn!rynaC,eek._inlCR3EV1EEU3 ?. }vc Nu. Mark Reader, P.E. Big Canyon Creek Restoration Decem her 19, 2008 Page 5 of 7 to address comments issued by CDFG, the Regional Water Quality Control Board, and the City of Newport Beach. The total VA fee for this task is $19,000. Easement Mapping and Legal Description VA Consulting will provide mapping of all the existing easements within Big Canyon as described in the Preliminary Title Report Order Nurnbers 153425 and 153425a by Stewart Title dated October 22, 2008 and October 23, 2008 respectively, provided by the City. VA Consulting will also prepare (1) legal description and plat for the sewer line and sewer maintenance road along the easterly property line at Jamboree Road within APN 440 -092 -079. The total VA fee for this task is $5,000. 8. Mitigated Negative Declaration As a result of continuing final design activities, further definition of environmental conditions, and impacts associated with the Project have been defined. As such changes in the Project configuration and functions are forthcoming. In response to these changes, the Existing Project CEQA document, i.e. the Mitigated Negative Declamation, will require changes of such an extent that a new CEQA document is anticipated. This task includes the preparation of a Mitigated Negative Declaration for the revised Project. As of the date of this change order request, the fee for these services has not been estimated by VA or its sub - consultants. Therefore, the indicated fee for this task is provided for budgetary purposes and is subject to adjustment by the City to provide for the actual fee estimate once this fee is defined. The budget amount for this task is $35,000. 9. Project Management, Meetings, and Coordination Project management, meetings, and coordination activities to -date have depleted our original budget authorization for these activities. This task provides for an additional 120 man -hours of project management activities related to the oversight and management of the various Project subconsuitants and coordinating the transfer of information between subconsultants, VA and the City. This task also provides for an additional 120 man-hours for the purpose of preparing for and attending meetings as requested. by the City. The total VA fee- for this task is $36,000. II. FEES Requested Tasks 1. Revised Freshwater Pond & Sediment Basin ....... .......... ....................... ...$ 84,436 2. Preliminary Operation and Maintenance Plan .............. ..............................$ 6,000 3. Preliminary Opinion of Probable Cost.-.. .............. ..... .........__........_..........$ 8,600 Y {Troie0230900 n1InC001 ?igC"OnC; -_it 1 ?170611EYISEe3edtl Mr. Big Canyon week Restoration n*"em»*r`y,x"0v Page 6^rr 4. Selenium M0nitnhng. ................................. .................................. ....... O 73.111 5. Salt Marsh Bird's Beak Technical Report and Monitoring Pka1.... 22,778 6. Revisions 1O Feasibility Skdy Design .....—.,^---..'....,..—$ 18.808 7 Easement Mapping and Legal DoSChodon~ ........................... ................... $ 5,000 8, Mitigated Negative Declaration .... . .......... ....... .................. .. ........ ...... $ 35,000 8. Project Management, Meetings, and Coordination ... ....... ...... ....... TOTALFEES�.....~—... .................................................. .................. ..... $2&y^y%5 If you have any AU9StinnS Or require additional iAf0nDaU08. please {e8| f/88 to contact Dan Vi||i8esnrAAe8t(94A)474`14U00r John Wolter 8t(851) 340'O030. MSincer Vahid, P. —��v President and CEO MPV0am Enclosure no: DaVVl||inos John Wolter Contracts VA CONSULTING, INC. FEE SCHEDULE 2008 Staff classification Civil Enr4ir eering atzd i Eanreirr 5 t'vic s President .................................. ..................... _.....:........... _....._.... _...................... Division Presideniilivision Manager ... ......... .: ...................... . :................ .............. Sr. Vice President Vice President/ Exec. Director..... ............ _ .................. _ .......... Director ....... ........... ... .............. ............................................... ...... :........................ SeniorProject Manager., ....... ..................... ........................... ......................... ProjectManager ............ ....... .................. .... ....... ......... ........... .............. ....... .... ..._.. Assistant Project Manager ....... ............. ............ . :................ ..:......................... Senior Project Engineer /Senior Design Supervisor /Senior Planner...... ........... Project Engineer /Design Supervisor ....................................... ............................... Senior Design Engineer /Senior Designer ........... ................................................... Design Engineer /Planner ...I ....................... ........................ ............................... Designer.....................................................................:.....:.... ..1..,......................... Assistant Engineer /Assistant Planner ..................................... ............................... Research and Processing Coordinatorr ................................... ............................... SeniorCADD Technician ............................ ....................... .........................._.... JuniorEngineer .........................................................:............ ....,........I................. CADD Technician ......... ... ........... .................................:......,... ......................... :..... EngineeringIntern..._ ....................................._...................... ............................... Office Support/Cierical .................. ........................._.....,.... ............................... Field Survey and Mappina Services Director of Survey and Mapping.......... Manager of Field Survey._, .................. Survey and Mapping Associate ............ Survey and Mapping Technician .......... 3 -Man GPS Crew ... ............................... 2 -Man GPS Crew ... ............................... 1-Man GPS Crew ......................... Special Services Litigation ........................ Notes: 1 'CL Fratq ...:.: ---- $ 190 .......... $173 ........ $163 ..........5160 ......... $155 ..... $147 .... $142 .......... $ 137 ....... _$132 ...... $122 .......... $117 $110 $100 .. .......$95 ............$85 ............$80 ............ $70 ............ $69 ................................................................ ............................... $450 1. Invoices will be. prepared for all services through the end of each calendar month. Invoices are due and payable on presentation. 2. Ovedime: w1hen requested by the client, will be surcharged at a rate of 135a'o of the standard hourly rtes. Sundays and holidays will be surcharged at a rate of 1?0,% of the standard hourly rates. ;3. Relxograptlics, messenger service, travel (including lodging and (peels), and other direct expenses will be charged at cast plus 1096. The services of outside consultants will be charged at cost plus 155 to cover administration and overhead- In-house reprographics charges: B &W Bond copies $i.001sg.fl, Color Band $6.00 /sq.ft. 6. Mileage v,1111 be billed at standard mileage isles set by IRS. 2008 rates currently listed al $0.535 per rric=. G-DU E ATTACHMENTA City of Newport Beach Big Canyon Cmok Restomtlon Pruett ESTIMATED FEES & EXPENSES (1 at 2) Me T,Wr wivlli ...... .. ...... --- -------- ---- -- . ...... apF1 Ginan A.24 N,I,l — ---- ---- - ----- -------- 0e n FGG- RWn, RO�h anaal� P� ... .... ------ ------ - 11 S StLt Fail u 2 .h.n FG2- 4 4 Pan Po U 4 Is 2.01 IVRT" ".071'elacTUM2 .... ......... Sam 17 .1 F9 . 1 2 --- Mae Ifan _L. jh.t RP3!RMllaayq. -M MA Sh.t RP� R� 1. Rn.�.In �llra 1.� 2 --- ----- ------ ------ ....... . Stan 2 ZM�!�n 202�' 21 .1.1 . ........ . 2 v �lar.., _I, U� Pan a 12 5 vmro I Vm CdJL __ 3A 12 o I ss —34 tLmUwQWwj . ...... ... ---------- ----- ------ --- ------ - — --------- Pura "A 11 pa --- -- - ------ -- -- ---- - - ----- ixwl Soma. �Fm—lalGmr—I—Oftf�IMPVW�n$ 64]m fa]m 4 U�l. Pb_._._ . .... ....... .... . .... .. ...... ... ... - ---- ---- --------- . . .... - .. .... ....... .. . ... ... .............. --- y...I.n Won. ftnaaob� a. ... ........ . ....... ...... . .... .. .. .......... ..... . ... ... ..... ..... .. - --- - ------ .-A u'a-'. MX� �aMl Imam— Paz .... ................. ..... . . . . ..... ....... ........... ... ..... . ..... ............ .. ... .... "a al Wa 3 l A.W. -in B . ...... .... I — DID'. I —,a 2 , 4 . C P' Co .cd.ac.al MA....... Non, 37 ums z Can o.nNg h %MO. {1 @0 80 1 BI ,Td ... ......... --- 'Gnago.n. 1-7 ---- .......... . ATTACH(AEI,rr A City of N.w,.rt st,..h Big Canyon Crook HgStOrstloei Pml.ct EMIATM FEES & EXPENSES (2 of 2) O CH2MHt[l .. . .... ......... ... .. ........ ...... . ....... .. ....... .... .... ........ I ...... . . . ....... ... ........ .. 3" :4 1 ........ . ... .. .. ... I.,— I,00 ....... ... .. .. . . ...... ... ]TftlMN' -r------------ I 25 ------ -- Eq----- o. o—Ore lo, NOZEM It I V, M;jO W� 20 M : W -TtiW MR W-- MI'2 .i,n :Ta— . ........ ..... ------ - - - — 2 0 . . . .......... . .1. 1. 1 RSq P-- U.. .. ... ......... =1 I Or -.—AR . ..... _ID ofau aEvsemml M!,Tin,end L. .1 D..r Von . ... ........ . . ........ . ... ... .... .... ....... MM Mi ME W, MEN .✓;=.. u. .o W2 fi MR ME Ram E.¢/r� i ..... .... WRA .... .. fo. SC H1xB --------- --- . .... .... 771—M 6 wi.ofl0 • MO J&,,,ar ME e: "0,0 W.IkR.� I .... ........ .. ------- . . ... ....... ....... . lo ri w MIM ME m 2m =ii 9�9 M�E UMU�05i I' 'v 'a ME ME m Nam %Agmmumpm $Ila =ZO mUR-53FE03 a0,.: n! TMA ,0011 -.1 a im.1 e sl ws TOTALPESS.. sip so sa'sgs .$060 ' M ..... --- R' Tma i-3— , ATTACHMENT B W RA Big Canyon Creek Restoration Project ESTIMATED FEES & EXPENSES FOR DESIGN AND PERMITTING Tasks, a>' ,,,tya^yt i"' y . DescripttB�c' 'S' .waro rrvs M wi , ir�,e'n �G$w :, r5:�a t AA5 -5¢K ras W1rSm. A F r+,a: W fs - �57`iA'"+sG7 a w.N r i hts �E .. Kw en.s°'"�8s�x�'24d.tf''ar`x 1, 2015 1 Assistance with Revised Freshwater Pond Configuration 3 60 83 63 $6,940 2 Impacts Summary 12 . 25 0 37 $3,401 3 Update Enironmental Documents and Permit Applications so a 110 68 $6,592 4 Update Wetfand Planting Plans 2 56 122 19 132 331 $20,678 5 Meetin s and Coordination 5 5 10 55 20 $2,865 6 Cost Estimate 10 $1,000 7 Salt Marsh Bird's Beak Techincal Memo 6 5 $0 $1,944 6 Salt marsh Bird's Beak Monitoring Plan 45 8 $39 53 $5,122 TOTAL HOURS L 14 `..67 56 . 137 :" 127.. TOTAL FEES $3;,* 99,,179 $6,,496. $13,704 $:12,4,46Q: -:. $5 357y . ,..; . $41:9 $50,961, yy t :Tic 4 °Sa:"'4;,. .ynS96Y.'.d..''S+�L ".vim"w:�lFf✓iXa5 '` i'�+ .rvS��iP�V =`K5!y���+Y&T150 �K 62 $�r��� LS9ya Note: Total includes tasks 1, 3, and 5 X:WrCIW$1S79 UOMn;\T"heocs \RepoO5 Oos1 E9 ma1e temp e1ot229h8 .x15 i&alaws ATTACHMENT C LSA Associates, Inc. Big Canyon Creek Restoration Project ESTIMATED FEES & EXPENSES FOR VEGETATION MAPPING Auf 9 as a a a0pl ", , . ,. -a- esaw M IRAN P " .6. M60 - 1 Vegetation Mapping 10 10 22 42 $4,500 2 Reimbursables $100 TOTAL HOURS 10 ., 10 ` -., 22' TOTAL FEES :, $1,50b $1,130. $11870 -$100 Note: Total includes a portion of task 1 % 1Pm1actsQ73 _0400,Eng%Tach0om1Repons%0ast Eadm9&template122MS.r 12/31/2008 ATTACHMENT D LSA Associates, Inc. Big Canyon Creek Restoration Project ESTIMATED FEES & EXPENSES FOR UPDATING PLANS AND SPECIFICATIONS "s s T4t'KMWiy..3- b5,�'"W" d'fl'SL'T� -.:. � 's::. Des r pfi {5 '• J M3i. R].� - s3�5[g[^ L.. 1 Restoration Planting Areas a a $960 2 Invasive Species Removal Zones and Phasing 8 a $960 3 Restoration Plan Specifications 4 4 a $1.080 4 Invasive Species Removal Specifications a s $960 5 Meetings and Coordination 4 2 6 $840 6 Reimbursabtes $100 7 Cost Estimate 8 6 $1.000 - TOTAL HOURS 8. 38 TOTAL FEES $1,1*200; $4400 l��BaS($lil �r'`..$x1'SOax"$720,� Notr: Total Includes a portlon from task 1 and all of task 3 %; LPmlecnt3 ]3_04POtEmpTecnOOnVteppRatCasl EStlmero- Iemplp1a12290B.xh - ,y�lx2� fi I !i A-t'rAc "M6A) f � ITEM RATE : - HR or UNIT;:. COST I EXTENSION FIELD EXPLORATION Field Geologist/Engineer $100.00 6.0 $600.00 Bucket -Auger Drill Rig $225.00 6.0 $1,350.00 Mileage $35.00 $1,985.00 LABORATORY TESTING .Maximum Dry Density $150.00 1 $150.00 Moisture/ Dry Density $20.00 6 $120.00 Sieve Analysis $150.00 2 $300.00 Expansion Index $135.00 2 $270.00 Atterberg Limits $112.50 2 $225.00 R -Value Test $232.50 1 $232.50 Direct Shear $150.00 1 $150.00 General Corrosivity Test (Resistivity, pH, Soluble Salt) $150.00 1 $150.00 $1,597.50 ANALYSIS AND REPORT PREPARATION /MISC. Principal GeologisVEngineer $160.00 4.0 $640.00 Staff GeologisVEngineer $100.00 14.0 $1,400.00 Technical Illustrator $69.00 4.0 $276.00 Technical Typist $65.00 3.0 $195.00 Reproduction /Office Services /Misc. Fxp. $300.00 $2,811.00 PREVIOUS MEETINGS ATTENDED BY PROJECT MANAGERS Project Engineer /Geologist $130.00 7 $910.00 Staff Engineer /Geologist $100.00 2 $200.00 $ 1,710.00 TOTAL ;� 1$7,503 50J VA Consulting, Inc. Big Canyon Creek Restoration - Newport Beach Fi1ed: \wp10 \00\5500 \5595ai .cor Lea -of;F , fna� W.O. 5595 -A1 -OC May 27, 2008 Page 2 A -FT A(_1 A GN T -F- JOB NO: 13075 -2 PROJECT: Big Canyon Restoration Plan I= Task Description 1. Revision of Initial Study 2. Public and Agency Comment Responses 3. Final CEQA Documentation 4. Project Coordination and Meetings Total Hours Total Expense Total Labor Estimated Total Cost 1. Revision of Initial Study 2. Public and Agency Comment Responses 3. Final CEQA Documentation 4. Project Coordination and Meetings WRA RATE SCHEDULE Effective January 2009 M. Josselyn Senior Technician GIS Technician Time Assignment in Hours $240 per hour $98 $89 Sen GIs Expenses Labor Total AJ Tech Tech GIS Technician $89 $712 3 30 4 $110 $4,016 $4,126, 3 25 $Z2 $3,170 $3,1921 1 15 4 $110 $2,066 $2,176 20 $110 $1,960 $2,070, 7 90 8 $352 $11,212 $11,564 Copy . Post/ Total Plus 10% Costs Tele 100 $100 $110 20 $20 22 100 $100 110 100 $100 110 Staff Rate Amount M. Josselyn $240 $1,680 Senior Technician $98 $8,820 GIS Technician $89 $712 Expenses $352 Estimated Total Cost $11,564 ATTACHMENT G The Acorn Group Big Canyon Creek Restoration Project ESTIMATED FEES & EXPENSES FOR COST ESTIMATE 4 a Tasks 7 . i� S/ q :ix. �, •� G•c .3."?,ti" \ 5's ' r� d �'�rA�E3"y�t,8y°4"'- "bias.. a ��� a �,� . ` � =�' 'r Desc "ripti n ' � �' °x Cost Estimate .r.• "'' �»Tr �•�P x t s, s.;+ttinme.ara .Ex enses L,�'d tig � A „�, Tatat?� �:�; t $ion TOTAL HOURS TOTAL FEES . $t00 ..:; ..$0 ... $100. ... moldi' 'f1�5' '�e E�< K-1 4" 'h i' X. Wro�acls ',313_06pgErq \TechDOeslPapo's \Cost ES(�rt:elenempiala122908 xN 121312008 City of Newport Beach BUDGET AMENDMENT 2008 -09 EFFECT ON BUDGETARY FUND BALANCE: Increase Revenue Estimates X Increase Expenditure Appropriations AND Transfer Budget Appropriations SOURCE: from existing budget appropriations from additional estimated revenues PX from unappropriated fund balance EXPLANATION: NO. BA- 09BA -035 AMOUNT: $289,926.00 Increase in Budgetary Fund Balance X Decrease in Budgetary Fund Balance No effect on Budgetary Fund Balance This budget amendment is requested to provide for the following: To increase revenue estimates expenditure appropriations to recognize contributions from the County of Orange Coastal Impact Assistance Program the Irvine Company, and the Irvine Ranch Conservancy and appropriate the funds to enter into a PSA with VA Consulting for the Big Canyon Creek Restoration Project. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE Fund Account REVENUE ESTIMATES (3601) Fund /Division Account 250 4941 250 4926 250 4927 EXPENDITURE APPROPRIATIONS (3603) Division Number 7251 Account Number C5100709 Division Number Account Number Division Number Account Number Division Number Account Number Signed: Signed: Description Description Contrib - OC Coastal Impact Assist Prgm Contrib - the Irvine Company Contrib - Irvine Ranch Conservancy Description Contributions Big Canyon Creek Restoration Fin ncial Approval: Administr a Services Director Administrative Appr al: City Manager Amount Debit Credit $60,000 $60,000 $169,925.00 Automatic $289,925.00 Date at � Signed: City Council Approval: City Clerk Date ci3C) PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING INC, FOR BIG CANYON CREEK RESTORATION PROJECT THIS AGREEMENT is made and entered into as of this Y— day of 2knbe'K 200 -1 , by and between the CITY OF NEWPORT BEACH, a Municipal Corporation ( "City "), and VA CONSULTING INC a California Corporation whose address is17801 Cartwright Road, Irvine, California, 92614 ( "Consultant "), and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City is planning to restore the historic tidal wetlands that have been traditionally situated in the mouth of Big Canyon. Water quality features will be incorporated which include a series of fresh water ponds. Also new interpretive and educational facilities will be constructed within the Big Canyon Nature Park. C. City desires to engage Consultant to act as the lead consultant and provide final engineering services as outlined in VA Consulting Scope of Services referenced as Exhibit "A" for the Big Canyon Creek Restoration Project ( "Project"). D. Consultant possesses the skill, experience, ability, background, certification and knowledge to provide the services described in this Agreement. E. The principal member of Consultant for purposes of Project shall be John S. Walter, Inland Empire Division President and Daniel D. Villenes, Director of Water Resources. F. City has solicited and received a proposal from Consultant, has reviewed the previous experience and evaluated the expertise of Consultant, and desires to retain Consultant to render professional services under the terms and conditions set forth in this Agreement. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of this Agreement shall commence on the above written date, and shall terminate on the 31 day of June, 2009, unless terminated earlier as set forth herein. � s 2. SERVICES TO BE PERFORMED Consultant shall diligently perform all the services described in the Scope of Services attached hereto as Exhibit A and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 3. TIME OF PERFORMANCE Time is of the essence in the performance of services under this Agreement and the services shall be performed to completion in a diligent and timely manner. The failure by Consultant to perform the services in a diligent and timely manner may result in termination of this Agreement by City. Notwithstanding the foregoing, Consultant shall not be responsible for delays due to causes beyond Consultant's reasonable control. However, in the case of any such delay in the services to be provided for the Project, each party hereby agrees to provide notice to the other party so that all delays can be addressed. 3.1 Consultant shall submit all requests for extensions of time for performance in writing to the Project Administrator not later than ten (10) calendar days after the start of the condition that purportedly causes a delay. The Project Administrator shall review all such requests and may grant reasonable time extensions for unforeseeable delays that are beyond Consultant's control. 3.2 For all time periods not specifically set forth herein, Consultant shall respond in the most expedient and appropriate manner under the circumstances, by either telephone, fax, hand - delivery or mail. 4. COMPENSATION TO CONSULTANT City shall pay Consultant for the services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by reference. Consultant's compensation for all work performed in accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed Four Hundred Thirty Five Thousand One Hundred Fifty Nine Dollars and no /100 ($435,159.00) without prior written authorization from City. No billing rate changes shall be made during the term of this Agreement without the prior written approval of City. 4.1 Consultant shall submit monthly invoices to City describing the work performed the preceding month. Consultant's bills shall include the name of the person who performed the work, a brief description of the services performed and/or the specific task in the Scope of Services to which it relates, the date the services were performed, the number of hours spent on all work billed on an hourly basis, and a description of any ■ reimbursable expenditures. City shall pay Consultant no later than thirty (30) days after approval of the monthly invoice by City staff. 4.2 City shall reimburse Consultant only for those costs or expenses specifically approved in this Agreement, or specifically approved in writing in advance by City. Unless otherwise approved, such costs shall be limited and include nothing more than the following costs incurred by Consultant: A. The actual costs of subconsultants for performance of any of the services that Consultant agrees to render pursuant to this Agreement, which have been approved in advance by City and awarded in accordance with this Agreement. B. Approved reproduction charges. C. Actual costs and /or other costs and/or payments specifically authorized in advance in writing and incurred by Consultant in the performance of this Agreement. 4.3 Consultant shall not receive any compensation for Extra Work performed without the prior written authorization of City. As used herein, "Extra Work" means any work that is determined by City to be necessary for the proper completion of the Project, but which is not included within the Scope of Services and which the parties did not reasonably anticipate would be necessary at the execution of this Agreement. Compensation for any authorized Extra Work shall be paid in accordance with the Schedule of Billing Rates as set forth in Exhibit B. 4.4 Notwithstanding any other provision of this Agreement, when payments made by City equal 90% of the maximum fee provided for in this Agreement, no further payments shall be made until City has accepted the final work under this Agreement. 