Loading...
HomeMy WebLinkAboutC-4949 - Agreement for Repair Services for 38th Street Park Patio Structuret- - ECEirVED AUG 2 4 2011 AGREEMENT FOR REPAIR SERVICES . v WITH ALL PRO BUILDERS, INC FOR 38TH STREET PARK PATIO STRUCTURE j� THIS AGREEMENT FOR REPAIR SERVICES ( "Agreement ") is made and entered into as of this 30 day of August, 2011 ( "Commencement Date ") by and between the -CITY OF NEWPORT BEACH, a California Municipal Corporation and charter city ( "City "), and ALL PRO BUILDERS, INC, a California corporation ( "Contractor "), whose principal place of business is 1400 W. Commonwealth Avenue, Fullerton, California 92833 and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. The 38th Street Park patio structure requires repairs. C. City desires to engage Contractor to remove existing patio cover at 38th Street Park, and build a new patio cover to City's specifications as further depicted in Exhibit A ( "Project "). D. Contractor has examined the location of all proposed work, carefully reviewed and evaluated the specifications set forth by the City for the Project, and is familiar with all conditions relevant to the performance of services and has committed to perform all work required for the price specified in this Agreement. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of this Agreement shall commence on the Commencement Date, and shall terminate on September 30, 2011, unless terminated earlier as set forth herein. 2. SCOPE OF WORK 2.1. City and Contractor acknowledge that the above Recitals are true and correct and are hereby incorporated by reference. Contractor shall perform all the work depicted in the City's Specifications, attached hereto as Exhibit A and incorporated herein by reference and further described in the Scope of Work attached hereto as Exhibit B and incorporated herein by this reference ( "Services" or "Work "). As a material inducement to the City entering into this Agreement, Contractor represents and warrants that Contractor is a provider of first class work and Contractor is experienced in performing the Work contemplated herein and, in light of such status and experience, Contractor covenants that it shall follow the highest professional standards in performing the Work required hereunder and that all materials will be of good quality. For purposes of this Agreement, the phrase "highest professional standards" shall mean those standards of practice recognized by one or more first -class firms performing similar work under similar circumstances. 2.2. Contractor shall perform everything required to be performed, and shall provide and furnish all the labor, materials, necessary tools, expendable equipment and all utility and transportation services necessary for the Project. 3. TIME OF PERFORMANCE 3.1. Time is of the essence in the performance of Services under this Agreement and Contractor shall complete the Work by September 30, 2011. 4. COMPENSATION 4.1. As full compensation for the performance and completion of the Project as required by the Scope of Work and Schedule of Billing Rates attached hereto as Exhibit B, City shall pay to Contractor and Contractor accepts as full payment the sum Twenty Five Thousand Four Hundred Twenty Dollars and 65/100 ($25,420.65). Contractor shall not receive any additional compensation unless approved in advance by the City in writing. The City shall make full payment to contractor no later than thirty (30) days after acceptance of Work by City. 5. ADMINISTRATION This Agreement will be administered by the Municipal Operations Department. Jim Auger, Operations Support Superintendent or his /her designee shall be the Project Administrator and shall have the authority to act for City under this Agreement. The Project Administrator or his /her authorized representative shall represent City in all matters pertaining to the Services to be rendered pursuant to this Agreement. 6. TYPE AND INSTALLATION OF MATERIALS /STANDARD OF CARE 6.1. Contractor shall use only the standard materials described in Exhibit A in performing Services under this Agreement. Any deviation from the materials described in Exhibit A shall not be installed unless approved in advance by the Project Administrator. 