Loading...
HomeMy WebLinkAboutC-5562 - Cooperative Agreement for the Irvine Avenue Pavement Rehabilitation projectAgreement No. D13-081 COOPERATIVE AGREEMENT BETWEEN COUNTY OF ORANGE AND CITY OF NEWPORT BEACH FOR FUNDING OF ROADWAY IMPROVEMENTS IN THE CITY OF NEWPORT BEACH This Cooperative Agreement is made and entered into this 17 4-LA day of SE pTt=MGe2 2013 (the "Agreement"), by and between the COUNTY OF ORANGE ("County"), a political subdivision of the State of California, and the CITY OF NEWPORT BEACH ("City"), a municipal corporation in the State of California. The County and City shall sometimes be referred to separately as a "Party" and collectively as the "Parties." RECITALS A. The County of Orange proposes to rehabilitate various roadways as part of the Asphalt Overlay Resurfacing of Various Streets in Orange County 2012-13 project ("Project"). Irvine Avenue will be rehabilitated as shown in Exhibit A, with such roadways lying within the unincorporated area of the County and within City limits; and B. The total construction cost of rehabilitation within the City's area of the Project is estimated to be One Hundred Fifty Thousand Eight Hundred Thirty Two dollars ($150,832) as shown in Exhibit B. C. The City agrees to reimburse the County for all improvements on Irvine Avenue within the City's jurisdiction ("City Project Area"). AGREEMENT NOW, THEREFORE, in consideration of the foregoing recitals of fact, the mutual covenants and conditions contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the Parties agree as follows: COUNTY OBLIGATIONS 1. County shall design, administer and construct all improvements for Irvine Avenue. County shall submit plans, specifications and constructioncost estimates ("PS&E") covering work within the City Project Area to the City for review and approval. 2. County shall pass a Resolution declaring City Project Area to be a County highway (as provided for in Section 1700 of the Streets and Highways Code) for purposes of construction. 3. County shall obtain the written concurrence from the City Engineer or his designee ("City Engineer") for any contract change orders ("CCOs") for the Project, which would require the City to share in the cost. County's contractor will only perform extra work after approval of a CCO by City Engineer. 4. Prior to County accepting improvements from County's contractor under the contract for Project, County shall obtain City Engineer's written approval for the City Project Area improvements. Approval shall be withheld only for work not completed per the Page I of 6 Agreement No. D13-081 approved PS&E and CCO's for Project. 5. Upon approval of the improvements by the City Engineer and acceptance of the contract work by County, County shall pass a Resolution declaring City Project Area to no longer be a County highway (as provided for in Section 1704 of the Streets and Highways Code). 6. County shall, within sixty (60) days of the County's approval of a Notice of Completion of project construction, prepare and submit to the City a Final Cost Accounting Report and Invoice authorized by this Agreement, which will itemize costs including cost for proportionate construction support and administration, roadway rehabilitation, and approved CCOs, if any. 7. County shall cause its contractors for the City's portion of the Project to obtain insurance coverage sufficiently broad to insure matters set forth in this Agreement and to include City as an additional insured on all insurance policies that County requires its contractors to provide. As evidence of such insurance coverage, County shall, prior to commencement of the Project, provide City with certificates of insurance and insurance endorsements in fonns that are acceptable to City. 8. County's Contractor shall obtain an encroachment permit from City prior to the start of any work within the City Project Area. CITY OBLIGATIONS 9. City shall pass a Resolution consenting to City Project Area being a County highway (as provided for in Section 1701 of the Streets and Highways Code) for purposes of construction. 10. City shall at all times during the progress of construction of Project within City Project Area, have access to the Project site for the purpose of inspection and, should City Engineer deem any remedial measures to be necessary, City Engineer shall notify County thereof for communication to the contractor. 11. City shall reimburse County for actual quantities constructed for each bi.d item shown in Exhibit B for all improvements within the City Project Area. 12. City shall pay all costs for approved CCOs associated with construction of the Project within the City Project Area. If CCOs are required, City Engineer shall have five (5) working days to review and either approve or disapprove costs for CCOs. If the City Engineer does not respond to a CCO within the appropriate timeframe, the CCO will be deemed disapproved by default. 