5. PROJECT MANAGER Consultant shall designate a Project Manager, who shall coordinate all phases of the Project. This Project Manager shall be available to City at all reasonable times during the Agreement term. Consultant has designated Daniel D. Villenes, Director of Water Resources to be its Project Manager. Consultant shall not remove or reassign the Project Manager or any personnel listed in Exhibit A or assign any new or replacement personnel to the. Project without the prior written consent of City. City's approval shall not be unreasonably withheld with respect to the removal or assignment of non -key personnel. Consultant, at the sole discretion of City, shall remove from the Project any of its personnel assigned to the performance of services upon written request of City. Consultant warrants that it will continuously furnish the necessary personnel to complete the Project on a timely basis as contemplated by this Agreement. 3 6. ADMINISTRATION This Agreement will be administered by the Public Works Department. Mark Reader, PE shall be the Project Administrator and shall have the authority to act for City under this Agreement. The Project Administrator or his/her authorized representative shall represent City in all matters pertaining to the services to be rendered pursuant to this Agreement. 7. CITY'S RESPONSIBILITIES In order to assist Consultant in the execution of its responsibilities under this Agreement, City agrees to, where applicable: A. Provide access to, and upon request of Consultant, one copy of all existing relevant information on file at City. City will provide all such materials in a timely manner so as not to cause delays in Consultant's work schedule. B. Provide blueprinting and other services through City's reproduction company for bid documents. Consultant will be required to coordinate the required bid documents with City's reproduction company. All other reproduction will be the responsibility of Consultant and as defined above. C. Provide usable life of facilities criteria and information with regards to new facilities or facilities to be rehabilitated. 8. STANDARD OF CARE 8.1 All of the services shall be performed by Consultant or under Consultant's supervision. Consultant represents that it possesses the professional and technical personnel required to perform the services required by this Agreement, and that it will perform all services in a manner commensurate with community professional standards. All services shall be performed by qualified and experienced personnel who are not employed by City, nor have any contractual relationship with City. By delivery of completed work, Consultant certifies that the work conforms to the requirements of this Agreement and all applicable federal, state and local laws and the professional standard of care. 8.2 Consultant represents and warrants to City that it has, shall obtain, and shall keep in full force in effect during the term hereof, at its sole cost and expense, all licenses, permits, qualifications, insurance and approvals of whatsoever nature that is legally required of Consultant to practice its profession. Consultant shall maintain a City of Newport Beach business license during the term of this Agreement. 8.3 Consultant shall not be responsible for delay, nor shall Consultant be responsible for damages or be in default or deemed to be in default by reason of strikes, lockouts, accidents, or acts of God, or the failure of City ■ to furnish timely information or to approve or disapprove Consultant's work promptly, or delay or faulty performance by City, contractors, or governmental agencies. 9. HOLD HARMLESS To the fullest extent permitted by law, Consultant shall indemnify, defend and hold harmless City, its City Council, boards and commissions, officers, agents, volunteers and employees (collectively, the "Indemnified Parties) from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever (individually, a Claim; collectively, "Claims "), which may arise from or in any manner relate (directly or indirectly) to the negligence, recklessness, or willful misconduct of the Consultant or its principals, officers, agents, employees, vendors, suppliers, consultants, subcontractors, anyone employed directly or indirectly by any of them or for whose acts they may be liable or any or all of them. Notwithstanding the foregoing, nothing herein shall be construed to require Consultant to indemnify the Indemnified Parties from any Claim arising from the sole negligence, active negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall be construed as authorizing any award of attorney's fees in any action on or to enforce the terms of this Agreement. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by the Consultant. 10. INDEPENDENT CONTRACTOR It is understood that City retains Consultant on an independent contractor basis and Consultant is not an agent or employee of City. The manner and means of conducting the work are under the control of Consultant, except to the extent they are limited by statute, rule or regulation and the expressed terms of this Agreement. Nothing in this Agreement shall be deemed to constitute approval for Consultant or any of Consultant's employees or agents, to be the agents or employees of City. Consultant shall have the responsibility for and control over the means of performing the work, provided that Consultant is in compliance with the terms of this Agreement. Anything in this Agreement that may appear to give City the right to direct Consultant as to the details of the performance or to exercise a measure of control over Consultant shall mean only that Consultant shall follow the desires of City with respect to the results of the services. 11. COOPERATION Consultant agrees to work closely and cooperate fully with City's designated Project Administrator and any other agencies that may have jurisdiction or 5 interest in the work to be performed. City agrees to cooperate with the Consultant on the Project. 12. CITY POLICY Consultant shall discuss and review all matters relating to policy and Project direction with City's Project Administrator in advance of all critical decision points in order to ensure the Project proceeds in a manner consistent with City goals and policies. 13. PROGRESS Consultant is responsible for keeping the Project Administrator and/or his/her duly authorized designee informed on a regular basis regarding the status and progress of the Project, activities performed and planned, and any meetings that have been scheduled or are desired. 14. INSURANCE Without limiting Consultant's indemnification of City, and prior to commencement of work, Consultant shall obtain, provide and maintain at its own expense during the term of this Agreement, a policy or policies of liability insurance of the type and amounts described below and in a form satisfactory to City. A. Certificates of Insurance. Consultant shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Insurance certificates must be approved by City's Risk Manager prior to commencement of performance or issuance of any permit. Current certification of insurance shall be kept on file with City at all times during the term of this Agreement. B. Signature. A person authorized by the insurer to bind coverage on its behalf shall sign certification of all required policies. C. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. D. Coverage Requirements. Workers' Compensation Coverage. Consultant shall maintain Workers' Compensation Insurance and Employer's Liability Insurance for his or her employees in accordance with the laws of the State of California. In addition, Consultant shall. require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California for all of the subcontractor's • employees. Any notice of cancellation or non - renewal of all Workers' Compensation policies must be received by City at least thirty (30) calendar days (10 calendar days written notice of non- payment of premium) prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Consultant for City. ii. General Liability Coverage. Consultant shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury, and property damage, including without limitation, contractual liability. If commercial general liability insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement, or the general aggregate limit shall be at least twice the required occurrence limit. iii. Automobile Liability Coverage. Consultant shall maintain automobile insurance covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with work to be performed under this Agreement, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than one million dollars ($1,000,000) combined single limit for each occurrence. iv. Professional Errors and Omissions Insurance. Consultant shall maintain professional errors and omissions insurance, which covers the services to be performed in connection with this Agreement in the minimum amount of one million dollars ($1,000,000). E. Endorsements. Each general liability and automobile liability insurance policy shall be endorsed with the following specific language: i. The City, its elected or appointed officers, officials, employees, agents and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the Consultant. ii. This policy shall be considered primary insurance as respects to City, its elected or appointed officers, officials, employees, agents and volunteers as respects to all claims, losses, or liability arising directly or indirectly from the Consultant's operations or services provided to City. Any insurance maintained by City, including any self- insured retention City may have, shall be considered excess insurance only and not contributory with the insurance provided hereunder. 7 0 iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company. iv. The insurer waives all rights of subrogation against City, its elected or appointed officers, officials, employees, agents and volunteers. V. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to City, its elected or appointed officers, officials, employees, agents or volunteers. vi. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits, by either party except after thirty (30) calendar days (10 calendar days written notice of non - payment of premium) written notice has been received by City. F. Timely !Notice of Claims. Consultant shall give City prompt and timely notice of claim made or suit instituted arising out of or resulting from Consultant's performance under this Agreement. G. Additional Insurance. Consultant shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work. 15. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS Except as specifically authorized under this Agreement, the services to be provided under this Agreement shall not be assigned, transferred contracted or subcontracted out without the prior written approval of City. Any of the following shall be construed as an assignment: The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Consultant, or of the interest of any general partner or joint venturer or syndicate member or cotenant if Consultant is a partnership or joint- venture or syndicate or cotenancy, which shall result in changing the control of Consultant. Control means fifty percent (50 %) or more of the voting power, or twenty -five percent (25 %) or more of the assets of the corporation, partnership or joint- venture. 16. SUBCONTRACTING City and Consultant agree that subconsultants may be used to complete the work outlined in the Scope of Services. The subconsultants authorized by City to perform work on this Project are identified in Exhibit A. Consultant shall be fully responsible to City for all acts and omissions of the subcontractor. Nothing in this Agreement shall create any contractual relationship between City and subcontractor nor shall it create any obligation on the part of City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. The City is an intended beneficiary of any work 8 performed by the subcontractor for purposes of establishing a duty of care between the subcontractor and the City. Except as specifically authorized herein, the services to be provided under this Agreement shall not be otherwise assigned, transferred, contracted or subcontracted out without the prior written approval of City. 17. OWNERSHIP OF DOCUMENTS Each and every report, draft, map, record, plan, document and other writing produced (hereinafter "Documents'), prepared or caused to be prepared by Consultant, its officers, employees, agents and subcontractors, in the course of implementing this Agreement, shall become the exclusive property of City, and City shall have the sole right to use such materials in its discretion without further compensation to Consultant or any other party. Consultant shall, at Consultant's expense, provide such Documents to City upon prior written request. Documents, including drawings and specifications, prepared by Consultant pursuant to this Agreement are not intended or represented to be suitable for reuse by City or others on any other project. Any use of completed Documents for other projects and any use of incomplete Documents without specific written authorization from Consultant will be at City's sole risk and without liability to Consultant. Further, any and all liability arising out of changes made to Consultant's deliverables under this Agreement by City or persons other than Consultant is waived against Consultant and City assumes full responsibility for such changes unless City has given Consultant prior notice and has received from Consultant written consent for such changes. All improvement and /or construction plans shall be prepared with indelible waterproof ink or electrostaticly plotted on standard 24 -inch by 36 -inch Mylar with a minimum thickness of three mils. Consultant shall provide to City `As- Built' drawings, and a copy of digital ACAD and tiff image files of all final sheets within ninety (90) days after finalization of the Project. For more detailed requirements, a copy of the City of Newport Beach Standard Design Requirements is available from the City's Public Works Department. 18. COMPUTER DELIVERABLES CADD data delivered to City shall include the professional stamp of the engineer or architect in charge of or responsible for the work. City agrees that Consultant shall not be liable for claims, liabilities or losses arising out of, or connected with (a) the modification or misuse by City, or anyone authorized by City, of CADD data; (b) the decline of accuracy or readability of CADD data due to inappropriate storage conditions or duration; or (c) any use by City, or anyone authorized by City, of CADD data for additions to this Project, for the completion of this Project by others, or for any other Project, excepting only such use as is authorized, in writing, by Consultant. By acceptance of CADD data, City agrees to indemnify Consultant for damages and liability resulting from the modification or misuse of such CADD data. All original drawings shall be submitted to City in the version of AutoCAD used by CITY in ".dwg" file format on a CD, and should comply with 9 0 the City's digital submission requirements for Improvement Plans. The City will provide AutoCAD file of City Title Sheets. All written documents shall be transmitted to City in the City's latest adopted version of Microsoft Word and Excel. 19. CONFIDENTIALITY All Documents, including drafts, preliminary drawings or plans, notes and communications that result from the services in this Agreement, shall be kept confidential unless City authorizes in writing the release of information. 20. OPINION OF COST Any opinion of the construction cost prepared by Consultant represents his/her judgment as a design professional and is supplied for the general guidance of City. Since Consultant has no control over the cost of labor and material, or over competitive bidding or market conditions, Consultant does not guarantee the accuracy of such opinions as compared to contractor bids or actual cost to City. 21. INTELLECTUAL PROPERTY INDEMNITY The Consultant shall defend and indemnify City, its agents, officers, representatives and employees against any and all liability, including costs, for infringement of any United States' letters patent, trademark, or copyright infringement, including costs, contained in Consultant's drawings and specifications provided under this Agreement. 22. RECORDS Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures and disbursements charged to City, for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of City to. examine, audit and make transcripts or copies of such records and invoices during regular business hours. Consultant shall allow inspection of all work, data, Documents, proceedings and activities related to the Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement. 23. WITHHOLDINGS City may withhold payment to Consultant of any disputed sums until satisfaction of the dispute with respect to such payment. Such withholding shall not be deemed to constitute a failure to pay according to the terms of this Agreement. Consultant shall not discontinue work as a result of such withholding. Consultant shall have an immediate right to appeal to the City Manager or his /her designee 10 with respect to such disputed sums. Consultant shall be entitled to receive interest on any withheld sums at the rate of return that City earned on its investments during the time period, from the date of withholding of any amounts found to have been improperly withheld. 24. ERRORS AND OMISSIONS In the event of errors or omissions that are due to the negligence or professional inexperience of Consultant which result in expense to City greater than what would have resulted if there were not errors or omissions in the work accomplished by Consultant, the additional design, construction and /or restoration expense shall be borne by Consultant. Nothing in this paragraph is intended to limit City's rights under the law or any other sections of this Agreement. 25. CITY'S RIGHT TO EMPLOY OTHER CONSULTANTS City reserves the right to employ other Consultants in connection with the Project. 26. CONFLICTS OF INTEREST The Consultant or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act "), which (1) requires such persons to disclose any financial interest that may foreseeably be materially affected by the work performed under this Agreement, and (2) prohibits such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. If subject to the Act, Consultant shall conform to all requirements of the Act. Failure to do so constitutes a material breach and is grounds for immediate termination of this Agreement by City. Consultant shall indemnify and hold harmless City for any and all claims for damages resulting from Consultant's violation of this Section. 27. NOTICES All notices, demands, requests or approvals to be given under the terms of this Agreement shall be given in writing, and conclusively shall be deemed served when delivered personally, or on the third business day after the deposit thereof in the United States mail, postage prepaid, first -class mail, addressed as hereinafter provided. All notices, demands, requests or approvals from Consultant to City shall be addressed to City at: Attn: Mark Reader Public Works Department City of Newport Beach 3300 Newport Boulevard Newport Beach, CA, 92663 Phone: 949 - 644 -3311 Fax: 949 - 644 -3318 11 All notices, demands, requests or approvals from CITY to Consultant shall be addressed to Consultant at: Mr. Max P. Vahid, P.E. President and CDO VA Consulting, Inc. 17801 Cartwright Road Irvine, CA 92614 Phone: 949 - 474 -1400 Fax: 949 - 261 -8482 28. TERMINATION In the event that either party fails or refuses to perform any of the provisions of this Agreement at the time and in the manner required, that party shall be deemed in default in the performance of this Agreement. If such default is not cured within a period of two (2) calendar days, or if more than two (2) calendar days are reasonably required to cure the default and the defaulting party fails to give adequate assurance of due performance within two (2) calendar days after receipt of written notice of default, specifying the nature of such default and the steps necessary to cure such default, and thereafter diligently take steps to cure the default, the non - defaulting party may terminate the Agreement forthwith by giving to the defaulting party written notice thereof. Notwithstanding the above provisions, City shall have the right, at its sole discretion and without cause, of terminating this Agreement at any time by giving seven (7) calendar days prior written notice to Consultant. In the event of termination under this Section, City shall pay Consultant for services satisfactorily performed and costs incurred up to the effective date of termination for which Consultant has not been previously paid. On the effective date of termination, Consultant shall deliver to City all reports, Documents and other information developed or accumulated in the performance of this Agreement, whether in draft or final form. 29. COMPLIANCE WITH ALL LAWS Consultant shall at its own cost and expense comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. In addition, all work prepared by Consultant shall conform to applicable City, county, state and federal laws, rules, regulations and permit requirements and be subject to approval of the Project Administrator and City. 30. WAIVER A waiver by either party of any breach, of any term, covenant or condition contained herein shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition contained herein, whether of the same or a different character. 12 0 0 31. INTEGRATED CONTRACT This Agreement represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions herein. 32. CONFLICTS OR INCONSISTENCIES In the event there are any conflicts or inconsistencies between this Agreement and the Scope of Services or any other attachments attached hereto, the terms of this Agreement shall govern. 