6.2. All of the Services shall be performed by Contractor or under Contractor's supervision. Contractor represents that it possesses the personnel required to perform the Services required by this Agreement, and that it will perform all Services in a manner commensurate with highest professional standards. All Services shall be performed by qualified and experienced personnel who are not employed by City, nor have any contractual relationship with City. 7. RESPONSIBILITY FOR DAMAGES OR INJURY 7.1. City and all officers, employees and representatives thereof shall not be responsible in any manner for any loss or damage to any of the materials or other things used or employed in performing the Project or for injury to or death of any person as a result of Contractor's performance of the Services required hereunder; or for damage to All Pro Builders Inc. Page 2 property from any cause arising from the performance of the Project by Contractor, or its subcontractors, or its workers, or anyone employed by either of them. 7.2. Contractor shall be responsible for any liability imposed by law and for injuries to or death of any person or damage to property resulting from defects, obstructions or from any cause arising from Contractor's Work on the Project, or the Work of any subcontractor or supplier selected by the Contractor. 7.3. To the fullest extent permitted by law, Contractor shall indemnify, defend and hold harmless City, its City Council, boards and commissions, officers, agents, volunteers, and employees (collectively, the "Indemnified Parties') from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever (individually, a Claim; collectively, "Claims "), which may arise from or in any manner relate (directly or indirectly) to any breach of the terms and conditions of this Agreement, any Work performed or Services provided under this Agreement including, without limitation, defects in workmanship or materials or Contractor's presence or activities conducted on the Project (including the negligent and /or willful acts, errors and /or omissions of Contractor, its principals, officers, agents, employees, vendors, suppliers, consultants, subcontractors, anyone employed directly or indirectly by any of them or for whose acts they may be liable or any or all of them). 7.4. Notwithstanding the foregoing, nothing herein shall be construed to require Contractor to indemnify the Indemnified Parties from any Claim arising from the sole negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall be construed as authorizing any award of attorney's fees in any action on or to enforce the terms of this Agreement. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by the Consultant. 7.5. Contractor shall perform all Project Work in a manner to minimize public inconvenience and possible hazard, to restore other work areas to their original condition and former usefulness as soon as possible, and to protect public and private property. Contractor shall be liable for any private or public property damaged during the performance of the Project Work. 7.6. To the extent authorized by law, as much of the money due Contractor under and by virtue of the Agreement as shall be considered necessary by City may be retained by it until disposition has been made of such suits or claims for damages as aforesaid. 7.7. The rights and obligations set forth in this Section shall survive the termination of this Agreement. All Pro Builders Inc. Page 3 8. INDEPENDENT CONTRACTOR City has retained Contractor as an independent contractor and neither Contractor nor its employees are to be considered employees of the City. The manner and means of conducting the Work are under the control of Contractor, except to the extent they are limited by statute, rule or regulation and the express terms of this Agreement. No civil service status or other right of employment shall accrue to Contractor or its employees. Contractor shall have the responsibility for and control over the means of performing the Work, provided that Contractor is in compliance with the terms of this Agreement. Anything in this Agreement that may appear to give City the right to direct Contractor as to the details of the performance or to exercise a measure of control over Contractor shall mean only that Contractor shall follow the desires of City with respect to the results of the Services. 9. COOPERATION Contractor agrees to work closely and cooperate fully with City's designated Project Administrator and any other agencies that may have jurisdiction or interest in the Work to be performed. City agrees to cooperate with the Contractor on the Project. 10. INSURANCE 10.1. Without limiting Contractor's indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to City. The cost of such insurance shall be included in Contractor's bid. 10.2. Coverage and Limit Requirements. 10.2.1. Workers' Compensation. Contractor shall maintain Workers' Compensation Insurance providing statutory benefits and employer's liability insurance with limits of at least one million dollars ($1,000,000) each type for Contractor's employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, Contractor shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor's employees. The insurer issuing the Workers' Compensation insurance shall amend its policy by endorsement to waive all rights of subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers. Contractor shall submit to City, along with the required certificate of insurance, a copy of such waiver of subrogation endorsement. 