Loading...
HomeMy WebLinkAboutC-4161 - OASIS Senior Center Site Utilities for Staff Temporary TrailersCITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT g INFORMAL CONTRACT FOR OASIS SENIOR CENTER �- SITE UTILITIES FOR STAFF TEMPORARY TRAILERS 1 U THIS AGREEMENT, entered into this2-1 day of 2O4) 2009, by and between the CITY OF NEWPORT BEACH, hereinafter "City," and Wiesen Construction, Inc., a California corporation, hereinafter "Contractor," is made with reference to the following facts: WHEREAS, City has solicited for bids for the following described public work: the framing work per A1.0, dated 1/7/09, and S -1, dated 12/21/08. The scope of work shall include all labor, materials, tools, equipment, and supervision to furnish and install the new deck including all decking, structural support, hardware, and connections. The wood stairs, ramps, guardrail, and handrail are also included. WHEREAS, Contractor has been determined by City to be have submitted the lowest responsible price to complete this project, and the compensation set forth in this Contract, is based upon Contractor's careful examination of all Contract documents, plans and specifications. NOW, THEREFORE, City and Contractor agree as follows A. CONTRACT DOCUMENTS The complete Contract for the Project includes all of the following documents: Instructions to Contractor, Proposal, Non - Collusion Affidavit, Faithful Performance Bond, Labor and Materials Payment Bond, Permits, General Conditions, Standard Special Provisions and Standard Drawings, Plans and Special Provisions for Informal Contract, Standard Specifications for Public Works Construction (current adopted edition and all supplements) and this Agreement, and all modifications and amendments thereto (collectively the "Contract Documents "). The Contract Documents comprise the sole agreement between the parties as to the subject matter therein. Any representations or agreements not specifically contained in the Contract Documents are null and void. Any amendments must be made in writing, and signed by both parties in the manner specified in the Contract Documents. B. SCOPE OF WORK Contractor shall perform everything required to be performed, and shall provide and furnish all the labor, materials, necessary tools, expendable equipment and all utility and transportation services required for the Project: All of the work to be performed and materials to be furnished shall be in strict accordance with the provisions of the Contract Documents. Contractor is required to perform all activities, at no extra cost to City which are reasonably inferable from the Contract Documents as being necessary to produce the intended results. C. COMPENSATION As full compensation for the performance and completion of the Project as required by the Contract Documents, City shall pay to Contractor and Contractor accepts as full payment the sum of Seventeen Thousand, Ninety -Six and 00/100 Dollars ($17,096.00). 0 (1) Any loss or damage arising from the nature of the work, (2) Any loss or damage arising from any unforeseen difficulties or obstructions in the performance of the wort, (3) Any expense incurred as a result of any suspension or discontinuance of the work, but excludes any loss resulting from earthquakes of a magnitude in excess of 3.5 on the Richter Scale and tidal waves, and which loss or expense occurs prior to acceptance of the work by City. D. NOTICE OF CLAIMS Unless a shorter time is specified elsewhere in this Contract, before making its final request for payment under the Contract Documents, Contractor shall submit to City, in writing, all claims for compensation under or arising out of this Contract. Contractor's acceptance of the final payment shall constitute a waiver of all claims for compensation under or arising out of this Contract except those previously made in writing and identified by Contractor in writing as unsettled at the time of its final request for payment. The Contractor and City expressly agree that in addition to all claims filing requirements set fort in the Contract and Contract documents, the contractor shall be required to file any claim the contractor may have against the City in strict conformance with the Tort Claims Act (Government code 900 et. seq.) E. WRITTEN NOTICE Any written notice required to be given under the Contract Documents shall be performed by depositing the same in the U.S. Mail, postage prepaid, directed to the address of Contractor and to City, addressed as follows: CITY City of Newport Beach Public Works Department 3300 Newport Boulevard Newport Beach, CA 92663 Attention: Dave Webb (949) 644 -3311 (949) 6443308 Fax CONTRACTOR Wiesen Construction 28825 Aloma Avenue Laguna Niguel, CA 92677 949- 463 -6644 949- 429 -1503 Fax F. INSURANCE Without limiting Contractor's indemnification of City, and rio or to commencement of work, Contractor shall obtain, provide and maintain at its own expense during the term of this Agreement, a policy or policies of liability insurance of the type and amounts described below and in a form satisfactory to City. 1. Certificates of Insurance. Contractor shall provide original certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Insurance certificates must be approved by City's Risk Manager prior to commencement of performance or issuance of any permit. Current certification of insurance shall be kept on file with City at all times during the term of this contract. City reserves the right to require complete, certified copies of all required insurance policies, at any time. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the work hereunder by Contractor, his agents, representatives, employees or subcontractors. The cost of such insurance shall be included in Contractor's bid. R y 2. Signature. A person authorized by the insurer to bind coverage on its behalf shall sign certification of all required policies. 3. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. 