33. INTERPRETATION The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of the Agreement or any other rule of construction which might otherwise apply. 34. AMENDMENTS This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney. 35. SEVERABILITY If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 36. CONTROLLING LAW AND VENUE The laws of the State of California shall govern this Agreement and all matters relating to it and any action brought relating to this Agreement shall be adjudicated in a court of competent jurisdiction in the County of Orange. 37. EQUAL OPPORTUNITY EMPLOYMENT Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. 13 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the day and year first written above. APPROVED AS TO FORM: -'— C Ci Attorney for the City of Newport Beach CIT�Imayol NEWP T BEACH, A p I 'orp r ti n for the City of Newport Beach CONSULTANT: By: orporate Officer) Title: President and CEO Print Name: Max P. vahid By: 6A (Financial Officer) Title: Secretary and CFO Print Name: Michael S. Carter Attachments: Exhibit A — Scope of Services Exhibit B — Schedule of Billing Rates f:\users\pbw\shared\agreements\fy 07-08\va consulting -big canyon creek.doc 14 Exhibit A V CONSULTING December 4, 2007 Mr. Mark Reader, P.E. Project Manager Public Works Department City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 -3884 Dear Mr. Reader: Thank you for providing VA Consulting, Inc. (VA) the opportunity to submit this proposal for professional consultant services to prepare the final design, contract documents and obtain resource agency permits for the Big Canyon Creek Restoration Project (Project). This proposal supersedes our proposal submitted to the City on November 29, 2007. VA understands that the City of Newport Beach (City) has undertaken the Project in order to restore historical tidal wetlands that have been traditionally situated in the Upper Newport Bay at the mouth of Big Canyon. The Project Feasibility Study, prepared by WRC Consulting Services, Inc., was completed in June 2007 and the Project Mitigated Negative Declaration (CEQA Document) was adopted by the City council in September 2007. The services provided in this proposal are for the project described in the above Feasibility Study and CEQA Document. VA has assembled a highly qualified Project team to perform the design and permitting tasks necessary to bid and construct the Project. VA staff will perform field surveys and mapping, civil engineering and structural engineering design, preparation of construction plans, specifications and cost estimates and provide overall project management. LSA Associates, Inc. (LSA) will provide the design and specifications for the riparian and upland vegetation planting, the design and specifications for removal and monitoring of invasive species, and the landscaping design and specifications for the Project trail system. From the previous Feasibility Study Project Team, Ron Yeo, FAIA Architect, Inc. (RY). will continue to provide the architectural services necessary for the final design of Project improvements. Geosoils Inc. (GSI) will provide geotechnical services necessary to update the preliminary soils investigation to include final design criteria for the conceptual Project plans. Weston Solutions Inc. (Weston) will continue with the Project and will prepare a post- construction Water Quality Sampling and Analysis Plan (SAP). The Acorn Group (Acorn). will provide design and specifications for interpretive signing and WRA Consultants (WRA) will provide design guidelines and specifications for the grading and planting of the proposed tidal wetlands and freshwater ponds and will provide services necessary for the completion of regulatory agency permitting activities. VA Consulting, Inc. Corporate office Orange County Division 17801 Cartwright Road Irvine, CA 92614 Phone 949.474.1400 Fax 949.261.8482 Mr. Mark Reader December 4, 2007 Page 2 of 13 Our total estimated fee for the services included in this proposal is $435,159.00, which includes $38,703 for the Orange County Sanitation District (OCSD) portion of the design services that are related to the improving access to their sewer facilities located adjacent to Jamboree Road. Detailed descriptions of the services proposed for the Project are provided in the following sections of this proposal. Section I provides a detailed scope -of- services for the Project and Section II a listing of assumptions and excluded services that are not included in this proposal. Section III provides a summary of the fees associated with the tasks identified in the scope -of- services. SECTION 1— SCOPE -OF- SERVICES PART 1 — PROJECT PERMIT AND AGENCY APPROVALS A. Resource Agency Permitting WRA initiated resource agency permitting during the Feasibility Study phase of the Project and will complete the permitting process with Federal and State Resource Agencies and the California Coastal Commission. Included in the permitting process will be the preparation of an Essential Fish Habitat Study (EFHS). Mr. Rick Ware of Coastal Resources Management, Inc. on behalf of WRA, will prepare the EFHS. At the conclusion of the Permitting Process, WRA will prepare a California Environmental Quality Act (CEQA) and permit conditions compliance matrix for inclusion into the Project contract documents. B. OCSD Process and Approvals VA will submit construction plans and specifications to obtain approvals from the Orange County Sanitation District. C. NPDES Compliance VA will prepare a Water Quality Management Plan (WQMP) that will identify BMP's to provide for the water quality of on -site runoff to the proposed Big Canyon improvements. The WQMP will conform to Regional Water Quality Control Board (RWQCB) and City standards. VA will also prepare a Storm Water Pollution Prevention Plan (SWPPP) that will identify water quality BMP's to be implemented during the construction phase of the Project. Both of these documents will demonstrate compliance with current NPDES requirements. This task also provides for assistance to the City while filing and processing the Notice of Intent (NOI) and the subsequent Notice of Termination (NOT) with the RWQCB. PART 2 — PREPARATION OF PLANS AND FINAL CONTRACT DOCUMENTS A. Civil Engineering Design VA will perform the civil engineering design services for the two specific Project areas as follows: The Orange County Sanitation District Access Road Improvements The City Project Area for the Big Canyon Restoration X"dYkeUMPmposali�P 3WTPWIiMMtvpo�BNdPBb LeT'aAP(tOPM Ne�BlpgirymResWialoMNW]IPWAI PEVFOOo a�dR.° Ytl Y WA' ° & QL�'i�Q ° ��1%]8 "✓�9 i�11dOQt�('. • • Mr. Mark Reader December 4, 2007 Page 3 of 13 VA will perform the following tasks related to the civil engineering and design of the Project facilities and components: Collect and Review Existing Data This task will provide for the collection and review of existing information, hydrologic and hydraulic analyses, sediment transport analyses included in existing reports and documentation as provided by the City. The collected information will be reviewed and incorporated into the civil design of the Project. 2. Hydraulic Design of Stormwater Conveyances This task provides for design -level hydraulic analyses of the proposed hydraulic features of the Project. These features include the following: • The Jamboree Road culvert extension and energy dissipater structure; a Overflow outlets from the two freshwater ponds; Y Flo-slit facility downstream of the lower freshwater pond; and e Back Bay Drive culverts to the Upper Newport Bay The hydraulic analyses will use the WSPG and /or HEC -RAS hydraulic analysis software packages to determine conveyance capacities, hydraulic grade lines, and facility configurations. The results of the hydraulic analyses will be used to develop construction plans and details for the Project. 3. Selection and Design of Proposed BMP's This task provides for the selection and sizing of the proposed BMP's to be located at storm drain inlets to the Big Canyon Restoration Area. VA will coordinate with suppliers of BMP devices and the City in order to assist the City with the selection of BMP's. Once selected, BMP's will be hydraulically sized and details for their installation and /or construction will be depicted on the overall Project improvement plans. 4. Structural Analyses and Designs This task provides for structural analyses of architectural and reinforced concrete elements of the proposed restoration project. These elements include interpretive signing, gathering area covering, restroom facility enclosures, culvert headwalls, outlet weirs, energy dissipater structures, and BMP connections to storm drain lines. The results of the analyses will be used to determine foundation dimensions, timber sizing and timber connections and the section thicknesses and reinforcement requirements for the various concrete structures. Structural analyses will be prepared in accordance with the latest requirements of the National Design Specification (NDS) for wood construction and the American Concrete Institute Code 318 for reinforced concrete construction. � (o�i,�se h�n�'d�i � f4'au�ur�� 5�ul�rro.yi�lni� 0 0 Mr. Mark Reader December 4, 2007 Page 4 of 13 5. Back Bay Drive Realignment Improvement Plans This task provides for the preparation of street improvement plans for the realigned portion of Back Bay Drive. The plans will consist of approximately 1,600 linear feet of street improvements shown on 1 "=40' plan and profile sheets. The plans will be prepared on City titleblock and formatted for inclusion in the Project Improvement Plan Set as described below. It is estimated that two plan and profile sheets and two signing and striping sheets will be required for the proposed realignment. 6. Interpretive Area and Street Precise Grading Plans This task provides for the preparation of precise grading and Improvement plans for the Interpretive Area. The plans will be prepared at a scale of 1 " =10' and will provide spot elevations for access roads, parking lots, trails and walkways. These plans will also depict signing and striping information for vehicular access way and parking areas within the Interpretive Area. A total of four plan sheets will depict the Interpretive Area and will be placed on City titleblock for inclusion in the overall Project Improvement Plan Set as described below. 7. Restoration Area Grading Plans This task provides for the preparation of grading and improvement plans for the Big Canyon Restoration Project between Jamboree Road and the Upper Newport Bay. The grading plans will provide contour grading for the proposed facilities including the freshwater ponds, trails, treatment wetland, service roads and tidal marsh. The restoration area grading plans will be prepared at a scale of 1 "=40' consisting of 5 plan sheets and one grading note sheet. The plans will be prepared on City titleblock and formatted for Inclusion in the Project Improvement Plan Set as described below. 8. Drainage Improvement Plans and Details This task provides for the preparation of plans, details and sections of the proposed Project drainage facilities. The drainage improvement plans will be based on the hydraulic and structural analyses as described above and will provide construction -level details for the following Project elements: • The Jamboree Road culvert extension and energy dissipater • Overflow outlets from the two freshwater ponds • Flow slit facility downstream of the lower freshwater pond • Back Bay Drive culverts to the Upper Newport Bay The plans will be prepared on City titleblock and formatted for inclusion in the Project Improvement Plan Set as described below. eC46lYN: NJiYt�;l" = i�b�UB•U70 " Mme' (&Yr� �ppQ''J.{�' I • Mr. Mark Reader December 4, 2007 Page 5 of 13 9. Erosion Control Plans VA will prepare a set of erosion control plans that will identify the construction BMP's necessary to minimize site erosion and the transport of sediments beyond the Project site. The erosion control plans will be prepared at a scale of V =40' consisting of 5 plan sheets and a BMP detail sheet. The erosion control plans will be prepared on City titleblock and formatted for inclusion in the Project Improvement Plan Set as described below. 10. Project Technical Specifications VA will prepare a set of technical specifications to define material and construction requirements of the work included In the Project Improvement Plan Set. The specifications will be prepared in accordance with City standards and will be formatted for inclusion with the City's bid package. This task also includes the preparation of a bid sheet to list the items of work and their associated quantities. 11. Engineer's Opinion of Probable Construction Costs VA will prepare quantity estimates for the items of work depicted on the Project Improvement Plan Set. The quantity estimates will be Itemized along with corresponding units of measurement. VA will then create an opinion of probable construction cost from the quantity estimate by applying unit cost data to the estimated quantities as collected by VA during recent construction activities or as published in current cost data manuals. 12. Process Improvement Plans VA will submit the improvement plans and technical specifications to the City Public Works Department for review and approval. It is anticipated that two submittals will be required prior to approval of the documents. This task provides for written responses to comments and minor adjustments to the plans and specifications after each submittal. In the event that the City requires significant changes to the plans and /or technical specifications, a separate proposal for these changes will be provided when and if these changes are required. B. Survey and Mapping VA will perform the following tasks: Research VA will research, compile and review all existing survey control and mapping data from the City, County and /or other governing agencies for boundary Information adjacent to or relevant to the Project's design. 2. Project Control VA field crews will locate project specific horizontalivertical control (NAD83 and NAVD88) and transfer it to the project including boundary monument search (if XWx U%Pwp "-200TPU0icWo-µvn Ne 19 (FR FEV1 . i t# NJ' ®9—kv o C41.gMV o >l�Oh *0 b IR9,(W .I • i Mr. Mark Reader December4,2007 Page 6 of 13 existing /recoverable) to use for the subsequent topographic design survey. VA field crews will establish a temporary benchmark on the project site. 3. Topographic Design Survey VA will perform an aerial topographic survey of undeveloped drainage area west of Jamboree Road, east of Back Bay Drive, north of San Joaquin Hills Road and south of Eastbluff Drive in Newport Beach (approximately 75 acres). VA field crews will perform a topographic design survey to be utilized in preparation of the base map to include ground shots on a twenty five foot (25') grid over the westerly portion (approximately 35 acres) and the area around the outlet structure off Jamboree Road. 4. Topographic Mapping Survey data from Task B.2 & B.3 will be compiled by VA staff to create topographic mapping at a scale of one inch equals forty feet (1 "=40') with one foot (t') contours for the project area. The topographic base map will depict the existing conditions together with the right -of -way boundary as required. 5. Big Canyon Nature Park Boundary VA staff will show the Big Canyon Nature Park boundary and CDFG boundary on the new project topo map. C. Geotechnlcal Investigation & Soils Report GSI will perform the geotechnical investigation and prepare a Soils Report for the two specific Project Areas, including: The OCSD access road improvement area, including the Jamboree Road storm drain extension, new head -wall and wing -wall construction and construction of the maintenance road adjacent to Jamboree Road. The City Project area including freshwater ponds, upper spillways, hydraulic structures and underlying drainage culverts, Back Bay Drive Re- alignment, parking areas and the Interpretive Area building pad(s). GSI will perform the following tasks: • Review available published literature, maps and aerial photos of the vicinity. • Meet with Underground Service Alert (USA), if warranted, to search for buried utilities within the public right of way. • Consult with the project environmental firm with respect to suitability of proposed boring and test pit locations, in light of environmental constraints at the site. • Perform site exploration via hollow stem auger rig, backhoe and hand auger in order to evaluate subsurface soil conditions at the site. We propose to perform four (4) hours of backhoe trench work and eight (8) hours of hand auger boring %1MMrtf +�A W oaeWP�011TPU0AMNa.9o� BOXM9 CargoM➢ 1WP01_NBnfOB. &O�M'oMbPpaUwNtWO> (ANK REV)A • i Mr. Mark Reader December 4, 2007 Page 7 of 13 within the storm drain extension and maintenance road area. For the other area we propose to conduct ten (10) hours of hollow stem auger drilling, four (4) hours of backhoe trenching and eight (3) hours of hand auger boring. Boring and excavations are anticipated to range from 3 to 50 feet in depth, or practical /economic refusal. • Obtain representative samples of site soil for laboratory testing. Testing may include, but may not. be limited to: in -situ moisture density determinations; compaction, permeability, soil expansion; grain size; shear strength; consolidation; and corrosion. • Perform an evaluation of site seismicity and seismic hazards. • Prepare an appropriately illustrated geotechnical engineering, and engineering geologic report that would include: the logs of the explorations; extent of earth material units; laboratory test results; hydraulic embankment design parameters; earthwork factors; liquefaction potential; and conclusions and recommendations related to project planning, preliminary foundation design and grading guidelines. D. Tidal Wetlands and Freshwater Ponds Design WRA will perform the following tasks: • Prepare the fine grading plans for the tidal wetlands, new freshwater pond and restored wetland. • Prepare planting and irrigation plans and specifications for the tidal wetlands, new freshwater pond and restored wetland. • Prepare bid specifications in a format to be provided by VA. • Prepare a final cost estimate for planting components of the plan. • Attend up to 3 project meetings. E. Riparian and Upland Areas Planting Design LSA will perform the following tasks: • Prepare the planting plans and specifications for the Riparian and Upland Project Areas. • Prepare plan and specifications for the removal and monitoring of invasive species removal. • Prepare maintenance, monitoring and reporting requirements for the planted vegetation and for the invasive species removal. • Attend up to 3 project meetings. %:WYMatinpPgweid�R�OOnrygqW¢�yp, B.aW qCa,� OPo1_�ffi�n-mW2tryCnRBdOrtti0M20101(Fw& Rv).tl ' .Qpnj dgNa f4FAt{'tH' o �['M.7NAiAa 7'�!