10.2.2. General Liability. Contractor shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence, two million dollars ($2,000,000) General Aggregate and two million dollars ($2,000,000) Products and Completed Operations Aggregate for bodily injury, personal injury, and property damage, including without limitation, blanket contractual liability. Coverage shall be at least as broad as that provided by Insurance Services Office form All Pro Builders Inc. Page 4 CG 00 01. None of the policies required herein shall be in compliance with these requirements if they include any limiting endorsement that has not been first submitted to City and approved in writing. 10.2.3. Automobile Liability. Contractor shall maintain automobile insurance covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than one million dollars ($1,000,000) combined single limit for each accident. 10.2.4. Builders Risk. For Agreements or Contracts with Construction /Builders Risk property exposures, Contractor shall maintain Builders Risk insurance or an installation floater as directed by City, covering damages to the Work for "all risk" or special form causes of loss with limits equal to one hundred percent (100 %) of the completed value of contract, with coverage to continue until final acceptance of the Work by City. At the discretion of City, the requirement for such coverage may include additional protection for Earthquake and /or Flood. City shall be included as an insured on such policy, and Contractor shall provide the City with a copy of the policy. 10.3. Other Insurance Provisions or Requirements. 10.3.1. Evidence of Insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers' compensation and an additional insured endorsement for general liability. Insurance certificates and endorsements must be approved by City's Risk Manager prior to commencement of performance or issuance of any permit. Current evidence of insurance shall be kept on file with City at all times during the term of this Agreement. All of the executed documents referenced in this Agreement must be returned within ten (10) working days after the date on the "Notification of Award," so that the City may review and approve all insurance and bond documentation. City reserves the right to require complete, certified copies of all required insurance policies, at any time. 10.3.2. General liability insurance provisions. Primary and excess or umbrella liability policies are to contain, or be endorsed to contain, the following provisions: 10.3.2.1. City, its elected or appointed officers, agents, officials, employees, and volunteers are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of Contractor, including the insured's general supervision of Contractor; products and completed operations of Contractor; premises owned, occupied or used by Contractor. The coverage shall contain no special limitations on the scope of protection afforded to City, its elected or appointed officers, officials, employees, agents or volunteers. Contractor shall submit to City a copy of the additional insured endorsement along with the required certificates of insurance. All Pro Builders Inc. Page 5 10.3.2.2. Contractor's insurance coverage shall be primary insurance and /or primary source of recovery as respects City, its elected or appointed officers, agents, officials, employees and volunteers as respects to all claims, losses, or liability arising directly or indirectly from the Contractor's operations or services provided to the City. Any insurance or self- insurance maintained by City, its officers, officials, employees and volunteers shall be excess of the Contractor's insurance and shall not contribute with it. 10.3.2.3. Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 10.4. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. 10.5. Notice of Cancellation. Contractor agrees to oblige its insurance broker and insurers to provide to City with 30 days notice of cancellation (except for nonpayment for which 10 days notice is required) or nonrenewal of coverage for each required coverage except for builder's risk insurance. The builder's risk policy will contain or be endorsed to contain a provision providing for 30 days written notice to City of cancellation or nonrenewal, except for nonpayment for which 10 days notice is required. 10.6. Self- Insured Retentions. Contractor agrees not to self- insure or to use any self- insured retentions on any portion of the insurance required herein and further agrees that it will not allow any indemnifying party to self- insure its obligations to City. If contractor's existing coverage includes a self- insured retention, the self- insured retention must be declared to City. City may review options with the contractor, which may include reduction or elimination of the self- insured retention, substitution of other coverage, or other solutions. Contractor agrees to be responsible for payment of any deductibles on their policies. 