4. Coverage Requirements. a. Workers' Compensation Coverage. Contractor shall maintain Workers' Compensation Insurance and Employer's Liability Insurance for his or her employees in accordance with the laws of the State of California, Section 3700 of the Labor Code In addition, Contractor shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor's employees. Any notice of cancellation or non - renewal of all Workers' Compensation policies must be received by City at least thirty (30) calendar days (10 calendar days written notice of non - payment of premium) prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Contractor for City. b. General Liability Coverage. Contractor shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury, and property damage, including without limitation, contractual liability. If commercial general liability insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement, or the general aggregate limit shall be at least twice the required occurrence limit. c. Automobile Liability Coverage. Contractor shall maintain automobile insurance covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with work to be performed under this Agreement, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than one million dollars ($1,000,000) combined single limit for each occurrence. 5. Deductibles and Self- Insured Retentions Any deductibles or self- insured retentions must be declared to and approved by City. At the option of City, either: the insurer shall reduce or eliminate such deductibles or self- insured retentions as respects City, its officers, officials, employees and volunteers; or Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. 6. Other Insurance Provisions The policies are to contain, or be endorsed to contain, the following provisions: R a) General Liability and Automobile Liability Coverages City, its elected or appointed officers, agents, officials, employees, and volunteers are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of Contractor, including the insured's general supervision of Contractor; products and completed operations of Contractor; premises owned, occupied or used by Contractor; or automobiles owned, leased, hired or borrowed by Contractor. The coverage shall contain no special limitations on the scope of protection afforded to City, its elected or appointed officers, officials, employees, agents or volunteers. ii. Contractor's insurance coverage shall be primary insurance and /or primary source of recovery as respects City, its elected or appointed officers, agents, officials, employees and volunteers as respects to all claims, losses, or liability arising directly or indirectly from the Contractor's operations or services provided to the City. Any insurance or self - insurance maintained by City, its officers, officials, employees and volunteers shall be excess of the Contractor's insurance and shall not contribute with it. iii. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to City, its officers, agents, officials, employees and volunteers. iv. Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. v. The insurance afforded by the policy for contractual liability shall include liability assumed by contractor under the indemnification /hold harmless provision contained in this Contract. vi. The insurer shall agree to waive all rights of subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers for losses arising from work performed by Contractor for City. b) All Coverages Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled, rescinded by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to City. Timely Notice of Claims — Contractor shall give City prompt and timely notice of any claim made or suit instituted arising out of or resulting from Contractor's performance under this agreement. All of the executed documents referenced in this contract must be returned within ten (10) working days after the date on the "Notification of Award," so that the City may review and approve all insurance and bonds documentation. 7. Acts of God 7 Pursuant to Public Contract Code Section 7105, Contractor shall not be responsible for the repairing and restoring damage to Work, when damage is determined to have been proximately caused by an Act of God, in excess of 5 percent of the Contract amount provided that the Work damaged is built in accordance with the plans and specifications. 8. Right to Stop Work for Non - Compliance City shall have the right to direct the Contractor to stop work under this Agreement and /or withhold any payment(s), which become due to Contractor hereunder until Contractor demonstrates compliance with the requirements of this article. G. RESPONSIBILITY FOR DAMAGES OR INJURY City and all officers, employees and representatives thereof shall not be responsible in any manner: for any loss or damages that may happen to the Work or any part thereof; for any loss or damage to any of the materials or other things used or employed in performing the Work, for injury to or death of any person either workers or the public; or for damage to property from any cause arising from the construction of the work by Contractor, or its subcontractors, or its workers, or anyone employed by it. 2. Contractor shall be responsible for any liability imposed by law and for injuries to or death of any person or damage to property resulting from defects, obstructions or from any cause arising from Contractor's work on the Project, or the work of any subcontractor or supplier selected by the Contractor. 3. Contractor shall indemnify, hold harmless, and defend City, its officers and employees from and against (1) any and all loss, damages, liability, claims, allegations of liability, suits, costs and expenses for damages of any nature whatsoever, including, but not limited to, bodily injury, death, personal injury, property damages, or any other claims arising from any and all acts or omissions of Contractor, its employees, agents or subcontractors in the performance of services or work conducted or performed pursuant to this Contract; (2) use of improper materials in construction of the Work; or, (3) any and all claims asserted by Contractor's subcontractors or suppliers on the project, and shall include reasonable attorneys' fees and all other costs incurred in defending any such claim. Contractor shall not be required to indemnify City from the active negligence or willful misconduct of City, its officers or employees. 4. To the extent authorized by law, as much of the money due Contractor under and by virtue of the Contract as shall be considered necessary by City may be retained by it until disposition has been made of such suits or claims for damages as aforesaid. 