�jk1(fEQC$'� j • i Mr. Mark Reader December 4, 2007 Page 8 of 13 F. Architectural Services Ron Yeo will provide project architectural services and perform the following tasks: • Prepare enclosure plans and specifications for 4 portable chemical toilets. • Prepare plans and specifications for Vista Terrace seating area plan for 100. • Prepare plans and specifications for Vista Terrace seating area shade structure (hand retractable canvas). • Prepare plans and specifications for minor structure for interpretive materials. • Attend up to 6 meetings. G. Interpretive Sign Design The Acorn Group will perform the following tasks: • Provide digital photographs for 8 panels. • Develop text for Interpretive, Regulatory and Orientation Panels for 15 panels. • Prepare final design development and final art production and delivery on disk per vendor specifications. H. Trail and Overlook Design LSA will provide landscape architect services and prepare plans and specifications for Project Trail and overlook system. • Assist with development of the grading plans to include the trail and overlook system. • Prepare plans, details and specifications for preparation of the trail and overlook system. • Attend up to 3 project meetings. PART 3 — POST- CONSTRUCTION WATER QUALITY SAMPLING AND ANALYSIS PLAN (SAP) Weston will develop and submit post - construction Water Quality Sampling and Analysis Plan to the Regional Water Quality Control Board. Included with this task, Weston will prepare for and attend one meeting with the Big Canyon County Club Golf Course. PART 4 — PROJECT MANAGEMENT, COORDINATION AND MEETINGS We anticipate project design duration of 6 months starting from the City's Notice to Proceed. Project management time is required to coordinate the transfer of project information to sub - consultant and City staff, coordinate consultant and sub - consultant activities and to coordinate ltW ake9n� ,P,opPBIdP,200TPUdkINVapn1 Bgngtlgip CtrtryAPPOPoIJIpryw4 &pCenypeJi¢fpg{p�1II➢CO] (FlNAL PEV)Mo �t:k �. n99trAh' � Q7roftrq�g o dZ?e4lkY�`11M9 �. i Mr. Mark Reader December 4, 2007 Page 9 of 13 project status with the Technical Advisory Committee. For the purpose of the proposal we have estimated 40 hours per month for a total of 240 hours for project management. We estimate a total of 12 Project meetings during the 6 month period including, 1 kickoff meeting, 6 monthly status meetings, 4 TAC meetings and 1 City council meeting. VA will provide agendas and meeting minutes for each of the meetings. For the purpose of this proposal we have assumed 3 hours of Project Management and 4 hours of support staff for each meeting. PART 6 — ENGINEERING SUPPORT DURING BID PHASE It is anticipated that Project improvements may be constructed in phases over several years. However, at this time it is not clear if one construction contract or separate construction contracts will be awarded to contractor(s) for the construction of the proposed improvements. Therefore, for the purpose of this proposal we have assumed there will be one bid phase. Should engineering support services for additional bid phases be required, a change order request or a separate contract will be processed through the City. For purpose of this proposal, we have assumed 16 hours of VA staff time for participation in engineering support activities during the bidding process. VA will provide assistance to the City during the bid process as follows: Attend pre -bid meeting with interested contractors. Respond to request for clarification, interpretation of plans and interpretation of specifications. Prepare addenda to bid documents as necessary. For purpose of this proposal we have assumed one (1) addenda will be prepared and that city staff will be responsible for distribution of addenda to the bidders. PART 6 — REIMBURSABLE EXPENSES This task provides for the cost of reproduction of plan sets and reports for submittals and the cost of messenger services, delivery services, reproduction services, etc. that wilt be associated with assisting the City with the preparation of materials for meetings and project reviews. SECTION II — ASSUMPTIONS AND EXCLUSIONS It has been assumed for the purposes of this proposal that hydrological studies of Big Canyon have been completed during the preparation of the previous Project studies including the Feasibility Study. As such, the flow rates reported in previous Project studies are assumed to be acceptable to the City and other reviewing agencies for purposes of facility design. Furthermore, additional hydrological studies are excluded from this proposal. Lastly, the foregoing tasks and the attached fee estimate do not include the following: Lot Line Adjustments; ➢ Monumentation of Lot Line Adjustments; ➢ ALTA (American Land Title Association) Surveys; Parcel Mergers; ➢ Preparation of Record Maps; X::1Meipepn((Mw IAPf20pTP10A± GWPl peec 0CmpMPHpPpt_Nev.Pat pipCarypngeAp,apaMZPIpJ(EV& PE14A Mr. Mark Reader December 4, 2007 Page 10 of 13 Re- establishment of missing Monumentation; ➢ Record of Surveys; ➢ Re- establishment of missing post- construction Monumentation; ➢ Corner Records; ➢ Preparation of Legal Documents (Metes & Bounds) for Easement Acquisitions; Obtaining Title Reports/Deeds/Easement Documents; ➢ Rights -of -way acquisitions; ➢ Obtaining Permission to Enter upon Private Properties; ➢ Interior Property Parcel Boundary Surveys; ➢ Construction Staking; ➢ As -Built Surveys; ➢ Resource Agency Permit Fees; ➢ Engineering Support during Construction; ➢ Construction Management; ➢ Construction Services including: • Geotechnical • Biology • Environment • Survey • Materials Testing • Inspection SECTION III — SUMMARY OF FEES A detailed breakdown of the proposal fees is included below. Our services will be provided on a time - and - materials, not -to- exceed basis in accordance with the attached fee schedule (Exhibit "A "). As requested, the fees associated with improvements to the OCWD facilities have been indicated separately. PART 1 - PROJECT PERMITS AND AGENCY APPROVALS A. Resource Agency Permits (City Project Area ) ............................. .....................$23,582.00 B. OCSD Process and Approvals (OCSD Improvement Area) ......... ......................$7,500.00 C. NPDES Compliance (City Project Area ........ ............................... .....................$15,000.00 Subtotal (Part 1 - City Project Area) ..................... ............................... .....................$38,582.00 Subtotal (Part 1 - OCSD Improvement Area) ........ ............................... ......................$7,500.00 PART 2 - PREPARATION OF PLANS AND FINAL CONTRACT DOCUMENTS A. Civil Engineering Design Collect and Review Existing Data a. City Project Area .................... ............................... ......................$2,500.00 b. OCSD Improvement Area ...... ............................... ......................$1,000.00 2. Hydraulic Design of Stormwater Conveyance a. City Project Area .................... ............................... ......................$5,000.00 X' U4MeY,1p�VimasalOP10WWW9CNC+9on McW0�MCP�' POPM _NB.gonBipC4ryonRBS,o,aEm12Wl(Fx FE1).e tt'+r Via; �rure"am � C4 "buftNkYM • �4vkY��799�IltfdG0.L'9T' .. Mr. Mark Reader December 4, 2007 Page 11 of 13 0 B. Survey and Mapping 1. Field Survey and Mapping (City Project Area) ................. .....................$18,600.00 2. Field Survey and Mapping (OCSD Improvement Area).. .. . ......................$1,000.00 Sub -total (Part 2B - City Project Area) ...... ............................... .....................$18,600.00 i Sub -total (Part 213 - OCSD Improvement Area) ........................ ......................$1,000.00 x�mcn�e9� ,MO0DE6�9�P3�nsuuannrow�emtlPep Cbpvn�nlOVO� rcexyunappm��sam�at2ow�l�+u. nEV,am (��.° Gandmm � �'�7naxt� o.ii�kmu�n Win' b. OCSD Improvement Area ...... ............................... ......................$2,500.00 3. Selection and Design of Proposed BMP's a. City Project Area .................... ............................... ......................$6,000.00 4. Structured Analyses and Design a. City Project Area .................... ............................... ......................$6,500.00 b. OCSD Improvement Area ...... ............................... ......................$2,000.00 5. Back Bay Drive Realignment Improvement Plans a. City Project Area ................... ............................... .....................$12,000.00 6. Interpretive Area and Street Precise Grading Plans a. City Project Area ................... ............................... .....................$21,000.00 7. Restoration Area and OCSD Access Road Grading Plans a. City Project Area ................... ............................... .....................$14,000.00 b. OCSD Improvement Area ...... ............................... ......................$4,000.00 8. Drainage Improvement Plans and Details a. City Project Area .................... ............................... ......................$6,000.00 b. OCSD Improvement Area ...... ............................... ......................$3,000.00 9. Erosion Control Plans a. City Project Area .................... ............................... ......................$5,500.00 b. OCSD Improvement Area ...... ............................... ......................$2,000.00 10. Project Technical Specifications a. City Project Area .................... ............................... ......................$8,500.00 b. OCSD Improvement Area ...... ............................... ......................$3,500.00 11. Engineer's Opinion of Probable Construction Costs a. City Project Area .................... ............................... ......................$4,000.00 b. OCSD Improvement Area ...... ............................... ......................$1,500.00 I 12. Process Improvement Plans a. City Project Area .................... ............................... ......................$6,500.00 b. OCSD Improvement Area ...... ............................... ......................$3,500.00 Sub -total (Part 2A -City Project Area) ...... ............................... .....................$97,500.00 Sub -total (Part 2A - OCSD Improvement Area) ....................... .....................$23,000.00 B. Survey and Mapping 1. Field Survey and Mapping (City Project Area) ................. .....................$18,600.00 2. Field Survey and Mapping (OCSD Improvement Area).. .. . ......................$1,000.00 Sub -total (Part 2B - City Project Area) ...... ............................... .....................$18,600.00 i Sub -total (Part 213 - OCSD Improvement Area) ........................ ......................$1,000.00 x�mcn�e9� ,MO0DE6�9�P3�nsuuannrow�emtlPep Cbpvn�nlOVO� rcexyunappm��sam�at2ow�l�+u. nEV,am (��.° Gandmm � �'�7naxt� o.ii�kmu�n Win' Mr. Mark Reader December 4, 2007 Page 12 of 13 C. Geotechnical Investigation & Soils Report 1. Geotechnical Services (City Project Area) ....................... .....................$14,412.00 2. Geotechnical Services (OCSD Improvement Area) .......... ......................$7,203.00 Sub -total (Part 2C - City Project Area) ...... ............................... .....................$14,412.00 Sub -total (Part 2C - OCSD Improvement Area) ........................ ......................$7,203.00 D. Tidal Wetlands and Freshwater Pond Design 1. Final design, plans and specifications ............................. .....................$34,970.00 2. Attend up to 3 project meetings ......... ............................... ......................$9,678.00 Sub -total (Part 2D - City Project Area) ...... ............................... .....................$44,648.00 E. Riparian and Upland Area Planting Design 1. Preparation of Planting Plans and Specifications ............. ......................$8,165.00 2. Preparation of Invasive Vegetation Removal Specifications ...................$3,680.00 3. Preparation and Attendance of up to 3 project meetings .. ......................$6,785.00 Subtotal (Part 2E - City Project Area) ...... ............................... .....................$18,630.00 F. Architectural Services 1. Prepare Plans and Specifications ..... ............................... .....................$11,500.00 2. Attend up to 6 project meetings ......... ............................... ......................$6,900.00 Sub -total (Part 2F - City Project Area) ...... ............................... .....................$18,400.00 G. Interpretive Sign Design 1. Design interpretive sign panels ........ ............................... .....................$40,190.00 2. Attend up to 4 project meetings ......... ............................... ......................$1,380.00 Sub -total (Part 2G - City Project Area) ..... ............................... .....................$41,570.00 H. Trail and Overlook Design 1. Prepare Plans and Specifications ..... ............................... .....................$22,425.00 2. Preparation and Attendance of up to 3 project meetings .. ......................$6,785.00 Sub -total (Part 2H - City Project Area) ........................... ............................... $29,210.00 Sub -total (Part 2A through 2H - City Project Area) ................ ....................$282,970.00 Sub -total (Part 2A through 2H - OCSD Improvement Area) ... .....................$31,203.00 xsa :nocnngv,e„enys�p_aaonr„uawwyon B-- W14 (Fl u REV) c RAP tl ft #R w- Vumoow -" W Mr. Mark Reader December 4, 2007 Page 13 of 13 PART 3 - POST - CONSTRUCTION WATER QUALITY SAMPLING AND ANALYSIS PLAN (SAP) A. Post Construction Sampling and Monitoring Plan.. ............................................ $6,9W.00 B. Meeting with Big Canyon County Club Golf Course ..................... ......................$1,200.00 Sub -total (Part 3 - City Project Area) ......... ............................... ......................$8,100.00 PART 4 - PROJECT MANAGEMENT, COORDINATION AND MEETINGS A. Project Management & Coordination .......... ............................... .....................$41,520.00 B. Attendance at project, TAC and City Council Meetings ............... .....................$13,284.00 Sub -total (Part 4 - City Project Area) .................... ............................... .....................$54,804.00 PART 5 ENGINEERING SUPPORT DURING BID PHASE Sub -total (Part 5 - City Project Area) ..................... ............................... ......................$3,000.00 PART 6 REIMBURSABLE EXPENSES Sub -total (Part 6 - City Project Area) ..................... ............................... ......................$9,000.00 TOTAL FEES (PART 1 THROUGH 6 - CITY PROJECT AREA) .......... ....................$396,456.00 TOTAL FEES (PART 1 THROUGH 6 - OCSD IMPROVEMENT AREA) .....................$38,703.00 TOTAL ESTIMATED FEE (PART 1 THROUGH PART 6 - CITY PROJECT & OCSD IMPROVEMENT AREAS) ........................... ............................... ....................$435,159.00 We look forward to being of service to you on this Project. We have the resources available to perform these services and will initiate work upon the receipt of your "Notice to Proceed ". If you have any questions, please call,�ohn Wolter at (951) 340 -0030 or me at (949) 474 -1400. hid, P.E./ and CEO MPV /kam /cmj Enclosure: cc: John Wolter Daniel Villines Contracts XW&"WPrty=W_IIUpT kWWPM 9exH911 Cp. ryyApgpPol_ NmrpdTBlpCan,a�Pesro2WniAaW(FINK AMV PA 1,M) fiv. WW. crwP *Q 1' UAI7{il�B MOOT' :. . (9) City of Newport Beach Big Canyon Creek Restoration Project Phase IV & V Forward Budget Assessment Pnpamd By VA Consulting, Inc. 29 -NW -07 VPIL CONSULTING • • VA WESTON ACORN LSA R. YEO GEOSOILS WRA Total Phase Description Cont. Amt. Cont. Amt Cant Amt. Cont. Amt Corrt. Amt Cont Amt Cont Amt. Amount 1. Feasibility Assessment -Task Completed- 11. Water Quality QAPP and SAP -Task Completed - Ill. Preliminary Engineering -Task Completed- IV. Environmental Review & Permits $23,582 $23,562 V. Outreach, Final Engineering & Design Public Meetings - Budget Expended - Final Engineering $97,500 $13,000 $30,690 $11,500 $34,970 $187,560 Meetings, Technical Team (Original Scope) $13,284 $1,380 $14,664 I. Post Construction Water Quality Monitoring Plan $6,900 $6,900 Project ManagementlCo ord inatlon/Meetings/Reimbursables $50.520 $1,200 $13,570 $6,900 $9,678 $81,868 SUBTOTAL (Phase I to VII) $314,574 Ill. OCSD Maintance Road $31,500 $7,203 $38,703 IX. Additional Consulting Services Survey and Mapping $18,600 $18,600 Geotechnicai Investigations and Report $14,412 $14,412 Invasive Vegetation Removal Specifications $3,680 $3,680 Interpretive Sign Graphic Design $27,190 $27,190 NPDES City Compliance $15,000 $15,000 Engineering Support During Bidding $3,000 $3,000 $ $ $ SUBTOTAL (Phase VIII & IX) $120,688 ota 229404 9,110 $41,870 $47,840 $16,400 21,616 $68,230 $436,159 • • EXHIBIT "8P VA CONSULTING, INC. FEE SCHEDULE 2007 Staff Classification Civil Engineering and Planning Services Hourly Rate President............................................................................................................ ............................... $190 Division President/Division Manager ................................................................. ............................... $173 Sr. Vice PresidentNice President/ Exec. Director ............................................. ............................... $163 Director.............................................................................................................. ............................... $1604 — Senior Project Manager .................................................................................... ............................... $155 ProjectManager ................................................................................................. ............................... $147 Assistant Project Manager..................................... ............. ................................. ... ....... ................... $142 Senior Project Engineer /Senior Design Supervisor /Senior Planner .................. ............................... $137 Project Engineer /Design Supervisor .................................................................. ............................... $132 Inspector............................................................................................................ ............................... $1304 — Senior Design Engineer /Senior Designer .......................................................... ............................... $122A' Design Engineer/ Planner ................................................................................... ............................... $117 Designer... ......................... _ ....... ......................................... __ ........................ ................... __ .... $110 Assistant Engineer /Assistant Planner ................................................................ ............................... $100 Research and Processing Coordinator ................................................................ ............................... $95 SeniorCADD Technician... ................................................................................. ............... ......... $90 JuniorEngineer .................................................................................................... ............................... $85 CADD Technician .............. ............................ ............................... ....................... ............................... $80 EngineeringIntern ............................................................................................... ............................... $70 OfficeSupport / Clerical ........................................................................................ ............................... $69 Field Survey and Mannino Services Director of Survey and Mapping ........................................................................ ............................... $158 Managerof Field Survey ................................................................ ............................... ...........................$130 Survey and Mapping Associate ..................................................................................... ............................$95 Survey and Mapping Technician ................................................................................... ...........................:$75 3 -Man GPS Crew ........................................................................... ............................... ...........................$225 2 -Man GPS Crew.. ... - ............... ................................................ .............................. .............................. $200 1 -Man GPS Crew ........................................................................... ............................... ...........................$170 Special Services Litigation......................................................................................... ............................... ...........................$400 Notes. 1. Invoices will be prepared for all services through the end of each calendar month. Invoices are due and payable on presentation. 2. Overtime, when requested by the client, will be surcharged at a rate of 135% of the standard hourly rates. Sundays and holidays win he surcharged at a rate of 170,0/o of the standard hourly Yates. 3. Reprographics, messenger service, travel (including lodging and meals), and other direct expenses will be charged at cost plus 10 %. The services of outside consultants will be charged at cost plus 15% to cover administration and overhead. 4. In-house reprographics charges: B8W Bond copies $1.001sq.0, Color Bond $6.00 /sqA 5. Mileage will be billed at standard mileage rates set by IRS. 2007 rates currently listed at $0.465 per mile. %'.Mmhf001ROr,o eaoorwi,d Mne Pawm]umoaKarewsee arocosa�wor Rcunm eoc OC /IE G- to [us O Al.�e.ef( Ibwbin Lk. E LH fipeV� �rlOd+q fa Ce f. w is c~ ftAOtawv Nolwd POW / 1.-i MW Pbrood. o 1pj I(.a1 �o ��i�yy MM kG� I:ryp 9 N.1 Pb 1y0(/YCh Ib. m gM'O"d vsVped P..sraMrIJN1 1 •IC (OYIYIIIY• 1 WRCL.1.. c..m Client#- t& AkCONSULT ACORD- CERTIFiclrm OF LIABILITY INSURANCE ti1i1 0°7�' PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Dealey, Renton & Associates P. O. Box 10550 ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Santa Ana, CA 92711 -0550 POLWYEFFECTIVE DATE MM D POLICYEXPIRALVION DAT 714 427-0810 INSURERS AFFORDING COVERAGE NAIC # INSURED INSURER A Travelers Property Casualty Cc of Am 6804848L.258 VA Consulting Inc. 17801 Cartwright Road Irvine, CA 92614 INSURER e: Travelers Indemnity Co. of Connectic EACH OCCURRENCE INSURER c: ACE American Insurance Company INSURER D: X COMMERCIALGENERALUABILn INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDIT IONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INISR LTR WV NSR TYPE OF INSURANCE POLICY NUMBER POLWYEFFECTIVE DATE MM D POLICYEXPIRALVION DAT LIMITS A GENERAL LIABILITY 6804848L.258 09101/07 09/01108 EACH OCCURRENCE $1000000 X COMMERCIALGENERALUABILn General Liab. DAMAGE TO RENTED $11,000.000 CLAIMS MADE a OCCUR excludes claims MED EXP Any om ran $6,000 PERSONAL S ADV INJURY $11.000.000 X Contractual Llab. arising out of GENERAL AGGREGATE s2,000.000 the performance GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - OOMPIOP AGO 52000000 of professional POLICY 51 PRO- 3ECT LOC services. B AUTOMOBILE LIABILITY ANY AUTO BA490SL54B 99101107 D9101/08 COMBINED SINGLE LIMIT (EaaWdant) 51,000,000 X BODILY INJURY (Par Partin) $ ALL OWNED AUTOS SCHEDULED AUTOS X BODILY INJURY (Para dart) S HIREDAUTOS NON -OWNEDAUTOS X PROPERTY DAMAGE (Peraavdant) $ GARAGE LIABILITY AUTO ONLY - EA ACCIDENT E OTHER THAN EAACC $ ANYAUTO 5 AUTO ONLY: AGG A EXCESWUMBRELLA LIABILITY CUP7156Y612 09/01/07 09/01/08 EACH OCCURRENCE $2.000.000 X OCCUR 0 CLAIMS MADE (Not Included AGGREGATE . 