10.7. Timely Notice of Claims. Contractor shall give City prompt and timely notice of any claim made or suit instituted arising out of or resulting from Contractor's performance under this agreement. 10.8. Waiver. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers, or shall specifically allow Contractor or others providing insurance evidence in compliance with these requirements to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subcontractors. All Pro Builders Inc. Page 6 10.9. Enforcement of Contract Provisions. Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non - compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder. 10.10. Requirements not Limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. 10.11..City's Remedies. City shall have the right to order the Contractor to stop Work under this Agreement and /or withhold any payment(s) that become due to Contractor hereunder until Contractor demonstrates compliance with the requirements of this article. In the alternative, City may purchase the required coverage and charge Contractor the cost of the premiums or deduct the cost from Contractor's payments. 10.12. Coverage not Limited. All insurance coverage and limits provided by contractor and available or applicable to this agreement are intended to apply to the full extent of the policies. Nothing contained in this agreement or any other agreement relating to the city or its operations limits the application of such insurance coverage. 10.13. Coverage Renewal. Contractor will renew the coverage required here annually as long as Contractor continues to provide any Services under this or any other contract or agreement with the City. Contractor shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contractor's insurance agent to this effect is acceptable. A certificate of insurance and /or additional insured endorsement as required in these specifications applicable to the renewing or new coverage must be provided to City within five days of the expiration of the coverages. 11. PREVAILING WAGES Pursuant to the applicable provisions of the Labor Code of the State of California, not less than the general prevailing rate of per diem wages including legal holidays and overtime Work for each craft or type of workman needed to execute the Work contemplated under the Contract shall be paid to all workmen employed on the Work to be done according to the Contract by the Contractor and any subcontractor. In accordance with the California Labor Code (Sections 1770 et seq.), the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages in the locality in which the Work is to be performed for each craft, classification, or type of workman or mechanic needed to execute the Contract. A copy of said determination is available by calling the prevailing wage hotline number (415) 703 -4774, and requesting one from the Department of Industrial Relations. The Contractor is required to obtain the wage determinations from the Department of Industrial Relations and post at the job site the prevailing rate or per diem wages. It shall be the obligation of the Contractor or All Pro Builders Inc. Page 7 any subcontractor under him /her to comply with all State of California labor laws, rules and regulations and the parties agree that the City shall not be liable for any violation thereof. 12. SUBCONTRACTING City and Contractor agree that subcontractors may be used to complete the Work outlined in the Scope of Work provided the Contractor obtains City approval prior to the subcontractor performing any work. Contractor shall be fully responsible to City for all acts and omissions of the subcontractors. Nothing in this Agreement shall create any contractual relationship between City and subcontractor nor shall it create any obligation on the part of City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. 13. WITHHOLDINGS City may withhold payment to Contractor of any disputed sums until satisfaction of the dispute with respect to such payment. Such withholding shall not be deemed to constitute a failure to pay according to the terms of this Agreement. Contractor shall not discontinue Work as a result of such withholding. Contractor shall have an immediate right to appeal to the City Manager or his /her designee with respect to such disputed sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of return that City earned on its investments during the time period, from the date of withholding of any amounts found to have been improperly withheld. 