13. Upon approval by City Engineer and acceptance of the improvements under the contract by County, City shall assume operation and maintenance responsibility for City Project Area improvements. 14. Within thirty (30) days of receipt of the Final Cost Accounting Report and Invoice from the County, City shall deposit with the County's financial officer the total as Page 2 of 6 Agreement No. D13-081 indicated on aid nvoice. 15. City shall issue an encroachment permit at no cost to County's contractor prior to the start of any work within the City Project Area. GENERAL 16. Indemnification & Hold Harmless City shall indemnify, defend with counsel approved in writing, save and hold County and each of its elected officials, officers, directors, agents and employees harmless from any and all claims, injuries, liabilities, actions, damages, losses or expenses, including attorney's fees and costs, of every type and description to which they may be subjected arising out of any act or omission of, its employees, representatives, agents and independent contractors in connection with the implementation of the actions described in this agreement. County shall indemnify, defend with counsel approved in writing, save and hold City and each of its elected officials, officers, directors, agents and employees harmless from any and all claims, injuries, liabilities, actions, damages, losses or expenses, including attorney's fees and costs, of every type and description to which they may be subjected arising out of any act or omission of, its employees, representatives, agents and independent contractors in connection with the implementation of the actions described in this agreement. 17. Assignment This Agreement shall be binding upon and inure to the benefit of the successors and assigns of the Parties. No assignment of either Party's interest in. this Agreement shall be made without the written consent of the other Party. 18. Entirety & Amendments This Agreement contains the entire agreement between the Parties with respect to the matters provided for herein. No alteration or variation of the teams of this Agreement shall be valid unless made in writing and signed by the Parties; and no oral understanding or agreement not incorporated herein shall be binding on either of the Parties. 19. Severability If any part of this Agreement is held, determined, or adjudicated to be illegal, void, or unenforceable by a court of competent jurisdiction, the remainder of this Agreement shall be given effect to the fullest extent reasonably possible. 20. Calendar Days Any reference to the word "day" or "days" herein means calendar day or calendar days respectively, unless otherwise expressly provided. 21. Notices Notices or other communications which may be required or provided under the terms of this Agreement shall be given as follows: CITY OF NEWPORT BEACH Public Works Department 100 Civic Center Drive Newport Beach, CA 92660 Attn: City Engineer COUNTY OF ORANGE OC Public Works 300 N. Flower Street P.O. Box 4048 Santa Ana, CA 92703 Attn: Director/Chief Engineer, OC Engineering Page 3 of 6 Agreement No. D13-081 All notices shall be in writing and deemed effective when delivered in person or deposited in the United States mail, first class, postage prepaid and addressed as above. Notwithstanding the above, the Parties may also provide notices by facsimile transmittal, and any such notice so given shall be deemed to have been given upon receipt during normal business hours or, in the event of receipt after business, on the following business day. Any notices, correspondence, reports and/or statements authorized or required by this Agreement, addressed in any other fashion shall be deemed not given. 22. Waiver of Jury Trial Each Party acknowledges that it is aware of and has had the opportunity to seek advice of counsel of its choice with respect to its rights to trial by jury, and each Party, for itself and its successors, creditors, and assigns, does hereby expressly and knowingly waive and release all such rights to trial by jury in any action, proceeding or counterclaim brought by any Party hereto against the other (and/or against its officers, directors, employees, agents, or subsidiary or affiliated entities) on or with regard to any matters whatsoever arising out of or in any way connected with this Agreement and/or any other claim of injury or damage. 23. Attomey's Fees In any action or proceeding to enforce or interpret any provision of this Agreement, or where any provision hereof is validly asserted as a defense, the Parties shall bear their own attorney's fees, costs and expenses. 