00 _s2,000.0 t Professional $ DEDUCTIBLE Liability) $ RETENTION S B WORKERS COMPp18ATK)N AND XEU67665Y53507 11/24107 11/24/08 X VAC STATU- OTH- EMPLOYERS' LIABILITY ANY PROPMETOR/PARTNER.EXECUTIVE OFFICER/MEMBER EXCLUDED? E.L. EACH ACCIDENT $1,000 6DD E.L. DISEASE - EA EMPLOYEE $1,000,000 ndar SPEGAL PROVISIONS below E. L. DISEASE- POLICYLIMIT $1,000000 C OTHER Professional G23633711001 06/16107 06116/08 $1,000,000 per claim Liability $2,000,000 annl aggr. Claims Made DESCRIPTION OF OPERATIONS 1 LOCATIONS 1 VEHICLES 1 EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS Re: Big Canyon Creek Restoration. City of Newport Beach, its elected or appointed officers, officals, employees, agents and volunteers are Additional Insured as respects to General Liability coverage as required by written contract. (See Attached Descriptions) City of Newport Beach Public Works Department Attn: Mark Reader 3300 Newport Blvd. Newport Beach, CA 92663 ANY OF THE ABOVE DESCRIBED BEFORE THE EXPIRATION THEREOF, THE ISSUING INSURER Wei EMAIL _3(L DAYS WRITTEN :E TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, 1 of 2 #S2132211M209652 TMN Is ACORD CORPORATION 1988 PRODUCER'S FACT SHE M NAMED INSURED: HANK KAMINSKY POL #: 30 SBM UF6829 DV PRODUCER'S NAME: PRODUCER'S CODE: 721336 MAURY DONNELLY & PARR, INC /PHS POL EFF DATE: 11/10/07 POL EXP DATE: 11/10/08 DIRECT ACCOUNT BILL NUMBER - 12108973 TRANSACTION TYPE: NEW BUSINESS FORM SS 00 01 04 93 SS 00 02 12 06 SS 00 05 12 06 SS 00 08 04 05 SS O1 29 03 92 SS Ol 57 03 92 SS 04 38 06 01 SS 05 47 09 01 G- 2997 -2 G- 3418 -0 SS 09 27 06 01 SS 09 42 07 99 SS 50 30 06 03 100722REVB SS 83 13 01 97 SS B3 39 06 01 SS B3 76 02 06 AGENT SALES TITLE POLICY FRONT COVER DECLARATIONS COMMON POLICY CONDITIONS BUSINESS LIABILITY COVERAGE 30ElM ARKANSAS CHANGES - CANCELLA121M ARKANSAS CHANGES HIRED AUTO AND NON -OWNED AU'LV EXCLUSION - NUCLEAR ENERGY LI=[L:dTY IMPORTANT NOTICE TO ARKANSAS 3KIDICYHOLDER'S ACCESS TO INSURER INFORMATION PRODUCER COMPENSATION NOTICE EMPLOYMENT PRACTICES LLABLLL'M COVRAGE FORM - ARKANSAS EMPLOYMENT PRACTICES - E%CL0.371 E - PRIOR ACTS CAP ON LOSSES FROM CERTIFLED RLT93 OF TERRORISM DIRECT BILL INFORMATION IMPORTANT NOTICE TO OUR POLLC'YiYffOLaERS POLICYHOLDER NOTICE- EMPLOYMMM PRACTICES LIABILITY INSURANCE DISCLOSURE PURSUANT TO TERRC11iISI:BISK INSURANCE ACT OF 2002 A Vg:So U-1 1;a PRODUCER'S FACT SHtliF pp PAGE 1 11/13/07 30 Sim UF6829 DV (11/10/08) I DESCRIPTIONS (Continued from Fage 1) Coverage afforded the Additional Insured is Primary B Noncontributory. 7. Separation of Insureds Except with respect to the Limits of Liability in this liability Coverage Part and any rights or duties specifically assigned In this Liability Coverage Part to the first Named Insured, this insurance applies: a. As if each Named Insured were the only Named Insured; and b. Separately to each Insured against whom the claim or suit is brought. Waiver of Subrogation included in Work Comp. AMS 25.3 (2007106) t M JW JW i� 006799 •COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED (ARCHITECTS3 ENGINEERS AND SURVEYORS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART 1. WHO IS AN INSURED (Section 11) is amended to Include arty person or organization that you agree in a "contract or agreement requiring insurance" to include as an additional insured on this Cover- age Part, but a. Only with respect to liability for "bodily injury", "property damage" or "personal injury"; and b. If the injury or damage arises out of the per- formance, by you or your subcontractor, of "your work" to which the "contract or agree- ment requiring insurance" applies. Such per- son or organization does not quality as an additional insured with respect to their inde- pendent acts or for "bodily injury", "property damage" or "personal injury" for which that person or organization has assumed liability in a contract or agreement. 2. The insurance provided to the additional insured by this endorsement is limited as follows: a. This insurance does not apply on any basis to any person or organization for whirl cover- age as an additional Insured specifically is added by another endorsement to this Cover- age Part. b. This insurance does not apply to the render- ing of or failure to render any "professional services ". c. The limits of insurance afforded to the addi- tional insured shall be the limits which you agreed to provide in that "contract or agree- ment requiring insurance", or the limits shown in the Declarations for this Coverage Part, whichever are less. This endorsement does not increase the limits of insurance stated in the LIMITS OF INSURANCE (Section 111) for this Coverage Part, 3. The following is added to Paragraph a. of 4. Other Insurance in COMMERCIAL GENERAL LIABILITY CONDITIONS (Section IV): However, If you specifically agree in a "contract or agreement requiring insurance" that the insurance provided to an additional insured under this Cov- erage Part must apply on a primary basis, or a primary and non - contributory basis, this insurance is primary to other insurance that is available to such additional insured which covers such addi- tional insured as a named Insured, and we Wit not share with the other insurance, provided that: (1) The "bodily injury" or "property damage" for which coverage is sought occurs; and (2) The "personal injury" for which coverage is sought arises out of an offense committed; after you have entered into that "contract or agreement requiring insurance". But this insur. ance still is excess over valid and collectible other insurance, whether primary, excess, contingent or on any other basis, that is available to the insured when the insured is an additional insured under any other insurance. 4. The following is added to Paragraph .8. Transfer Of Rights Of Recovery Against Others To Us in COMMERCIAL GENERAL LIABILITY CON- DITIONS (Section IV): We waive any rights of recovery we may have against any person or organization because of payments we make for "bodily injury", "property damage" or "personal Injury" arising out of "your work" performed by you, or on your behalf, under a "contract or agreement requiring insurance" with that person or organization. We waive these rights only where you have agreed to do so as part of the "contract or agreement requiring insur- ance" with such person or organization entered Into by you before, and-in effect when, the "bodily injury" or "property damage" occurs, or the "per- sonal injury" offense is committed. S. As respects the insurance provided to the addi- tional insured by this endorsement, the following definition Is added to DEFINITIONS (Section V): CG D3 81 09'06 ® 2006, The St Paul Travelers Insurance companies, Inc. Page 1 of 2 Imiudes copyrighted material of insurance Services Office, Inc., vAh its permission. . COMMERCIAL GENERAL UABILMY 'contract or agreement requiring insurance" means that part of any contract or agreement un- der which you are required to include a person or organization as an additional insured on this Cov= erage Part, provided that the "bodily injury" and "property damage' occurs, and the "personal in- jury" is caused by an offense committed: a. After you have entered into that contract or agreement; b. White that part of the contract or agreement is in effect; and c. Before the end of the policy period. All other terms of your policy remain the same. Page 2 of 2 ® 2006, The St. Paul Travelers Insurance companies, Inc. CG D$ 8109 06 Includes copyrighted material of Insurance Services Office, Inc., with its permission. C, TRAVELERSJ~ • WORKERS COMPENSATION AND EMPLOYERS LIABILITY POLICY ENDORSEMENT WC 99 03 76 (00) -001 POLICY NUMBER: WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT CALIFORNIA (BLANKET WAIVER) We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. You must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work described in the Schedule. The additional premium for this endorsement shall be 5% of the California workers' compensation premium otherwise due on such remuneration. Schedule Person or Organization Job Description ALL PERSONS OR ORGANIZATIONS THAT ARE PARTIES TO A CONTRACT THAT REQUIRES YOU TO OBTAIN THIS AGREEMENT PROVIDED YOU EXECUTED THE CONTRACT BEFORE THE LOSS. Fax #: • • CERTIFICATE OF INSURANCE CHECKLIST City of Newport Beach This checklist is comprised of requirements as outlined by the City of Newport Beach. Date Received: 12 -20 -07 Dept. /Contact Received From: Shauna Oyler Date Completed: 1 -3 -08 Sent to: Shauna By: April Walker Company /Person required to have certificate: VA Consulting GENERAL LIABILITY A. INSURANCE COMPANY: Travelers Property Casualty B. AM BEST RATING (A: VII or greater): A +XV C. ADMITTED Company (Must be California Admitted): Is Company admitted in California? ® Yes ❑ No D. LIMITS (Must be $1M or greater): What is limit provided? 2 mil agg/ 1 mil occ E. PRODUCTS AND COMPLETED OPERATIONS (Must include): Is it included? ® Yes ❑ No F. ADDITIONAL INSURED WORDING TO INCLUDE (The City its officers, officials, employees and volunteers): Is it included? ® Yes ❑ No G. PRIMARY & NON - CONTRIBUTORY WORDING (Must be included): Is it included? ® Yes ❑ No H. CAUTION! (Confirm that loss or liability of the named insured is not limited solely by their negligence) Does endorsement include "solely by negligence' wording? ❑ Yes ® No I. NOTIFICATION OF CANCELLATION: Although there is a provision that requires notification of cancellation by certified mail; per Lauren Farley, the City will accept the endeavor wording. H. AUTOMOBILE LIABILITY A. INSURANCE COMPANY: Travelers Indemnity Co. of Connecticut B. AM BEST RATING (A: VII or greater): A+ XV C. ADMITTED COMPANY (Must be California Admitted): Is Company admitted in California? D. LIMITS (Must be $1M min. BI & PD and $500,000 UM): What is limits provided? E. ADDITIONAL INSURED WORDING TO INCLUDE (The City its officers, officials, employees and volunteers): Is it included? F. PRIMARY & NON- CONTRIBUTORY WORDING (For Waste Haulers only): Is it included? N/A 1 mil ® Yes ❑ No ❑ Yes ® No ❑ Yes ❑ No G. NOTIFICATION OF CANCELLATION: Although there is a provision that requires notification of cancellation by certified mail; per Lauren Farley, the City will accept the endeavor wording. .I III. WORKERS' COMPENSATION A. INSURANCE COMPANY: Travelers AM BEST RATING (A: VII or greater): A+ XV LIMITS: Statutory WAIVER OF SUBROGATION (To include): Co. of Connecticut Is it included? ® Yes ❑ No HAVE ALL ABOVE REQUIREMENTS BEEN MET? ❑ Yes ® No IF NO, WHICH ITEMS NEED TO BE COMPLETED? Auto: Additional Insured endorsement missing. DEC i i . .. + 1l (�lioo -zao�) CITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 6 December 11, 2007 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Mark Reader, Project Manager 949 -644 -3311 SUBJECT: BIG CANYON CREEK RESTORATION PROJECT - APPROVAL OF PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING, INC.; BUDGET AMENDMENT ISSUE: Should the City contract with a new lead engineering firm, at a slightly higher price (including some additional services), to continue work on the Big Canyon Creek Restoration Project? RECOMMENDATIONS: Approve a Professional Services Agreement with VA Consulting, Inc., of Irvine, California, for design services at a contract price of $435,159 and authorize the Mayor and City Clerk to execute the Agreement. 2. Approve a Budget Amendment appropriating $28,222 to Account No. 7251- 05100709 and increasing revenue estimates by $28,222 representing a contribution from Orange County Sanitation District for preliminary design and CEQA documents for an OCSD maintenance access road. 3. Approve a Budget Amendment appropriating $38,703 to Account No. 7251 - 05100709 and increasing revenue estimates by $38,703 representing a contribution from Orange County Sanitation District for additional costs related to the design of the access roadway. 4. Approve a Budget Amendment appropriating $50,000 to Account No. 7251- 05100709 and increasing revenue estimates by $50,000 representing contributions from the Irvine Company via the Irvine Ranch Conservancy to cover educational and interpretative elements for the project. 5. Approve a Budget Amendment appropriating $48,456 from the unappropriated General Fund Reserves (Tidelands) to Account No. 7231- C5100709 for the Big Canyon Creek Restoration Project. Big C9 Creek Restoration — Approval of Professional S Agreement with VA ConsuRing, Inc. December 11, 2607 Page 2 DISCUSSION: On May 23, 2006, the City Council approved a Professional Services Agreement with WRC Consulting Services (WRC) in the amount of $698,595 to prepare a feasibility assessment, Water Quality Assurance Program Plan (QAPP), Sampling and Analysis Plan (SAP), CEQA documents and notifications, and preliminary engineering tasks as well as final construction documents for the Big Canyon Creek Restoration Project. Per recommendations by the Regional Water Quality Control Board, three amendments to the agreement were subsequently approved adding $8,650 to the contract. Also, at the request of Orange County Sanitation District (OCSD), the City of Newport Beach approved Amendment No. 4 for $28,222 for the preliminary design and CEQA documents for an OCSD maintenance road to cross Big Canyon Creek to provide maintenance access to an OCSD manhole on the other side of the creek. (OCSD will reimburse the City $28,222 for this task.) With these amendments, the total contract amount is $735,467. WRC completed several aspects of the work — the feasibility assessment, the QAPP, the SAP, CEQA document preparation and most of the preliminary engineering. But for preparation of the final construction documents, city staff determined, in consultation with our two major grant funders (the Regional Water Quality Control Board and the State Coastal Conservancy) that a fully - staffed civil engineering firm should take the lead on completing the final construction documents by next summer. WRC did not want to be subordinate to another firm. As such, on October 17, 2007 the City terminated WRC's contract per Section 28 of the Professional Services Agreement with WRC leaving $298,000 remaining in the contract and project fund once the City receives the $28,222 reimbursement from OCSD. Staff subsequently spoke with three firms and selected VA Consulting as the best suited for completing the project within this schedule. Staff requested that VA prepare a budget based on the remaining tasks in WRC scope of work VA Consulting contacted all the previous subconsultants and has reconstituted the original WRC team with the exception of WRC plus the addition of LSA for the upland landscape design. Based on the remaining tasks in the WRC scope of work, VA Consulting submitted its proposal for a fee of $314,574. This amount is $16,574 (about 5 %) higher than WRC's original budget. In addition to the change of lead engineering firms, VA Consulting suggested, and staff agrees, that some additional design - related work should be done as a part of this Phase. This work is described in the following section. Big Can Week Restoration — Approval of Professional Servi0greement with VA Consulting, Inc. December 11, 2007 Page 3 . Additional Work Items Not Covered Under the Original WRC Scope of Work During the preliminary engineering phase of the work, WRC identified additional tasks that need to be performed during the final engineering phase of this project. A discussion of the additional services follows: Survey and Mapping: Even though an aerial survey was previously provided for the 60 acre project, additional topographic survey information is required for the final engineering design to obtain more accurate information than the aerial survey currently provides. The proposed work also includes ground truthing the original topographic survey for its acceptance by VA Consulting as to its accuracy. Geotechnical: Geotechnical investigations were provided by Geosoils during the preliminary engineering phase of the project. It is recommended to provide additional geotechnical data in the locations of design elements of the project. Invasive Vegetation: During preparation of the feasibility report, it was determined that certain invasive species which inhabit the Big Canyon Nature Park also occur on the bluffs and in some instances on private property. Due to the sensitive nature of soil stability and erosion of the bluffs the consultant will prepare specifications relating to removals of the invasive species and planting specifications for non invasive species. Interpretive Signage: The original contract fee estimate assumptions stated "One interpretive panel at kiosk and four signs along the trait for final design ". Since completion of the feasibility study, it is recommended that 15 additional sign panels be provided than originally considered for the project. The scope of the interpretive sign design is noted in Part 2 -G of the VA Consulting Scope of Services. NPDES: A Water Quality Management Plan (WQMP) and a Storm Water Pollution Prevention Plan (SWPPP) were excluded from the contract documents with WRC and needs to be included with the VA Consulting contract. Engineering Support During Bidding: This item provides for consultant time to support activities during the bidding process. The total for these tasks is $120,585. Of this amount, $88,703 would be reimbursed by others: OCSD would reimburse $38,703 for the design of the access roadway. The Irvine Ranch Conservancy (IRC) is administering a grant to the City as a part of the Irvine Company's donation to the Big Canyon Creek Project. The Irvine Company's donation is to cover the educational and interpretive elements of this Project. For this design phase, IRC will budget $50,000 of the TIC grant to be used by the City. Big C* Creek Restoration — Approval of Professional $a Agreement with VA Consulting, Inc. December 11, 2007 Page 4 As a result of these funds, the net cost to the City for these additional design related tasks is $31,882. With the additional costs of $16,574 for the base contract, the total additional funds required for the design work is $48,456. Funding Availability: Initial funding for this project came from State Water Resources Control Board ($200,000), State Coastal Conservancy ($500,000) and $100,000 to match these funds from the City's tidelands account. Upon approval of the recommended Budget Amendment, sufficient funds are available in the following accounts for the project: Account Description Unappropriated General Fund Reserves (Tidelands) OCSD Reimbursement The Irvine Company via IRC Prepared by: Aa2z-,�� Mark Read r Project Manager Account Number Amount 7231- C5100709 $48,456 7251- C5100709 $66,925 7251- C5100709 $50,000 Total: $165,381 Submitted by: to . Bad Publi orks Director Attachment: PSA with VA Consulting Inc. Big Canyon Creek Restoration Exhibit 0 PROFESSIONAL SERVICES AGREEMENT WITH VA CONSULTING INC FOR BIG CANYON CREEK RESTORATION PROJECT THIS AGREEMENT is made and entered into as of this _ day of 200_, by and between the CITY OF NEWPORT BEACH, a Municipal Corporation ( "City "), and VA CONSULTING INC a California Corporation whose address is1:7801 Cartwright Road, Irvine, California, 92614 ( "Consultant"), and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to cant' on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City is planning to restore the historic tidal wetlands that have been traditionally situated in the mouth of Big Canyon. Water quality features will be incorporated which include a series of fresh water ponds. Also new interpretive and educational facilities will be constructed within the Big Canyon Nature Park. C. City desires to engage Consultant to act as the lead consultant and provide final engineering services as outlined in VA Consulting Scope of Services referenced as Exhibit "A" for the Big Canyon Creek Restoration Project ( "Project "). D. Consultant possesses the skill, experience, ability, background, certification and knowledge to provide the services described in this Agreement. E. The principal member of Consultant for purposes of Project shall be John S. Wolter, Inland Empire Division President and Daniel D. Villenes, Director of Water Resources. F. City has solicited and received a proposal from Consultant, has reviewed the previous experience and evaluated the expertise of Consultant, and desires to retain Consultant to render professional services under the terms and conditions set forth in this Agreement. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of this Agreement shall commence on the above written date, and shall terminate on the 31 day of June, 2009, unless terminated earlier as set forth herein. 2. SERVICES TO BE PERFORMED Consultant shall diligently perform all the services described in the Scope of Services attached hereto as Exhibit A and incorporated herein by reference. The City may elect to delete certain tasks of the Scope of Services at its sole discretion. 3.-- TIME OF PERFORMANCE Time is of the essence in the performance of services under this Agreement and the services shall be performed to completion in a diligent and timely manner. The failure by Consultant to perform the services in a diligent and timely manner may result in termination of this Agreement by City. Notwithstanding the foregoing, Consultant shall not be responsible for delays due to causes beyond Consultant's reasonable control. However, in the case of any such delay in the services to be provided for the Project, each party hereby agrees to provide notice to the other party so that all delays can be addressed. 3.1 Consultant shall submit all requests for extensions of time for performance in writing to the Project Administrator not later than ten (10) calendar days after the start of the condition that purportedly causes a delay. The Project Administrator shall review all such requests and may grant reasonable time extensions for unforeseeable delays that are beyond Consultant's control. 3.2 For all time periods not specifically set forth herein, Consultant shall respond in the most expedient and appropriate manner under the circumstances, by either telephone, fax, hand - delivery or mail. 4. COMPENSATION TO CONSULTANT City shall pay Consultant for the services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by reference. Consultant's compensation for all work performed in accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed Four Hundred Thirty Five Thousand One Hundred Fifty Nine Dollars and no /100 ($435,159.00) without prior written authorization from City. No billing rate changes shall be made during the term of this Agreement without the prior written approval of City. 4.1 Consultant shall submit monthly invoices to City describing the work performed the preceding month. Consultant's bills shall include the name of the person who performed the work, a brief description of the services performed and /or the specific task in the Scope of Services to which it relates, the date the services were performed, the number of hours spent on all work billed on an hourly basis, and a description of any 2 reimbursable expenditures. City shall pay Consultant no later. than thirty (30) days after approval of the monthly invoice by City staff. 