14. CONFLICTS OF INTEREST 14.1. The Contractor or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act "), which (1) requires such persons to disclose any financial interest that may foreseeably be materially affected by the Work performed under this Agreement, and (2) prohibits such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. 14.2. If subject to the Act, Contractor shall conform to all requirements of the Act. Failure to do so constitutes a material breach and is grounds for immediate termination of this Agreement by City. Contractor shall indemnify and hold harmless City for any and all claims for damages resulting from Contractor's violation of this Section. 15. NOTICES 15.1. All notices, demands, requests or approvals to be given under the terms of this Agreement shall be given in writing, to City by Contractor and conclusively shall be deemed served when delivered personally, or on the third business day after the deposit thereof in the United States mail, postage prepaid, first -class mail, addressed as hereinafter provided. All notices, demands, requests or approvals from Contractor to City shall be addressed to City at: All Pro Builders Inc. Page 8 Attn: Jim Auger Municipal Operations Department City of Newport Beach 3300 Newport Blvd. PO Box 1768 Newport Beach, CA 92658 Email: jauger @newportbeachca.gov Phone: 949 - 718 -3477 Fax: 949 - 650 -0747 15.2. All notices, demands, requests or approvals from City to Contractor shall be addressed to Contractor at: Attn: Carrie Harris All Pro Builders, Inc. 1400 W. Commonwealth Ave Fullerton, CA 92833 Email: carrie @allprobuildersinc.com Phone: 714 - 255 -0131 Fax: 714 -449 -1519 16. NOTICE OF CLAIMS 16.1. Unless a shorter time is specified elsewhere in this Contract, before making its final request for payment under the Contract, Contractor shall submit to City, in writing, all claims for compensation under or arising out of this Contract. Contractor's acceptance of the final payment shall constitute a waiver of all claims for compensation under or arising out of this Contract except those previously made in writing and identified by Contractor in writing as unsettled at the time of its final request for payment. The Contractor and the City expressly agree that in addition to all claims filing requirements set forth in the Contract and Contract Documents, the Contractor shall be required to file any claim the Contractor may have against the City in strict conformance with the Tort Claims Act (Govt. Code §§ 900 et seq.). 17. TERMINATION 17.1. In the event that either party fails or refuses to perform any of the provisions of this Agreement at the time and in the manner required, that party shall be deemed in default in the performance of this Agreement. If such default is not cured within a period of two (2) calendar days, or if more than two (2) calendar days are reasonably required to cure the default and the defaulting party fails to give adequate assurance of due performance within two (2) calendar days after receipt of written notice of default, specifying the nature of such default and the steps necessary to cure such default, the non - defaulting party may terminate the Agreement forthwith by giving to the defaulting party written notice thereof. 17.2. Notwithstanding the above provisions, City shall have the right, at its sole discretion and without cause, of terminating this Agreement at any time by giving seven (7) calendar days prior written notice to Contractor. In the event of termination under All Pro Builders Inc. Page 9 this Section, City shall pay Contractor for Services satisfactorily performed and costs incurred up to the effective date of termination for which Contractor has not been previously paid. On the effective date of termination, Contractor shall deliver to City all materials purchased in performance of this Agreement. 18. STANDARD PROVISIONS 18.1. Compliance with all Laws. Contractor shall at its own cost and expense comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. 18.2. Waiver. A waiver by City of any term, covenant, or condition in the Contract shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition. 18.3. Integrated Contract. This Contract represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and Contracts of whatsoever kind or nature are merged herein. No verbal Contract or implied covenant shall be held to vary the provisions herein. 18.4. Conflicts or Inconsistencies. In the event there are any conflicts or inconsistencies between this Contract and the Exhibits attached hereto, the terms of this Contract shall govern. 18.5. Amendments. This Contract may be modified or amended only by a written document executed by both Contractor and City and approved as to form by the City Attorney. 