5. Nothing in this article, nor any other portion of the Contract Documents shall be construed as authorizing any award of attorneys' fees in any action to enforce the terms of this Contract, except to the extent provided for in H.3, above. 6. The rights and obligations set forth in this Article shall survive the termination of this Contract. H. EFFECT OF CONTRACTOR'S EXECUTION Execution of this Contract and all other Contract Documents by Contractor is a representation that Contractor has visited the Project Site, has become familiar with the local conditions under which the work is to be 8 performed, and has correlated all relevant observations with the requirements of the Contract Documents. CONFLICT If there is a conflict between provisions of this Contract and any other Contract Document, the provisions of this Contract shall prevail. J. WAIVER A waiver by City or any term, covenant, or condition in the Contract Documents shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition. IN WITNESS WHEREOF, the parties hereto have caused this contract to be executed the day and year first written above. ATTEST: IN APO, VRIPFC. n.- ,9. Attachment: Proposal CITY OF NEWPORT BEACH A Municipal Corpon#k) s Badum .s Director WIWN CONSTRUCTION, INC. By: d ", (Corporate Officer) Title: GA2,0 Print Name: Al Mws� By: /,—(Financial Officer) Title: F0 Print Name: 3k& k if GLEN Please note: Corporations must complete and sign both Places above even if each office is held by the same individual 0 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT INFORMAL CONTRACT FOR OASIS SENIOR CENTER SITE UTILITIES FOR STAFF TEMPORARY TRAILERS NOTICE TO CONTRACTOR The following Contract Documents shall be executed and delivered to the City: • CONTRACT WITH REQUIRED INSURANCE CERTIFICATES AND ENDORSEMENTS The City of Newport Beach will not permit a substitute format for these Contract Documents. Contractors are advised to review their content with bonding, insuring and legal agents prior to submission of bid. Certificate(s) of Insurance, General Liability Insurance Endorsement, and Automobile Liability Insurance Endorsement shall be provided as required by the Contract documents and delivered to the Public Works Department before a Notice to Proceed will be issued. Pursuant to Public Contract Code Section 22300, appropriate securities may be substituted for any monies to be withheld to ensure performance under the Contract. Insurance companies affording coverage shall be (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, and (2) assigned Policyholders' Rating A (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide: Property - Casualty. Coverages shall be provided as specified in the Standard Specifications for Public Works Construction, except as modified by the Special Provisions. Certificates of Insurance and additional insured endorsements shall be on the insurance company's forms, fully executed and delivered with the Contract. The Notice to Proceed will not be issued until all contract documents have been received and approved by the City. 3 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT 1. The following documents shall be completed, executed and received by the Public Works Department: CONTRACT PROPOSAL 2. The City of Newport Beach will not permit a substitute format for the Contract Documents listed above. Contractors are advised to review their content with bonding and legal agents prior to submission of bid. 3. In accordance with the California Labor Code (Sections 1770 et seq.), the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages in the locality in which the work is to be performed for each craft, classification, or type of workman or mechanic needed to execute the contract. A copy of said determination is available by calling the prevailing wage hotline number (415) 703- 4774, and requesting one from the Department of Industrial Relations. All parties to the contract shall be governed by all provisions of the California Labor Code — including, but not limited to the requirement to pay prevailing wage rates (Sections 1770 -7981 inclusive). A copy of the prevailing wage rates shall be posted by the Contractor at the job site. 4. The Contractor shall be responsible for insuring compliance with provisions of Section 1777.5 of the Labor Code Apprenticeship requirements and Section 4100 et seq. of the Public Contracts Code, °Subletting and Subcontracting Fair Practices Act". 5. All documents shall bear signatures and titles of persons authorized to sign on behalf of the bidder. For corporations, the signatures shall be of a corporate officer or an individual authorized by the corporation. For partnerships, the signatures shall be of a general partner. For sole ownership, the signature shall be of the owner. The signature below represents that the above has been reviewed. 35' Contractor's License No. & Classification U/10 Ey✓ COW TVC-h) ry Bidder r /5v orized Signature/Title Date CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT DESIGNATION OF SUBCONTRACTORS) State law requires the listing of all subcontractors who will perform work in an amount in excess of one -half of one percent of the Contractor's total contract price. If a subcontractor is not listed, the Contractor represents that he /she is fully qualified to and will be responsible for performing that portion of the work. Substitution of subcontractors shall be made only in accordance with State law and /or the Standard Specifications for Public Works Construction, as applicable. Pursuant to Public Contract Code Section 22300 appropriate securities may be substituted for any monies to be withheld to ensure performance under the Contract. The Contractor, by signing this designation, certifies that bids from the following subcontractors have been used in formulating the bid for the project and that these subcontractors will be used subject to the approval of the Engineer and in accordance with State law. No changes may be made in these subcontractors except with prior approval of the City of Newport Beach. (Use additional sheets if needed) Subcontractor's Name, Address, Telephone # Bid Item Number Percent Of Total Bid Description of Work Percent of Total Bid Bidder A�15rfzed Signaturerritle 2