4.2 City shall reimburse Consultant only for those costs or expenses specifically approved in this Agreement, or specifically approved in writing in advance by City. Unless otherwise approved, such costs shall be limited and include nothing more than ' the following costs incurred by Consultant: A. The actual costs of subconsultants for performance of any of the services that Consultant agrees to render pursuant to this Agreement, which have been approved in advance by City and awarded in accordance with this Agreement. B. Approved reproduction charges. C. Actual costs and /or other costs and /or payments specifically authorized in advance in writing and incurred by Consultant in the performance of this Agreement. 4.3 Consultant shall not receive any compensation for Extra Work performed without the prior written authorization of City. As used herein, "Extra Work" means any work that is determined by City to be necessary for the proper completion of the Project, but which is not included within the Scope of Services and which the parties did not reasonably anticipate would be necessary at the execution of this Agreement. Compensation for -any authorized Extra Work shall be paid in accordance with the Schedule of Billing Rates as set forth in Exhibit B. 4.4 Notwithstanding any other provision of this Agreement, when payments made by City equal 90% of the maximum fee provided for in this Agreement, no further payments shall be made until City has accepted the final work under this Agreement. 5. PROJECT MANAGER Consultant shall designate a Project Manager, who shall coordinate all phases of the Project. This Project Manager shall be available to City at all reasonable times during the Agreement term. Consultant has designated Daniel D. Villenes, Director of Water Resources to be its Project Manager. Consultant shall not remove or reassign the Project Manager or any personnel listed in Exhibit A or assign any new or replacement personnel to the Project without the prior written consent of City. City's approval shall not be unreasonably withheld with respect to the removal or assignment of non -key personnel. Consultant, at the sole discretion of City, shall remove from the Project any of its personnel assigned to the performance of services upon written request of City. Consultant warrants that it will continuously furnish the necessary personnel to complete the Project on a timely basis as contemplated by this Agreement. I 6. ADMINISTRATION This Agreement will be administered by the Public Works Department. Mark Reader, PE shall be the Project Administrator and shall have the authority to act for City under this Agreement. The Project Administrator or his /her authorized representative shall represent City in all matters pertaining to the services to be rendered pursuant to this Agreement. 7. CITY'S RESPONSIBILITIES In order to assist Consultant in the execution of its responsibilities under this Agreement, City agrees to, where applicable: A. Provide access to, and upon request of Consultant, one copy of all existing relevant information on file at City. City will provide all such materials in a timely manner so as not to cause delays in Consultant's work schedule. B. Provide blueprinting and other services through City's reproduction company for bid documents. Consultant will be required to coordinate the required bid documents with City's reproduction company. All other reproduction will be the responsibility of Consultant and as defined above. C. Provide usable life of facilities criteria and information with regards to new facilities or facilities to be rehabilitated. 8. STANDARD OF CARE 8.1 All of the services shall be performed by Consultant or under Consultant's supervision. Consultant represents that it possesses the professional and technical personnel required to perform the services required by this Agreement, and that it will perform all services in a manner commensurate with community professional standards. All services shall be performed by qualified and experienced personnel who are not employed by City, nor have any contractual relationship with City. By delivery of completed work, Consultant certifies that the work conforms to the requirements of this Agreement and all applicable federal, state and local laws and the professional standard of care. 8.2 Consultant represents and warrants to City that it has, shall obtain, and shall keep in full force in effect during the term hereof, at its sole cost and expense, all licenses, permits, qualifications, insurance and approvals of whatsoever nature that is legally required of Consultant to practice its profession. Consultant shall maintain a City of Newport Beach business license during the term of this Agreement. 8.3 Consultant shall not be responsible for delay, nor shall Consultant be responsible for damages or be in default or deemed to be in default by reason of strikes, lockouts, accidents, or acts of God, or the failure of City 2 to furnish timely information or to approve or disapprove Consultant's work promptly, or delay or faulty performance by City, contractors, or governmental agencies. 9. HOLD HARMLESS To the fullest extent permitted by law, Consultant shall indemnify, defend and hold harmless City, its City Council, boards and commissions, officers; agents, volunteers and employees (collectively, the "Indemnified Parties) from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever (individually, a Claim; collectively, "Claims "), which may arise from or in any manner relate (directly or indirectly) to the negligence, recklessness, or willful misconduct of the Consultant or its principals, officers, agents, employees, vendors, suppliers, consultants, subcontractors, anyone employed directly or indirectly by any of them or for whose acts they may be liable or any or all of them. Notwithstanding the foregoing, nothing herein shall be construed to require Consultant to indemnify the Indemnified Parties from any Claim arising from the sole negligence, active negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall be construed as authorizing any award of attorney's fees in any action on or to enforce the terms of this Agreement. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by the Consultant. 10. INDEPENDENT CONTRACTOR It is understood that City retains Consultant on an independent contractor basis and Consultant is not an agent or employee of City. The manner and means of conducting the work are under the control of Consultant, except to the extent they are limited by statute, rule or regulation and the expressed terms of this Agreement. Nothing in this Agreement shall be deemed to constitute approval for Consultant or any of Consultant's employees or agents, to be the agents or employees of City. Consultant shall have the responsibility for and control over the means of performing the work, provided that Consultant is in compliance with the terms of this Agreement. Anything in this Agreement that may appear to give City the right to direct Consultant as to the details of the performance or to exercise a measure of control over Consultant shall mean only that Consultant shall follow the desires of City with respect to the results of the services. 11. COOPERATION Consultant agrees to work closely and cooperate fully with City's designated Project Administrator and any other agencies that may have jurisdiction or 5 interest in the work to be performed. City agrees to cooperate with the Consultant on the Project. 12. CITY POLICY Consultant shall discuss and review all matters relating to policy and Project direction with City's Project Administrator in advance of all critical decision points in order to ensure the Project proceeds in a manner consistent with City goals and policies. 13. PROGRESS Consultant is responsible for keeping the Project Administrator and /or his /her duly authorized designee informed on a regular basis regarding the status and progress of the Project, activities performed and planned, and any meetings that have been scheduled or are desired. 14. INSURANCE Without limiting Consultant's indemnification of City, and prior to commencement of work. Consultant shall obtain, provide and maintain at its own expense during the term of this Agreement, a policy or policies of liability insurance of the type and amounts described below and in a form satisfactory to City. A. Certificates of Insurance. Consultant shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Insurance certificates must be approved by City's Risk Manager prior to commencement of performance or issuance of any permit. Current certification of insurance shall be kept on file with City at all times during the term of this Agreement. B. Signature. A person authorized by the insurer to bind coverage on its behalf shall sign certification of all required policies. C. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. D. Coverage Requirements. L Workers' Compensation Coverage. Consultant shall maintain Workers' Compensation Insurance and Employer's .Liability Insurance for his or her employees in accordance with the laws of the State of California. In addition, Consultant shall require_ each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California for all of the subcontractors C 0 employees. Any notice of cancellation or non - renewal of all Workers' Compensation policies must be received by City at least thirty (30.) calendar days (10 calendar days written notice of non- payment of premium) prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Consultant for City. ii. General Liability Coverage. Consultant shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury, and property damage, including without limitation, contractual liability. If commercial general liability insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement, or the general aggregate limit shall be at least twice the required occurrence limit. iii. Automobile Liability Coverage. Consultant shall maintain automobile insurance covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with work to be performed under this Agreement, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than one million dollars ($1,000,000) combined single limit for each occurrence. iv. Professional Errors and Omissions Insurance. Consultant shall maintain professional errors and omissions insurance, which covers the services to be performed in connection with this Agreement in the minimum amount of one million dollars ($1,000,000). E. Endorsements. Each general liability and automobile liability insurance policy shall be endorsed with the following specific language: The City, its elected or appointed officers, officials, employees, agents and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the Consultant. ii. This policy shall be considered primary insurance as respects to City, its elected or appointed officers, officials, employees, agents and volunteers as respects to all claims, losses, or liability arising directly or indirectly from the Consultant's operations or services provided to City. Any insurance maintained by City, including any self- insured retention City may have, shall be considered excess insurance only and not contributory with the insurance provided hereunder. 7 iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company. iv. The insurer waives all rights of subrogation against City, its elected or appointed officers, officials, employees, agents and volunteers. V. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to City, its elected or appointed officers, officials, employees, agents or volunteers. vi. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits, by either party except after thirty (30) calendar days (10 calendar days written notice of non - payment of premium) written notice has been received by City. F. Timely Notice of Claims. Consultant shall give City prompt and timely notice of claim made or suit instituted arising out of or resulting from Consultant's performance under this Agreement. G. Additional Insurance. Consultant shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work. 15. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS Except as specifically authorized under this Agreement, the services to be provided under this Agreement shall not be assigned, transferred contracted or subcontracted out without the prior written approval of City. Any of the following shall be construed as an assignment: The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Consultant, or of the interest of any general partner or joint venturer or syndicate member or cotenant if Consultant is a partnership or joint- venture or syndicate or cotenancy, which shall result in changing the control of Consultant. Control means fifty percent (50 %) or more of the voting power, or twenty-five percent (25 %) or more of the assets of the corporation, partnership or joint - venture. 16. SUBCONTRACTING City and Consultant agree that subconsultants may be used to complete the work outlined in the Scope of Services. The subconsultants authorized by City to perform work on this Project are identified in Exhibit A. Consultant shall be fully responsible to City for all acts and omissions of the subcontractor. Nothing in this Agreement shall create any contractual relationship between City and subcontractor nor shall it create any obligation on the part of City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. The City is an intended beneficiary of any work. 8 0 performed by the subcontractor for purposes of establishing a duty of care between the subcontractor and the City. Except as ' specifically authorized herein, the services to be provided under this Agreement shall not be otherwise assigned, transferred, contracted or subcontracted out without the prior written approval of City. 17. OWNERSHIP OF DOCUMENTS Each and every report, draft, map, record, plan, document and other writing produced (hereinafter "Documents "), prepared or caused to be prepared by Consultant, its officers, employees, agents and subcontractors, in the course of implementing this Agreement, shall become the exclusive property of City, and City shall have the sole right to use such materials in its discretion without further compensation to Consultant or any other party. Consultant shall, at Consultant's expense, provide such Documents to City upon prior written request. Documents, including drawings and specifications, prepared by Consultant pursuant to this Agreement are not intended or represented to be suitable for reuse by City or others on any other project. Any use of completed Documents for other projects and any use of incomplete Documents without specific written authorization from Consultant will be at City's_ sole risk and without liability to Consultant. Further, any and all liability arising out of changes made to Consultant's deliverables under this Agreement by City or persons other than Consultant is waived against Consultant and City assumes full responsibility for such changes unless City has given Consultant prior notice and has received from Consultant written consent for such changes. All improvement and /or construction plans shall be prepared with indelible waterproof ink or electrostaticly plotted on standard 24 -inch by 36 -inch Mylar with a minimum thickness of three mils. Consultant shall provide to City 'As- Built' drawings, and a copy of digital ACAD and tiff image files of all final sheets within ninety (90) days after finalization of the Project. For more detailed requirements, a copy of the City of Newport Beach Standard Design Requirements is available from the City's Public Works Department. 18. COMPUTER DELIVERABLES CADD data delivered to City shall include the professional stamp of the engineer or architect in charge of or responsible for the work. City agrees that Consultant shall not be liable for claims, liabilities or losses arising out of, or connected with (a) the modification or misuse by City, or anyone authorized by City, of CADD data; (b) the decline of accuracy or readability of CADD data due to inappropriate storage conditions or duration; or (c) any use by City, or anyone authorized by City, of CADD data for additions to this Project, for the completion of this Project by others, or for any other Project, excepting only such use as is authorized, in writing, by Consultant. By acceptance of CADD data, City agrees to indemnify Consultant for damages and liability resulting from the modification or misuse of such CADD data. All original drawings shall be submitted to City in the version of AutoCAD used by CITY in ".dwg" file format on a CD, and should comply with O the City's digital submission requirements for Improvement Plans. The City will provide AutoCAD file of City Title Sheets. All written documents shall be transmitted to City in the City's latest adopted version of Microsoft Word and Excel. 19. CONFIDENTIALITY All Documents, including drafts, preliminary drawings or plans, notes and communications that result from the services in this Agreement, shall be kept confidential unless City authorizes in writing the release of information. 20. OPINION OF COST Any opinion of the construction cost prepared by Consultant represents his/her judgment as a design professional and is supplied for the general guidance of City. Since Consultant has no control over the cost of labor and material, or over competitive bidding or market conditions, Consultant does not guarantee the accuracy of such opinions as compared to contractor bids or actual cost to City. 21. INTELLECTUAL PROPERTY INDEMNITY The Consultant shall defend and indemnify City, its agents, officers, representatives and employees against any and all liability, including costs, for infringement of any United States' letters patent, trademark, or copyright infringement, including costs, contained in Consultant's drawings and specifications provided under this Agreement. 22. RECORDS Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures and disbursements charged to City, for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of City to examine, audit and make transcripts or copies of such records and invoices during regular business hours. Consultant shall allow inspection of all work, data, Documents, proceedings and activities related to the Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement. 23. WITHHOLDINGS City may withhold payment to Consultant of any disputed sums until satisfaction of the dispute with respect to such payment. Such withholding shall not be deemed to constitute a failure to pay according to the terms of this Agreement. Consultant shall not discontinue work as a result of such withholding. Consultant shall have an immediate right to appeal to the City Manager or his/her designee 10 _ 0 with respect to such disputed sums. Consultant shall be entitled to receive interest on any withheld sums at the rate of return that City earned on its investments during the time period, from the date of withholding of any amounts found to have been improperly withheld. 24. ERRORS AND OMISSIONS In the event of errors or omissions that are due to the negligence or professional inexperience of Consultant which result in expense to City greater than what would have resulted if there were not errors or omissions in the work accomplished by Consultant, the additional design, construction and/or restoration expense shall be bome by Consultant. Nothing in this paragraph is intended to limit City's rights under the law or any other sections of this Agreement. 25. CITY'S RIGHT TO EMPLOY OTHER CONSULTANTS City reserves the right to employ other Consultants in connection with the Project. 26. CONFLICTS OF INTEREST The Consultant or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act "), which (1) requires such persons to disclose any financial interest that may foreseeably be materially affected by the work performed under this Agreement, and (2) prohibits such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. If subject to the Act, Consultant shall conform to all requirements of the Act. Failure to do so constitutes a material breach and is grounds for immediate termination of this Agreement by City. Consultant shall indemnify and hold harmless City for any and all claims for damages resulting from Consultant's violation of this Section. 