24. Governing Law & Venue This Agreement has been negotiated and executed in the State of California and shall be governed by and construed under the laws of the State of California. In the event of any legal action to enforce or interpret this Agreement, the sole and exclusive venue shall be a court of competent jurisdiction located in Orange County, California, and the Parties hereto agree to and do hereby submit to the jurisdiction of such court, notwithstanding Code of Civil Procedure Section 394. 25. Counterparts This Agreement may he executed in two or more counterparts, each of which shall be deemed an original, but all of which together shall constitute but one and the same instrument. 26. Termination In the event County or City defaults in the perfoiuiance of any of their obligations under this Agreement or materially breaches any of the provisions of this Agreement, City and. County shall have the option to terminate this Agreement upon thirty (30) days' prior written notice to the other Party. In the event City or County cures such default within such thirty (30) day period, City and County's election to terminate shall be deemed revoked and of no further force and effect as to that particular default. Page 4 of 6 Agreement No. D13-081 IN WITNESS WHEREOF, the parties hereto have caused this Agreement be executed on the date first above written. City of Newport Beach, A Municipal Corporation By: %/✓f /���% Keith D. Curry, Mayor Date: ATTEST: Date: Leilani Brown, City Clerk JC-v1e3 APPROVED AS TO FORM: By: Date: Aaron C. Harp, City Attorney vetklw Page 5 of 6 Agreement No. D13-081 IN WITNESS WHEREOF, the parties hereto have caused this Agreement be executed on the date first above written, COUNTY OF ORANGE A political subdivision of the State of California Date: — SIGNED AND CERTIFIED THAT A COPY OF THIS DOCUMENT HAS BEEN DELIVERED TO THE CHAIRMAN OF THE BOARD OF SUPERVISORS Susan/Novak Clerk of the Board of Supervisors of Orange County CA Date: APPROVED AS TO FORM: COUNTY COUNSEL ORANGE COUNTY, CALIFORNIA By: Date: Page 6 of 6 Exhibit A ASPHALT OVERLAY RESURFACING OF VARIOUS STREETS IN ORANGE COUNTY 2012-13 COOPERATIVE AGREEMENT WITH CITY OF NEWPORT BEACH FOR IRVINE AVENUE 7r MONTE VISTA rF / / /_L / / / / / / / / / ! / / / .,overlay location maps.dgn 7/17/2013 1:38:03 PM 08/07/2013 Exhibit B 1 Engineer's Estimate for Cooperative Agreement with City of Newport Beach Asphalt Overlay Resurfacing of Various Streets in Orange County, 2012-13 Irvine Avenue 1 L.S. Administrative Costs $13,700.00 $13,700.00 2 1 EA. Remove and Replace PCC Access Ramp - Type I - Black Domes $2,350.00 $2,350.00 3 206 C.Y. Remove AC Pavement $188.00 $38,728.00 4 400 TON Asphalt Concrete: Patching - Warm Mix $57.50 $23,000.00 5 48,195 S.F. Cold Mill Asphalt: Other $0.22 $10,602.90 6 770 TON Asphalt Concrete: ARHM $78.00 $60,060.00 7 6 TON Rock Dust Blotter $0.58 $3.48 8 1,330 L.F. 4" Solid White Line $0.26 $345.80 9 410 L.F. 4" Skip White Line $0.23 $94.30 10 365 L.F. 6" Solid White Line $0.30 $109.50 11 184 L.F. 12" Solid White Line $2.00 $368.00 12 220 L.F. 12" Solid Yellow Line $1.95 $429.00 13 160 S.F. Zebra Crosswalk $2.00 $320.00 14 2 EA. Right Turn Arrow $63.00 $126.00 15 3 EA. RPM - Reflective Blue $8.50 $25.50 16 28 EA. RPM - Reflective Clear $2.50 $70.00 17 E.A. Traffic Detector Loops: Irvine Ave @ University Drive (Advanced ES) $500.00 $500.00 TOTAL $150,832,48 RESOLUTION NO. 2013-65 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH FOR THE DECLARATION OF IRVINE AVENUE WITHIN THE CITY OF NEWPORT BEACH TO BE A COUNTY HIGHWAY WHEREAS, a portion of Irvine Avenue from Anniversary Lane to Monte Vista Avenue lies within the City limits of the City of Newport Beach and is deemed to be a highway of County -wide importance; and WHEREAS, the County of Orange proposes to improve said portion of Irvine Avenue; and WHEREAS, the City of Newport Beach desires to consent to the establishment of said portions of Irvine Avenue as a County highway during the period of said improvement. NOW, THEREFORE, be it resolved by the City Council of the City of Newport Beach that pursuant to the provisions of Section 1701, Article 3, Chapter 9, Division 2 of the Streets and Highways Code, the City of Newport Beach does declare those portions of Irvine Avenue lying within the City Limits of Newport Beach to be a County highway during the period of improvement by the County of Orange. Adopted this 13th day of August, 2013. Keith D. Curry, Mayor ATTEST: Leilani I. Brown, City Clerk STATE OF CALIFORNIA COUNTY OF ORANGE CITY OF NEWPORT BEACH SS. I, Leilanl I. Brown, City Clerk of the City of Newport Beach, California, do hereby certify that the whole number of members of the