18.6. Effect of Contractor's Execution. Execution of this Contract by Contractor is a representation that Contractor has visited the Project Site, has become familiar with the local conditions under which the Work is to be performed, and has taken into consideration these factors in submitting its Project Proposal and Scope of Work. 18.7. Controlling Law and Venue. The laws of the State of California shall govern this Contract and all matters relating to it and any action brought relating to this Contract shall be adjudicated in a court of competent jurisdiction in the County of Orange. 18.8. Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. 18.9. Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of the Agreement or any other rule of construction which might otherwise apply. All Pro Builders Inc. Page 10 18.10. Severability. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 18.11. No Attorney's Fees. In the event of any dispute or legal action arising under this Agreement, the prevailing party shall not be entitled to attorney's fees. 18.12. Counterparts. This Agreement may be executed in two or more counterparts, each of which shall be deemed an original and all of which together shall constitute one and the same instrument. [SIGNATURES ON NEXT PAGE] All Pro Builders Inc. Page 11 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the dates written below. APPROVED AS TO FORM: OFFICE T CI Y ATTORNEY Da By: 1 Leonie Mulvihill Assistant City Attorney ATTEST: n I I w I Date: By: Leilani I. Brown City Clerk CITY OF NEWPORT BEACH, A California munjcipal corpora By: -` ?' / Mark Harmon ' Municipal Operations Director CONSULTANT: All Pro Builders, Inc, a California Cor rati n n atpl- 9� By: L :� Paul Paniagua President [END OF SIGNATURES] Attachments: Exhibit A - Scope of Work Exhibit B — Schedule of Billing Rates All Pro Builders Inc. Page 12 EXHIBIT A Scope of Work Shade Structure Specifications A -1 I Page I _N -P �4 —')FA Em {Em SRO es j aG 2i_pu m� NN 30 uIrur Uit LUUe �U H -TF L# SHADE STRUCTURE mi -mil 12�- lllyon Im�GgM... COLUMU-TTP L FYMP N=2122 OTF TIM 5.6 MLOCWN6 -7YE PPE- rAE'+TPU .0 -TI'P. EEQPL ML-TH15 Pf P Bra a -4.1- TYF' ELEVATION - TYPICAL ALL SIDES - 1/4' -1' -0- K. E S SES -T 1P. ALLOAU _TMF 4z xl NOT'e5: ALL'WOO MEMBERS 6MALL -EE GL.umO WAMINATIED DOU6LP5 FIR - RET N- PRGHTTFL UPPL6 E FINISH: LINSEED OIL SOLID GTAIN-OLYMPIC ORMOUI- VALr=w. GOLOR: OLYMPIc 'OUISIDe wH?EOR EOUNALa NT C HTFMOTOP SHALL 6UEMMT HOP OR+NII� FbR PF2M3&E qK T2D TRry9� LANG� A H. PRIOP TO Fl°BFlcPMONOFTPU'-'1 ALL HAPOWPRE: SHALL EE 6 LVAWIZED, PRIMED PAINTED -c LORTO E60 Le MP DY L•A. NOTE: ALL MCMB0P SHALL EE 6LV:ED VMINP: ED COU6LAe PIR -REAP WN-PPCHlTE'GTUPPL6PPDE ALL EL WN6{H womP65HALL ALISN VEaTicALLY1!i>�I- ZONTPLL`( ANO 5'.wLL NOI" GPOJBtT ASE Oa FSF_ LO W c.e RUPrePe PREFABRICATED TRUSS A%ONOMETRIC - 310'.1' -0' _ `l�ibrlt `BciryR�lliamot}WtL�rJl` ssocialcs rcxenra L, PLJ At ALL JO�.�TS Exhibit A I.9 Nono BALBOA BLVD. WIDENING SHADE STRUCTURE CITY OF NEWPORT BEACH I R-56me s I % A -2 s f. TY6C UMNT °SEAM OONN�ON e I e INGIOM MN PLAN ' -- TYP. coLUM }}�E ANi=HNEOTION— e I E OUTSID6 G UMN ae a r ' X21 III -_ SMPUON NN I1 rvNGPR"J TYP. ALL 51O=A ELEVATION - TYPICAL ALL SIDES - 1/4' -1' -0- K. E S SES -T 1P. ALLOAU _TMF 4z xl NOT'e5: ALL'WOO MEMBERS 6MALL -EE GL.umO WAMINATIED DOU6LP5 FIR - RET N- PRGHTTFL UPPL6 E FINISH: LINSEED OIL SOLID GTAIN-OLYMPIC ORMOUI- VALr=w. GOLOR: OLYMPIc 'OUISIDe wH?EOR EOUNALa NT C HTFMOTOP SHALL 6UEMMT HOP OR+NII� FbR PF2M3&E qK T2D TRry9� LANG� A H. PRIOP TO Fl°BFlcPMONOFTPU'-'1 ALL HAPOWPRE: SHALL EE 6 LVAWIZED, PRIMED PAINTED -c LORTO E60 Le MP DY L•A. NOTE: ALL MCMB0P SHALL EE 6LV:ED VMINP: ED COU6LAe PIR -REAP WN-PPCHlTE'GTUPPL6PPDE ALL EL WN6{H womP65HALL ALISN VEaTicALLY1!i>�I- ZONTPLL`( ANO 5'.wLL NOI" GPOJBtT ASE Oa FSF_ LO W c.e RUPrePe PREFABRICATED TRUSS A%ONOMETRIC - 310'.1' -0' _ `l�ibrlt `BciryR�lliamot}WtL�rJl` ssocialcs rcxenra L, PLJ At ALL JO�.�TS Exhibit A I.9 Nono BALBOA BLVD. WIDENING SHADE STRUCTURE CITY OF NEWPORT BEACH I R-56me s I % A -2 s A-3 N�f ' ALL HWROW SELL ANP F-,N b M�H T-INA w -u INTERIOR COLUMN BEAM CONNECTION 2 EXTERIOR COLUMN I BEAM CONNECTION ....... 2`l 48 'Itba �Bq W,11,am%w 9A61a� It BALBOA BLVD. WIDENING mt-'ML AIDE STRUCTURE DETAILS CITY OF NEWPORT REACH .29 a�a A-3 Exhibit B Schedule of Billing Rates 38 St Park — Patio Structure Demo existing cover and haul all trash from job to dump Demo Patio site. Temp Wall Temporary fence Frame up new patio cover to match existing cover use Patio Cover Doug fir on beams instead of glue lams 6x12, 6x10,6x8 Electrical Electrical take down and re- install Paint new patio cover as per plan, prime and paint Dunn Paint Exterior Edwards paint (owner picks color) Plans Blue prints as per City's plan City will reimburse All Pro Builders Inc. for any and all Permit Fee permit fees and engineering fees if needed. Price may change if additional engineering is required. Total $25,420.65 B- 1IPage