27. NOTICES All notices, demands, requests or approvals to be given under the terms of this Agreement shall be given in writing, and conclusively shall be deemed served when delivered personally, or on the third business day after the deposit thereof in the United States mail, postage prepaid, first -class mail, addressed as hereinafter provided. All notices, demands, requests or approvals from Consultant to City shall be addressed to City at: Attn: Mark Reader Public Works Department City of Newport Beach 3300 Newport Boulevard Newport Beach, CA, 92663 Phone: 949 - 644 -3311 Fax: 949 - 644 -3318 11 All notices, demands, requests or approvals from CITY to Consultant shall be addressed to Consultant at: Mr. Max P. Vahid, P.E. President and CDO VA Consulting, Inc. 17801 Cartwright Road Irvine, CA 92614 Phone: 949 - 474 -1400 Fax: 949 - 261 -8482 28. TERMINATION In the event that either party fails or refuses to perform any of the provisions of this Agreement at the time and in the manner required, that party shall be deemed in default in the performance of this Agreement. If such default is not cured within a period of two (2) calendar days, or if more than two (2) calendar days are reasonably required to cure the default and the defaulting party fails to give adequate assurance of due performance within two (2) calendar days after receipt of written notice of default, specifying the nature of such default and the steps necessary to cure such default, and thereafter diligently take steps to cure the default, the non - defaulting party may terminate the Agreement forthwith by giving to the defaulting party written notice thereof. Notwithstanding the above provisions, City shall have the right, at its sole discretion and without cause, of terminating this Agreement at any time by giving seven (7) calendar days prior written notice to Consultant. In the event of termination under this Section, City shall pay Consultant for services satisfactorily performed and costs incurred up to the effective date of termination for which Consultant has not been previously paid. On the effective date of termination, Consultant shall deliver to City all reports, Documents and other information developed or accumulated in the performance of this Agreement, whether in draft or final form. 29. COMPLIANCE WITH ALL LAWS Consultant shall at its own cost and expense comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. In addition, all work prepared by Consultant shall conform to applicable City, county, state and federal laws, rules, regulations and permit requirements and be subject to approval of the Project Administrator and City. 30. WAIVER A waiver by either party of any breach, of any term, covenant or condition contained herein shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition contained herein, whether of the same or a different character. 12 0 31. INTEGRATED CONTRACT This Agreement represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions herein. 32. CONFLICTS OR INCONSISTENCIES In the event there are any conflicts or inconsistencies between this Agreement and the Scope of Services or any other attachments attached hereto, the terms of this Agreement shall govern. 33. INTERPRETATION The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of the Agreement or any other rule of construction which might otherwise apply. 34. AMENDMENTS This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney. 35. SEVERABILITY If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 36. CONTROLLING LAW AND VENUE The laws of the State of California shall govern this Agreement and all matters relating to it and any action brought relating to this Agreement shall be adjudicated in a court of competent jurisdiction in the County of Orange. 37. EQUAL OPPORTUNITY EMPLOYMENT Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age.. 13 0 E IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the day and year first written above. APPROVED AS TO FORM: CiA �.., C ate--- - orney for the City of Newport Beach ATTEST: LaVonne Harkless, City Clerk CITY OF NEWPORT BEACH, A Municipal Corporation By: Mayor for the City of Newport Beach CONSULTANT: 0 (Corporate Officer) Title: Print Name: 0 (Financial Officer) Print Name: Attachments: Exhibit A — Scope of Services Exhibit B — Schedule of Billing Rates f .\userslpbvAsharedlagmementslfy 07 -Oita consulting -big canyon creek.doc 14 n- CONSULTING December 4, 2007 Mr. Mark Reader, P.E. Project Manager Public Works Department City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 -3884 Dear Mr. Reader: 0 Exhibit A Thank you for providing VA Consulting, Inc. (VA) the opportunity to submit this proposal for professional consultant services to prepare the final design, contract documents and obtain resource agency permits for the Big Canyon Creek Restoration Project (Project). This proposal supersedes our proposal submitted to the City on November 29, 2007. VA understands that the City of Newport Beach (City) has undertaken the Project in order to restore historical tidal wetlands that have been traditionally situated in the Upper Newport Bay at the mouth of Big Canyon. The Project Feasibility Study, prepared by WRC Consulting Services, Inc., was completed in June 2007 and the Project Mitigated Negative Declaration (CEQA Document) was adopted by the City council In September 2007. The services provided in this proposal are for the project described in the above Feasibility Study and CEQA Document. VA has assembled a highly qualified Project team to perform the design and permitting tasks necessary to bid and construct the Project. VA staff will perform field surveys and mapping, civil engineering and structural engineering design, preparation of construction plans, specifications and cost estimates and provide overall project management. LSA Associates, Inc. (LSA) will provide the design and specifications for the riparian and upland vegetation planting, the design and specifications for removal and monitoring of invasive species, and the Landscaping design and specifications for the Project trail system. From the previous Feasibility Study Project Team, Ron Yeo, FAIA Architect, Inc. (RY) ifill- continue to provide the architectural services necessary for the final design of Protect .. improvements. Geosoils Inc. (GSI) will provide geotechnical services necessary to update the preliminary soils investigation to include final design criteria for the conceptual Project plans. Weston Solutions Inc. (Weston) will continue with the Project and will prepare a post- construction Water Quality Sampling and Analysis Plan (SAP). The Acorn Group (Acorn): will provide design and specifications for interpretive signing and WRA Consultants (WRA) will provide design guidelines and specifications for the grading and planting of the proposed tidal wetlands and freshwater ponds and will provide services necessary for the completion of regulatory agency permitting activities. VA Consul ing, Inc. Corporam office Orange Cowry Division 17801 Cartwright Bold hvine, CA92614 Phone949.4741400 In 949.261.8482 Mr. Mark Reader December 4, 2007 Page 2 of 13 Our total estimated fee for the services included in this proposal is $435,159.00, which includes $38,703 for the Orange County Sanitation District (OCSD) portion of the design services that are related to the improving access to their sewer facilities located adjacent to Jamboree Road. Detailed descriptions of the services proposed for the Project are provided in the following sections of this proposal. Section I provides a detailed scope -of- services for the Project and Section II a listing of assumptions and excluded services that are not included in this proposal. Section III provides a summary of the fees associated with the tasks identified in the scope -of- services. SECTION I — SCOPE -OF- SERVICES PART 1 — PROJECT PERMIT AND AGENCY APPROVALS A. Resource Agency Permitting WRA initiated resource agency permitting during the Feasibility Study phase of the Project and will complete the permitting process with Federal and State Resource Agencies and the California Coastal Commission. Included in the permitting process will be the preparation of an Essential Fish Habitat Study (EFHS). Mr. Rick Ware of Coastal Resources Management, Inc. on behalf of WRA, will prepare the EFHS. At the conclusion of the Permitting Process, WRA will prepare a California Environmental Quality Act (CEQA) and permit conditions compliance matrix for inclusion into the Project contract documents. B. OCSD Process and Approvals VA will submit construction plans and specifications to obtain approvals from the Orange County Sanitation District. C. NPDES Compliance VA will prepare a Water Quality Management Plan (WQMP) that will identify BMP's to provide for the water quality of on -site runoff to the proposed Big Canyon improvements. The WQMP will conform to Regional Water Quality Control Board (RWQCB) and City standards. VA will also prepare a Storm Water Pollution Prevention Plan (SWPPP) that will identify water quality BMP's to be implemented during the construction phase of the Project. Both of these documents will demonstrate compliance with current NPDES requirements. This task also provides for assistance to the City while filing and processing the Notice of Intent (NOI) and the subsequent Notice of Termination (NOT) with the RWQCB. PART 2 — PREPARATION OF PLANS AND FINAL CONTRACT DOCUMENTS A. Civil Engineering Design VA will perform the civil engineering design services for the two specific Project areas as follows: The Orange County Sanitation District Access Road Improvements The City Project Area for the Big Canyon Restoration ■^ C��spaW_ 2UV1` PwpN4�pwt& atlh9B�MN��Po11ro ,�pdFBmCartM�siu +Cm120W] (FNYd • Mr. Mark Reader December 4, 2007 Page 3 of 13 VA will perform the following tasks related to the civil engineering and design of the Project facilities and components: Collect and Review Existing Data This task will provide for the collection and review of existing information, hydrologic and hydraulic analyses, sediment transport analyses included in existing reports and documentation as provided by the City. The collected information will be reviewed and incorporated into the civil design of the Project. 2. Hydraulic Design of Stormwater Conveyances This task provides for design -level hydraulic analyses of the proposed hydraulic features of the Project. These features include the following: • The Jamboree Road culvert extension and energy dissipater structure; 0 Overflow outlets from the two freshwater ponds; C Flo -slit facility downstream of the lower freshwater pond; and • Back Bay Drive culverts to the Upper Newport Bay The hydraulic analyses will use the WSPG and /or HEC -RAS hydraulic analysis software packages to determine conveyance capacities, hydraulic grade lines, and facility configurations. The results of the hydraulic analyses will be used to develop construction plans and details for the Project. 3. Selection and Design of Proposed BMP s This task provides for the selection and sizing of the proposed BMP's to be located at storm drain inlets to the Big Canyon Restoration Area. VA will coordinate with suppliers of BMP devices and the City in order to assist the City with the selection of BMP's. Once selected, BMP's will be hydraulically sized and details for their installation and /or construction will be depicted on the overall Project improvement plans. 4. Structural Analyses and Designs This task provides for structural analyses of architectural and reinforced concrete elements of the proposed restoration project. These elements include interpretive signing, gathering area covering, restroom facility enclosures, culvert headwalls, outlet weirs, energy dissipater structures, and BMP connections to storm drain lines. The results of the analyses will be used to determine foundation dimensions, timber sizing and timber connections and the section thicknesses and reinforcement requirements for the various concrete structures. Structural analyses will be prepared in accordance with the latest requirements of the National Design Specification (NDS) for wood construction and the American Concrete institute Code 318 for reinforced concrete construction. - YWr..nxWmnawM ewMV. Mr. Mark Reader December 4, 2007 Page 4 of 13 5. Back Bay Drive Realignment Improvement Plans This task provides for the preparation of street improvement plans for the realigned portion of Back Bay Drive. The plans will consist of approximately 1,600 linear feet of street improvements shown on 1 "=40' plan and profile sheets. The plans will be prepared on City titleblock and formatted for inclusion in the Project Improvement Plan Set as described below. it is estimated that two plan and profile sheets and two signing and striping sheets will be required for the proposed realignment. 6. Interpretive Area and Street Precise Grading Plans This task provides for the preparation of precise grading and improvement plans for the Interpretive Area. The plans will be prepared at a scale of 1 " =10' and will provide spot elevations for access roads, parking lots, trails and walkways. These plans will also depict signing and striping information for vehicular access way and parking areas within the Interpretive Area: A total of four plan sheets will depict the Interpretive Area and will be placed on City titleblock for inclusion in the overall Project Improvement Plan Set as described below. Restoration Area Grading Plans This task provides for the preparation of grading and Improvement plans for the Big Canyon Restoration Project between Jamboree Road and the Upper Newport Bay. The grading plans will provide contour grading for the propospd facilities including the freshwater ponds, trails, treatment wetland, service roads and tidal marsh. The restoration area grading plans will be prepared at a scale of 1 "=40' consisting of 5 plan sheets and one grading note sheet. The plans will be prepared on City titleblock and formatted for inclusion in the Project Improvement Plan Set as described below. 8. Drainage Improvement Plans and Details This task provides for the preparation of plans, details and sections of the proposed Project drainage facilities. The drainage improvement plans will be based on the hydraulic and structural analyses as described above and will provide construction -level details for the following Project elements: • The Jamboree Road culvert extension and energy dissipater • Overflow outlets from the two freshwater ponds • Flow slit facility downstream of the lower freshwater pond • Back Bay Drive culverts to the Upper Newport Bay The plans will be prepared on City titleblock and formatted for inclusion in the Project improvement Plan Set as described below. _.�. r .,,• �a• �'^••,• �•,,^• T���. au,: avu� ,vrmJ.�au�wewiawmmw�ffwuraviaoo 0 Mr. Mark Reader December 4, 2007 Page 5 of 13 9. Erosion Control Plans VA will prepare a set of erosion control plans that will identify the construction BMP's necessary to minimize site erosion and the transport of sediments beyond the Project site. The erosion control plans will be prepared at a scale of 1 "=40' consisting of 5 plan sheets and a BMP detail sheet. The erosion control plans will be prepared on City titleblock and formatted for inclusion in the Project Improvement Plan Set as described below. 10. Project Technical Specifications VA will prepare a set of technical specifications to define material and construction requirements of the work included in the Project Improvement Plan Set. The specifications will be prepared in accordance with City standards and will be formatted for inclusion with the City's bid package. This task also includes the preparation of a bid sheet to list the items of work and their associated quantities. 11. Engineer's Opinion of Probable Construction Costs VA will prepare quantity estimates for the items of work depicted on the Project Improvement Plan Set. The quantity estimates will be itemized along with corresponding units of measurement. VA will then create an opinion of probable construction cost from the quantity estimate by applying unit cost data to the estimated quantities as collected by VA during recent construction activities or as published in current cost data manuals. 12. Process Improvement Plans VA will submit the improvement plans and technical specifications to the City Public Works Department for review and approval. It is anticipated that two submittals will be required prior to approval of the documents. This task provides for written responses to comments and minor adjustments to the plans and specifications after each submittal. In the event that the City requires significant changes to the plans and/or technical specifications, a separate proposal for these changes will be provided when and if these changes are required. B. Survey and Mapping VA will perform the following tasks: Research VA will research, compile and review all existing surrey control and mapping data from the City, County and /or other governing agencies for boundary information adjacent to or relevant to the Project's design. 2. Project Control VA field crews will locate project specific horizontal/vertical control (NAD83 and NAVD88) and transfer it to the project including boundary monument search (if X' �. ROO1wWfpNSy�B�q�gq� ,�pgpppi�PesereGwn4010, piXKPEV/.Ox Mr. Mark Reader December 4, 2007 Page 6 of 13 existing /recoverable) to use for the subsequent topographic design survey. VA field crews will establish a temporary benchmark on the project site. 3. Topographic Design Survey VA will perform an aerial topographic survey of undeveloped drainage area west of Jamboree Road, east of Back Bay Drive, north of San Joaquin Hills Road and south of Eastbiuff Drive in Newport Beach (approximately 75.acres). VA field crews will perform a topographic design survey to be utilized in preparation of the base map to include ground shots on a twenty five foot (25') grid over the westerly portion (approximately 35 acres) and the area around the outlet structure off Jamboree Road. 4. Topographic Mapping Survey data from Task B.2 & B3 will be compiled by VA staff to create topographic mapping at a scale of one inch equals forty feet (1 °=40) with one foot (1') contours for the project area. The topographic base map will depict the existing conditions together with the right -of -way boundary as required. 5. Big Canyon Nature Park Boundary VA staff will show the Big Canyon Nature Park boundary and CDFG boundary on the new project topo map. C. Geotechnbcal Investigation & Soils Report GSI will perform the geotechnical investigation and prepare a Solis Report for the two specific Project Areas, including: The OCSD access road improvement area, including the Jamboree Road storm drain extension, new head -wall and wing -wall construction and construction of the maintenance road adjacent to Jamboree Road. The City Project area including freshwater ponds, upper spillways, hydraulic structures and underlying drainage culverts, Back Bay Drive Re- alignment, parking areas and the Interpretive Area building pad(s). GSI will perform the following tasks: • Review available published literature, maps and aerial photos of the vicinity. • Meet with Underground Service Alert (USA), if warranted, to search for buried utilities within the public right of way. • Consult with the project environmental firm with respect to suitability of proposed boring and test pit locations, in light of environmental constraints at the site. • Perform site exploration via hollow stem auger rig, backhoe and hand auger in order to evaluate subsurface soil conditions at the site. We propose to perform four (4) hours of backhoe trench work and eight (8) hours of hand auger boring ■:uwO.OP.p _MAKU+wwmftmft (R� R.� Mr. Mark Reader December 4, 2007 Page 7 of 13 within the storm drain extension and maintenance road area. For the other area we propose to conduct ten (10) hours of hollow stem auger drilling, four (4) hours of backhoe trenching and eight (8) hours of hand auger boring. Boring and excavations are anticipated to range from 3 to 50 feet in depth, or practical/economic refusal. • Obtain representative samples of site soil for laboratory testing. Testing may include, but may not. be limited to: in -situ moisture density determinations; compaction, permeability, soil expansion; grain size; shear strength; consolidation; and corrosion. • Perform an evaluation of site seismicity and seismic hazards. • Prepare an appropriately illustrated geotechnical engineering, and engineering geologic report that would include: the logs of the explorations; extent of earth material units; laboratory test results; hydraulic embankment design parameters; earthwork factors; liquefaction potential; and conclusions and recommendations related to project planning, preliminary foundation design and grading guidelines. D. Tidal Wetlands and Freshwater Ponds Design W RA will perform the following tasks: • Prepare the fine grading plans for the tidal wetlands, new freshwater pond and restored wetland. • Prepare planting and irrigation plans and specifications for the tidal wetlands, new freshwater pond and restored wetland. • Prepare bid specifications in a format to be provided by VA. • Prepare a final cost estimate for planting components of the plan. • Attend up to 3 project meetings. E. Riparian and Upland Areas Planting Design LSA will perform the following tasks: • Prepare the planting plans and specifications for the Riparian and Upland Project Areas. • Prepare plan and specifications for the removal and monitoring of invasive species removal. • Prepare maintenance, monitoring and reporting requirements for the planted vegetation and for the invasive species removal. • Attend up to 3 project meetings. L7�iS1pSr�; 'fuwtrtir.�4'aumime�[�au�x�' ::: . 