City Council is seven; that the foregoing resolution, being Resolution No, 2013-65 was duly and regularly introduced before and adopted by the City Council of said City at a regular meeting of said Council, duly and regularly held on the 131h day of August, 2013, and that the same was so passed and adopted by the following vote, to wit: Ayes: Gardner, Petros, Hill, Selich, Henn, Mayor Curry Nays: None Absent: Daigle IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed the official seal of said City this 141h day of August, 2013. City Clerk Newport Beach, California (Seal) ORANGE COUNTY BOARD OF SUPERVISORS MINUTE ORDER September 17, 2013 5'ubmittingAgency/Department: OC PUBLIC WORKS Approve agreement D 13-081 with the City of Newport Beach for asphalt overlay of Irvine Avenue from University Drive to Monte Vista Avenue ($150,832); adopt resolution declaring City of Newport project area to be a County highway; and make California Environmental Quality Act findings - District 2 The following is action taken by the Board of Supervisors: APPROVED AS RECOMMENDED ® OTHER 0 Unanimous I7 (1) NGUYEN: Y (2) MOORLACH: Y (3) SPITZER: Y (4) NELSON: Y (5) BATES: Y Vote Key: Y=Yes; N=No; A=Abstain; X=Excused; B.O.=Board Order Documents accompanying this matter: ® Resolution(s) 13-088 0 Ordinances(s) 1 1 Contract(s) 612 «C, Item No. 22 Special Notes: Copies sent to: OCPW: Steve Clayton Eric Swint q 2r)-l3 I certify that the foregoing is a true and correct copy of the Minute Order adopter by the Board of Supervisors , Orange County. State of California Susan Novak, Clerk of the Board Staffing Impact: No # of Positions: Current Fiscal Year Revenue: N/A Funding Source: OC Road Fund 115:100% (reimbursed by the City of Newport Beach) Prior Board Action: 06/18/13 #70 AGENDA STAFF REPORT C MEETING DATE: LEGAL ENTITY TAKING ACTION: BOARD OF SUPERVISORS DISTRICT(S): SUBMITTING AGENCY/DEPARTMENT: DEPARTMENT CONTACT PERSON(S): Agenda Item ASR Control 13-001018 09/17/13 Board of Supervisors 2 OC Public Works (Approved) Kevin Onuma (714) 647-3939 Victor Valdovinos (714) 955-0221 SUBJECT: Agreement with the City of Newport Beach CEO CONCUR Concur COUNTY COUNSEL REVIEW Approved Agreement(s) and Resolution(s) CLERK OF THE BOARD Consent Calendar 3 Votes Board Majority Budgeted: Yes Current Year Cost: $150,832 Annual Cost: N/A Sole Source: No County Audit in last 3 years No Year of Audit RECOMMENDED ACTION(S): 1. Find that the subject Project was previously determined to be Categorically Exempt from the California Environmental Quality Act (CEQA) per sections 15301 & 15302 (Classes 1 and 2) of the CEQA Guidelines, which provide for the exemption for minor alterations to public facilities or structures (Class 1), and provide for the replacement or reconstruction of existing structures and facilities (Class 2) at the time the Project Plans and Special Provisions were approved on March 19, 2013. No substantial changes have been made in the project; no substantial changes in the circumstances under which the Project is being undertaken; and no new information of substantial importance to the Project, which was not known or could not have been known when the previous CEQA finding was adopted has become known, and no further environmental review is required. 2. Adopt a Resolution declaring the City of Newport Beach (City) Project Area to be a County highway (as provided for in Section 1700 of the Streets and Highways Code) for purposes of construction. 3. Approve Cooperative Agreement No. D13-081 with the City for a total estimated payment of $1.50,832 from the City to the County for the asphalt overlay of Irvine Avenue from University Drive to 317 feet south of Monte Vista Avenue. Page 1 SUMMARY: Approving Cooperative Agreement D13-081 with the City of Newport (City) for $150,832 will allow the County to perform an asphalt overlaying of Irvine Avenue from University Drive to 317 feet south of Monte Vista Avenue and receive payment from the City for said overlay. BACKGROUND INFORMATION: On June 18, 2013, your Board awarded a Contract to R.J. Noble Company in the amount of $5,088,226 for the Asphalt Overlay Resurfacing of Various Streets in Orange County 2012-13 Project in the unincorporated County areas of East Tustin, Fountain Valley Island, Irvine Island, Northeast Tustin, Red Hill, and Santa Ana Heights Island. The County as Project lead was responsible for the preparation of plans and specifications, construction, construction administration, and preparation of all documents necessary to deliver the Project including, but not limited to CEQA documentation and permits. Approval of Cooperative Agreement D13-081 (Agreement) between the County and the City of Newport Beach (City) will provide for the seamless delivery