SIDEWALKS, CURBS, AND GUTTERS
A. General
L-1
1. Nothing herein shall relieve the property owner from the burden
of initially installing concrete sidewalks, curbs, and gutters.
2. Nothing herein shall relieve the property owner of his obligation
under Section 13.01.100 of the Newport Beach Municipal Code.
3. Nothing herein shall prevent the City from performing any repair
work within the public right -of -way when it is in the best interest
of the City to do so.
B. Cost Sharing of Repairing Sidewalks, Curbs, and Gutters
1. The City will pay 100% of the cost of repairing concrete curbs and
gutters.
2. The City will pay 100% for approaches at alley intersections.
3. The City will pay 100% of the cost of repairing standard concrete
sidewalk adjoining private property where damage is caused by
other than the adjacent property owner, including damage caused
by City parkway trees.
4. Property owner shall pay 100% of the cost of repairs to sidewalks
where the damage was caused by trees on private property,
and /or where the damage was caused by acts of omissions of the
property owner.
5. Property owner shall pay 100% the cost of repairs to non - standard
improvements installed in the public right -of -way by the property
owner or his predecessors in accordance with the terms of the non-
standard improvement agreement, regardless of cause of damage.
6. Property owner shall pay 100% of the cost of repairs to non-
standard improvements installed without a permit in the public
right -of -way by the property owner or his predecessors, regardless
of cause of damage.
L -1 •
7. Where ground cover and sprinkler systems, or standard flatwork
installed in accordance with City policy and pursuant to an
approved encroachment permit, are damaged as a result of City
construction work the repairs will be performed by the Contractor
and /or by City forces, as provided for in the contract
8. The City will not pay for the cost of repairing private concrete
driveway approaches, including the sidewalk areas; except that the
City will pay such costs if the damage was caused by City parkway
trees (for standard approaches, only).
9. A list to prioritize the locations where work will be done with
annual appropriations based on need, benefit to the public, and
date of application shall be established by the General Services
Department.
10. Property owners requesting their projects to be advanced to the top
of the priority list shall be requested to contribute 50% of the cost
11. A sum of money shall be appropriated every year to be applied to •
the City's share of repair work.
12. City participation under this policy shall be subject to the
availability of funds.
C. Lido Isle
The City will cooperate with the Lido Isle Community Association to
replace specially colored and scored sidewalk in kind, provided that City
cost will not exceed that of plain concrete with standard scoring. LICA
color is "Chromix Adobe Tan No. C -21" by the L.M. Scofield Company.
Adopted - March 22,1965
Amended - August 30,1966
Amended - September 25,1967
Amended - October 12,1982
Amended - October 27,1986
Amended - November 28,1988
Amended - December 14,1992
Amended - January 24,1994
Amended - February 26,1996
Amended - February 24,1997
Corrected - June 9, 1997