0 0 Mr. Mark Reader December 4, 2007 Page 8 of 13 F. Architectural Services Ron Yeo will provide project architectural services and perform the following tasks: • Prepare enclosure plans and specifications for 4 portable chemical toilets. • Prepare plans and specifications for Vista Terrace seating area plan for 100. • Prepare plans and specifications for Vista Terrace seating area shade structure (hand retractable canvas). • Prepare plans and specifications for minor structure for interpretive materials. • Attend up to 6 meetings. G. Interpretive Sign Design The Acorn Group will perform the following tasks: • Provide digital photographs for 8 panels. • Develop text for Interpretive, Regulatory and Orientation Panels for 15 panels. • Prepare final design development and final art production and delivery on disk per vendor specifications. H. Trail and Overlook Design LSA will provide landscape architect services and prepare plans and specifications for Project Trail and overlook system. • Assist with development of the grading plans to include the trail and overlook system. • Prepare plans, details and specifications for preparation of the trail and overlook system. • Attend up to 3 project meetings. PART 3 — POST- CONSTRUCTION WATER QUALITY SAMPLING AND ANALYSIS PLAN (SAP) Weston will develop and submit post- construction Water Quality Sampling and Analysis Plan to the Regional Water Quality Control Board. Included with this task, Weston will prepare for and attend one meeting with the Big Canyon County Club Golf Course. PART 4 — PROJECT MANAGEMENT, COORDINATION AND MEETINGS We anticipate project design duration of 6 months starting from the City's Notice to Proceed. Project management time is required to coordinate the transfer of project information to sub - consultant and City staff, coordinate consultant and sub - consultant activities and to coordinate ILWri. KryW��1�1' �E�We' pOr�8N9J. 0' qf. �„ wIRiOMUL�N�'•W�N1nM¢tlnGa�120(0f (FiNPL PEV1Aac Mr. Mark Reader December 4, 2007 Page 9 of 13 project status with the Technical Advisory Committee. For the purpose of the proposal we have estimated 40 hours per month for a total of 240 hours for project management. We estimate a total of 12 Project meetings during the 6 month period including, 1 kickoff meeting, 6 monthly status meetings, 4 TAC meetings and 1 City council meeting. VA will provide agendas and meeting minutes for each of the meetings. For the purpose of this proposal we have assumed 3 hours of Project Management and 4 hours of support staff for each meeting. PART 5 — ENGINEERING SUPPORT DURING BID PHASE It is anticipated that Project improvements may be constructed in phases over several years. However, at this time it is not clear if one construction contract or separate construction contracts will be awarded to contractor(s) for the construction of the proposed improvements. Therefore, for the purpose of this proposal-we have assumed there will be one bid phase. Should engineering support services for additional bid phases be required, a change order request or a separate contract will be processed through the City. For purpose of this proposal, we have assumed 16 hours of VA staff time for participation in engineering support activities during the bidding process. VA will provide assistance to the City during the bid process as follows: Attend pre -bid meeting with interested. contractors. Respond to request for clarification, interpretation of plans and interpretation of specifications. Prepare addenda to bid documents as necessary. For purpose of this proposal we have assumed one (1) addenda will be prepared and that city staff will be responsible for distribution of addenda to the bidders. PART 6 — REIMBURSABLE EXPENSES This task provides for the cost of reproduction of plan sets and reports for submittals and the cost of messenger services, delivery services, reproduction services, etc. that will be associated with assisting the City with the preparation of materials for meetings and project reviews. SECTION II — ASSUMPTIONS AND EXCLUSIONS It has been assumed for the purposes of this proposal that hydrological studies of Big Canyon have been completed during the preparation of the previous Project studies including the Feasibility Study. As such, the flow rates reported in previous Project studies are assumed to be acceptable to the City and other reviewing agencies for purposes of facility design. Furthermore, additional hydrological studies are excluded from this proposal. Lastly, the foregoing tasks and the attached fee estimate do riot include the following: Lot Line Adjustments; Monumentation of Lot Line Adjustments; ➢ ALTA (American Land Title Association) Surveys; • Parcel Mergers; • Preparation of Record Maps; It]M p{P_XUWWM CV"P HOPDI�,YOWl (PMK REVI.ds Mr. Mark Reader December4,2007 Page 10 of 13 ➢ Re- establishment of missing Monumentation; ➢ Record of Surveys; A Re- establishment of missing post - construction Monumentaticn; Corner Records; ➢ Preparation of Legal Documents (Metes & Bounds) for Easement Acquisitions; ➢ Obtaining Title Reports/Deeds /Easement Documents; ➢ Rights -of -way acquisitions; ➢ Obtaining Permission to Enter upon Private Properties; ➢ Interior Property Parcel Boundary Surveys; Construction Staking; ➢ As -Built Surveys; ➢ Resource Agency Permit Fees; ➢ Engineering Support during Construction; ➢ Construction Management; D Construction Services including: • Geotechnical • Biology • Environment • Survey • Materials Testing • Inspection SECTION III — SUMMARY OF FEES A detailed breakdown of the proposal fees is included below. Our services will be provided on a time - and - materials, not -to- exceed basis in accordance with the attached fee schedule (Exhibit "A ") As requested, the fees associated with improvements to the OCWD facilities have been indicated separately. PART 1 - PROJECT PERMITS AND AGENCY APPROVALS A. Resource Agency Permits (City Project Area ) ............................. .....................$23,582.00 B. OCSD Process and Approvals (OCSD Improvement Area) ......... ......................$7,500.00 C. NPDES Compliance (City Project Area ........ ............................... .....................$15,000.00 Subtotal (Part 1 - City Project Area) ..................... ............................... .....................$38,582.00 Subtotal (Part 1- OCSD Improvement Area) ........ ............................... ......................$7,500.00 PART 2 - PREPARATION OF PLANS AND FINAL CONTRACT DOCUMENTS A. Civil Engineering Design 1. Collect and Review Existing Data a. City Project Area .................................................... .....................$2,500.()U b. OCSD Improvement Area ...... ............................... ......................$1,000.00 2. Hydraulic Design of Stormwater Conveyance a. City Project Area .................... ............................... ......................$5,000.00 x+lc@ *P- PosACNXmlam90rv.WA 6emrewC-W�A.Pw we wmem«aeu., 0e rev,. ;Ri".iw 4%3W C,Cr°e!+>pAWa lawbo .." .. ;. ; ..:. 0 0 Mr. Mark Reader December 4, 2007 Page 11 of 13 B. Survey and Mapping 1. Feld Survey and Mapping (City Project Area) ................. .....................$18,600.00 2. Reid Survey and Mapping (OCSD Improvement Area) .... ..............:.......$1,000.00 Sub -total (Part 213 - City Project Area) ...... ............................... .....................$18,600.00 i Sub -total (Part 213 - OCSD Improvement Area) ......................... .....................$1,000.00 �nnsmnnna�+e�a,ae u�.,a�w,nro,x�a�w.,xam FUM b. OCSD Improvement Area ...... ............................... ......................$2,500.00 I' 3. Selection and Design of Proposed BMP's I a. City Project Area .................... ............................... ......................$6,000.00 4. Structured Analyses and Design a. City Project Area .................... ............................... ......................$6,500.00 b. OCSD Improvement Area ...................... ........... -- ...................... $2,000.00 5. Back Bay Drive Realignment Improvement Plans a. City Project Area ................... ............................... .....................$12,000.00 6. Interpretive Area and Street Precise Grading Plans j a. City Project Area ................... ............................... .....................$21,000.00 i 7. Restoration Area and OCSD Access Road Grading Plans a. City Project Area ................... ............................... .....................$14,000.00 b. OCSD Improvement Area ...... ............................... ......................$4,000.00 8. Drainage Improvement Plans and Details a. City Project Area .................... ............................... ......................$6,000.00 b. OCSD Improvement Area ...... ............................... ................:.....$3,000.00 9. Erosion Control Plans a. City Project Area .................... ............................... ......................$5,500.00 b. OCSD Improvement Area ...... ............................... ......................$2,000.00 10. Project Technical Specifications a. City Project Area ................... ............................... ......................$8,500.00 b. OCSD Improvement Area ...... ............................... ......................$3,500.00 11. Engineer's Opinion of Probable Construction Casts a. City Project Area ..................... .............$4,000.00 b. OCSD Improvement Area ...... ............................... ......................$1,500.00 12. Process Improvement Plans a. City Project Area .................... ............................... ......................$6,500.00 b. OCSD Improvement Area ...... ............................... ......................$3,500.00 Sub -total (Part 2A - City Project Area) ...... ............................... .....................$97,500.00 Sub -total (Part 2A - OCSD Improvement Area) ....................... .....................$23,000.00 B. Survey and Mapping 1. Feld Survey and Mapping (City Project Area) ................. .....................$18,600.00 2. Reid Survey and Mapping (OCSD Improvement Area) .... ..............:.......$1,000.00 Sub -total (Part 213 - City Project Area) ...... ............................... .....................$18,600.00 i Sub -total (Part 213 - OCSD Improvement Area) ......................... .....................$1,000.00 �nnsmnnna�+e�a,ae u�.,a�w,nro,x�a�w.,xam FUM Mr. Mark Reader December 4, 2007 Page 12 of 13 C. Geotechnical Investigation & Soils Report 1. Geotechnical Services (City Project Area) ....................... .....................$14,412.00 2. Geotechnical Services (OCSD Improvement Area) .......... ......................$7,203.00 Sub -total (Part 2C - City Project Area) ...... ............................... .....................$14,412.00 Sub -total (Part 2C - OCSD Improvement Area) ........................ ......................$7,203.00 D. Tidal Wetlands and Freshwater Pond Design 1. Final design, plans and specifications.... .............................................. $34,970.00 2. Attend up to 3 project meetings ......... ............................... ......................$9,678.00 Sub -total (Part 2D - City Project Area) ...... ............................... .....................$44,648.00 F. Riparian and Upland Area Planting Design 1. Preparation of Planting Plans and Specifications ............. ......................$8,165.00 2. Preparation of Invasive Vegetation Removal Specifications ...................$3,680.00 3. Preparation and Attendance of up to 3 project meetings .. ......................$6,785.00 Sub -total (Part 2E - City Project Area) ...... ..........................:.... .....................$18,630.00 F. Architectural Services 1. Prepare Plans and Specifications ..... ............................... .....................$11,500.00 2. Attend up to 6 project meetings ......... ............................... ......................$6,900.00 Sub -total (Part 2F - City Project Area) ...... ............................... .....................$18,400.00 G. Interpretive Sign Design 1. Design interpretive sign panels ........ ............................... .....................$40,190.00 2. Attend up to 4 project meetings ......... ............................... ......................$1,380.00 Sub -total (Part 2G - City Project Area) ..... ............................... .....................$41,570.00 H. Trail and Overlook Design 1. Prepare Plans and Specifications ..... ............................... .....................$22,425.00 2. Preparation and Attendance of up to 3 project meetings .. ......................$6,785.00 Sub -total (Part 2H - City Project Area) ...... ............................... .....................$29,210.00 Sub -total (Part 2A through 2H - City Project Area) ................ ....................$282,970.00 I Sub -total (Part 2A through 2H - OCSD Improvement Area) ... .....................$31,203.00 I cvnaw,onprmwaabw.2aom�muwaym e.wrao gem «�wnow,�l.ynn.aocar�wAV+ro.+um� zao� (flwL xPnao� Mr. Mark Reader December 4, 2007 Page 13 of 13 PART 3 - POST - CONSTRUCTION WATER QUALITY SAMPLING AND ANALYSIS PLAN (SAP) A. Post Construction Sampling and Monitoring Plan ........................ ......................$6,900.00 B. Meeting with Big Canyon County Club Golf Course ..................... ......................$1,200.00 Sub -total (Part 3 - City Project Area) ......... ............................... ......................$8,100.00 PART 4 - PROJECT MANAGEMENT, COORDINATION AND MEETINGS A. Project Management & Coordination .......... ............................... .....................$41,520.00 B. Attendance at project, TAC and City Council Meetings ............... .....................$13,284.00 Sub-total (Part 4 - City Project Area) .................... ............................... .....................$54,804.00 PART 5 ENGINEERING SUPPORT DURING BID PHASE Sub -total (Part 5 - City Project Area) ..................... ............................... ......................$3,000.00 PART 6 REIMBURSABLE EXPENSES Sub -total (Part 6 - City Project Are a) ..................... ............................... ......................$9,000.00 TOTAL FEES (PART 1 THROUGH 6 - CITY PROJECT AREA) .......... ....................$396,456.00 TOTAL FEES (PART 1 THROUGH 6 - OCSD IMPROVEMENT AREA) .....................$38,703.00 TOTAL ESTIMATED FEE (PART 1 THROUGH PART 6 - CITY PROJECT & OCSD IMPROVEMENT AREAS) .............:............. ............................... ....................$435,159.00 We.look forward to being of service to you on this Project. We have the resources available to perform these services and will initiate work upon the receipt of your "Notice to Proceed'. if you have any questions, please call,�ohn Wolter at (951) 340 -0030 or me at (949) 474 -1400. hid, P.E/ and CEO MPV/kam/cmj Enclosure: cc: John Wolter Daniel Villines Contracts XVw-*0P xW -W1PW e.M12 samt�M ..sw% o City of Newport Beach Big Canyon Creek Restoration Project Phase IV & V Forward Budget Assessment Prepared By VA Conwaing, hie. 29d ov-ff CONSULTING J E VA WESTON ACORN LSA R.YEO GEOSOILS WRA Total Phase Description Cont. Amt Cont. Amt Cont. Amt Cant Amt Cont. Amt. Cont. Amt. Cont. Amt, Amount I. Feasibility Assessment -Task Completed - 11. Water Quality QAPP and SAP -Task Completed - 111. Preliminary Engineering -Task Completed - IV. Environmental Review 8 Permits $23,582 $23,582 V. Outreach, Final Engineering 8 Design Public Meetings - Budget Expended - Final Engineering $97,600 $13,000 $30,590 $11,500 $34,970 $187,560 Meetings, Technical Team (Original Scope) $13,284 $1,380 $14,664 VI. Post Construction Water Quality Monitoring Plan $6,900 $6,900 V8. Project Management/ CoordinatlonlMastingalReimbumables $50,520 $1200 $13,570 $6,900 $9,678 $81,868 SUBTOTAL (Phase 1 to V8) $314,874 Vlll. OCSO Meintance Road $31,500 $7,203 $38,703 IX. Additional Consulting Services Survey and Mapping $18,600 $18,600 Geotachnical investigations and Report $14,412 $14,412 Invasive Vegetation Removal Specifications $3,680 $3,680 Interpretive Sign Graphic Design $27,190 $27,190 NPDES City Compliance $15,000 $15,000 Engineering Support During Bidding $3,000 $3,000 $ SUBTOTAL (Phase Vill 81X) $120,686 ores I a 404 $3,100 $41,570 $47,840 $18,400 $21,616 i 88,230 6,169 J E 0 EXHIBIT j /b" VA CONSULTING, INC. FEE SCHEDULE 2007 Staff Classification Civil Engineering and Planning Services Hourly Rate President............................................................ ............................... ..... ...... ............................... $190 Division President[Division Manager ................................................................. ............................... $173 Sr. Vice President/Vice President/ Exec. Director .................................._......... ............................... $163 Director. .. .............................................................................................._.. . ....._..........._............. $1504 - SeniorProject Manager ... ............................. .. -- ...._.. ............................:.. ................._.........$155 ProjectManager... ............................... ! ..................... .................................................... st ................ $147 AssistantProject Manager................................... ..: ............. ...................... ........ . ..... .... ...... .....:: .... :...... $142 Senior Project Engineer /Senior Design SuperaisorlSenlor Planner .................. ............................... $137 Project Enginw/Design Supervisor ......................... _.. ................. ........................... ............ ............ $132 Inspector.............................................................................. ............................... .... $130a -- Senior Design Engineer/Senior Designer .......................................................... ............................... $122*" DesignEngineer/ Planner ....................... :....................... .. ..................................... ... ............ ............. $117 Designer............... : ............. ....... ...... .... ................... :........................................ :..... ....... ............ ......... $110 Assistant Engineer /Assistant Planner.,.... ................................ 2. ...... ...... ........................ ........... $100 Research and Processing Coordinator_....... .....................................................:. ...:........:::.....:.......... $95 SeniorGADD Technician .............. ........................................................................... .............. _........... $90 JuniorEngineer ........................... ............................. .... .....:.........._............... ............................... $86 CADDTechnician ..................................... ........ .. .......................... _ ........................... ..................... .... $80 EngineeringIntern ................................................................ :. ......... ................................................... $70 OfficeSupport( Clerical ....................................................................................... ............................... $fig Field Survey and Manning Services Director of Survey and Mapping ............................... ............................. ............................... . -- ....... $168 Managerof field Survey .............. ............................................... ......................... ...........................$130 Surveyand Mapping Associate ..... --- ............................................................. ........ ....:............:............, $ , Surveyand Mapping Technician .... ...................................................... ......._................................. ........... $75' 3-Man OPS Crew ....... _ .................................................................. ............................... ...........................$226 2-Man GPS Crew ....................... .. ............................ ....................._....... -- ........ .._........................$300 1 Wan GPSCrew .................. ............................. -- ........_... ......._....................... ...........................$170 Special Services Litigation ....................................... Notes. . ............... ................. _.........$400 1. Invoices will be prepared for all services through the,end of each calendar month. Invoices are due and payable on presentation. 2. Overtime, when requested by the client, will be surcharged at a rate of 135% of the standard hourly rates. Sundays and holidays will be surcharged at a rate of 170% of the standard hourly rates 3. Reprographics, messenger service, travel tirrcluding lodging and meals), and other direct expenses will be eharged at cost plus 106/6. The services of outside consultants will be charged accost plus 15% to cover administration and overhead. 4. In -house reprographics charges: B&W Bond copies $1,00*.ft, Color Bond 88.00/@q.it. 5. Mileage Wit be billed at standard mileage rates set by IRS. 2007 rates currently listed at $0.485 per mile. cwaa�rov+awsaaw_mamVaey.:»�ew awm upyu6nVa-.n.n empasMamr rmw6rdoc OCAE L FIGURE 2.2.2 Grading, Drainage, and Utilities Plan ifty of Newport BeacI6 NO. BA- 08BA -032 BUDGET AMENDMENT 2007 -08 AMOUNT: $tss,3sl.00 EFFECT ON BUDGETARY FUND BALANCE: X Increase Revenue Estimates Increase in Budgetary Fund Balance X Increase Expenditure Appropriations AND NX Decrease in Budgetary Fund Balance Transfer Budget Appropriations No effect on Budgetary Fund Balance SOURCE: from existing budget appropriations X from additional estimated revenues X from unappropriated fund balance EXPLANATION: This budget amendment is requested to provide for the following: To increase revenue estimates and expenditure appropriations due to contributions from the Orange County Sanitation District and the Irvine Ranch Conservancy and to increase expenditure appropriations from Tidelands fund balance for approval of a PSA with VA Consulting to provide design services for the Big Canyon Creek Restoration Project. ACCOUNTING ENTRY: BUDGETARY FUND BALANCE I Amount Fund Account Description Debit Credit 230 3605 Tidelands Fund - Fund Balance $48,456.00 " REVENUE ESTIMATES (3601) Fund /Division Account Description 250 4839 Contributions - OC Sanitation District Contri $28,222.00 250 4839 Contributions - OC Sanitation District Contri $38,703.00 250 4887 Contributions - Irvine Ranch Water District $50,000.00 EXPENDITURE APPROPRIATIONS (3603) Division Number Account Number Autcmaf7c System Entry. Signed: Approval: Administrat4o Services Director Signed:�Jir.+..v^' Signed: City Manager 'Date d� at City Council Approval: City Clerk Date Description Division Number 7251 Contributions Account Number C5100709 Big Canyon Creek Restoration $28,222.00 Division Number 7251 Contributions Account Number C5100709 Big Canyon Creek Restoration $38,703.00 Division Number 7251 Contributions Account Number C5100709 Big Canyon Creek Restoration $50,000.00 Division Number 7231 Tidelands Capital Account Number C5100709 Big Canyon Creek Restoration $48,456.00 Division Number Account Number Autcmaf7c System Entry. Signed: Approval: Administrat4o Services Director Signed:�Jir.+..v^' Signed: City Manager 'Date d� at City Council Approval: City Clerk Date