of public improvements. The work in the City portion of Irvine Avenue from University Drive to 317 feet south of Monte Vista Avenue will be implemented through the current asphalt overlaying contract between the County and R.J. Noble Company. The amounts identified in the Agreement are estimated to be $150,832 for the asphalt overlaying of Irvine Ave within City limits. The City will be responsible for the actual costs of work performed in accordance with the terms of the Agreement. Compliance with CEQA: The subject Project was previously determined to be Categorically Exempt from the California Environmental Quality Act (CEQA) per sections 15301 & 15302 (Classes 1 and 2) of the CEQA Guidelines, which provide for the exemption for minor alterations to public facilities or structures (Class 1), and provide for the replacement or reconstruction of existing structures and facilities (Class 2) at the time the Project Plans and Special Provisions were approved on March 19, 2013. FINANCIAL IMPACT: N/A STAFFING IMPACT: N/A EXHIBIT(S): Exhibit A - Location Map Exhibit B - City Highway Resolution ATTACHMENT(S): Page 2 Attachment A - Cooperative Agreement D 13-081 Attachment B - County Highway Resolution Page 3 RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA September 17, 2013 WHEREAS, the County of Orange proposes to construct roadway improvements on Irvine Avenue from University Drive to 317 feet south of Monte Vista Avenue in the Santa Ana Heights area of the County ("Project"), and a portion of Irvine Avenue from University Drive to 317 feet south of Monte Vista Avenue is within the City of Newport Beach; and WHEREAS, the City Council of the City of Newport Beach adopted a resolution on August 13, 2013 (file on copy with the Orange County Clerk of the Board) declaring portions of Irvine Avenue within the City of Newport Beach to be a County highway for the purposes of roadway improvements during the period of Project construction, pending the Orange County Board of Supervisor's resolution declaring the same; and WHEREAS, the County of Orange and the City of Newport Beach have entered into Agreement No. D13-081 to define the responsibilities of the County and the City with respect to construction of City's Street(s); and WHEREAS, Streets & Highways Code Sections 1700-1704 set forth procedures by which the County may perform improvements on City Street(s). NOW, THEREFORE, BE IT RESOLVED AND ORDERED that City's Street(s) are hereby declared to be a County highway for the purposes of design, right-of-way acquisition, and construction by the County of Orange. BE IT FURTHER RESOLVED that the Clerk of the Board is hereby authorized and directed to transmit to the City Council of the City of Newport Beach a certified copy of this Resolution, and that City's Street(s) shall become a County highway upon the consent of the City Council. BE IT FURTHER RESOLVED that upon the filing of a Notice of Completion that all improvements to City's Street(s) are complete, the Board of Supervisors hereby declares City's Street(s) to no longer be a County highway, and instructs OC Public Works to file copies of this Resolution and the Resolution No, 13-088 Item No. 22 Page 1 of 2 Declaration of Irvine Avenue within the City of Newport Beach Between Irvine Avenue from University Drive to 317 Feet South of Monte Vista Avenue to be a County Highway for the Duration of Construction Notice of Completion with the City Clerk. Ten days after said filing, City's Street(s) shall cease to be a County highway. Resolution No, 13-088, Item No. 22 Page 2 of 2 Declaration of Irvine Avenue within the City of Newport Beach Between Irvine Avenue from University Drive to 317 Feet South of Monte Vista Avenue to be a County Highway for the Duration of Construction The foregoing was passed and adopted by the following vote of the Orange County Board of Supervisors, on September 17, 2013, to wit: AYES: NOES: EXCUSED: ABSTAINED: Supervisors: JOHN M.W. MOORLACH, PATRICIA BATES, JANETNGUYEN TODD SPITZER, SHAWN NELSON Supervisor(s): Supervisor(s): Supervisor(s): STATE OF CALIFORNIA ) COUNTY OF ORANGE ) I, SUSAN NOVAK, Clerk of the Board of Orange County, California, hereby certify that a copy of this document has been delivered to the Chairman of the Board and that the above and foregoing Resolution was duly and regularly adopted by the Orange County Board of Supervisors IN WITNESS WHEREOF, I have hereto set my hand and seal. Resolution No: Agenda Date: Rem No: 13-088 09/17/2013 22 SUSA NOVAK Clerk of the Board County of Orange, State of California I certify that the foregoing is a true and correct copy of the Resolution adopted by the Board of Supervisors , Orange County, State of California Susan Novak, Clerk o ervisors By: Depu